Last Updated: 26/10/2012 10:45:33
The following information provides details about RMIT programs, units of study (courses), census dates and fees that are eligible for VET FEE-HELP.
The census date of a class is determined by the session in which a class is running. Detailed below are the commencement dates, census dates and completion dates of all TAFE classes/courses.
Your confirmation of enrolment, available to all enrolled students on the 'Enrolment Online' system, shows you what classes/courses you are enrolled in.
Session descriptions for Semester 2, 2012 are:
| Session | Session Description | Classes in the session |
| JUL | July | Classes that commence in July and end in 2nd Semester |
| AUG | August | Classes that commence in August and end in 2nd Semester |
| SEP | September | Classes that commence in September and end in 2nd Semester |
| OCT | October | Classes that commence in October and end in 2nd Semester |
| NOV | November | Classes that commence in November and end in 2nd Semester |
| DEC | December | Classes that commence in December and end in 2nd Semester |
| TFY | TAFE Full Year | Classes that commence in 1st Semester this year and end in 2nd Semester this year |
| CY1 | Cross Year 1 | Classes that commence in 1st Semester this year and end in 1st Semester next year |
*: Please note that JUL sessions may have classes that start on 25 Jun 2012.
RMIT will calculate fees for each course in compliance with the Victorian Ministerial Directions for Fees
The maximum tuition fee per year for 2012 is $2500
Eligible students under the age of 25 at 1 January 2012 will be charged a concession fee of $100 for enrolments at the diploma and advanced diploma level (classified as level Skills Deepening prior to 30 June). For students aged 25 years and over at 1 January 2012, no concession is available at the diploma and advanced diploma level, however indigenous students will only be charged the concession fee of $100.
Tuition Fee Youth Concessions are no longer available to commencing students. Indigenous students will continue to be able to access concessions at all levels including at the diploma and advanced diploma level. These concessions will be 20 per cent of the standard fee for the same course.
| Unit Of Study (Course) | Session | Course Code | Commencement Date | Census Date | Completion Date | Student Contact Hours (SCH) | EFTSL* | Tuition Fee: Onsite|Distance|RPL | |||
| Government Subsidised Fee | Full Fee (Non Government Subsidised) | ||||||||||
| Program commenced 1 July 2009-30 June 2012 ($) | Program commenced 1 July 2012-31 December 2012 ($) | Program commenced 1 July 2012-31 December 2012 Concession ** ($) | Australian Full Fee Paying ($) | ||||||||
| Research and critically analyse history and theory to inform artistic practice | JUL | VART6062C | 25-06-2012 | 31-08-2012 | 30-11-2012 | 70 | 0.08 | 303 | 461 | 92 | 807.10 |
* EFTSL : Equivalent Full Time Study Load
** Concession fees are only available at diploma and advanced diploma level for indigenous students.
Back to Program List
| Unit Of Study (Course) | Session | Course Code | Commencement Date | Census Date | Completion Date | Student Contact Hours (SCH) | EFTSL* | Tuition Fee: Onsite|Distance|RPL | |||
| Government Subsidised Fee | Full Fee (Non Government Subsidised) | ||||||||||
| Program commenced 1 July 2009-30 June 2012 ($) | Program commenced 1 July 2012-31 December 2012 ($) | Program commenced 1 July 2012-31 December 2012 Concession ** ($) | Australian Full Fee Paying ($) | ||||||||
| Follow OHS procedures | CY2 | PUBH9415C | 01-08-2012 | 31-03-2013 | 21-06-2013 | 20 | 0.03 | 87 | 72 | 14 | 266.60 |
| Observe environmental work practices | CY2 | PUBH9416C | 01-08-2012 | 31-03-2013 | 21-06-2013 | 20 | 0.03 | 87 | 72 | 14 | 266.60 |
| Work effectively in the industry | CY2 | NONE9693C | 01-08-2012 | 31-03-2013 | 21-06-2013 | 20 | 0.03 | 87 | 72 | 14 | 266.60 |
| Participate in workplace communications | CY2 | NONE9694C | 01-08-2012 | 31-03-2013 | 21-06-2013 | 30 | 0.04 | 130 | 108 | 22 | 399.90 |
| Plan river restoration works | JUL | EASC5030C | 25-06-2012 | 31-08-2012 | 09-11-2012 | 150 | 0.20 | 650 | 542 | 108 | 1,999.50 |
| Develop a management plan for a designated area | JUL | ENVI5049C | 25-06-2012 | 31-08-2012 | 09-11-2012 | 200 | 0.27 | 866 | 722 | 144 | 2,666.00 |
| Develop and manage a chemical use strategy | JUL | MKTG6985C | 25-06-2012 | 31-08-2012 | 09-11-2012 | 80 | 0.11 | 346 | 289 | 58 | 1,066.40 |
| Develop and review catchment management plan | JUL | CIVE5716C | 25-06-2012 | 31-08-2012 | 16-11-2012 | 100 | 0.13 | 433 | 361 | 72 | 1,333.00 |
* EFTSL : Equivalent Full Time Study Load
** Concession fees are only available at diploma and advanced diploma level for indigenous students.
Back to Program List
| Unit Of Study (Course) | Session | Course Code | Commencement Date | Census Date | Completion Date | Student Contact Hours (SCH) | EFTSL* | Tuition Fee: Onsite|Distance|RPL | |||
| Government Subsidised Fee | Full Fee (Non Government Subsidised) | ||||||||||
| Program commenced 1 July 2009-30 June 2012 ($) | Program commenced 1 July 2012-31 December 2012 ($) | Program commenced 1 July 2012-31 December 2012 Concession ** ($) | Australian Full Fee Paying ($) | ||||||||
| Apply health and safety practices in the workplace | AUG | OHTH5450C | 01-08-2012 | 30-09-2012 | 17-08-2012 | 25 | 0.05 | 108 | 109 | 22 | 326.00 |
| Maintain financial records | AUG | ACCT5286C | 01-08-2012 | 30-09-2012 | 30-11-2012 | 60 | 0.11 | 260 | 261 | 52 | 782.40 |
| Maintain financial records | CY2 | ACCT5286C | 01-08-2012 | 31-03-2013 | 25-01-2013 | 60 | 0.11 | 260 | 261 | 52 | 782.40 |
| Maintain financial records | CY2 | ACCT5286C | 17-12-2012 | 31-03-2013 | 06-06-2013 | 60 | 0.11 | 260 | 261 | 52 | 782.40 |
| Maintain financial records | CY2 | ACCT5286C | 17-12-2012 | 31-03-2013 | 22-04-2013 | 60 | 0.11 | 260 | 261 | 52 | 782.40 |
| Communicate in the workplace | JUL | EMPL5580C | 25-06-2012 | 31-08-2012 | 28-09-2012 | 30 | 0.06 | 130 | 130 | 26 | 391.20 |
| Use technology in the workplace | JUL | EMPL5581C | 25-06-2012 | 31-08-2012 | 09-11-2012 | 50 | 0.09 | 216 | 218 | 44 | 652.00 |
| Prepare financial statements | JUL | ACCT5237C | 25-06-2012 | 31-08-2012 | 26-10-2012 | 60 | 0.11 | 260 | 261 | 52 | 782.40 |
| Produce job costing information | JUL | COSC5937C | 25-06-2012 | 31-08-2012 | 24-08-2012 | 40 | 0.07 | 173 | 174 | 35 | 521.60 |
| Maintain asset and inventory records | JUL | ACCT5251C | 25-06-2012 | 31-08-2012 | 24-08-2012 | 30 | 0.06 | 130 | 130 | 26 | 391.20 |
| Prepare financial reports | JUL | ACCT5287C | 25-06-2012 | 31-08-2012 | 26-10-2012 | 50 | 0.09 | 216 | 218 | 44 | 652.00 |
| Set up and operate a computerised accounting system | OCT | COSC5939C | 08-10-2012 | 30-11-2012 | 19-10-2012 | 80 | 0.15 | 346 | 348 | 70 | 1,043.20 |
| Communicate in the workplace | SEP | EMPL5580C | 17-09-2012 | 31-10-2012 | 29-09-2012 | 30 | 0.06 | 130 | 130 | 26 | 391.20 |
| Apply principles of professional practice to work in the financial services industry | SEP | SOSK5182C | 17-09-2012 | 31-10-2012 | 29-09-2012 | 30 | 0.06 | 130 | 130 | 26 | 391.20 |
| Prepare operational budgets | SEP | COSC5938C | 03-09-2012 | 31-10-2012 | 26-10-2012 | 40 | 0.07 | 173 | 174 | 35 | 521.60 |
* EFTSL : Equivalent Full Time Study Load
** Concession fees are only available at diploma and advanced diploma level for indigenous students.
Back to Program List
| Unit Of Study (Course) | Session | Course Code | Commencement Date | Census Date | Completion Date | Student Contact Hours (SCH) | EFTSL* | Tuition Fee: Onsite|Distance|RPL | |||
| Government Subsidised Fee | Full Fee (Non Government Subsidised) | ||||||||||
| Program commenced 1 July 2009-30 June 2012 ($) | Program commenced 1 July 2012-31 December 2012 ($) | Program commenced 1 July 2012-31 December 2012 Concession ** ($) | Australian Full Fee Paying ($) | ||||||||
| Apply health and safety practices in the workplace | AUG | OHTH5450C | 01-08-2012 | 30-09-2012 | 17-08-2012 | 25 | 0.07 | 108 | 168 | 34 | 335.75 |
| Manage own professional development | AUG | SOSK5190C | 06-08-2012 | 30-09-2012 | 12-10-2012 | 40 | 0.12 | 173 | 269 | 54 | 537.20 |
| Manage own professional development | AUG | SOSK5190C | 06-08-2012 | 30-09-2012 | 24-08-2012 | 40 | 0.12 | 173 | 269 | 54 | 537.20 |
| Communicate in the workplace | JUL | EMPL5580C | 25-06-2012 | 31-08-2012 | 28-09-2012 | 30 | 0.09 | 130 | 202 | 40 | 402.90 |
| Use technology in the workplace | JUL | EMPL5581C | 25-06-2012 | 31-08-2012 | 09-11-2012 | 50 | 0.15 | 216 | 336 | 67 | 671.50 |
| Develop and nurture relationships with clients, other professionals and third party referrers | JUL | MKTG5878C | 25-06-2012 | 31-08-2012 | 28-09-2012 | 50 | 0.15 | 216 | 336 | 67 | 671.50 |
| Obtain and analyse all information for the transaction | JUL | LAW5172C | 25-06-2012 | 31-08-2012 | 26-10-2012 | 60 | 0.18 | 260 | 403 | 80 | 805.80 |
| Finalise conveyancing transactions | OCT | LAW5171C | 01-10-2012 | 30-11-2012 | 26-10-2012 | 30 | 0.09 | 130 | 202 | 40 | 402.90 |
| Establish business and legal requirements | SEP | BUSM9931C | 17-09-2012 | 31-10-2012 | 29-09-2012 | 35 | 0.10 | 152 | 235 | 47 | 470.05 |
| Communicate in the workplace | SEP | EMPL5580C | 17-09-2012 | 31-10-2012 | 29-09-2012 | 30 | 0.09 | 130 | 202 | 40 | 402.90 |
| Apply principles of professional practice to work in the financial services industry | SEP | SOSK5182C | 17-09-2012 | 31-10-2012 | 29-09-2012 | 30 | 0.09 | 130 | 202 | 40 | 402.90 |
| Negotiate to achieve goals and manage disputes | SEP | EMPL5656C | 03-09-2012 | 31-10-2012 | 26-10-2012 | 50 | 0.15 | 216 | 336 | 67 | 671.50 |
* EFTSL : Equivalent Full Time Study Load
** Concession fees are only available at diploma and advanced diploma level for indigenous students.
Back to Program List
| Unit Of Study (Course) | Session | Course Code | Commencement Date | Census Date | Completion Date | Student Contact Hours (SCH) | EFTSL* | Tuition Fee: Onsite|Distance|RPL | |||
| Government Subsidised Fee | Full Fee (Non Government Subsidised) | ||||||||||
| Program commenced 1 July 2009-30 June 2012 ($) | Program commenced 1 July 2012-31 December 2012 ($) | Program commenced 1 July 2012-31 December 2012 Concession ** ($) | Australian Full Fee Paying ($) | ||||||||
| Process and interpret physical data pertaining to the food industry | AUG | ONPS5213 | 06-08-2012 | 30-09-2012 | 07-12-2012 | 70 | 0.16 | 303 | 405 | 81 | 1,152.20 |
| Identify sensory analysis fundamentals | AUG | MIET5799 | 06-08-2012 | 30-09-2012 | 07-12-2012 | 15 | 0.03 | 65 | 87 | 17 | 246.90 |
| Apply the fundamentals of nutrition | AUG | ONPS5229 | 20-08-2012 | 30-09-2012 | 09-11-2012 | 20 | 0.05 | 87 | 116 | 23 | 329.20 |
| Manufacture meat and meat products | AUG | ONPS5231 | 06-08-2012 | 30-09-2012 | 07-12-2012 | 20 | 0.05 | 87 | 116 | 23 | 329.20 |
| Manufacture fish and seafood products | AUG | ONPS5234 | 06-08-2012 | 30-09-2012 | 07-12-2012 | 20 | 0.05 | 87 | 116 | 23 | 329.20 |
| Process and handle poultry and egg products | AUG | ONPS5235 | 06-08-2012 | 30-09-2012 | 07-12-2012 | 20 | 0.05 | 87 | 116 | 23 | 329.20 |
| Process and handle poultry and egg products | AUG | ONPS5235 | 20-08-2012 | 30-09-2012 | 09-11-2012 | 20 | 0.05 | 87 | 116 | 23 | 329.20 |
| Apply critical control point requirements | AUG | OHTH5092C | 27-08-2012 | 30-09-2012 | 09-11-2012 | 40 | 0.09 | 173 | 232 | 46 | 658.40 |
| Conduct sensory analysis | AUG | ONPS5239C | 27-08-2012 | 30-09-2012 | 09-11-2012 | 40 | 0.09 | 173 | 232 | 46 | 658.40 |
| Apply chemical knowledge and laboratory practices in the workplace | CY2 | ONPS5215 | 01-10-2012 | 31-03-2013 | 01-02-2013 | 60 | 0.14 | 260 | 347 | 70 | 987.60 |
| Identify nutritional fundamentals | JUL | ONPS5217 | 25-06-2012 | 31-08-2012 | 07-12-2012 | 20 | 0.05 | 87 | 116 | 23 | 329.20 |
| Identify nutritional fundamentals | JUL | ONPS5217 | 25-06-2012 | 31-08-2012 | 09-11-2012 | 20 | 0.05 | 87 | 116 | 23 | 329.20 |
| Apply principles of food packaging | JUL | ONPS5218C | 25-06-2012 | 31-08-2012 | 09-11-2012 | 50 | 0.11 | 216 | 290 | 58 | 823.00 |
| Apply an understanding of the food processing industry | JUL | ONPS5219 | 25-06-2012 | 31-08-2012 | 13-08-2012 | 15 | 0.03 | 65 | 87 | 17 | 246.90 |
| Apply an understanding of the fermentation process in food production | JUL | ONPS5225 | 25-06-2012 | 31-08-2012 | 09-11-2012 | 10 | 0.02 | 43 | 58 | 12 | 164.60 |
| Apply water and waste management principles to the food industry | JUL | ONPS5227 | 25-06-2012 | 31-08-2012 | 09-11-2012 | 40 | 0.09 | 173 | 232 | 46 | 658.40 |
| Apply the fundamentals of nutrition | JUL | ONPS5229 | 25-06-2012 | 31-08-2012 | 07-12-2012 | 20 | 0.05 | 87 | 116 | 23 | 329.20 |
| Manufacture meat and meat products | JUL | ONPS5231 | 25-06-2012 | 31-08-2012 | 09-11-2012 | 20 | 0.05 | 87 | 116 | 23 | 329.20 |
| Manufacture dairy products | JUL | ONPS5232 | 25-06-2012 | 31-08-2012 | 07-12-2012 | 20 | 0.05 | 87 | 116 | 23 | 329.20 |
| Process fruit and vegetables | JUL | ONPS5233 | 25-06-2012 | 31-08-2012 | 07-12-2012 | 20 | 0.05 | 87 | 116 | 23 | 329.20 |
| Manufacture fish and seafood products | JUL | ONPS5234 | 25-06-2012 | 31-08-2012 | 09-11-2012 | 20 | 0.05 | 87 | 116 | 23 | 329.20 |
| Perform microbiological tests pertaining to the food industry | JUL | ONPS5236 | 25-06-2012 | 31-08-2012 | 14-11-2012 | 50 | 0.11 | 216 | 290 | 58 | 823.00 |
| Perform statistical process control | JUL | BUSM5805 | 25-06-2012 | 31-08-2012 | 09-11-2012 | 20 | 0.05 | 87 | 116 | 23 | 329.20 |
| Implement effective workplace relationships | JUL | EMPL5408C | 25-06-2012 | 31-08-2012 | 07-09-2012 | 50 | 0.11 | 216 | 290 | 58 | 823.00 |
| Use structured problem solving tools | JUL | GEDU5229C | 25-06-2012 | 31-08-2012 | 09-11-2012 | 20 | 0.05 | 87 | 116 | 23 | 329.20 |
| Perform food tests | JUL | ONPS5246C | 25-06-2012 | 31-08-2012 | 09-11-2012 | 100 | 0.23 | 433 | 579 | 116 | 1,646.00 |
| Plan and conduct a research project in food analysis | JUL | ONPS5247 | 25-06-2012 | 31-08-2012 | 09-11-2012 | 25 | 0.06 | 108 | 145 | 29 | 411.50 |
| Apply an understanding of nutritional biochemistry | JUL | ONPS5248 | 25-06-2012 | 31-08-2012 | 09-11-2012 | 45 | 0.10 | 195 | 261 | 52 | 740.70 |
| Analyse nutritional issues in the food processing industry | JUL | ONPS5249 | 25-06-2012 | 31-08-2012 | 09-11-2012 | 80 | 0.18 | 346 | 463 | 93 | 1,316.80 |
| Identify nutritional fundamentals | NOV | ONPS5217 | 19-11-2012 | 31-12-2012 | 14-12-2012 | 20 | 0.05 | 87 | 116 | 23 | 329.20 |
| Use structured problem solving tools | NOV | GEDU5229C | 10-11-2012 | 31-12-2012 | 14-12-2012 | 20 | 0.05 | 87 | 116 | 23 | 329.20 |
| Apply principles of food packaging | OCT | ONPS5218C | 01-10-2012 | 30-11-2012 | 07-12-2012 | 50 | 0.11 | 216 | 290 | 58 | 823.00 |
| Apply water and waste management principles to the food industry | OCT | ONPS5227 | 01-10-2012 | 30-11-2012 | 07-12-2012 | 40 | 0.09 | 173 | 232 | 46 | 658.40 |
| Process and interpret physical data pertaining to the food industry | SEP | ONPS5213 | 17-09-2012 | 31-10-2012 | 09-11-2012 | 70 | 0.16 | 303 | 405 | 81 | 1,152.20 |
| Perform microbiological techniques in the food industry | SEP | ONPS5214 | 17-09-2012 | 31-10-2012 | 09-11-2012 | 80 | 0.18 | 346 | 463 | 93 | 1,316.80 |
| Identify sensory analysis fundamentals | SEP | MIET5799 | 17-09-2012 | 31-10-2012 | 09-11-2012 | 15 | 0.03 | 65 | 87 | 17 | 246.90 |
| Identify the principles of hazard analysis and critical control points (HACCP) | SEP | MIET5800 | 17-09-2012 | 31-10-2012 | 09-11-2012 | 15 | 0.03 | 65 | 87 | 17 | 246.90 |
| Identify unit operations | SEP | ONPS5221 | 17-09-2012 | 31-10-2012 | 09-11-2012 | 15 | 0.03 | 65 | 87 | 17 | 246.90 |
| Apply principles of low temperature preservation methods | SEP | ONPS5222 | 10-09-2012 | 31-10-2012 | 09-11-2012 | 15 | 0.03 | 65 | 87 | 17 | 246.90 |
| Apply principles of high temperature preservation methods | SEP | ONPS5223 | 17-09-2012 | 31-10-2012 | 09-11-2012 | 15 | 0.03 | 65 | 87 | 17 | 246.90 |
| Apply an understanding of the process of concentration and drying in food production | SEP | ONPS5224 | 17-09-2012 | 31-10-2012 | 09-11-2012 | 10 | 0.02 | 43 | 58 | 12 | 164.60 |
| Communicate in the workplace | SEP | EMPL5407C | 17-09-2012 | 31-10-2012 | 09-11-2012 | 30 | 0.07 | 130 | 174 | 35 | 493.80 |
| Plan a career in food technology | SEP | ONPS5230 | 17-09-2012 | 31-10-2012 | 14-12-2012 | 20 | 0.05 | 87 | 116 | 23 | 329.20 |
| Operate a spreadsheet application | SEP | COSC5248C | 17-09-2012 | 31-10-2012 | 14-12-2012 | 30 | 0.07 | 130 | 174 | 35 | 493.80 |
| Manufacture dairy products | SEP | ONPS5232 | 17-09-2012 | 31-10-2012 | 29-10-2012 | 20 | 0.05 | 87 | 116 | 23 | 329.20 |
| Implement effective workplace relationships | SEP | EMPL5408C | 17-09-2012 | 31-10-2012 | 09-11-2012 | 50 | 0.11 | 216 | 290 | 58 | 823.00 |
| Operate database application | SEP | COSC5378C | 17-09-2012 | 31-10-2012 | 09-11-2012 | 30 | 0.07 | 130 | 174 | 35 | 493.80 |
* EFTSL : Equivalent Full Time Study Load
** Concession fees are only available at diploma and advanced diploma level for indigenous students.
Back to Program List
| Unit Of Study (Course) | Session | Course Code | Commencement Date | Census Date | Completion Date | Student Contact Hours (SCH) | EFTSL* | Tuition Fee: Onsite|Distance|RPL | |||
| Government Subsidised Fee | Full Fee (Non Government Subsidised) | ||||||||||
| Program commenced 1 July 2009-30 June 2012 ($) | Program commenced 1 July 2012-31 December 2012 ($) | Program commenced 1 July 2012-31 December 2012 Concession ** ($) | Australian Full Fee Paying ($) | ||||||||
| Manage a Major Project | JUL | BUSM5980C | 25-06-2012 | 31-08-2012 | 23-11-2012 | 35 | 0.12 | 152 | 242 | 48 | 557.90 |
| Specify sound systems | JUL | VART5745C | 25-06-2012 | 31-08-2012 | 23-11-2012 | 35 | 0.12 | 152 | 242 | 48 | 557.90 |
| Collect and organise information | JUL | PERF5045C | 25-06-2012 | 31-08-2012 | 23-11-2012 | 15 | 0.05 | 65 | 104 | 21 | 239.10 |
| Participate in negotiations | JUL | SOSK5119C | 25-06-2012 | 31-08-2012 | 23-11-2012 | 35 | 0.12 | 152 | 242 | 48 | 557.90 |
| Work with others | JUL | EMPL5398C | 25-06-2012 | 31-08-2012 | 16-11-2012 | 15 | 0.05 | 65 | 104 | 21 | 239.10 |
| Work with others | JUL | EMPL5398C | 25-06-2012 | 31-08-2012 | 23-11-2012 | 15 | 0.05 | 65 | 104 | 21 | 239.10 |
| Produce digital images | JUL | VART5790C | 25-06-2012 | 31-08-2012 | 23-11-2012 | 50 | 0.17 | 216 | 345 | 69 | 797.00 |
| Establish and maintain work and contractual relationships | JUL | EMPL5401C | 25-06-2012 | 31-08-2012 | 23-11-2012 | 70 | 0.24 | 303 | 483 | 97 | 1,115.80 |
| Write complex documents | JUL | COMM5432C | 25-06-2012 | 31-08-2012 | 23-11-2012 | 50 | 0.17 | 216 | 345 | 69 | 797.00 |
| Undertake marketing activities | JUL | MKTG5351C | 25-06-2012 | 31-08-2012 | 23-11-2012 | 60 | 0.21 | 260 | 414 | 83 | 956.40 |
| Plan and develop activities, events and programs | JUL | BUSM6147C | 25-06-2012 | 31-08-2012 | 23-11-2012 | 60 | 0.21 | 260 | 414 | 83 | 956.40 |
| Visual Communication | JUL | VART5897 | 25-06-2012 | 31-08-2012 | 23-11-2012 | 50 | 0.17 | 216 | 345 | 69 | 797.00 |
| Apply principles of visual design and communication to the development of a multimedia product | JUL | COMM5452C | 25-06-2012 | 31-08-2012 | 23-11-2012 | 40 | 0.14 | 173 | 276 | 55 | 637.60 |
| Originate and develop concepts | JUL | BUSM6217C | 25-06-2012 | 31-08-2012 | 23-11-2012 | 30 | 0.10 | 130 | 207 | 41 | 478.20 |
| Plan and manage film and media post-production | JUL | VART5927C | 25-06-2012 | 31-08-2012 | 23-11-2012 | 35 | 0.12 | 152 | 242 | 48 | 557.90 |
| Collaborate in a creative process | JUL | MKTG5778C | 25-06-2012 | 31-08-2012 | 23-11-2012 | 40 | 0.14 | 173 | 276 | 55 | 637.60 |
| Create digital visual effects | JUL | COSC5382C | 25-06-2012 | 31-08-2012 | 23-11-2012 | 70 | 0.24 | 303 | 483 | 97 | 1,115.80 |
| Edit screen content for fast turnaround | JUL | VART5930C | 25-06-2012 | 31-08-2012 | 23-11-2012 | 30 | 0.10 | 130 | 207 | 41 | 478.20 |
| Shoot a wide range of television content | JUL | VART5931C | 25-06-2012 | 31-08-2012 | 23-11-2012 | 70 | 0.24 | 303 | 483 | 97 | 1,115.80 |
| Design interaction | JUL | VART5935C | 25-06-2012 | 31-08-2012 | 23-11-2012 | 40 | 0.14 | 173 | 276 | 55 | 637.60 |
| Write simple stories | JUL | COMM5910C | 25-06-2012 | 31-08-2012 | 23-11-2012 | 30 | 0.10 | 130 | 207 | 41 | 478.20 |
| Write extended stories | JUL | COMM5911C | 25-06-2012 | 31-08-2012 | 23-11-2012 | 40 | 0.14 | 173 | 276 | 55 | 637.60 |
| Write an episode of a TV series | JUL | COMM5922 | 25-06-2012 | 31-08-2012 | 23-11-2012 | 70 | 0.24 | 303 | 483 | 97 | 1,115.80 |
| Design web environments | JUL | COSC5949C | 25-06-2012 | 31-08-2012 | 23-11-2012 | 50 | 0.17 | 216 | 345 | 69 | 797.00 |
| Install, align and test sound equipment | OCT | VART5724C | 18-10-2012 | 30-11-2012 | 15-12-2012 | 35 | 0.12 | 152 | 242 | 48 | 557.90 |
| Edit sound using computerised digital equipment/systems | OCT | COSC5222C | 18-10-2012 | 30-11-2012 | 15-12-2012 | 85 | 0.29 | 368 | 586 | 117 | 1,354.90 |
| Implement lighting designs | OCT | PERF5064C | 18-10-2012 | 30-11-2012 | 15-12-2012 | 30 | 0.10 | 130 | 207 | 41 | 478.20 |
| Operate vision systems | OCT | VART5968C | 18-10-2012 | 30-11-2012 | 15-12-2012 | 80 | 0.28 | 346 | 552 | 110 | 1,275.20 |
| Repair and maintain vision systems | OCT | EEET6841C | 18-10-2012 | 30-11-2012 | 15-12-2012 | 55 | 0.19 | 238 | 380 | 76 | 876.70 |
* EFTSL : Equivalent Full Time Study Load
** Concession fees are only available at diploma and advanced diploma level for indigenous students.
Back to Program List
| Unit Of Study (Course) | Session | Course Code | Commencement Date | Census Date | Completion Date | Student Contact Hours (SCH) | EFTSL* | Tuition Fee: Onsite|Distance|RPL | |||
| Government Subsidised Fee | Full Fee (Non Government Subsidised) | ||||||||||
| Program commenced 1 July 2009-30 June 2012 ($) | Program commenced 1 July 2012-31 December 2012 ($) | Program commenced 1 July 2012-31 December 2012 Concession ** ($) | Australian Full Fee Paying ($) | ||||||||
| Identify and produce estimated costs for building and construction projects | JUL | BUIL5850C | 02-07-2012 | 31-08-2012 | 09-11-2012 | 60 | 0.07 | 260 | 242 | 49 | 894.00 |
| Apply building codes and standards to the construction process for medium-rise building projects | JUL | BUIL5860C | 02-07-2012 | 31-08-2012 | 09-11-2012 | 200 | 0.25 | 866 | 808 | 162 | 2,980.00 |
| Supervise the planning of on-site medium-rise building or construction work | JUL | BUIL5861C | 02-07-2012 | 31-08-2012 | 09-11-2012 | 200 | 0.25 | 866 | 808 | 162 | 2,980.00 |
| Apply structural principles to the construction of medium-rise buildings | JUL | BUIL5862C | 02-07-2012 | 31-08-2012 | 09-11-2012 | 300 | 0.37 | 1,299 | 1,212 | 243 | 4,470.00 |
| Apply principles of OHS risk management | JUL | OHTH5435C | 02-07-2012 | 31-08-2012 | 09-11-2012 | 30 | 0.04 | 130 | 121 | 24 | 447.00 |
| Manage project quality | JUL | MIET6036C | 02-07-2012 | 31-08-2012 | 09-11-2012 | 40 | 0.05 | 173 | 162 | 32 | 596.00 |
| Manage project risk | JUL | BUSM6154C | 02-07-2012 | 31-08-2012 | 09-11-2012 | 40 | 0.05 | 173 | 162 | 32 | 596.00 |
| Apply site surveys and set out procedures to medium-rise building projects | JUL | BUIL5863C | 02-07-2012 | 31-08-2012 | 09-11-2012 | 110 | 0.14 | 476 | 444 | 89 | 1,639.00 |
| Administer the legal obligations of a building or construction contract | JUL | BUIL5864C | 02-07-2012 | 31-08-2012 | 09-11-2012 | 100 | 0.12 | 433 | 404 | 81 | 1,490.00 |
| Identify services layout and connection methods to medium-rise construction projects | JUL | BUIL5865C | 02-07-2012 | 31-08-2012 | 09-11-2012 | 140 | 0.17 | 606 | 566 | 113 | 2,086.00 |
| Manage construction work/projects | JUL | BUIL5866C | 02-07-2012 | 31-08-2012 | 09-11-2012 | 150 | 0.19 | 650 | 606 | 122 | 2,235.00 |
| Manage building or construction, environmental management practices and processes | JUL | BUIL5867C | 02-07-2012 | 31-08-2012 | 09-11-2012 | 150 | 0.19 | 650 | 606 | 122 | 2,235.00 |
| Monitor building or construction costing systems on medium-rise building and construction projects | JUL | BUIL5921C | 02-07-2012 | 31-08-2012 | 09-11-2012 | 60 | 0.07 | 260 | 242 | 49 | 894.00 |
* EFTSL : Equivalent Full Time Study Load
** Concession fees are only available at diploma and advanced diploma level for indigenous students.
Back to Program List
| Unit Of Study (Course) | Session | Course Code | Commencement Date | Census Date | Completion Date | Student Contact Hours (SCH) | EFTSL* | Tuition Fee: Onsite|Distance|RPL | |||
| Government Subsidised Fee | Full Fee (Non Government Subsidised) | ||||||||||
| Program commenced 1 July 2009-30 June 2012 ($) | Program commenced 1 July 2012-31 December 2012 ($) | Program commenced 1 July 2012-31 December 2012 Concession ** ($) | Australian Full Fee Paying ($) | ||||||||
| Perform engineering measurements | CY2 | MIET7349C | 01-08-2012 | 31-03-2013 | 31-07-2013 | 30 | 0.03 | 130 | 171 | 34 | 505.80 |
| Perform engineering measurements | CY2 | MIET7349C | 02-07-2012 | 31-03-2013 | 28-06-2013 | 30 | 0.03 | 130 | 171 | 34 | 505.80 |
| Perform engineering measurements | CY2 | MIET7349C | 16-07-2012 | 31-03-2013 | 28-06-2013 | 30 | 0.03 | 130 | 171 | 34 | 505.80 |
| Perform engineering measurements | CY2 | MIET7349C | 16-07-2012 | 31-03-2013 | 30-04-2013 | 30 | 0.03 | 130 | 171 | 34 | 505.80 |
| Perform engineering measurements | CY2 | MIET7349C | 16-07-2012 | 31-03-2013 | 31-05-2013 | 30 | 0.03 | 130 | 171 | 34 | 505.80 |
| Perform engineering measurements | CY2 | MIET7349C | 25-06-2012 | 31-03-2013 | 28-06-2013 | 30 | 0.03 | 130 | 171 | 34 | 505.80 |
| Apply quality systems | CY2 | MIET7350C | 01-08-2012 | 31-03-2013 | 31-07-2013 | 20 | 0.02 | 87 | 114 | 23 | 337.20 |
| Apply quality systems | CY2 | MIET7350C | 25-06-2012 | 31-03-2013 | 28-06-2013 | 20 | 0.02 | 87 | 114 | 23 | 337.20 |
| Apply quality procedures | CY2 | MIET7351C | 01-08-2012 | 31-03-2013 | 31-07-2013 | 10 | 0.01 | 43 | 57 | 11 | 168.60 |
| Apply quality procedures | CY2 | MIET7351C | 02-07-2012 | 31-03-2013 | 28-06-2013 | 10 | 0.01 | 43 | 57 | 11 | 168.60 |
| Apply quality procedures | CY2 | MIET7351C | 16-07-2012 | 31-03-2013 | 26-04-2013 | 10 | 0.01 | 43 | 57 | 11 | 168.60 |
| Apply quality procedures | CY2 | MIET7351C | 16-07-2012 | 31-03-2013 | 28-02-2013 | 10 | 0.01 | 43 | 57 | 11 | 168.60 |
| Apply quality procedures | CY2 | MIET7351C | 16-07-2012 | 31-03-2013 | 31-05-2013 | 10 | 0.01 | 43 | 57 | 11 | 168.60 |
| Apply quality procedures | CY2 | MIET7351C | 25-06-2012 | 31-03-2013 | 28-06-2013 | 10 | 0.01 | 43 | 57 | 11 | 168.60 |
| Interpret technical drawing | CY2 | MIET7352C | 01-08-2012 | 31-03-2013 | 31-07-2013 | 40 | 0.05 | 173 | 228 | 46 | 674.40 |
| Interpret technical drawing | CY2 | MIET7352C | 02-07-2012 | 31-03-2013 | 28-06-2013 | 40 | 0.05 | 173 | 228 | 46 | 674.40 |
| Interpret technical drawing | CY2 | MIET7352C | 16-07-2012 | 31-03-2013 | 26-04-2013 | 40 | 0.05 | 173 | 228 | 46 | 674.40 |
| Interpret technical drawing | CY2 | MIET7352C | 16-07-2012 | 31-03-2013 | 28-02-2013 | 40 | 0.05 | 173 | 228 | 46 | 674.40 |
| Interpret technical drawing | CY2 | MIET7352C | 16-07-2012 | 31-03-2013 | 28-06-2013 | 40 | 0.05 | 173 | 228 | 46 | 674.40 |
| Interpret technical drawing | CY2 | MIET7352C | 16-07-2012 | 31-03-2013 | 29-03-2013 | 40 | 0.05 | 173 | 228 | 46 | 674.40 |
| Interpret technical drawing | CY2 | MIET7352C | 16-07-2012 | 31-03-2013 | 30-04-2013 | 40 | 0.05 | 173 | 228 | 46 | 674.40 |
| Interpret technical drawing | CY2 | MIET7352C | 16-07-2012 | 31-03-2013 | 31-05-2013 | 40 | 0.05 | 173 | 228 | 46 | 674.40 |
| Interpret technical drawing | CY2 | MIET7352C | 25-06-2012 | 31-03-2013 | 28-06-2013 | 40 | 0.05 | 173 | 228 | 46 | 674.40 |
| Use hand tools | CY2 | MIET7353C | 01-08-2012 | 31-03-2013 | 31-07-2013 | 20 | 0.02 | 87 | 114 | 23 | 337.20 |
| Use hand tools | CY2 | MIET7353C | 02-07-2012 | 31-03-2013 | 28-06-2013 | 20 | 0.02 | 87 | 114 | 23 | 337.20 |
| Use hand tools | CY2 | MIET7353C | 16-07-2012 | 31-03-2013 | 26-04-2013 | 20 | 0.02 | 87 | 114 | 23 | 337.20 |
| Use hand tools | CY2 | MIET7353C | 16-07-2012 | 31-03-2013 | 28-06-2013 | 20 | 0.02 | 87 | 114 | 23 | 337.20 |
| Use hand tools | CY2 | MIET7353C | 16-07-2012 | 31-03-2013 | 31-05-2013 | 20 | 0.02 | 87 | 114 | 23 | 337.20 |
| Use hand tools | CY2 | MIET7353C | 25-06-2012 | 31-03-2013 | 28-06-2013 | 20 | 0.02 | 87 | 114 | 23 | 337.20 |
| Use power tools/hand held operations | CY2 | MIET7354C | 01-08-2012 | 31-03-2013 | 31-07-2013 | 20 | 0.02 | 87 | 114 | 23 | 337.20 |
| Use power tools/hand held operations | CY2 | MIET7354C | 02-07-2012 | 31-03-2013 | 28-06-2013 | 20 | 0.02 | 87 | 114 | 23 | 337.20 |
| Use power tools/hand held operations | CY2 | MIET7354C | 16-07-2012 | 31-03-2013 | 26-04-2013 | 20 | 0.02 | 87 | 114 | 23 | 337.20 |
| Use power tools/hand held operations | CY2 | MIET7354C | 16-07-2012 | 31-03-2013 | 28-06-2013 | 20 | 0.02 | 87 | 114 | 23 | 337.20 |
| Use power tools/hand held operations | CY2 | MIET7354C | 16-07-2012 | 31-03-2013 | 31-05-2013 | 20 | 0.02 | 87 | 114 | 23 | 337.20 |
| Use power tools/hand held operations | CY2 | MIET7354C | 25-06-2012 | 31-03-2013 | 28-06-2013 | 20 | 0.02 | 87 | 114 | 23 | 337.20 |
| Dismantle, replace and assemble engineering components | CY2 | MIET7355C | 01-08-2012 | 31-03-2013 | 31-07-2013 | 30 | 0.03 | 130 | 171 | 34 | 505.80 |
| Dismantle, replace and assemble engineering components | CY2 | MIET7355C | 02-07-2012 | 31-03-2013 | 28-06-2013 | 30 | 0.03 | 130 | 171 | 34 | 505.80 |
| Dismantle, replace and assemble engineering components | CY2 | MIET7355C | 16-07-2012 | 31-03-2013 | 26-04-2013 | 30 | 0.03 | 130 | 171 | 34 | 505.80 |
| Dismantle, replace and assemble engineering components | CY2 | MIET7355C | 16-07-2012 | 31-03-2013 | 28-02-2013 | 30 | 0.03 | 130 | 171 | 34 | 505.80 |
| Dismantle, replace and assemble engineering components | CY2 | MIET7355C | 16-07-2012 | 31-03-2013 | 31-05-2013 | 30 | 0.03 | 130 | 171 | 34 | 505.80 |
| Dismantle, replace and assemble engineering components | CY2 | MIET7355C | 25-06-2012 | 31-03-2013 | 28-06-2013 | 30 | 0.03 | 130 | 171 | 34 | 505.80 |
| Perform brazing and/or silver soldering | CY2 | MIET7356C | 01-08-2012 | 31-03-2013 | 31-07-2013 | 20 | 0.02 | 87 | 114 | 23 | 337.20 |
| Perform brazing and/or silver soldering | CY2 | MIET7356C | 02-07-2012 | 31-03-2013 | 28-06-2013 | 20 | 0.02 | 87 | 114 | 23 | 337.20 |
| Perform brazing and/or silver soldering | CY2 | MIET7356C | 16-07-2012 | 31-03-2013 | 26-04-2013 | 20 | 0.02 | 87 | 114 | 23 | 337.20 |
| Perform brazing and/or silver soldering | CY2 | MIET7356C | 16-07-2012 | 31-03-2013 | 28-02-2013 | 20 | 0.02 | 87 | 114 | 23 | 337.20 |
| Perform brazing and/or silver soldering | CY2 | MIET7356C | 16-07-2012 | 31-03-2013 | 31-05-2013 | 20 | 0.02 | 87 | 114 | 23 | 337.20 |
| Perform brazing and/or silver soldering | CY2 | MIET7356C | 25-06-2012 | 31-03-2013 | 28-06-2013 | 20 | 0.02 | 87 | 114 | 23 | 337.20 |
| Perform routine gas metal arc welding | CY2 | MIET7358C | 01-08-2012 | 31-03-2013 | 31-07-2013 | 20 | 0.02 | 87 | 114 | 23 | 337.20 |
| Perform routine gas metal arc welding | CY2 | MIET7358C | 02-07-2012 | 31-03-2013 | 28-06-2013 | 20 | 0.02 | 87 | 114 | 23 | 337.20 |
| Perform routine gas metal arc welding | CY2 | MIET7358C | 16-07-2012 | 31-03-2013 | 26-04-2013 | 20 | 0.02 | 87 | 114 | 23 | 337.20 |
| Perform routine gas metal arc welding | CY2 | MIET7358C | 16-07-2012 | 31-03-2013 | 28-02-2013 | 20 | 0.02 | 87 | 114 | 23 | 337.20 |
| Perform routine gas metal arc welding | CY2 | MIET7358C | 16-07-2012 | 31-03-2013 | 31-05-2013 | 20 | 0.02 | 87 | 114 | 23 | 337.20 |
| Perform routine gas metal arc welding | CY2 | MIET7358C | 25-06-2012 | 31-03-2013 | 28-06-2013 | 20 | 0.02 | 87 | 114 | 23 | 337.20 |
| Mark off/out (general engineering) | CY2 | MIET7362C | 16-07-2012 | 31-03-2013 | 28-06-2013 | 40 | 0.05 | 173 | 228 | 46 | 674.40 |
| Perform computations | CY2 | MATH5266C | 01-08-2012 | 31-03-2013 | 31-07-2013 | 30 | 0.03 | 130 | 171 | 34 | 505.80 |
| Perform computations | CY2 | MATH5266C | 16-07-2012 | 31-03-2013 | 28-06-2013 | 30 | 0.03 | 130 | 171 | 34 | 505.80 |
| Perform computations | CY2 | MATH5266C | 16-07-2012 | 31-03-2013 | 29-03-2013 | 30 | 0.03 | 130 | 171 | 34 | 505.80 |
| Perform computations | CY2 | MATH5266C | 16-07-2012 | 31-03-2013 | 30-04-2013 | 30 | 0.03 | 130 | 171 | 34 | 505.80 |
| Perform computations | CY2 | MATH5266C | 25-06-2012 | 31-03-2013 | 28-06-2013 | 30 | 0.03 | 130 | 171 | 34 | 505.80 |
| Apply principles of occupational health and safety in the work environment | CY2 | OHTH5402C | 01-08-2012 | 31-03-2013 | 31-07-2013 | 10 | 0.01 | 43 | 57 | 11 | 168.60 |
| Apply principles of occupational health and safety in the work environment | CY2 | OHTH5402C | 02-07-2012 | 31-03-2013 | 28-06-2013 | 10 | 0.01 | 43 | 57 | 11 | 168.60 |
| Apply principles of occupational health and safety in the work environment | CY2 | OHTH5402C | 16-07-2012 | 31-03-2013 | 26-04-2013 | 10 | 0.01 | 43 | 57 | 11 | 168.60 |
| Apply principles of occupational health and safety in the work environment | CY2 | OHTH5402C | 16-07-2012 | 31-03-2013 | 28-06-2013 | 10 | 0.01 | 43 | 57 | 11 | 168.60 |
| Apply principles of occupational health and safety in the work environment | CY2 | OHTH5402C | 16-07-2012 | 31-03-2013 | 30-04-2013 | 10 | 0.01 | 43 | 57 | 11 | 168.60 |
| Apply principles of occupational health and safety in the work environment | CY2 | OHTH5402C | 25-06-2012 | 31-03-2013 | 28-06-2013 | 10 | 0.01 | 43 | 57 | 11 | 168.60 |
| Plan to undertake a routine task | CY2 | EMPL6983C | 01-08-2012 | 31-03-2013 | 31-07-2013 | 10 | 0.01 | 43 | 57 | 11 | 168.60 |
| Plan to undertake a routine task | CY2 | EMPL6983C | 02-07-2012 | 31-03-2013 | 28-06-2013 | 10 | 0.01 | 43 | 57 | 11 | 168.60 |
| Plan to undertake a routine task | CY2 | EMPL6983C | 16-07-2012 | 31-03-2013 | 26-04-2013 | 10 | 0.01 | 43 | 57 | 11 | 168.60 |
| Plan to undertake a routine task | CY2 | EMPL6983C | 16-07-2012 | 31-03-2013 | 28-02-2013 | 10 | 0.01 | 43 | 57 | 11 | 168.60 |
| Plan to undertake a routine task | CY2 | EMPL6983C | 16-07-2012 | 31-03-2013 | 28-06-2013 | 10 | 0.01 | 43 | 57 | 11 | 168.60 |
| Plan to undertake a routine task | CY2 | EMPL6983C | 16-07-2012 | 31-03-2013 | 30-04-2013 | 10 | 0.01 | 43 | 57 | 11 | 168.60 |
| Plan to undertake a routine task | CY2 | EMPL6983C | 16-07-2012 | 31-03-2013 | 31-05-2013 | 10 | 0.01 | 43 | 57 | 11 | 168.60 |
| Plan to undertake a routine task | CY2 | EMPL6983C | 25-06-2012 | 31-03-2013 | 28-06-2013 | 10 | 0.01 | 43 | 57 | 11 | 168.60 |
| Plan a complete activity | CY2 | EMPL6984C | 01-08-2012 | 31-03-2013 | 31-07-2013 | 20 | 0.02 | 87 | 114 | 23 | 337.20 |
| Plan a complete activity | CY2 | EMPL6984C | 25-06-2012 | 31-03-2013 | 28-06-2013 | 20 | 0.02 | 87 | 114 | 23 | 337.20 |
| Organise and communicate information | CY2 | EMPL6985C | 01-08-2012 | 31-03-2013 | 31-07-2013 | 20 | 0.02 | 87 | 114 | 23 | 337.20 |
| Organise and communicate information | CY2 | EMPL6985C | 02-07-2012 | 31-03-2013 | 28-06-2013 | 20 | 0.02 | 87 | 114 | 23 | 337.20 |
| Organise and communicate information | CY2 | EMPL6985C | 16-07-2012 | 31-03-2013 | 26-04-2013 | 20 | 0.02 | 87 | 114 | 23 | 337.20 |
| Organise and communicate information | CY2 | EMPL6985C | 16-07-2012 | 31-03-2013 | 28-02-2013 | 20 | 0.02 | 87 | 114 | 23 | 337.20 |
| Organise and communicate information | CY2 | EMPL6985C | 16-07-2012 | 31-03-2013 | 31-05-2013 | 20 | 0.02 | 87 | 114 | 23 | 337.20 |
| Organise and communicate information | CY2 | EMPL6985C | 25-06-2012 | 31-03-2013 | 28-06-2013 | 20 | 0.02 | 87 | 114 | 23 | 337.20 |
| Work with others in a manufacturing, engineering or related environment | CY2 | EMPL6986C | 01-08-2012 | 31-03-2013 | 31-07-2013 | 10 | 0.01 | 43 | 57 | 11 | 168.60 |
| Work with others in a manufacturing, engineering or related environment | CY2 | EMPL6986C | 02-07-2012 | 31-03-2013 | 28-06-2013 | 10 | 0.01 | 43 | 57 | 11 | 168.60 |
| Work with others in a manufacturing, engineering or related environment | CY2 | EMPL6986C | 16-07-2012 | 31-03-2013 | 26-04-2013 | 10 | 0.01 | 43 | 57 | 11 | 168.60 |
| Work with others in a manufacturing, engineering or related environment | CY2 | EMPL6986C | 16-07-2012 | 31-03-2013 | 28-02-2013 | 10 | 0.01 | 43 | 57 | 11 | 168.60 |
| Work with others in a manufacturing, engineering or related environment | CY2 | EMPL6986C | 16-07-2012 | 31-03-2013 | 31-05-2013 | 10 | 0.01 | 43 | 57 | 11 | 168.60 |
| Work with others in a manufacturing, engineering or related environment | CY2 | EMPL6986C | 25-06-2012 | 31-03-2013 | 28-06-2013 | 10 | 0.01 | 43 | 57 | 11 | 168.60 |
| Interact with computing technology | CY2 | COSC5928C | 01-08-2012 | 31-03-2013 | 31-07-2013 | 20 | 0.02 | 87 | 114 | 23 | 337.20 |
| Interact with computing technology | CY2 | COSC5928C | 25-06-2012 | 31-03-2013 | 28-06-2013 | 20 | 0.02 | 87 | 114 | 23 | 337.20 |
| Assist in the provision of on the job training | CY2 | EMPL6987C | 01-08-2012 | 31-03-2013 | 31-07-2013 | 20 | 0.02 | 87 | 114 | 23 | 337.20 |
| Assist in the provision of on the job training | CY2 | EMPL6987C | 25-06-2012 | 31-03-2013 | 28-06-2013 | 20 | 0.02 | 87 | 114 | 23 | 337.20 |
| Enter and change programmable controller operational parameters | CY2 | COSC5929C | 01-08-2012 | 31-03-2013 | 31-07-2013 | 20 | 0.02 | 87 | 114 | 23 | 337.20 |
| Enter and change programmable controller operational parameters | CY2 | COSC5929C | 25-06-2012 | 31-03-2013 | 28-06-2013 | 20 | 0.02 | 87 | 114 | 23 | 337.20 |
| Terminate and connect electrical wiring | CY2 | EEET6693C | 01-08-2012 | 31-03-2013 | 31-07-2013 | 30 | 0.03 | 130 | 171 | 34 | 505.80 |
| Terminate and connect electrical wiring | CY2 | EEET6693C | 25-06-2012 | 31-03-2013 | 28-06-2013 | 30 | 0.03 | 130 | 171 | 34 | 505.80 |
| Perform electrical/electronic measurement | CY2 | EEET6695C | 01-08-2012 | 31-03-2013 | 31-07-2013 | 20 | 0.02 | 87 | 114 | 23 | 337.20 |
| Perform electrical/electronic measurement | CY2 | EEET6695C | 02-07-2012 | 31-03-2013 | 28-06-2013 | 20 | 0.02 | 87 | 114 | 23 | 337.20 |
| Perform electrical/electronic measurement | CY2 | EEET6695C | 16-07-2012 | 31-03-2013 | 26-04-2013 | 20 | 0.02 | 87 | 114 | 23 | 337.20 |
| Perform electrical/electronic measurement | CY2 | EEET6695C | 16-07-2012 | 31-03-2013 | 28-02-2013 | 20 | 0.02 | 87 | 114 | 23 | 337.20 |
| Perform electrical/electronic measurement | CY2 | EEET6695C | 16-07-2012 | 31-03-2013 | 31-05-2013 | 20 | 0.02 | 87 | 114 | 23 | 337.20 |
| Perform electrical/electronic measurement | CY2 | EEET6695C | 25-06-2012 | 31-03-2013 | 28-06-2013 | 20 | 0.02 | 87 | 114 | 23 | 337.20 |
| Use tools for precision work | CY2 | OENG6054C | 16-07-2012 | 31-03-2013 | 28-06-2013 | 40 | 0.05 | 173 | 228 | 46 | 674.40 |
| Use tools for precision work | CY2 | OENG6054C | 16-07-2012 | 31-03-2013 | 29-03-2013 | 40 | 0.05 | 173 | 228 | 46 | 674.40 |
| Use tools for precision work | CY2 | OENG6054C | 16-07-2012 | 31-03-2013 | 30-04-2013 | 40 | 0.05 | 173 | 228 | 46 | 674.40 |
| Perform general machining | CY2 | MIET7451C | 16-07-2012 | 31-03-2013 | 28-06-2013 | 80 | 0.09 | 346 | 457 | 91 | 1,348.80 |
| Perform general machining | CY2 | MIET7451C | 16-07-2012 | 31-03-2013 | 30-04-2013 | 80 | 0.09 | 346 | 457 | 91 | 1,348.80 |
| Participate in environmentally sustainable work practices | CY2 | EASC5047C | 16-07-2012 | 31-03-2013 | 28-06-2013 | 30 | 0.03 | 130 | 171 | 34 | 505.80 |
| Perform engineering measurements | JUL | MIET7349C | 16-07-2012 | 31-08-2012 | 12-12-2012 | 30 | 0.03 | 130 | 171 | 34 | 505.80 |
| Perform engineering measurements | JUL | MIET7349C | 16-07-2012 | 31-08-2012 | 14-12-2012 | 30 | 0.03 | 130 | 171 | 34 | 505.80 |
| Apply quality systems | JUL | MIET7350C | 16-07-2012 | 31-08-2012 | 14-12-2012 | 20 | 0.02 | 87 | 114 | 23 | 337.20 |
| Apply quality procedures | JUL | MIET7351C | 16-07-2012 | 31-08-2012 | 14-12-2012 | 10 | 0.01 | 43 | 57 | 11 | 168.60 |
| Interpret technical drawing | JUL | MIET7352C | 16-07-2012 | 31-08-2012 | 12-12-2012 | 40 | 0.05 | 173 | 228 | 46 | 674.40 |
| Interpret technical drawing | JUL | MIET7352C | 16-07-2012 | 31-08-2012 | 14-12-2012 | 40 | 0.05 | 173 | 228 | 46 | 674.40 |
| Use hand tools | JUL | MIET7353C | 16-07-2012 | 31-08-2012 | 14-12-2012 | 20 | 0.02 | 87 | 114 | 23 | 337.20 |
| Use hand tools | JUL | MIET7353C | 25-06-2012 | 31-08-2012 | 02-11-2012 | 20 | 0.02 | 87 | 114 | 23 | 337.20 |
| Use hand tools | JUL | MIET7353C | 25-06-2012 | 31-08-2012 | 09-11-2012 | 20 | 0.02 | 87 | 114 | 23 | 337.20 |
| Use power tools/hand held operations | JUL | MIET7354C | 16-07-2012 | 31-08-2012 | 14-12-2012 | 20 | 0.02 | 87 | 114 | 23 | 337.20 |
| Use power tools/hand held operations | JUL | MIET7354C | 25-06-2012 | 31-08-2012 | 02-11-2012 | 20 | 0.02 | 87 | 114 | 23 | 337.20 |
| Dismantle, replace and assemble engineering components | JUL | MIET7355C | 16-07-2012 | 31-08-2012 | 14-12-2012 | 30 | 0.03 | 130 | 171 | 34 | 505.80 |
| Perform brazing and/or silver soldering | JUL | MIET7356C | 16-07-2012 | 31-08-2012 | 14-12-2012 | 20 | 0.02 | 87 | 114 | 23 | 337.20 |
| Perform brazing and/or silver soldering | JUL | MIET7356C | 17-07-2012 | 31-08-2012 | 14-12-2012 | 20 | 0.02 | 87 | 114 | 23 | 337.20 |
| Perform routine gas metal arc welding | JUL | MIET7358C | 16-07-2012 | 31-08-2012 | 14-12-2012 | 20 | 0.02 | 87 | 114 | 23 | 337.20 |
| Mark off/out (general engineering) | JUL | MIET7362C | 16-07-2012 | 31-08-2012 | 14-12-2012 | 40 | 0.05 | 173 | 228 | 46 | 674.40 |
| Perform computations | JUL | MATH5266C | 16-07-2012 | 31-08-2012 | 12-12-2012 | 30 | 0.03 | 130 | 171 | 34 | 505.80 |
| Perform computations | JUL | MATH5266C | 16-07-2012 | 31-08-2012 | 14-12-2012 | 30 | 0.03 | 130 | 171 | 34 | 505.80 |
| Apply principles of occupational health and safety in the work environment | JUL | OHTH5402C | 16-07-2012 | 31-08-2012 | 14-12-2012 | 10 | 0.01 | 43 | 57 | 11 | 168.60 |
| Plan to undertake a routine task | JUL | EMPL6983C | 16-07-2012 | 31-08-2012 | 14-12-2012 | 10 | 0.01 | 43 | 57 | 11 | 168.60 |
| Plan a complete activity | JUL | EMPL6984C | 16-07-2012 | 31-08-2012 | 14-12-2012 | 20 | 0.02 | 87 | 114 | 23 | 337.20 |
| Plan a complete activity | JUL | EMPL6984C | 19-07-2012 | 31-08-2012 | 14-12-2012 | 20 | 0.02 | 87 | 114 | 23 | 337.20 |
| Organise and communicate information | JUL | EMPL6985C | 16-07-2012 | 31-08-2012 | 14-12-2012 | 20 | 0.02 | 87 | 114 | 23 | 337.20 |
| Organise and communicate information | JUL | EMPL6985C | 25-06-2012 | 31-08-2012 | 09-11-2012 | 20 | 0.02 | 87 | 114 | 23 | 337.20 |
| Work with others in a manufacturing, engineering or related environment | JUL | EMPL6986C | 16-07-2012 | 31-08-2012 | 14-12-2012 | 10 | 0.01 | 43 | 57 | 11 | 168.60 |
| Interact with computing technology | JUL | COSC5928C | 16-07-2012 | 31-08-2012 | 14-12-2012 | 20 | 0.02 | 87 | 114 | 23 | 337.20 |
| Assist in the provision of on the job training | JUL | EMPL6987C | 16-07-2012 | 31-08-2012 | 14-12-2012 | 20 | 0.02 | 87 | 114 | 23 | 337.20 |
| Enter and change programmable controller operational parameters | JUL | COSC5929C | 16-07-2012 | 31-08-2012 | 14-12-2012 | 20 | 0.02 | 87 | 114 | 23 | 337.20 |
| Terminate and connect electrical wiring | JUL | EEET6693C | 16-07-2012 | 31-08-2012 | 14-12-2012 | 30 | 0.03 | 130 | 171 | 34 | 505.80 |
| Perform electrical/electronic measurement | JUL | EEET6695C | 16-07-2012 | 31-08-2012 | 14-12-2012 | 20 | 0.02 | 87 | 114 | 23 | 337.20 |
| Use tools for precision work | JUL | OENG6054C | 16-07-2012 | 31-08-2012 | 12-12-2012 | 40 | 0.05 | 173 | 228 | 46 | 674.40 |
| Use tools for precision work | JUL | OENG6054C | 16-07-2012 | 31-08-2012 | 14-12-2012 | 40 | 0.05 | 173 | 228 | 46 | 674.40 |
| Apply mathematical techniques in a manufacturing engineering or related environment | JUL | MATH5268C | 25-06-2012 | 31-08-2012 | 09-11-2012 | 40 | 0.05 | 173 | 228 | 46 | 674.40 |
| Perform general machining | JUL | MIET7451C | 16-07-2012 | 31-08-2012 | 14-12-2012 | 80 | 0.09 | 346 | 457 | 91 | 1,348.80 |
| Perform lathe operations | JUL | MIET7452C | 16-07-2012 | 31-08-2012 | 14-12-2012 | 40 | 0.05 | 173 | 228 | 46 | 674.40 |
| Perform milling operations | JUL | MIET7453C | 16-07-2012 | 31-08-2012 | 14-12-2012 | 40 | 0.05 | 173 | 228 | 46 | 674.40 |
| Perform grinding operations | JUL | MIET7454C | 16-07-2012 | 31-08-2012 | 14-12-2012 | 40 | 0.05 | 173 | 228 | 46 | 674.40 |
| Perform ultrasonic thickness testing | JUL | PROC5248C | 25-06-2012 | 31-08-2012 | 09-11-2012 | 20 | 0.02 | 87 | 114 | 23 | 337.20 |
| Participate in environmentally sustainable work practices | JUL | EASC5047C | 16-07-2012 | 31-08-2012 | 12-12-2012 | 30 | 0.03 | 130 | 171 | 34 | 505.80 |
| Participate in environmentally sustainable work practices | JUL | EASC5047C | 23-07-2012 | 31-08-2012 | 21-12-2012 | 30 | 0.03 | 130 | 171 | 34 | 505.80 |
| Participate in environmentally sustainable work practices | JUL | EASC5047C | 25-06-2012 | 31-08-2012 | 09-11-2012 | 30 | 0.03 | 130 | 171 | 34 | 505.80 |
| Interpret technical drawing | OCT | MIET7352C | 09-10-2012 | 30-11-2012 | 14-12-2012 | 40 | 0.05 | 173 | 228 | 46 | 674.40 |
| Use hand tools | OCT | MIET7353C | 09-10-2012 | 30-11-2012 | 14-12-2012 | 20 | 0.02 | 87 | 114 | 23 | 337.20 |
| Use power tools/hand held operations | OCT | MIET7354C | 09-10-2012 | 30-11-2012 | 14-12-2012 | 20 | 0.02 | 87 | 114 | 23 | 337.20 |
| Dismantle, replace and assemble engineering components | OCT | MIET7355C | 11-10-2012 | 30-11-2012 | 14-12-2012 | 30 | 0.03 | 130 | 171 | 34 | 505.80 |
| Dismantle, replace and assemble engineering components | OCT | MIET7355C | 15-10-2012 | 30-11-2012 | 14-12-2012 | 30 | 0.03 | 130 | 171 | 34 | 505.80 |
| Perform brazing and/or silver soldering | OCT | MIET7356C | 11-10-2012 | 30-11-2012 | 14-12-2012 | 20 | 0.02 | 87 | 114 | 23 | 337.20 |
| Perform routine gas metal arc welding | OCT | MIET7358C | 11-10-2012 | 30-11-2012 | 14-12-2012 | 20 | 0.02 | 87 | 114 | 23 | 337.20 |
| Perform computations | OCT | MATH5266C | 09-10-2012 | 30-11-2012 | 14-12-2012 | 30 | 0.03 | 130 | 171 | 34 | 505.80 |
| Apply principles of occupational health and safety in the work environment | OCT | OHTH5402C | 09-10-2012 | 30-11-2012 | 14-12-2012 | 10 | 0.01 | 43 | 57 | 11 | 168.60 |
| Organise and communicate information | OCT | EMPL6985C | 10-10-2012 | 30-11-2012 | 09-11-2012 | 20 | 0.02 | 87 | 114 | 23 | 337.20 |
| Perform electrical/electronic measurement | OCT | EEET6695C | 11-10-2012 | 30-11-2012 | 14-12-2012 | 20 | 0.02 | 87 | 114 | 23 | 337.20 |
| Perform electrical/electronic measurement | OCT | EEET6695C | 15-10-2012 | 30-11-2012 | 14-12-2012 | 20 | 0.02 | 87 | 114 | 23 | 337.20 |
| Create 2D drawings using computer aided design system | OCT | COSC5339C | 09-10-2012 | 30-11-2012 | 14-12-2012 | 80 | 0.09 | 346 | 457 | 91 | 1,348.80 |
| Create 3D models using computer aided design system | OCT | COSC5340C | 09-10-2012 | 30-11-2012 | 14-12-2012 | 40 | 0.05 | 173 | 228 | 46 | 674.40 |
| Create 3D code files using computer aided manufacturing system | OCT | COSC5341C | 09-10-2012 | 30-11-2012 | 14-12-2012 | 60 | 0.07 | 260 | 343 | 68 | 1,011.60 |
| Apply mathematical techniques in a manufacturing engineering or related environment | OCT | MATH5268C | 10-10-2012 | 30-11-2012 | 09-11-2012 | 40 | 0.05 | 173 | 228 | 46 | 674.40 |
| Create 2D code files using computer aided manufacture system | OCT | ISYS5656C | 09-10-2012 | 30-11-2012 | 14-12-2012 | 40 | 0.05 | 173 | 228 | 46 | 674.40 |
| Participate in environmentally sustainable work practices | OCT | EASC5047C | 09-10-2012 | 30-11-2012 | 14-12-2012 | 30 | 0.03 | 130 | 171 | 34 | 505.80 |
| Perform engineering measurements | SEP | MIET7349C | 03-09-2012 | 31-10-2012 | 14-12-2012 | 30 | 0.03 | 130 | 171 | 34 | 505.80 |
| Apply quality systems | SEP | MIET7350C | 03-09-2012 | 31-10-2012 | 14-12-2012 | 20 | 0.02 | 87 | 114 | 23 | 337.20 |
| Apply quality procedures | SEP | MIET7351C | 03-09-2012 | 31-10-2012 | 14-12-2012 | 10 | 0.01 | 43 | 57 | 11 | 168.60 |
| Apply quality procedures | SEP | MIET7351C | 19-09-2012 | 31-10-2012 | 14-12-2012 | 10 | 0.01 | 43 | 57 | 11 | 168.60 |
| Interpret technical drawing | SEP | MIET7352C | 03-09-2012 | 31-10-2012 | 14-12-2012 | 40 | 0.05 | 173 | 228 | 46 | 674.40 |
| Interpret technical drawing | SEP | MIET7352C | 19-09-2012 | 31-10-2012 | 14-12-2012 | 40 | 0.05 | 173 | 228 | 46 | 674.40 |
| Use hand tools | SEP | MIET7353C | 03-09-2012 | 31-10-2012 | 14-12-2012 | 20 | 0.02 | 87 | 114 | 23 | 337.20 |
| Use hand tools | SEP | MIET7353C | 19-09-2012 | 31-10-2012 | 14-12-2012 | 20 | 0.02 | 87 | 114 | 23 | 337.20 |
| Use power tools/hand held operations | SEP | MIET7354C | 03-09-2012 | 31-10-2012 | 14-12-2012 | 20 | 0.02 | 87 | 114 | 23 | 337.20 |
| Use power tools/hand held operations | SEP | MIET7354C | 19-09-2012 | 31-10-2012 | 14-12-2012 | 20 | 0.02 | 87 | 114 | 23 | 337.20 |
| Dismantle, replace and assemble engineering components | SEP | MIET7355C | 03-09-2012 | 31-10-2012 | 14-12-2012 | 30 | 0.03 | 130 | 171 | 34 | 505.80 |
| Perform brazing and/or silver soldering | SEP | MIET7356C | 03-09-2012 | 31-10-2012 | 14-12-2012 | 20 | 0.02 | 87 | 114 | 23 | 337.20 |
| Perform brazing and/or silver soldering | SEP | MIET7356C | 19-09-2012 | 31-10-2012 | 14-12-2012 | 20 | 0.02 | 87 | 114 | 23 | 337.20 |
| Perform routine gas metal arc welding | SEP | MIET7358C | 03-09-2012 | 31-10-2012 | 14-12-2012 | 20 | 0.02 | 87 | 114 | 23 | 337.20 |
| Apply principles of occupational health and safety in the work environment | SEP | OHTH5402C | 03-09-2012 | 31-10-2012 | 14-12-2012 | 10 | 0.01 | 43 | 57 | 11 | 168.60 |
| Plan to undertake a routine task | SEP | EMPL6983C | 03-09-2012 | 31-10-2012 | 14-12-2012 | 10 | 0.01 | 43 | 57 | 11 | 168.60 |
| Plan to undertake a routine task | SEP | EMPL6983C | 19-09-2012 | 31-10-2012 | 14-12-2012 | 10 | 0.01 | 43 | 57 | 11 | 168.60 |
| Plan a complete activity | SEP | EMPL6984C | 03-09-2012 | 31-10-2012 | 14-12-2012 | 20 | 0.02 | 87 | 114 | 23 | 337.20 |
| Organise and communicate information | SEP | EMPL6985C | 03-09-2012 | 31-10-2012 | 14-12-2012 | 20 | 0.02 | 87 | 114 | 23 | 337.20 |
| Organise and communicate information | SEP | EMPL6985C | 19-09-2012 | 31-10-2012 | 14-12-2012 | 20 | 0.02 | 87 | 114 | 23 | 337.20 |
| Work with others in a manufacturing, engineering or related environment | SEP | EMPL6986C | 03-09-2012 | 31-10-2012 | 14-12-2012 | 10 | 0.01 | 43 | 57 | 11 | 168.60 |
| Work with others in a manufacturing, engineering or related environment | SEP | EMPL6986C | 19-09-2012 | 31-10-2012 | 14-12-2012 | 10 | 0.01 | 43 | 57 | 11 | 168.60 |
| Assist in the provision of on the job training | SEP | EMPL6987C | 13-09-2012 | 31-10-2012 | 11-10-2012 | 20 | 0.02 | 87 | 114 | 23 | 337.20 |
| Perform electrical/electronic measurement | SEP | EEET6695C | 03-09-2012 | 31-10-2012 | 14-12-2012 | 20 | 0.02 | 87 | 114 | 23 | 337.20 |
* EFTSL : Equivalent Full Time Study Load
** Concession fees are only available at diploma and advanced diploma level for indigenous students.
Back to Program List
| Unit Of Study (Course) | Session | Course Code | Commencement Date | Census Date | Completion Date | Student Contact Hours (SCH) | EFTSL* | Tuition Fee: Onsite|Distance|RPL | |||
| Government Subsidised Fee | Full Fee (Non Government Subsidised) | ||||||||||
| Program commenced 1 July 2009-30 June 2012 ($) | Program commenced 1 July 2012-31 December 2012 ($) | Program commenced 1 July 2012-31 December 2012 Concession ** ($) | Australian Full Fee Paying ($) | ||||||||
| Comply with infection control policies and procedures | AUG | HWSS5655C | 14-08-2012 | 30-09-2012 | 14-12-2012 | 20 | 0.07 | 87 | 46 | 9 | 259.40 |
| Comply with infection control policies and procedures | AUG | HWSS5670C | 01-08-2012 | 30-09-2012 | 31-08-2012 | 20 | 0.07 | 87 | 46 | 9 | 259.40 |
| Construct oral splints | AUG | DENT5267C | 27-08-2012 | 30-09-2012 | 03-12-2012 | 30 | 0.10 | 130 | 69 | 14 | 389.10 |
| Contribute to OHS processes | AUG | OHTH5674C | 01-08-2012 | 30-09-2012 | 31-08-2012 | 20 | 0.07 | 87 | 46 | 9 | 259.40 |
| Maintain financial records | CY2 | ACCT5150C | 25-06-2012 | 31-03-2013 | 20-02-2013 | 60 | 0.20 | 260 | 137 | 28 | 778.20 |
| Deliver and monitor a service to customers | CY2 | MKTG9243C | 15-10-2012 | 31-03-2013 | 11-10-2013 | 35 | 0.11 | 152 | 80 | 16 | 453.95 |
| Apply first aid | CY2 | NURS5115C | 02-11-2012 | 31-03-2013 | 07-06-2013 | 18 | 0.06 | 78 | 41 | 8 | 233.46 |
| Apply first aid | CY2 | NURS5115C | 05-10-2012 | 31-03-2013 | 24-05-2013 | 18 | 0.06 | 78 | 41 | 8 | 233.46 |
| Apply first aid | CY2 | NURS5115C | 10-08-2012 | 31-03-2013 | 19-04-2013 | 18 | 0.06 | 78 | 41 | 8 | 233.46 |
| Apply first aid | CY2 | NURS5115C | 13-07-2012 | 31-03-2013 | 22-03-2013 | 18 | 0.06 | 78 | 41 | 8 | 233.46 |
| Apply first aid | CY2 | NURS5115C | 14-09-2012 | 31-03-2013 | 10-05-2013 | 18 | 0.06 | 78 | 41 | 8 | 233.46 |
| Apply first aid | CY2 | NURS5115C | 23-11-2012 | 31-03-2013 | 21-06-2013 | 18 | 0.06 | 78 | 41 | 8 | 233.46 |
| Comply with infection control policies and procedures in health work | CY2 | NURS5119C | 01-10-2012 | 31-03-2013 | 30-09-2013 | 20 | 0.07 | 87 | 46 | 9 | 259.40 |
| Comply with infection control policies and procedures in health work | CY2 | NURS5119C | 06-08-2012 | 31-03-2013 | 05-08-2013 | 20 | 0.07 | 87 | 46 | 9 | 259.40 |
| Comply with infection control policies and procedures in health work | CY2 | NURS5119C | 09-07-2012 | 31-03-2013 | 08-07-2013 | 20 | 0.07 | 87 | 46 | 9 | 259.40 |
| Comply with infection control policies and procedures in health work | CY2 | NURS5119C | 10-09-2012 | 31-03-2013 | 09-09-2013 | 20 | 0.07 | 87 | 46 | 9 | 259.40 |
| Comply with infection control policies and procedures in health work | CY2 | NURS5119C | 19-11-2012 | 31-03-2013 | 18-11-2013 | 20 | 0.07 | 87 | 46 | 9 | 259.40 |
| Comply with infection control policies and procedures in health work | CY2 | NURS5119C | 29-10-2012 | 31-03-2013 | 28-10-2013 | 20 | 0.07 | 87 | 46 | 9 | 259.40 |
| Work effectively with culturally diverse clients and co-workers | CY2 | NURS5137C | 07-12-2012 | 31-03-2013 | 15-02-2013 | 20 | 0.07 | 87 | 46 | 9 | 259.40 |
| Maintain financial records | CY2 | ACCT5334C | 12-11-2012 | 31-03-2013 | 07-10-2013 | 60 | 0.20 | 260 | 137 | 28 | 778.20 |
| Apply first aid | CY2 | OHTH5648C | 02-11-2012 | 31-03-2013 | 07-06-2013 | 18 | 0.06 | 78 | 41 | 8 | 233.46 |
| Apply first aid | CY2 | OHTH5648C | 05-10-2012 | 31-03-2013 | 04-04-2013 | 18 | 0.06 | 78 | 41 | 8 | 233.46 |
| Apply first aid | CY2 | OHTH5648C | 05-10-2012 | 31-03-2013 | 24-05-2013 | 18 | 0.06 | 78 | 41 | 8 | 233.46 |
| Apply first aid | CY2 | OHTH5648C | 10-08-2012 | 31-03-2013 | 19-04-2013 | 18 | 0.06 | 78 | 41 | 8 | 233.46 |
| Apply first aid | CY2 | OHTH5648C | 13-07-2012 | 31-03-2013 | 22-03-2013 | 18 | 0.06 | 78 | 41 | 8 | 233.46 |
| Apply first aid | CY2 | OHTH5648C | 14-09-2012 | 31-03-2013 | 10-05-2013 | 18 | 0.06 | 78 | 41 | 8 | 233.46 |
| Apply first aid | CY2 | OHTH5648C | 23-11-2012 | 31-03-2013 | 21-06-2013 | 18 | 0.06 | 78 | 41 | 8 | 233.46 |
| Comply with infection control policies and procedures | CY2 | HWSS5655C | 01-10-2012 | 31-03-2013 | 04-04-2013 | 20 | 0.07 | 87 | 46 | 9 | 259.40 |
| Comply with infection control policies and procedures | CY2 | HWSS5655C | 01-10-2012 | 31-03-2013 | 30-01-2013 | 20 | 0.07 | 87 | 46 | 9 | 259.40 |
| Comply with infection control policies and procedures | CY2 | HWSS5655C | 01-10-2012 | 31-03-2013 | 30-09-2013 | 20 | 0.07 | 87 | 46 | 9 | 259.40 |
| Comply with infection control policies and procedures | CY2 | HWSS5655C | 06-08-2012 | 31-03-2013 | 05-08-2013 | 20 | 0.07 | 87 | 46 | 9 | 259.40 |
| Comply with infection control policies and procedures | CY2 | HWSS5655C | 09-07-2012 | 31-03-2013 | 08-07-2013 | 20 | 0.07 | 87 | 46 | 9 | 259.40 |
| Comply with infection control policies and procedures | CY2 | HWSS5655C | 10-07-2012 | 31-03-2013 | 25-03-2013 | 20 | 0.07 | 87 | 46 | 9 | 259.40 |
| Comply with infection control policies and procedures | CY2 | HWSS5655C | 10-09-2012 | 31-03-2013 | 09-09-2013 | 20 | 0.07 | 87 | 46 | 9 | 259.40 |
| Comply with infection control policies and procedures | CY2 | HWSS5655C | 19-11-2012 | 31-03-2013 | 18-11-2013 | 20 | 0.07 | 87 | 46 | 9 | 259.40 |
| Comply with infection control policies and procedures | CY2 | HWSS5655C | 29-10-2012 | 31-03-2013 | 28-10-2013 | 20 | 0.07 | 87 | 46 | 9 | 259.40 |
| Organise personal work priorities and development | CY2 | EMPL7019C | 06-08-2012 | 31-03-2013 | 03-05-2013 | 30 | 0.10 | 130 | 69 | 14 | 389.10 |
| Organise personal work priorities and development | CY2 | EMPL7019C | 10-09-2012 | 31-03-2013 | 07-06-2013 | 30 | 0.10 | 130 | 69 | 14 | 389.10 |
| Organise personal work priorities and development | CY2 | EMPL7019C | 19-11-2012 | 31-03-2013 | 16-08-2013 | 30 | 0.10 | 130 | 69 | 14 | 389.10 |
| Organise personal work priorities and development | CY2 | EMPL7019C | 22-10-2012 | 31-03-2013 | 19-07-2013 | 30 | 0.10 | 130 | 69 | 14 | 389.10 |
| Organise personal work priorities and development | CY2 | EMPL7019C | 26-11-2012 | 31-03-2013 | 23-08-2013 | 30 | 0.10 | 130 | 69 | 14 | 389.10 |
| Contribute to OHS processes | CY2 | OHTH5650C | 06-08-2012 | 31-03-2013 | 03-05-2013 | 20 | 0.07 | 87 | 46 | 9 | 259.40 |
| Contribute to OHS processes | CY2 | OHTH5650C | 10-09-2012 | 31-03-2013 | 07-06-2013 | 20 | 0.07 | 87 | 46 | 9 | 259.40 |
| Contribute to OHS processes | CY2 | OHTH5650C | 19-11-2012 | 31-03-2013 | 16-08-2013 | 20 | 0.07 | 87 | 46 | 9 | 259.40 |
| Contribute to OHS processes | CY2 | OHTH5650C | 22-10-2012 | 31-03-2013 | 19-07-2013 | 20 | 0.07 | 87 | 46 | 9 | 259.40 |
| Contribute to OHS processes | CY2 | OHTH5650C | 26-11-2012 | 31-03-2013 | 23-08-2013 | 20 | 0.07 | 87 | 46 | 9 | 259.40 |
| Comply with infection control policies and procedures | DEC | HWSS5670C | 03-12-2012 | 31-12-2012 | 28-12-2012 | 20 | 0.07 | 87 | 46 | 9 | 259.40 |
| Contribute to OHS processes | DEC | OHTH5674C | 03-12-2012 | 31-12-2012 | 28-12-2012 | 20 | 0.07 | 87 | 46 | 9 | 259.40 |
| Maintain business resources | JUL | BUSM9930C | 02-07-2012 | 31-08-2012 | 07-12-2012 | 20 | 0.07 | 87 | 46 | 9 | 259.40 |
| Maintain business resources | JUL | BUSM9930C | 13-07-2012 | 31-08-2012 | 03-12-2012 | 20 | 0.07 | 87 | 46 | 9 | 259.40 |
| Maintain financial records | JUL | ACCT5150C | 02-07-2012 | 31-08-2012 | 07-12-2012 | 60 | 0.20 | 260 | 137 | 28 | 778.20 |
| Maintain financial records | JUL | ACCT5150C | 13-07-2012 | 31-08-2012 | 03-12-2012 | 60 | 0.20 | 260 | 137 | 28 | 778.20 |
| Deliver and monitor a service to customers | JUL | MKTG9243C | 25-06-2012 | 31-08-2012 | 03-12-2012 | 35 | 0.11 | 152 | 80 | 16 | 453.95 |
| Organise personal work priorities and development | JUL | EMPL9650C | 25-06-2012 | 31-08-2012 | 03-12-2012 | 40 | 0.13 | 173 | 92 | 18 | 518.80 |
| Organise personal work priorities and development | JUL | EMPL9650C | 25-06-2012 | 31-08-2012 | 07-09-2012 | 40 | 0.13 | 173 | 92 | 18 | 518.80 |
| Organise workplace information | JUL | EMPL5468C | 25-06-2012 | 31-08-2012 | 03-12-2012 | 30 | 0.10 | 130 | 69 | 14 | 389.10 |
| Apply first aid | JUL | NURS5115C | 25-06-2012 | 31-08-2012 | 03-12-2012 | 18 | 0.06 | 78 | 41 | 8 | 233.46 |
| Contribute to OHS processes | JUL | NURS5121C | 25-06-2012 | 31-08-2012 | 07-09-2012 | 20 | 0.07 | 87 | 46 | 9 | 259.40 |
| Work effectively with Aboriginal and/or Torres Strait Islander people | JUL | NURS5125C | 25-06-2012 | 31-08-2012 | 16-11-2012 | 20 | 0.07 | 87 | 46 | 9 | 259.40 |
| Work effectively with culturally diverse clients and co-workers | JUL | NURS5137C | 25-06-2012 | 31-08-2012 | 16-11-2012 | 20 | 0.07 | 87 | 46 | 9 | 259.40 |
| Use business technology | JUL | OFFC5188C | 25-06-2012 | 31-08-2012 | 03-12-2012 | 30 | 0.10 | 130 | 69 | 14 | 389.10 |
| Construct cast metal alloy removable partial denture framework | JUL | DENT5200C | 17-07-2012 | 31-08-2012 | 03-12-2012 | 80 | 0.26 | 346 | 183 | 37 | 1,037.60 |
| Construct cast metal alloy removable partial denture framework | JUL | DENT5200C | 24-07-2012 | 31-08-2012 | 03-12-2012 | 80 | 0.26 | 346 | 183 | 37 | 1,037.60 |
| Construct cast metal alloy removable partial denture framework | JUL | DENT5200C | 30-07-2012 | 31-08-2012 | 03-12-2012 | 80 | 0.26 | 346 | 183 | 37 | 1,037.60 |
| Take tooth shades | JUL | DENT5203C | 25-06-2012 | 31-08-2012 | 03-12-2012 | 25 | 0.08 | 108 | 57 | 12 | 324.25 |
| Construct fixed restorations | JUL | DENT5204C | 25-06-2012 | 31-08-2012 | 03-12-2012 | 80 | 0.26 | 346 | 183 | 37 | 1,037.60 |
| Construct oral splints | JUL | DENT5207C | 25-06-2012 | 31-08-2012 | 03-12-2012 | 30 | 0.10 | 130 | 69 | 14 | 389.10 |
| Repair and modify dentures and appliances | JUL | DENT5208C | 25-06-2012 | 31-08-2012 | 03-12-2012 | 40 | 0.13 | 173 | 92 | 18 | 518.80 |
| Construct indirect composite polymer fixed restorations | JUL | DENT5209C | 25-06-2012 | 31-08-2012 | 03-12-2012 | 30 | 0.10 | 130 | 69 | 14 | 389.10 |
| Maintain business resources | JUL | OFFC5267C | 13-07-2012 | 31-08-2012 | 03-12-2012 | 15 | 0.05 | 65 | 34 | 7 | 194.55 |
| Maintain financial records | JUL | ACCT5334C | 13-07-2012 | 31-08-2012 | 03-12-2012 | 60 | 0.20 | 260 | 137 | 28 | 778.20 |
| Maintain financial records | JUL | ACCT5334C | 25-06-2012 | 31-08-2012 | 07-12-2012 | 60 | 0.20 | 260 | 137 | 28 | 778.20 |
| Apply first aid | JUL | OHTH5648C | 25-06-2012 | 31-08-2012 | 03-12-2012 | 18 | 0.06 | 78 | 41 | 8 | 233.46 |
| Comply with infection control policies and procedures | JUL | HWSS5655C | 25-06-2012 | 31-08-2012 | 09-11-2012 | 20 | 0.07 | 87 | 46 | 9 | 259.40 |
| Comply with infection control policies and procedures | JUL | HWSS5655C | 25-06-2012 | 31-08-2012 | 21-12-2012 | 20 | 0.07 | 87 | 46 | 9 | 259.40 |
| Comply with infection control policies and procedures | JUL | HWSS5655C | 25-06-2012 | 31-08-2012 | 23-08-2012 | 20 | 0.07 | 87 | 46 | 9 | 259.40 |
| Comply with infection control policies and procedures | JUL | HWSS5670C | 02-07-2012 | 31-08-2012 | 31-07-2012 | 20 | 0.07 | 87 | 46 | 9 | 259.40 |
| Organise workplace information | JUL | OFFC5268C | 25-06-2012 | 31-08-2012 | 03-12-2012 | 30 | 0.10 | 130 | 69 | 14 | 389.10 |
| Organise personal work priorities and development | JUL | EMPL7019C | 02-07-2012 | 31-08-2012 | 30-11-2012 | 30 | 0.10 | 130 | 69 | 14 | 389.10 |
| Organise personal work priorities and development | JUL | EMPL7019C | 25-06-2012 | 31-08-2012 | 03-12-2012 | 30 | 0.10 | 130 | 69 | 14 | 389.10 |
| Organise personal work priorities and development | JUL | EMPL7019C | 25-06-2012 | 31-08-2012 | 14-12-2012 | 30 | 0.10 | 130 | 69 | 14 | 389.10 |
| Construct removable acrylic partial dentures | JUL | DENT5260C | 25-06-2012 | 31-08-2012 | 03-12-2012 | 40 | 0.13 | 173 | 92 | 18 | 518.80 |
| Construct crown and bridge structures | JUL | DENT5262C | 02-07-2012 | 31-08-2012 | 03-12-2012 | 80 | 0.26 | 346 | 183 | 37 | 1,037.60 |
| Join alloy structures | JUL | DENT5263C | 02-07-2012 | 31-08-2012 | 03-12-2012 | 20 | 0.07 | 87 | 46 | 9 | 259.40 |
| Take tooth shades | JUL | DENT5264C | 02-07-2012 | 31-08-2012 | 03-12-2012 | 25 | 0.08 | 108 | 57 | 12 | 324.25 |
| Construct fixed restorations | JUL | DENT5265C | 25-06-2012 | 31-08-2012 | 03-12-2012 | 80 | 0.26 | 346 | 183 | 37 | 1,037.60 |
| Repair and modify dentures and appliances | JUL | DENT5268C | 25-06-2012 | 31-08-2012 | 03-12-2012 | 40 | 0.13 | 173 | 92 | 18 | 518.80 |
| Contribute to OHS processes | JUL | OHTH5650C | 02-07-2012 | 31-08-2012 | 30-11-2012 | 20 | 0.07 | 87 | 46 | 9 | 259.40 |
| Contribute to OHS processes | JUL | OHTH5650C | 25-06-2012 | 31-08-2012 | 09-11-2012 | 20 | 0.07 | 87 | 46 | 9 | 259.40 |
| Contribute to OHS processes | JUL | OHTH5650C | 25-06-2012 | 31-08-2012 | 14-12-2012 | 20 | 0.07 | 87 | 46 | 9 | 259.40 |
| Contribute to OHS processes | JUL | OHTH5650C | 25-06-2012 | 31-08-2012 | 21-12-2012 | 20 | 0.07 | 87 | 46 | 9 | 259.40 |
| Contribute to OHS processes | JUL | OHTH5650C | 25-06-2012 | 31-08-2012 | 27-09-2012 | 20 | 0.07 | 87 | 46 | 9 | 259.40 |
| Contribute to OHS processes | JUL | OHTH5674C | 02-07-2012 | 31-08-2012 | 31-07-2012 | 20 | 0.07 | 87 | 46 | 9 | 259.40 |
| Use business technology | JUL | OFFC5269C | 13-07-2012 | 31-08-2012 | 03-12-2012 | 20 | 0.07 | 87 | 46 | 9 | 259.40 |
| Use business technology | JUL | OFFC5269C | 25-06-2012 | 31-08-2012 | 14-12-2012 | 20 | 0.07 | 87 | 46 | 9 | 259.40 |
| Deliver and monitor a service to customers | JUL | MKTG7837C | 13-07-2012 | 31-08-2012 | 03-12-2012 | 35 | 0.11 | 152 | 80 | 16 | 453.95 |
| Construct indirect composite polymer fixed restorations | JUL | DENT5269C | 09-07-2012 | 31-08-2012 | 03-12-2012 | 30 | 0.10 | 130 | 69 | 14 | 389.10 |
| Comply with infection control policies and procedures | NOV | HWSS5670C | 01-11-2012 | 31-12-2012 | 30-11-2012 | 20 | 0.07 | 87 | 46 | 9 | 259.40 |
| Contribute to OHS processes | NOV | OHTH5674C | 01-11-2012 | 31-12-2012 | 30-11-2012 | 20 | 0.07 | 87 | 46 | 9 | 259.40 |
| Organise personal work priorities and development | OCT | EMPL9650C | 03-10-2012 | 30-11-2012 | 03-12-2012 | 40 | 0.13 | 173 | 92 | 18 | 518.80 |
| Organise workplace information | OCT | EMPL5468C | 03-10-2012 | 30-11-2012 | 03-12-2012 | 30 | 0.10 | 130 | 69 | 14 | 389.10 |
| Contribute to OHS processes | OCT | NURS5121C | 03-10-2012 | 30-11-2012 | 03-12-2012 | 20 | 0.07 | 87 | 46 | 9 | 259.40 |
| Work effectively with Aboriginal and/or Torres Strait Islander people | OCT | NURS5125C | 05-10-2012 | 30-11-2012 | 21-12-2012 | 20 | 0.07 | 87 | 46 | 9 | 259.40 |
| Work effectively with culturally diverse clients and co-workers | OCT | NURS5137C | 05-10-2012 | 30-11-2012 | 21-12-2012 | 20 | 0.07 | 87 | 46 | 9 | 259.40 |
| Work effectively with culturally diverse clients and co-workers | OCT | NURS5138C | 03-10-2012 | 30-11-2012 | 31-12-2012 | 20 | 0.07 | 87 | 46 | 9 | 259.40 |
| Construct simple complete removable acrylic dentures and appliances | OCT | DENT5197C | 03-10-2012 | 30-11-2012 | 03-12-2012 | 80 | 0.26 | 346 | 183 | 37 | 1,037.60 |
| Construct immediate dentures | OCT | DENT5198C | 03-10-2012 | 30-11-2012 | 03-12-2012 | 40 | 0.13 | 173 | 92 | 18 | 518.80 |
| Construct removable acrylic partial dentures | OCT | DENT5199C | 03-10-2012 | 30-11-2012 | 03-12-2012 | 40 | 0.13 | 173 | 92 | 18 | 518.80 |
| Construct cast metal alloy removable partial denture framework | OCT | DENT5200C | 03-10-2012 | 30-11-2012 | 03-12-2012 | 80 | 0.26 | 346 | 183 | 37 | 1,037.60 |
| Construct orthodontic appliances | OCT | DENT5205C | 08-10-2012 | 30-11-2012 | 03-12-2012 | 60 | 0.20 | 260 | 137 | 28 | 778.20 |
| Construct oral splints | OCT | DENT5207C | 03-10-2012 | 30-11-2012 | 03-12-2012 | 30 | 0.10 | 130 | 69 | 14 | 389.10 |
| Comply with infection control policies and procedures | OCT | HWSS5670C | 01-10-2012 | 30-11-2012 | 31-10-2012 | 20 | 0.07 | 87 | 46 | 9 | 259.40 |
| Comply with infection control policies and procedures | OCT | HWSS5670C | 15-10-2012 | 30-11-2012 | 09-11-2012 | 20 | 0.07 | 87 | 46 | 9 | 259.40 |
| Organise personal work priorities and development | OCT | EMPL7019C | 01-10-2012 | 30-11-2012 | 14-12-2012 | 30 | 0.10 | 130 | 69 | 14 | 389.10 |
| Construct orthodontic appliances | OCT | DENT5266C | 08-10-2012 | 30-11-2012 | 03-12-2012 | 60 | 0.20 | 260 | 137 | 28 | 778.20 |
| Contribute to OHS processes | OCT | OHTH5650C | 01-10-2012 | 30-11-2012 | 14-12-2012 | 20 | 0.07 | 87 | 46 | 9 | 259.40 |
| Contribute to OHS processes | OCT | OHTH5674C | 01-10-2012 | 30-11-2012 | 31-10-2012 | 20 | 0.07 | 87 | 46 | 9 | 259.40 |
| Contribute to OHS processes | OCT | OHTH5674C | 15-10-2012 | 30-11-2012 | 09-11-2012 | 20 | 0.07 | 87 | 46 | 9 | 259.40 |
| Organise personal work priorities and development | SEP | EMPL9650C | 14-09-2012 | 31-10-2012 | 03-12-2012 | 40 | 0.13 | 173 | 92 | 18 | 518.80 |
| Organise workplace information | SEP | EMPL5468C | 14-09-2012 | 31-10-2012 | 03-12-2012 | 30 | 0.10 | 130 | 69 | 14 | 389.10 |
| Work effectively with Aboriginal and/or Torres Strait Islander people | SEP | NURS5126C | 05-09-2012 | 31-10-2012 | 31-12-2012 | 20 | 0.07 | 87 | 46 | 9 | 259.40 |
| Work effectively with Aboriginal and/or Torres Strait Islander people | SEP | NURS5126C | 26-09-2012 | 31-10-2012 | 31-12-2012 | 20 | 0.07 | 87 | 46 | 9 | 259.40 |
| Work effectively with culturally diverse clients and co-workers | SEP | NURS5138C | 05-09-2012 | 31-10-2012 | 31-12-2012 | 20 | 0.07 | 87 | 46 | 9 | 259.40 |
| Construct simple complete removable acrylic dentures and appliances | SEP | DENT5197C | 10-09-2012 | 31-10-2012 | 07-12-2012 | 80 | 0.26 | 346 | 183 | 37 | 1,037.60 |
| Construct immediate dentures | SEP | DENT5198C | 10-09-2012 | 31-10-2012 | 07-12-2012 | 40 | 0.13 | 173 | 92 | 18 | 518.80 |
| Construct removable acrylic partial dentures | SEP | DENT5199C | 10-09-2012 | 31-10-2012 | 07-12-2012 | 40 | 0.13 | 173 | 92 | 18 | 518.80 |
| Construct cast metal alloy removable partial denture framework | SEP | DENT5200C | 10-09-2012 | 31-10-2012 | 07-12-2012 | 80 | 0.26 | 346 | 183 | 37 | 1,037.60 |
| Construct crown and bridge structures | SEP | DENT5201C | 10-09-2012 | 31-10-2012 | 07-12-2012 | 80 | 0.26 | 346 | 183 | 37 | 1,037.60 |
| Join alloy structures | SEP | DENT5202C | 10-09-2012 | 31-10-2012 | 07-12-2012 | 20 | 0.07 | 87 | 46 | 9 | 259.40 |
| Take tooth shades | SEP | DENT5203C | 10-09-2012 | 31-10-2012 | 07-12-2012 | 25 | 0.08 | 108 | 57 | 12 | 324.25 |
| Construct fixed restorations | SEP | DENT5204C | 10-09-2012 | 31-10-2012 | 07-12-2012 | 80 | 0.26 | 346 | 183 | 37 | 1,037.60 |
| Construct orthodontic appliances | SEP | DENT5205C | 10-09-2012 | 31-10-2012 | 07-12-2012 | 60 | 0.20 | 260 | 137 | 28 | 778.20 |
| Construct indirect composite polymer fixed restorations | SEP | DENT5209C | 10-09-2012 | 31-10-2012 | 07-12-2012 | 30 | 0.10 | 130 | 69 | 14 | 389.10 |
| Comply with infection control policies and procedures | SEP | HWSS5660C | 03-09-2012 | 31-10-2012 | 16-11-2012 | 20 | 0.07 | 87 | 46 | 9 | 259.40 |
| Comply with infection control policies and procedures | SEP | HWSS5670C | 03-09-2012 | 31-10-2012 | 28-09-2012 | 20 | 0.07 | 87 | 46 | 9 | 259.40 |
| Contribute to OHS processes | SEP | OHTH5674C | 03-09-2012 | 31-10-2012 | 28-09-2012 | 20 | 0.07 | 87 | 46 | 9 | 259.40 |
* EFTSL : Equivalent Full Time Study Load
** Concession fees are only available at diploma and advanced diploma level for indigenous students.
Back to Program List
| Unit Of Study (Course) | Session | Course Code | Commencement Date | Census Date | Completion Date | Student Contact Hours (SCH) | EFTSL* | Tuition Fee: Onsite|Distance|RPL | |||
| Government Subsidised Fee | Full Fee (Non Government Subsidised) | ||||||||||
| Program commenced 1 July 2009-30 June 2012 ($) | Program commenced 1 July 2012-31 December 2012 ($) | Program commenced 1 July 2012-31 December 2012 Concession ** ($) | Australian Full Fee Paying ($) | ||||||||
| Analyse health information | AUG | NURS5259C | 01-08-2012 | 30-09-2012 | 31-08-2012 | 30 | 0.03 | 130 | 154 | 31 | 249.90 |
| Provide specialised remedial massage treatments | AUG | SPRT5083C | 06-08-2012 | 30-09-2012 | 09-11-2012 | 40 | 0.04 | 173 | 206 | 41 | 333.20 |
| Work effectively with culturally diverse clients and co-workers | CY2 | NURS5137C | 07-12-2012 | 31-03-2013 | 15-02-2013 | 20 | 0.02 | 87 | 103 | 21 | 166.60 |
| Manage a practice | CY2 | EMPL5525C | 25-06-2012 | 31-03-2013 | 12-07-2013 | 50 | 0.05 | 216 | 258 | 52 | 416.50 |
| Analyse health information | CY2 | NURS5233C | 25-06-2012 | 31-03-2013 | 31-01-2013 | 30 | 0.03 | 130 | 154 | 31 | 249.90 |
| Manage a practice | CY2 | BUSM6449C | 13-08-2012 | 31-03-2013 | 09-08-2013 | 50 | 0.05 | 216 | 258 | 52 | 416.50 |
| Manage a practice | CY2 | BUSM6449C | 29-10-2012 | 31-03-2013 | 25-10-2013 | 50 | 0.05 | 216 | 258 | 52 | 416.50 |
| Implement and monitor compliance with legal and ethical requirements | CY2 | JUST5207C | 15-10-2012 | 31-03-2013 | 14-06-2013 | 50 | 0.05 | 216 | 258 | 52 | 416.50 |
| Analyse health information | DEC | NURS5259C | 03-12-2012 | 31-12-2012 | 28-12-2012 | 30 | 0.03 | 130 | 154 | 31 | 249.90 |
| Work effectively with Aboriginal and/or Torres Strait Islander people | JUL | NURS5125C | 25-06-2012 | 31-08-2012 | 16-11-2012 | 20 | 0.02 | 87 | 103 | 21 | 166.60 |
| Work effectively with culturally diverse clients and co-workers | JUL | NURS5137C | 25-06-2012 | 31-08-2012 | 16-11-2012 | 20 | 0.02 | 87 | 103 | 21 | 166.60 |
| Analyse health information | JUL | NURS5143C | 20-07-2012 | 31-08-2012 | 09-08-2012 | 30 | 0.03 | 130 | 154 | 31 | 249.90 |
| Analyse health information | JUL | NURS5143C | 25-06-2012 | 31-08-2012 | 30-11-2012 | 30 | 0.03 | 130 | 154 | 31 | 249.90 |
| Analyse health information | JUL | NURS5233C | 25-06-2012 | 31-08-2012 | 09-11-2012 | 30 | 0.03 | 130 | 154 | 31 | 249.90 |
| Analyse health information | JUL | NURS5259C | 02-07-2012 | 31-08-2012 | 31-07-2012 | 30 | 0.03 | 130 | 154 | 31 | 249.90 |
| Analyse health information | JUL | NURS5270C | 25-06-2012 | 31-08-2012 | 31-10-2012 | 30 | 0.03 | 130 | 154 | 31 | 249.90 |
| Develop professional expertise | JUL | BUSM6448C | 25-06-2012 | 31-08-2012 | 09-11-2012 | 40 | 0.04 | 173 | 206 | 41 | 333.20 |
| Provide remedial massage treatment to athletes | JUL | SPRT5084C | 25-06-2012 | 31-08-2012 | 09-11-2012 | 50 | 0.05 | 216 | 258 | 52 | 416.50 |
| Analyse health information | NOV | NURS5259C | 01-11-2012 | 31-12-2012 | 30-11-2012 | 30 | 0.03 | 130 | 154 | 31 | 249.90 |
| Work effectively with Aboriginal and/or Torres Strait Islander people | OCT | NURS5125C | 05-10-2012 | 30-11-2012 | 21-12-2012 | 20 | 0.02 | 87 | 103 | 21 | 166.60 |
| Work effectively with culturally diverse clients and co-workers | OCT | NURS5137C | 05-10-2012 | 30-11-2012 | 21-12-2012 | 20 | 0.02 | 87 | 103 | 21 | 166.60 |
| Work effectively with culturally diverse clients and co-workers | OCT | NURS5138C | 03-10-2012 | 30-11-2012 | 31-12-2012 | 20 | 0.02 | 87 | 103 | 21 | 166.60 |
| Analyse health information | OCT | NURS5259C | 01-10-2012 | 30-11-2012 | 31-10-2012 | 30 | 0.03 | 130 | 154 | 31 | 249.90 |
| Analyse health information | OCT | NURS5259C | 15-10-2012 | 30-11-2012 | 09-11-2012 | 30 | 0.03 | 130 | 154 | 31 | 249.90 |
| Manage a practice | OCT | BUSM6449C | 01-10-2012 | 30-11-2012 | 14-12-2012 | 50 | 0.05 | 216 | 258 | 52 | 416.50 |
| Work effectively with Aboriginal and/or Torres Strait Islander people | SEP | NURS5126C | 05-09-2012 | 31-10-2012 | 31-12-2012 | 20 | 0.02 | 87 | 103 | 21 | 166.60 |
| Work effectively with Aboriginal and/or Torres Strait Islander people | SEP | NURS5126C | 26-09-2012 | 31-10-2012 | 31-12-2012 | 20 | 0.02 | 87 | 103 | 21 | 166.60 |
| Work effectively with culturally diverse clients and co-workers | SEP | NURS5138C | 05-09-2012 | 31-10-2012 | 31-12-2012 | 20 | 0.02 | 87 | 103 | 21 | 166.60 |
| Analyse health information | SEP | NURS5144C | 10-09-2012 | 31-10-2012 | 31-12-2012 | 30 | 0.03 | 130 | 154 | 31 | 249.90 |
| Analyse health information | SEP | NURS5144C | 17-09-2012 | 31-10-2012 | 31-12-2012 | 30 | 0.03 | 130 | 154 | 31 | 249.90 |
| Analyse health information | SEP | NURS5259C | 03-09-2012 | 31-10-2012 | 28-09-2012 | 30 | 0.03 | 130 | 154 | 31 | 249.90 |
| Analyse health information | SEP | NURS5270C | 01-09-2012 | 31-10-2012 | 31-10-2012 | 30 | 0.03 | 130 | 154 | 31 | 249.90 |
* EFTSL : Equivalent Full Time Study Load
** Concession fees are only available at diploma and advanced diploma level for indigenous students.
Back to Program List
| Unit Of Study (Course) | Session | Course Code | Commencement Date | Census Date | Completion Date | Student Contact Hours (SCH) | EFTSL* | Tuition Fee: Onsite|Distance|RPL | |||
| Government Subsidised Fee | Full Fee (Non Government Subsidised) | ||||||||||
| Program commenced 1 July 2009-30 June 2012 ($) | Program commenced 1 July 2012-31 December 2012 ($) | Program commenced 1 July 2012-31 December 2012 Concession ** ($) | Australian Full Fee Paying ($) | ||||||||
| Innovation in education and training | AUG | TCHE5161 | 06-08-2012 | 30-09-2012 | 31-08-2012 | 60 | 0.19 | 260 | 250 | 50 | 593.40 |
| Facilitate learning in complex environments | AUG | TCHE5162 | 06-08-2012 | 30-09-2012 | 31-08-2012 | 50 | 0.16 | 216 | 208 | 42 | 494.50 |
| Development assessment tools for differentiating performance | AUG | TCHE5165 | 06-08-2012 | 30-09-2012 | 31-08-2012 | 60 | 0.19 | 260 | 250 | 50 | 593.40 |
| Maintain and enhance professional practice | AUG | EMPL5669C | 06-08-2012 | 30-09-2012 | 31-08-2012 | 40 | 0.13 | 173 | 167 | 33 | 395.60 |
| Design and develop learning strategies | AUG | TCHE5170C | 06-08-2012 | 30-09-2012 | 31-08-2012 | 40 | 0.13 | 173 | 167 | 33 | 395.60 |
| Design and develop learning resources | AUG | TCHE5171C | 06-08-2012 | 30-09-2012 | 31-08-2012 | 50 | 0.16 | 216 | 208 | 42 | 494.50 |
| Facilitate action learning projects | AUG | TCHE5172C | 06-08-2012 | 30-09-2012 | 31-08-2012 | 30 | 0.09 | 130 | 125 | 25 | 296.70 |
| Facilitate e-learning | AUG | TCHE5173C | 06-08-2012 | 30-09-2012 | 31-08-2012 | 30 | 0.09 | 130 | 125 | 25 | 296.70 |
| Undertake organisational training needs analysis | AUG | EMPL5670C | 06-08-2012 | 30-09-2012 | 31-08-2012 | 40 | 0.13 | 173 | 167 | 33 | 395.60 |
| Research and design e-learning resources | AUG | TCHE5174C | 06-08-2012 | 30-09-2012 | 31-08-2012 | 40 | 0.13 | 173 | 167 | 33 | 395.60 |
| Develop and evaluate e-learning resources | AUG | TCHE5175C | 06-08-2012 | 30-09-2012 | 31-08-2012 | 40 | 0.13 | 173 | 167 | 33 | 395.60 |
* EFTSL : Equivalent Full Time Study Load
** Concession fees are only available at diploma and advanced diploma level for indigenous students.
Back to Program List
| Unit Of Study (Course) | Session | Course Code | Commencement Date | Census Date | Completion Date | Student Contact Hours (SCH) | EFTSL* | Tuition Fee: Onsite|Distance|RPL | |||
| Government Subsidised Fee | Full Fee (Non Government Subsidised) | ||||||||||
| Program commenced 1 July 2009-30 June 2012 ($) | Program commenced 1 July 2012-31 December 2012 ($) | Program commenced 1 July 2012-31 December 2012 Concession ** ($) | Australian Full Fee Paying ($) | ||||||||
| Work in the Textiles, Clothing and Footwear industry | CY2 | EMPL5588C | 02-07-2012 | 31-03-2013 | 28-06-2013 | 40 | 0.04 | 173 | 144 | 29 | 486.40 |
| Work in the Textiles, Clothing and Footwear industry | CY2 | EMPL5588C | 03-09-2012 | 31-03-2013 | 30-08-2013 | 40 | 0.04 | 173 | 144 | 29 | 486.40 |
| Work in the Textiles, Clothing and Footwear industry | CY2 | EMPL5588C | 08-10-2012 | 31-03-2013 | 07-10-2013 | 40 | 0.04 | 173 | 144 | 29 | 486.40 |
| Work in the Textiles, Clothing and Footwear industry | CY2 | EMPL5588C | 16-07-2012 | 31-03-2013 | 28-06-2013 | 40 | 0.04 | 173 | 144 | 29 | 486.40 |
| Work in the Textiles, Clothing and Footwear industry | CY2 | EMPL5588C | 25-06-2012 | 31-03-2013 | 28-06-2013 | 40 | 0.04 | 173 | 144 | 29 | 486.40 |
| Work in the Textiles, Clothing and Footwear industry | CY2 | EMPL5588C | 26-11-2012 | 31-03-2013 | 27-02-2013 | 40 | 0.04 | 173 | 144 | 29 | 486.40 |
| Work in the Textiles, Clothing and Footwear industry | CY2 | EMPL5588C | 29-08-2012 | 31-03-2013 | 28-08-2013 | 40 | 0.04 | 173 | 144 | 29 | 486.40 |
| Identify fibres, yarns and textile materials and their uses in textile production | CY2 | MKTG5756C | 26-11-2012 | 31-03-2013 | 27-02-2013 | 50 | 0.05 | 216 | 180 | 36 | 608.00 |
| Organise and plan own work to achieve planned outcomes | CY2 | MANU5919C | 06-08-2012 | 31-03-2013 | 02-08-2013 | 30 | 0.03 | 130 | 108 | 22 | 364.80 |
| Organise and plan own work to achieve planned outcomes | CY2 | MANU5919C | 25-06-2012 | 31-03-2013 | 28-06-2013 | 30 | 0.03 | 130 | 108 | 22 | 364.80 |
| Organise and plan own work to achieve planned outcomes | CY2 | MANU5919C | 26-11-2012 | 31-03-2013 | 27-02-2013 | 30 | 0.03 | 130 | 108 | 22 | 364.80 |
| Implement and monitor OH&S in the workplace | CY2 | OHTH5451C | 26-11-2012 | 31-03-2013 | 27-02-2013 | 50 | 0.05 | 216 | 180 | 36 | 608.00 |
| Contribute to the development of products or processes | CY2 | MANU5914C | 26-11-2012 | 31-03-2013 | 27-02-2013 | 50 | 0.05 | 216 | 180 | 36 | 608.00 |
| Select dyes and develop dye specification and recipe for production | CY2 | MANU5915C | 26-11-2012 | 31-03-2013 | 27-02-2013 | 60 | 0.06 | 260 | 216 | 43 | 729.60 |
| Operate computing technology in a Textiles, Clothing and Footwear workplace | CY2 | MIET6060C | 26-11-2012 | 31-03-2013 | 27-02-2013 | 50 | 0.05 | 216 | 180 | 36 | 608.00 |
| Select raw materials | CY2 | MANU5918C | 26-11-2012 | 31-03-2013 | 27-02-2013 | 40 | 0.04 | 173 | 144 | 29 | 486.40 |
| Identify opportunities in the textiles, clothing and footwear market | CY2 | MKTG5755C | 26-11-2012 | 31-03-2013 | 27-02-2013 | 70 | 0.07 | 303 | 252 | 50 | 851.20 |
| Identify fibres and fabrics | CY2 | VART5902C | 02-07-2012 | 31-03-2013 | 28-06-2013 | 50 | 0.05 | 216 | 180 | 36 | 608.00 |
| Identify fibres and fabrics | CY2 | VART5902C | 03-09-2012 | 31-03-2013 | 30-08-2013 | 50 | 0.05 | 216 | 180 | 36 | 608.00 |
| Identify fibres and fabrics | CY2 | VART5902C | 08-10-2012 | 31-03-2013 | 07-10-2013 | 50 | 0.05 | 216 | 180 | 36 | 608.00 |
| Identify fibres and fabrics | CY2 | VART5902C | 09-10-2012 | 31-03-2013 | 08-10-2013 | 50 | 0.05 | 216 | 180 | 36 | 608.00 |
| Identify fibres and fabrics | CY2 | VART5902C | 10-09-2012 | 31-03-2013 | 06-09-2013 | 50 | 0.05 | 216 | 180 | 36 | 608.00 |
| Identify fibres and fabrics | CY2 | VART5902C | 16-07-2012 | 31-03-2013 | 28-06-2013 | 50 | 0.05 | 216 | 180 | 36 | 608.00 |
| Identify fibres and fabrics | CY2 | VART5902C | 25-06-2012 | 31-03-2013 | 28-06-2013 | 50 | 0.05 | 216 | 180 | 36 | 608.00 |
| Identify fibres and fabrics | CY2 | VART5902C | 29-08-2012 | 31-03-2013 | 28-08-2013 | 50 | 0.05 | 216 | 180 | 36 | 608.00 |
| Identify fibres and fabrics | CY2 | VART5902C | 29-10-2012 | 31-03-2013 | 25-10-2013 | 50 | 0.05 | 216 | 180 | 36 | 608.00 |
| Participate in environmentally sustainable work practices | CY2 | EASC5049C | 02-07-2012 | 31-03-2013 | 28-06-2013 | 30 | 0.03 | 130 | 108 | 22 | 364.80 |
| Participate in environmentally sustainable work practices | CY2 | EASC5049C | 25-06-2012 | 31-03-2013 | 28-06-2013 | 30 | 0.03 | 130 | 108 | 22 | 364.80 |
| Participate in environmentally sustainable work practices | CY2 | EASC5049C | 26-11-2012 | 31-03-2013 | 27-02-2013 | 30 | 0.03 | 130 | 108 | 22 | 364.80 |
| Select and apply drawing techniques and media to represent and communicate the concept | JUL | VART5770C | 25-06-2012 | 31-08-2012 | 02-11-2012 | 80 | 0.08 | 346 | 288 | 58 | 972.80 |
| Work in the Textiles, Clothing and Footwear industry | JUL | EMPL5588C | 25-07-2012 | 31-08-2012 | 23-11-2012 | 40 | 0.04 | 173 | 144 | 29 | 486.40 |
| Identify fibres, yarns and textile materials and their uses in textile production | JUL | MKTG5756C | 25-06-2012 | 31-08-2012 | 16-11-2012 | 50 | 0.05 | 216 | 180 | 36 | 608.00 |
| Identify fibres, yarns and textile materials and their uses in textile production | JUL | MKTG5756C | 25-07-2012 | 31-08-2012 | 23-11-2012 | 50 | 0.05 | 216 | 180 | 36 | 608.00 |
| Organise and plan own work to achieve planned outcomes | JUL | MANU5919C | 25-06-2012 | 31-08-2012 | 02-11-2012 | 30 | 0.03 | 130 | 108 | 22 | 364.80 |
| Organise and plan own work to achieve planned outcomes | JUL | MANU5919C | 25-07-2012 | 31-08-2012 | 23-11-2012 | 30 | 0.03 | 130 | 108 | 22 | 364.80 |
| Implement and monitor OH&S in the workplace | JUL | OHTH5451C | 09-07-2012 | 31-08-2012 | 26-07-2012 | 50 | 0.05 | 216 | 180 | 36 | 608.00 |
| Implement and monitor OH&S in the workplace | JUL | OHTH5451C | 25-07-2012 | 31-08-2012 | 23-11-2012 | 50 | 0.05 | 216 | 180 | 36 | 608.00 |
| Contribute to the development of products or processes | JUL | MANU5914C | 25-06-2012 | 31-08-2012 | 02-11-2012 | 50 | 0.05 | 216 | 180 | 36 | 608.00 |
| Contribute to the development of products or processes | JUL | MANU5914C | 25-07-2012 | 31-08-2012 | 23-11-2012 | 50 | 0.05 | 216 | 180 | 36 | 608.00 |
| Select dyes and develop dye specification and recipe for production | JUL | MANU5915C | 25-06-2012 | 31-08-2012 | 02-11-2012 | 60 | 0.06 | 260 | 216 | 43 | 729.60 |
| Select dyes and develop dye specification and recipe for production | JUL | MANU5915C | 25-07-2012 | 31-08-2012 | 23-11-2012 | 60 | 0.06 | 260 | 216 | 43 | 729.60 |
| Operate computing technology in a Textiles, Clothing and Footwear workplace | JUL | MIET6060C | 25-06-2012 | 31-08-2012 | 16-11-2012 | 50 | 0.05 | 216 | 180 | 36 | 608.00 |
| Operate computing technology in a Textiles, Clothing and Footwear workplace | JUL | MIET6060C | 25-07-2012 | 31-08-2012 | 23-11-2012 | 50 | 0.05 | 216 | 180 | 36 | 608.00 |
| Select raw materials | JUL | MANU5918C | 25-06-2012 | 31-08-2012 | 02-11-2012 | 40 | 0.04 | 173 | 144 | 29 | 486.40 |
| Select raw materials | JUL | MANU5918C | 25-07-2012 | 31-08-2012 | 23-11-2012 | 40 | 0.04 | 173 | 144 | 29 | 486.40 |
| Identify opportunities in the textiles, clothing and footwear market | JUL | MKTG5755C | 25-06-2012 | 31-08-2012 | 16-11-2012 | 70 | 0.07 | 303 | 252 | 50 | 851.20 |
| Identify opportunities in the textiles, clothing and footwear market | JUL | MKTG5755C | 25-07-2012 | 31-08-2012 | 23-11-2012 | 70 | 0.07 | 303 | 252 | 50 | 851.20 |
| Operate a weaving loom | JUL | MANU7211C | 25-06-2012 | 31-08-2012 | 02-11-2012 | 50 | 0.05 | 216 | 180 | 36 | 608.00 |
| Perform knitting operations | JUL | MANU7212C | 25-06-2012 | 31-08-2012 | 02-11-2012 | 50 | 0.05 | 216 | 180 | 36 | 608.00 |
| Assist in the development of textile designs | JUL | VART5904C | 25-06-2012 | 31-08-2012 | 02-11-2012 | 50 | 0.05 | 216 | 180 | 36 | 608.00 |
| Analyse use of colour in textiles | JUL | VART5905C | 25-06-2012 | 31-08-2012 | 02-11-2012 | 30 | 0.03 | 130 | 108 | 22 | 364.80 |
| Produce knitted textile samples | JUL | VART5906C | 25-06-2012 | 31-08-2012 | 02-11-2012 | 80 | 0.08 | 346 | 288 | 58 | 972.80 |
| Produce woven textile samples | JUL | VART5907C | 25-06-2012 | 31-08-2012 | 02-11-2012 | 80 | 0.08 | 346 | 288 | 58 | 972.80 |
| Produce screen printed textiles | JUL | MANU5921C | 25-06-2012 | 31-08-2012 | 02-11-2012 | 80 | 0.08 | 346 | 288 | 58 | 972.80 |
| Prepare stencils and screens for textile printing | JUL | MANU5922C | 25-06-2012 | 31-08-2012 | 02-11-2012 | 60 | 0.06 | 260 | 216 | 43 | 729.60 |
| Source textile materials and resources | JUL | MANU5923C | 25-06-2012 | 31-08-2012 | 02-11-2012 | 20 | 0.02 | 87 | 72 | 14 | 243.20 |
| Present and promote textile design concepts | JUL | VART5909C | 25-06-2012 | 31-08-2012 | 02-11-2012 | 50 | 0.05 | 216 | 180 | 36 | 608.00 |
| Apply manipulation techniques to create experimental textile samples | JUL | VART5910C | 25-06-2012 | 31-08-2012 | 02-11-2012 | 60 | 0.06 | 260 | 216 | 43 | 729.60 |
| Perform industrial sewing on textile products | JUL | GRAP5215C | 25-06-2012 | 31-08-2012 | 02-11-2012 | 50 | 0.05 | 216 | 180 | 36 | 608.00 |
| Implement and monitor environmentally sustainable work practices | JUL | OHTH5461C | 25-06-2012 | 31-08-2012 | 02-11-2012 | 40 | 0.04 | 173 | 144 | 29 | 486.40 |
| Market design product to local outlets | JUL | MKTG5769C | 25-06-2012 | 31-08-2012 | 02-11-2012 | 30 | 0.03 | 130 | 108 | 22 | 364.80 |
| Communicate and sell design concepts | JUL | VART5913C | 25-06-2012 | 31-08-2012 | 02-11-2012 | 30 | 0.03 | 130 | 108 | 22 | 364.80 |
| Communicate and sell design concepts | JUL | VART5913C | 25-06-2012 | 31-08-2012 | 16-11-2012 | 30 | 0.03 | 130 | 108 | 22 | 364.80 |
| Exhibit textile designs or products | JUL | VART5918C | 25-06-2012 | 31-08-2012 | 02-11-2012 | 50 | 0.05 | 216 | 180 | 36 | 608.00 |
| Cost production of textile designs | JUL | BUSM6204C | 25-06-2012 | 31-08-2012 | 02-11-2012 | 20 | 0.02 | 87 | 72 | 14 | 243.20 |
| Enhance, manipulate and output photoimages | JUL | VART5919C | 25-06-2012 | 31-08-2012 | 02-11-2012 | 80 | 0.08 | 346 | 288 | 58 | 972.80 |
| Participate in production planning processes | JUL | GRAP5232C | 25-06-2012 | 31-08-2012 | 02-11-2012 | 70 | 0.07 | 303 | 252 | 50 | 851.20 |
| Apply techniques to produce drawings | JUL | VART5932C | 25-06-2012 | 31-08-2012 | 02-11-2012 | 50 | 0.05 | 216 | 180 | 36 | 608.00 |
| Participate in environmentally sustainable work practices | JUL | EASC5049C | 02-07-2012 | 31-08-2012 | 01-10-2012 | 30 | 0.03 | 130 | 108 | 22 | 364.80 |
| Participate in environmentally sustainable work practices | JUL | EASC5049C | 11-07-2012 | 31-08-2012 | 07-12-2012 | 30 | 0.03 | 130 | 108 | 22 | 364.80 |
| Participate in environmentally sustainable work practices | JUL | EASC5049C | 25-06-2012 | 31-08-2012 | 02-11-2012 | 30 | 0.03 | 130 | 108 | 22 | 364.80 |
| Participate in environmentally sustainable work practices | JUL | EASC5049C | 25-06-2012 | 31-08-2012 | 16-11-2012 | 30 | 0.03 | 130 | 108 | 22 | 364.80 |
| Participate in environmentally sustainable work practices | JUL | EASC5049C | 25-07-2012 | 31-08-2012 | 23-11-2012 | 30 | 0.03 | 130 | 108 | 22 | 364.80 |
| Work in the Textiles, Clothing and Footwear industry | OCT | EMPL5588C | 15-10-2012 | 30-11-2012 | 23-11-2012 | 40 | 0.04 | 173 | 144 | 29 | 486.40 |
| Perform industrial sewing on textile products | OCT | GRAP5215C | 15-10-2012 | 30-11-2012 | 23-11-2012 | 50 | 0.05 | 216 | 180 | 36 | 608.00 |
| Participate in environmentally sustainable work practices | OCT | EASC5049C | 15-10-2012 | 30-11-2012 | 23-11-2012 | 30 | 0.03 | 130 | 108 | 22 | 364.80 |
| Organise and plan own work to achieve planned outcomes | SEP | MANU5919C | 03-09-2012 | 31-10-2012 | 03-12-2012 | 30 | 0.03 | 130 | 108 | 22 | 364.80 |
* EFTSL : Equivalent Full Time Study Load
** Concession fees are only available at diploma and advanced diploma level for indigenous students.
Back to Program List
| Unit Of Study (Course) | Session | Course Code | Commencement Date | Census Date | Completion Date | Student Contact Hours (SCH) | EFTSL* | Tuition Fee: Onsite|Distance|RPL | |||
| Government Subsidised Fee | Full Fee (Non Government Subsidised) | ||||||||||
| Program commenced 1 July 2009-30 June 2012 ($) | Program commenced 1 July 2012-31 December 2012 ($) | Program commenced 1 July 2012-31 December 2012 Concession ** ($) | Australian Full Fee Paying ($) | ||||||||
| Identify fibres, yarns and textile materials and their uses in textile production | CY2 | MKTG5756C | 26-11-2012 | 31-03-2013 | 27-02-2013 | 50 | 0.01 | 216 | 364 | 72 | 863.50 |
| Interpret and apply textile calculations and specifications | CY2 | MANU5910C | 26-11-2012 | 31-03-2013 | 27-02-2013 | 50 | 0.01 | 216 | 364 | 72 | 863.50 |
| Operate computing technology in a Textiles, Clothing and Footwear workplace | CY2 | MIET6060C | 26-11-2012 | 31-03-2013 | 27-02-2013 | 50 | 0.01 | 216 | 364 | 72 | 863.50 |
| Identify opportunities in the textiles, clothing and footwear market | CY2 | MKTG5755C | 26-11-2012 | 31-03-2013 | 27-02-2013 | 70 | 0.02 | 303 | 509 | 102 | 1,208.90 |
| Identify fibres and fabrics | CY2 | VART5902C | 02-07-2012 | 31-03-2013 | 28-06-2013 | 50 | 0.01 | 216 | 364 | 72 | 863.50 |
| Identify fibres and fabrics | CY2 | VART5902C | 03-09-2012 | 31-03-2013 | 30-08-2013 | 50 | 0.01 | 216 | 364 | 72 | 863.50 |
| Identify fibres and fabrics | CY2 | VART5902C | 08-10-2012 | 31-03-2013 | 07-10-2013 | 50 | 0.01 | 216 | 364 | 72 | 863.50 |
| Identify fibres and fabrics | CY2 | VART5902C | 09-10-2012 | 31-03-2013 | 08-10-2013 | 50 | 0.01 | 216 | 364 | 72 | 863.50 |
| Identify fibres and fabrics | CY2 | VART5902C | 10-09-2012 | 31-03-2013 | 06-09-2013 | 50 | 0.01 | 216 | 364 | 72 | 863.50 |
| Identify fibres and fabrics | CY2 | VART5902C | 16-07-2012 | 31-03-2013 | 28-06-2013 | 50 | 0.01 | 216 | 364 | 72 | 863.50 |
| Identify fibres and fabrics | CY2 | VART5902C | 25-06-2012 | 31-03-2013 | 28-06-2013 | 50 | 0.01 | 216 | 364 | 72 | 863.50 |
| Identify fibres and fabrics | CY2 | VART5902C | 29-08-2012 | 31-03-2013 | 28-08-2013 | 50 | 0.01 | 216 | 364 | 72 | 863.50 |
| Identify fibres and fabrics | CY2 | VART5902C | 29-10-2012 | 31-03-2013 | 25-10-2013 | 50 | 0.01 | 216 | 364 | 72 | 863.50 |
| Interact and network with fashion industry participants | CY2 | EMPL5599C | 25-06-2012 | 31-03-2013 | 07-06-2013 | 80 | 0.02 | 346 | 582 | 116 | 1,381.60 |
| Analyse consumer behaviour for specific markets | JUL | MKTG7755C | 25-06-2012 | 31-08-2012 | 16-11-2012 | 60 | 0.02 | 260 | 436 | 87 | 1,036.20 |
| Identify fibres, yarns and textile materials and their uses in textile production | JUL | MKTG5756C | 25-06-2012 | 31-08-2012 | 16-11-2012 | 50 | 0.01 | 216 | 364 | 72 | 863.50 |
| Identify fibres, yarns and textile materials and their uses in textile production | JUL | MKTG5756C | 25-07-2012 | 31-08-2012 | 23-11-2012 | 50 | 0.01 | 216 | 364 | 72 | 863.50 |
| Interpret and apply textile calculations and specifications | JUL | MANU5910C | 25-06-2012 | 31-08-2012 | 16-11-2012 | 50 | 0.01 | 216 | 364 | 72 | 863.50 |
| Interpret and apply textile calculations and specifications | JUL | MANU5910C | 25-07-2012 | 31-08-2012 | 23-11-2012 | 50 | 0.01 | 216 | 364 | 72 | 863.50 |
| Operate computing technology in a Textiles, Clothing and Footwear workplace | JUL | MIET6060C | 25-06-2012 | 31-08-2012 | 16-11-2012 | 50 | 0.01 | 216 | 364 | 72 | 863.50 |
| Operate computing technology in a Textiles, Clothing and Footwear workplace | JUL | MIET6060C | 25-07-2012 | 31-08-2012 | 23-11-2012 | 50 | 0.01 | 216 | 364 | 72 | 863.50 |
| Identify opportunities in the textiles, clothing and footwear market | JUL | MKTG5755C | 25-06-2012 | 31-08-2012 | 16-11-2012 | 70 | 0.02 | 303 | 509 | 102 | 1,208.90 |
| Identify opportunities in the textiles, clothing and footwear market | JUL | MKTG5755C | 25-07-2012 | 31-08-2012 | 23-11-2012 | 70 | 0.02 | 303 | 509 | 102 | 1,208.90 |
| Coordinate quality assurance for textiles, clothing and footwear products and services | JUL | MIET6061C | 25-06-2012 | 31-08-2012 | 02-11-2012 | 40 | 0.01 | 173 | 291 | 58 | 690.80 |
| Coordinate quality assurance for textiles, clothing and footwear products and services | JUL | MIET6061C | 25-06-2012 | 31-08-2012 | 16-11-2012 | 40 | 0.01 | 173 | 291 | 58 | 690.80 |
| Work with international textiles, clothing and footwear supply chains | JUL | MKTG5757C | 25-06-2012 | 31-08-2012 | 02-11-2012 | 60 | 0.02 | 260 | 436 | 87 | 1,036.20 |
| Calculate cost estimates for fashion products | JUL | GRAP5211C | 25-06-2012 | 31-08-2012 | 02-11-2012 | 30 | 0.01 | 130 | 218 | 44 | 518.10 |
| Calculate cost estimates for fashion products | JUL | GRAP5211C | 25-06-2012 | 31-08-2012 | 16-11-2012 | 30 | 0.01 | 130 | 218 | 44 | 518.10 |
| Use electronic fashion design tools | JUL | GRAP5212C | 25-06-2012 | 31-08-2012 | 02-11-2012 | 80 | 0.02 | 346 | 582 | 116 | 1,381.60 |
| Use electronic fashion design tools | JUL | GRAP5212C | 25-06-2012 | 31-08-2012 | 16-11-2012 | 80 | 0.02 | 346 | 582 | 116 | 1,381.60 |
| Source textile materials and resources | JUL | MANU5923C | 25-06-2012 | 31-08-2012 | 02-11-2012 | 20 | 0.01 | 87 | 145 | 29 | 345.40 |
| Communicate and sell design concepts | JUL | VART5913C | 25-06-2012 | 31-08-2012 | 02-11-2012 | 30 | 0.01 | 130 | 218 | 44 | 518.10 |
| Communicate and sell design concepts | JUL | VART5913C | 25-06-2012 | 31-08-2012 | 16-11-2012 | 30 | 0.01 | 130 | 218 | 44 | 518.10 |
| Cost production of textile designs | JUL | BUSM6204C | 25-06-2012 | 31-08-2012 | 02-11-2012 | 20 | 0.01 | 87 | 145 | 29 | 345.40 |
| Interact and network with fashion industry participants | JUL | EMPL5599C | 25-06-2012 | 31-08-2012 | 16-11-2012 | 80 | 0.02 | 346 | 582 | 116 | 1,381.60 |
| Apply textile, clothing and footwear market supply systems | JUL | MKTG5772C | 25-06-2012 | 31-08-2012 | 16-11-2012 | 60 | 0.02 | 260 | 436 | 87 | 1,036.20 |
| Develop patterns from a block using basic patternmaking principles | JUL | MANU7228C | 02-07-2012 | 31-08-2012 | 01-10-2012 | 50 | 0.01 | 216 | 364 | 72 | 863.50 |
| Develop patterns from a block using basic patternmaking principles | JUL | MANU7228C | 23-07-2012 | 31-08-2012 | 30-11-2012 | 50 | 0.01 | 216 | 364 | 72 | 863.50 |
| Develop patterns from a block using basic patternmaking principles | JUL | MANU7228C | 25-06-2012 | 31-08-2012 | 16-11-2012 | 50 | 0.01 | 216 | 364 | 72 | 863.50 |
| Develop product specifications for fashion design | JUL | GRAP5227C | 25-06-2012 | 31-08-2012 | 02-11-2012 | 40 | 0.01 | 173 | 291 | 58 | 690.80 |
| Develop product specifications for fashion design | JUL | GRAP5227C | 25-06-2012 | 31-08-2012 | 16-11-2012 | 40 | 0.01 | 173 | 291 | 58 | 690.80 |
| Identify contemporary fashion influences and construction techniques | JUL | GRAP5228C | 25-06-2012 | 31-08-2012 | 02-11-2012 | 40 | 0.01 | 173 | 291 | 58 | 690.80 |
| Manage merchandise and store presentation | JUL | MKTG5776C | 25-06-2012 | 31-08-2012 | 16-11-2012 | 35 | 0.01 | 152 | 254 | 51 | 604.45 |
| Assist in preparation of preliminary design concepts | JUL | GRAP5226C | 25-06-2012 | 31-08-2012 | 02-11-2012 | 80 | 0.02 | 346 | 582 | 116 | 1,381.60 |
| Develop and present design concepts within specific guidelines | JUL | MKTG5779C | 25-06-2012 | 31-08-2012 | 02-11-2012 | 50 | 0.01 | 216 | 364 | 72 | 863.50 |
| Develop and present design concepts within specific guidelines | JUL | MKTG5779C | 25-06-2012 | 31-08-2012 | 16-11-2012 | 50 | 0.01 | 216 | 364 | 72 | 863.50 |
| Develop merchandising plans for fashion products | JUL | MKTG5780C | 25-06-2012 | 31-08-2012 | 16-11-2012 | 40 | 0.01 | 173 | 291 | 58 | 690.80 |
| Participate in production planning processes | JUL | GRAP5232C | 25-06-2012 | 31-08-2012 | 02-11-2012 | 70 | 0.02 | 303 | 509 | 102 | 1,208.90 |
* EFTSL : Equivalent Full Time Study Load
** Concession fees are only available at diploma and advanced diploma level for indigenous students.
Back to Program List
| Unit Of Study (Course) | Session | Course Code | Commencement Date | Census Date | Completion Date | Student Contact Hours (SCH) | EFTSL* | Tuition Fee: Onsite|Distance|RPL | |||
| Government Subsidised Fee | Full Fee (Non Government Subsidised) | ||||||||||
| Program commenced 1 July 2009-30 June 2012 ($) | Program commenced 1 July 2012-31 December 2012 ($) | Program commenced 1 July 2012-31 December 2012 Concession ** ($) | Australian Full Fee Paying ($) | ||||||||
| Manage operational plan | CY2 | BUSM6227C | 23-08-2012 | 31-03-2013 | 17-04-2013 | 60 | 0.13 | 260 | 266 | 53 | 733.20 |
* EFTSL : Equivalent Full Time Study Load
** Concession fees are only available at diploma and advanced diploma level for indigenous students.
Back to Program List
| Unit Of Study (Course) | Session | Course Code | Commencement Date | Census Date | Completion Date | Student Contact Hours (SCH) | EFTSL* | Tuition Fee: Onsite|Distance|RPL | |||
| Government Subsidised Fee | Full Fee (Non Government Subsidised) | ||||||||||
| Program commenced 1 July 2009-30 June 2012 ($) | Program commenced 1 July 2012-31 December 2012 ($) | Program commenced 1 July 2012-31 December 2012 Concession ** ($) | Australian Full Fee Paying ($) | ||||||||
| Originate and develop concepts | JUL | BUSM6217C | 25-06-2012 | 31-08-2012 | 23-11-2012 | 30 | 0.04 | 130 | 179 | 36 | 548.40 |
| Collaborate in a creative process | JUL | MKTG5778C | 25-06-2012 | 31-08-2012 | 23-11-2012 | 40 | 0.06 | 173 | 239 | 48 | 731.20 |
| Ensure a safe workplace | JUL | OHTH5467C | 25-06-2012 | 31-08-2012 | 23-11-2012 | 60 | 0.09 | 260 | 358 | 71 | 1,096.80 |
| Establish networks | JUL | BUSM6222C | 25-06-2012 | 31-08-2012 | 23-11-2012 | 35 | 0.05 | 152 | 209 | 42 | 639.80 |
| Manage projects | JUL | BUSM6223C | 25-06-2012 | 31-08-2012 | 23-11-2012 | 60 | 0.09 | 260 | 358 | 71 | 1,096.80 |
| Create digital visual effects | JUL | COSC5382C | 25-06-2012 | 31-08-2012 | 23-11-2012 | 70 | 0.10 | 303 | 418 | 83 | 1,279.60 |
| Develop storylines and treatments | JUL | COMM5909C | 25-06-2012 | 31-08-2012 | 23-11-2012 | 50 | 0.07 | 216 | 298 | 60 | 914.00 |
| Edit screen content for fast turnaround | JUL | VART5930C | 25-06-2012 | 31-08-2012 | 23-11-2012 | 30 | 0.04 | 130 | 179 | 36 | 548.40 |
| Shoot a wide range of television content | JUL | VART5931C | 25-06-2012 | 31-08-2012 | 23-11-2012 | 70 | 0.10 | 303 | 418 | 83 | 1,279.60 |
| Develop sound designs | JUL | VART6065C | 25-06-2012 | 31-08-2012 | 23-11-2012 | 50 | 0.07 | 216 | 298 | 60 | 914.00 |
| Implement lighting designs | OCT | PERF5064C | 18-10-2012 | 30-11-2012 | 15-12-2012 | 30 | 0.04 | 130 | 179 | 36 | 548.40 |
* EFTSL : Equivalent Full Time Study Load
** Concession fees are only available at diploma and advanced diploma level for indigenous students.
Back to Program List
| Unit Of Study (Course) | Session | Course Code | Commencement Date | Census Date | Completion Date | Student Contact Hours (SCH) | EFTSL* | Tuition Fee: Onsite|Distance|RPL | |||
| Government Subsidised Fee | Full Fee (Non Government Subsidised) | ||||||||||
| Program commenced 1 July 2009-30 June 2012 ($) | Program commenced 1 July 2012-31 December 2012 ($) | Program commenced 1 July 2012-31 December 2012 Concession ** ($) | Australian Full Fee Paying ($) | ||||||||
| Originate and develop concepts | JUL | BUSM6217C | 25-06-2012 | 31-08-2012 | 23-11-2012 | 30 | 0.07 | 130 | 141 | 28 | 388.20 |
| Collaborate in a creative process | JUL | MKTG5778C | 25-06-2012 | 31-08-2012 | 23-11-2012 | 40 | 0.09 | 173 | 188 | 38 | 517.60 |
| Ensure a safe workplace | JUL | OHTH5467C | 25-06-2012 | 31-08-2012 | 23-11-2012 | 60 | 0.14 | 260 | 283 | 56 | 776.40 |
| Establish networks | JUL | BUSM6222C | 25-06-2012 | 31-08-2012 | 23-11-2012 | 35 | 0.08 | 152 | 165 | 33 | 452.90 |
| Manage projects | JUL | BUSM6223C | 25-06-2012 | 31-08-2012 | 23-11-2012 | 60 | 0.14 | 260 | 283 | 56 | 776.40 |
| Create digital visual effects | JUL | COSC5382C | 25-06-2012 | 31-08-2012 | 23-11-2012 | 70 | 0.16 | 303 | 330 | 66 | 905.80 |
| Shoot a wide range of television content | JUL | VART5931C | 25-06-2012 | 31-08-2012 | 23-11-2012 | 70 | 0.16 | 303 | 330 | 66 | 905.80 |
| Interpret and respond to a design brief | JUL | BUSM5879C | 25-06-2012 | 31-08-2012 | 16-11-2012 | 20 | 0.05 | 87 | 94 | 19 | 258.80 |
| Design interaction | JUL | VART5935C | 25-06-2012 | 31-08-2012 | 23-11-2012 | 40 | 0.09 | 173 | 188 | 38 | 517.60 |
| Implement design solutions | JUL | VART5937C | 25-06-2012 | 31-08-2012 | 23-11-2012 | 60 | 0.14 | 260 | 283 | 56 | 776.40 |
| Prepare 3D digital models for production | JUL | COSC5386C | 25-06-2012 | 31-08-2012 | 23-11-2012 | 50 | 0.12 | 216 | 236 | 47 | 647.00 |
| Create titles for screen productions | JUL | VART5938C | 25-06-2012 | 31-08-2012 | 23-11-2012 | 30 | 0.07 | 130 | 141 | 28 | 388.20 |
| Design web environments | JUL | COSC5949C | 25-06-2012 | 31-08-2012 | 23-11-2012 | 50 | 0.12 | 216 | 236 | 47 | 647.00 |
| Implement sound designs | JUL | VART6067C | 25-06-2012 | 31-08-2012 | 23-11-2012 | 50 | 0.12 | 216 | 236 | 47 | 647.00 |
* EFTSL : Equivalent Full Time Study Load
** Concession fees are only available at diploma and advanced diploma level for indigenous students.
Back to Program List
| Unit Of Study (Course) | Session | Course Code | Commencement Date | Census Date | Completion Date | Student Contact Hours (SCH) | EFTSL* | Tuition Fee: Onsite|Distance|RPL | |||
| Government Subsidised Fee | Full Fee (Non Government Subsidised) | ||||||||||
| Program commenced 1 July 2009-30 June 2012 ($) | Program commenced 1 July 2012-31 December 2012 ($) | Program commenced 1 July 2012-31 December 2012 Concession ** ($) | Australian Full Fee Paying ($) | ||||||||
| Analyse data from international markets | AUG | MKTG5790C | 06-08-2012 | 30-09-2012 | 09-11-2012 | 50 | 0.16 | 216 | 312 | 62 | 651.00 |
| Design and produce business documents | AUG | BUSM6232C | 06-08-2012 | 30-09-2012 | 09-11-2012 | 80 | 0.25 | 346 | 500 | 100 | 1,041.60 |
| Manage operational plan | AUG | BUSM6233C | 06-08-2012 | 30-09-2012 | 09-11-2012 | 60 | 0.19 | 260 | 375 | 75 | 781.20 |
| Manage projects | AUG | BUSM6234C | 06-08-2012 | 30-09-2012 | 09-11-2012 | 60 | 0.19 | 260 | 375 | 75 | 781.20 |
| Manage projects | AUG | BUSM6234C | 22-08-2012 | 30-09-2012 | 23-11-2012 | 60 | 0.19 | 260 | 375 | 75 | 781.20 |
| Design and produce business documents | CY2 | BUSM6232C | 11-07-2012 | 31-03-2013 | 31-01-2013 | 80 | 0.25 | 346 | 500 | 100 | 1,041.60 |
| Manage operational plan | CY2 | BUSM7814C | 13-08-2012 | 31-03-2013 | 09-08-2013 | 60 | 0.19 | 260 | 375 | 75 | 781.20 |
| Manage operational plan | CY2 | BUSM7814C | 23-07-2012 | 31-03-2013 | 22-07-2013 | 60 | 0.19 | 260 | 375 | 75 | 781.20 |
| Manage operational plan | CY2 | BUSM8708C | 09-08-2012 | 31-03-2013 | 02-08-2013 | 60 | 0.19 | 260 | 375 | 75 | 781.20 |
| Design and produce business documents | JUL | BUSM6232C | 25-06-2012 | 31-08-2012 | 09-11-2012 | 80 | 0.25 | 346 | 500 | 100 | 1,041.60 |
| Design and produce business documents | JUL | BUSM6232C | 25-06-2012 | 31-08-2012 | 26-10-2012 | 80 | 0.25 | 346 | 500 | 100 | 1,041.60 |
| Manage operational plan | JUL | BUSM6233C | 18-07-2012 | 31-08-2012 | 15-10-2012 | 60 | 0.19 | 260 | 375 | 75 | 781.20 |
| Manage projects | JUL | BUSM6234C | 25-06-2012 | 31-08-2012 | 26-10-2012 | 60 | 0.19 | 260 | 375 | 75 | 781.20 |
| Manage operational plan | SEP | BUSM6233C | 01-09-2012 | 31-10-2012 | 21-12-2012 | 60 | 0.19 | 260 | 375 | 75 | 781.20 |
* EFTSL : Equivalent Full Time Study Load
** Concession fees are only available at diploma and advanced diploma level for indigenous students.
Back to Program List
| Unit Of Study (Course) | Session | Course Code | Commencement Date | Census Date | Completion Date | Student Contact Hours (SCH) | EFTSL* | Tuition Fee: Onsite|Distance|RPL | |||
| Government Subsidised Fee | Full Fee (Non Government Subsidised) | ||||||||||
| Program commenced 1 July 2009-30 June 2012 ($) | Program commenced 1 July 2012-31 December 2012 ($) | Program commenced 1 July 2012-31 December 2012 Concession ** ($) | Australian Full Fee Paying ($) | ||||||||
| Operate computing technology in a Textiles, Clothing and Footwear workplace | CY2 | MIET6060C | 26-11-2012 | 31-03-2013 | 27-02-2013 | 50 | 0.05 | 216 | 210 | 42 | 680.50 |
| Identify fibres and fabrics | CY2 | VART5902C | 02-07-2012 | 31-03-2013 | 28-06-2013 | 50 | 0.05 | 216 | 210 | 42 | 680.50 |
| Identify fibres and fabrics | CY2 | VART5902C | 03-09-2012 | 31-03-2013 | 30-08-2013 | 50 | 0.05 | 216 | 210 | 42 | 680.50 |
| Identify fibres and fabrics | CY2 | VART5902C | 08-10-2012 | 31-03-2013 | 07-10-2013 | 50 | 0.05 | 216 | 210 | 42 | 680.50 |
| Identify fibres and fabrics | CY2 | VART5902C | 09-10-2012 | 31-03-2013 | 08-10-2013 | 50 | 0.05 | 216 | 210 | 42 | 680.50 |
| Identify fibres and fabrics | CY2 | VART5902C | 10-09-2012 | 31-03-2013 | 06-09-2013 | 50 | 0.05 | 216 | 210 | 42 | 680.50 |
| Identify fibres and fabrics | CY2 | VART5902C | 16-07-2012 | 31-03-2013 | 28-06-2013 | 50 | 0.05 | 216 | 210 | 42 | 680.50 |
| Identify fibres and fabrics | CY2 | VART5902C | 25-06-2012 | 31-03-2013 | 28-06-2013 | 50 | 0.05 | 216 | 210 | 42 | 680.50 |
| Identify fibres and fabrics | CY2 | VART5902C | 29-08-2012 | 31-03-2013 | 28-08-2013 | 50 | 0.05 | 216 | 210 | 42 | 680.50 |
| Identify fibres and fabrics | CY2 | VART5902C | 29-10-2012 | 31-03-2013 | 25-10-2013 | 50 | 0.05 | 216 | 210 | 42 | 680.50 |
| Interact and network with fashion industry participants | CY2 | EMPL5599C | 25-06-2012 | 31-03-2013 | 07-06-2013 | 80 | 0.08 | 346 | 335 | 67 | 1,088.80 |
| Follow defined OH&S policies and procedures | CY2 | OHTH5471C | 02-07-2012 | 31-03-2013 | 28-06-2013 | 30 | 0.03 | 130 | 126 | 25 | 408.30 |
| Follow defined OH&S policies and procedures | CY2 | OHTH5471C | 03-09-2012 | 31-03-2013 | 30-08-2013 | 30 | 0.03 | 130 | 126 | 25 | 408.30 |
| Follow defined OH&S policies and procedures | CY2 | OHTH5471C | 08-10-2012 | 31-03-2013 | 07-10-2013 | 30 | 0.03 | 130 | 126 | 25 | 408.30 |
| Follow defined OH&S policies and procedures | CY2 | OHTH5471C | 09-10-2012 | 31-03-2013 | 08-10-2013 | 30 | 0.03 | 130 | 126 | 25 | 408.30 |
| Follow defined OH&S policies and procedures | CY2 | OHTH5471C | 10-09-2012 | 31-03-2013 | 06-09-2013 | 30 | 0.03 | 130 | 126 | 25 | 408.30 |
| Follow defined OH&S policies and procedures | CY2 | OHTH5471C | 16-07-2012 | 31-03-2013 | 28-06-2013 | 30 | 0.03 | 130 | 126 | 25 | 408.30 |
| Follow defined OH&S policies and procedures | CY2 | OHTH5471C | 25-06-2012 | 31-03-2013 | 28-06-2013 | 30 | 0.03 | 130 | 126 | 25 | 408.30 |
| Follow defined OH&S policies and procedures | CY2 | OHTH5471C | 29-08-2012 | 31-03-2013 | 28-08-2013 | 30 | 0.03 | 130 | 126 | 25 | 408.30 |
| Follow defined OH&S policies and procedures | CY2 | OHTH5471C | 29-10-2012 | 31-03-2013 | 25-10-2013 | 30 | 0.03 | 130 | 126 | 25 | 408.30 |
| Operate computing technology in a Textiles, Clothing and Footwear workplace | JUL | MIET6060C | 25-06-2012 | 31-08-2012 | 16-11-2012 | 50 | 0.05 | 216 | 210 | 42 | 680.50 |
| Operate computing technology in a Textiles, Clothing and Footwear workplace | JUL | MIET6060C | 25-07-2012 | 31-08-2012 | 23-11-2012 | 50 | 0.05 | 216 | 210 | 42 | 680.50 |
| Coordinate quality assurance for textiles, clothing and footwear products and services | JUL | MIET6061C | 25-06-2012 | 31-08-2012 | 02-11-2012 | 40 | 0.04 | 173 | 168 | 34 | 544.40 |
| Coordinate quality assurance for textiles, clothing and footwear products and services | JUL | MIET6061C | 25-06-2012 | 31-08-2012 | 16-11-2012 | 40 | 0.04 | 173 | 168 | 34 | 544.40 |
| Work with international textiles, clothing and footwear supply chains | JUL | MKTG5757C | 25-06-2012 | 31-08-2012 | 02-11-2012 | 60 | 0.06 | 260 | 251 | 50 | 816.60 |
| Calculate cost estimates for fashion products | JUL | GRAP5211C | 25-06-2012 | 31-08-2012 | 02-11-2012 | 30 | 0.03 | 130 | 126 | 25 | 408.30 |
| Calculate cost estimates for fashion products | JUL | GRAP5211C | 25-06-2012 | 31-08-2012 | 16-11-2012 | 30 | 0.03 | 130 | 126 | 25 | 408.30 |
| Use electronic fashion design tools | JUL | GRAP5212C | 25-06-2012 | 31-08-2012 | 02-11-2012 | 80 | 0.08 | 346 | 335 | 67 | 1,088.80 |
| Use electronic fashion design tools | JUL | GRAP5212C | 25-06-2012 | 31-08-2012 | 16-11-2012 | 80 | 0.08 | 346 | 335 | 67 | 1,088.80 |
| Implement and monitor environmentally sustainable work practices | JUL | OHTH5461C | 25-06-2012 | 31-08-2012 | 02-11-2012 | 40 | 0.04 | 173 | 168 | 34 | 544.40 |
| Communicate and sell design concepts | JUL | VART5913C | 25-06-2012 | 31-08-2012 | 02-11-2012 | 30 | 0.03 | 130 | 126 | 25 | 408.30 |
| Communicate and sell design concepts | JUL | VART5913C | 25-06-2012 | 31-08-2012 | 16-11-2012 | 30 | 0.03 | 130 | 126 | 25 | 408.30 |
| Interact and network with fashion industry participants | JUL | EMPL5599C | 25-06-2012 | 31-08-2012 | 16-11-2012 | 80 | 0.08 | 346 | 335 | 67 | 1,088.80 |
| Develop patterns from a block using basic patternmaking principles | JUL | MANU7228C | 02-07-2012 | 31-08-2012 | 01-10-2012 | 50 | 0.05 | 216 | 210 | 42 | 680.50 |
| Develop patterns from a block using basic patternmaking principles | JUL | MANU7228C | 23-07-2012 | 31-08-2012 | 30-11-2012 | 50 | 0.05 | 216 | 210 | 42 | 680.50 |
| Develop patterns from a block using basic patternmaking principles | JUL | MANU7228C | 25-06-2012 | 31-08-2012 | 16-11-2012 | 50 | 0.05 | 216 | 210 | 42 | 680.50 |
| Develop product specifications for fashion design | JUL | GRAP5227C | 25-06-2012 | 31-08-2012 | 02-11-2012 | 40 | 0.04 | 173 | 168 | 34 | 544.40 |
| Develop product specifications for fashion design | JUL | GRAP5227C | 25-06-2012 | 31-08-2012 | 16-11-2012 | 40 | 0.04 | 173 | 168 | 34 | 544.40 |
| Identify contemporary fashion influences and construction techniques | JUL | GRAP5228C | 25-06-2012 | 31-08-2012 | 02-11-2012 | 40 | 0.04 | 173 | 168 | 34 | 544.40 |
| Assist in preparation of preliminary design concepts | JUL | GRAP5226C | 25-06-2012 | 31-08-2012 | 02-11-2012 | 80 | 0.08 | 346 | 335 | 67 | 1,088.80 |
| Develop and present design concepts within specific guidelines | JUL | MKTG5779C | 25-06-2012 | 31-08-2012 | 02-11-2012 | 50 | 0.05 | 216 | 210 | 42 | 680.50 |
| Develop and present design concepts within specific guidelines | JUL | MKTG5779C | 25-06-2012 | 31-08-2012 | 16-11-2012 | 50 | 0.05 | 216 | 210 | 42 | 680.50 |
| Develop merchandising plans for fashion products | JUL | MKTG5780C | 25-06-2012 | 31-08-2012 | 16-11-2012 | 40 | 0.04 | 173 | 168 | 34 | 544.40 |
| Participate in production planning processes | JUL | GRAP5232C | 25-06-2012 | 31-08-2012 | 02-11-2012 | 70 | 0.07 | 303 | 293 | 59 | 952.70 |
| Follow defined OH&S policies and procedures | JUL | OHTH5471C | 25-06-2012 | 31-08-2012 | 16-11-2012 | 30 | 0.03 | 130 | 126 | 25 | 408.30 |
| Modify patterns to create basic styles | JUL | MANU5926C | 02-07-2012 | 31-08-2012 | 01-10-2012 | 50 | 0.05 | 216 | 210 | 42 | 680.50 |
| Modify patterns to create basic styles | JUL | MANU5926C | 23-07-2012 | 31-08-2012 | 30-11-2012 | 50 | 0.05 | 216 | 210 | 42 | 680.50 |
| Identify fabric performance and handling requirements | JUL | MANU5928C | 02-07-2012 | 31-08-2012 | 01-10-2012 | 40 | 0.04 | 173 | 168 | 34 | 544.40 |
| Identify fabric performance and handling requirements | JUL | MANU5928C | 25-06-2012 | 31-08-2012 | 02-11-2012 | 40 | 0.04 | 173 | 168 | 34 | 544.40 |
| Apply design studio process | JUL | GRAP5234C | 25-06-2012 | 31-08-2012 | 02-11-2012 | 90 | 0.09 | 390 | 377 | 76 | 1,224.90 |
| Conduct quality assurance for garments | JUL | MIET6087C | 25-06-2012 | 31-08-2012 | 02-11-2012 | 30 | 0.03 | 130 | 126 | 25 | 408.30 |
| Construct stock size block for garment to meet size and fit specifications | JUL | MANU5930C | 25-06-2012 | 31-08-2012 | 02-11-2012 | 40 | 0.04 | 173 | 168 | 34 | 544.40 |
| Create pattern to meet design specifications applying advanced patternmaking principles | JUL | MANU5931C | 25-06-2012 | 31-08-2012 | 02-11-2012 | 80 | 0.08 | 346 | 335 | 67 | 1,088.80 |
| Cut fabrics for prototype designs | JUL | MANU5932C | 25-06-2012 | 31-08-2012 | 02-11-2012 | 40 | 0.04 | 173 | 168 | 34 | 544.40 |
| Grade 2D patterns | JUL | GRAP5235C | 25-06-2012 | 31-08-2012 | 02-11-2012 | 80 | 0.08 | 346 | 335 | 67 | 1,088.80 |
| Create pattern from block to meet customer specifications | JUL | GRAP5236C | 25-06-2012 | 31-08-2012 | 02-11-2012 | 50 | 0.05 | 216 | 210 | 42 | 680.50 |
| Sew design prototypes | JUL | GRAP5237C | 25-06-2012 | 31-08-2012 | 02-11-2012 | 60 | 0.06 | 260 | 251 | 50 | 816.60 |
| Develop marketing plans for fashion products | JUL | GRAP5240C | 25-06-2012 | 31-08-2012 | 02-11-2012 | 50 | 0.05 | 216 | 210 | 42 | 680.50 |
| Develop marketing plans for fashion products | JUL | GRAP5240C | 25-06-2012 | 31-08-2012 | 16-11-2012 | 50 | 0.05 | 216 | 210 | 42 | 680.50 |
| Produce fashion illustrations | JUL | GRAP5244C | 25-06-2012 | 31-08-2012 | 02-11-2012 | 50 | 0.05 | 216 | 210 | 42 | 680.50 |
| Construct complex blocks for fashion garments | JUL | GRAP5246C | 25-06-2012 | 31-08-2012 | 02-11-2012 | 100 | 0.10 | 433 | 419 | 84 | 1,361.00 |
| Develop patterns for complex fashion garments | JUL | GRAP5247C | 25-06-2012 | 31-08-2012 | 02-11-2012 | 100 | 0.10 | 433 | 419 | 84 | 1,361.00 |
| Grade shaped patterns | JUL | GRAP5248C | 25-06-2012 | 31-08-2012 | 02-11-2012 | 60 | 0.06 | 260 | 251 | 50 | 816.60 |
| Analyse individual fit and make pattern alterations | JUL | GRAP5251C | 25-06-2012 | 31-08-2012 | 02-11-2012 | 100 | 0.10 | 433 | 419 | 84 | 1,361.00 |
| Follow defined OH&S policies and procedures | OCT | OHTH5471C | 15-10-2012 | 30-11-2012 | 23-11-2012 | 30 | 0.03 | 130 | 126 | 25 | 408.30 |
* EFTSL : Equivalent Full Time Study Load
** Concession fees are only available at diploma and advanced diploma level for indigenous students.
Back to Program List
| Unit Of Study (Course) | Session | Course Code | Commencement Date | Census Date | Completion Date | Student Contact Hours (SCH) | EFTSL* | Tuition Fee: Onsite|Distance|RPL | |||
| Government Subsidised Fee | Full Fee (Non Government Subsidised) | ||||||||||
| Program commenced 1 July 2009-30 June 2012 ($) | Program commenced 1 July 2012-31 December 2012 ($) | Program commenced 1 July 2012-31 December 2012 Concession ** ($) | Australian Full Fee Paying ($) | ||||||||
| Manage projects | AUG | BUSM6234C | 06-08-2012 | 30-09-2012 | 09-11-2012 | 60 | 0.23 | 260 | 423 | 85 | 807.60 |
| Manage projects | AUG | BUSM6234C | 22-08-2012 | 30-09-2012 | 23-11-2012 | 60 | 0.23 | 260 | 423 | 85 | 807.60 |
| Promote innovation in a team environment | AUG | EMPL5624C | 01-08-2012 | 30-09-2012 | 21-12-2012 | 40 | 0.15 | 173 | 282 | 56 | 538.40 |
| Manage people performance | AUG | EMPL5632C | 21-08-2012 | 30-09-2012 | 22-11-2012 | 70 | 0.27 | 303 | 494 | 99 | 942.20 |
| Manage people performance | AUG | EMPL5632C | 21-08-2012 | 30-09-2012 | 26-10-2012 | 70 | 0.27 | 303 | 494 | 99 | 942.20 |
| Promote innovation in a team environment | CY2 | EMPL5624C | 01-08-2012 | 31-03-2013 | 25-01-2013 | 40 | 0.15 | 173 | 282 | 56 | 538.40 |
| Recruit, select and induct staff | CY2 | EMPL5625C | 07-11-2012 | 31-03-2013 | 16-01-2013 | 50 | 0.19 | 216 | 352 | 70 | 673.00 |
| Recruit, select and induct staff | CY2 | EMPL5625C | 15-10-2012 | 31-03-2013 | 28-06-2013 | 50 | 0.19 | 216 | 352 | 70 | 673.00 |
| Manage people performance | CY2 | EMPL5632C | 07-11-2012 | 31-03-2013 | 16-01-2013 | 70 | 0.27 | 303 | 494 | 99 | 942.20 |
| Manage people performance | CY2 | EMPL9757C | 01-08-2012 | 31-03-2013 | 31-07-2013 | 70 | 0.27 | 303 | 494 | 99 | 942.20 |
| Manage people performance | CY2 | EMPL9757C | 12-07-2012 | 31-03-2013 | 11-07-2013 | 70 | 0.27 | 303 | 494 | 99 | 942.20 |
| Manage people performance | CY2 | EMPL9757C | 13-08-2012 | 31-03-2013 | 09-08-2013 | 70 | 0.27 | 303 | 494 | 99 | 942.20 |
| Manage people performance | CY2 | EMPL9757C | 16-08-2012 | 31-03-2013 | 15-08-2013 | 70 | 0.27 | 303 | 494 | 99 | 942.20 |
| Manage people performance | CY2 | EMPL9757C | 17-09-2012 | 31-03-2013 | 16-09-2013 | 70 | 0.27 | 303 | 494 | 99 | 942.20 |
| Manage people performance | CY2 | EMPL9757C | 23-07-2012 | 31-03-2013 | 22-07-2013 | 70 | 0.27 | 303 | 494 | 99 | 942.20 |
| Manage people performance | CY2 | EMPL9758C | 02-07-2012 | 31-03-2013 | 01-07-2013 | 70 | 0.27 | 303 | 494 | 99 | 942.20 |
| Manage people performance | CY2 | EMPL9758C | 03-09-2012 | 31-03-2013 | 02-09-2013 | 70 | 0.27 | 303 | 494 | 99 | 942.20 |
| Manage people performance | CY2 | EMPL9758C | 07-08-2012 | 31-03-2013 | 06-08-2013 | 70 | 0.27 | 303 | 494 | 99 | 942.20 |
| Manage people performance | CY2 | EMPL9758C | 17-07-2012 | 31-03-2013 | 16-07-2013 | 70 | 0.27 | 303 | 494 | 99 | 942.20 |
| Manage people performance | CY2 | EMPL9758C | 23-07-2012 | 31-03-2013 | 22-07-2013 | 70 | 0.27 | 303 | 494 | 99 | 942.20 |
| Manage people performance | CY2 | EMPL9768C | 09-08-2012 | 31-03-2013 | 02-08-2013 | 70 | 0.27 | 303 | 494 | 99 | 942.20 |
| Manage personal work priorities and professional development | CY2 | EMPL5878C | 07-11-2012 | 31-03-2013 | 16-01-2013 | 60 | 0.23 | 260 | 423 | 85 | 807.60 |
| Manage quality customer service | CY2 | MKTG6079C | 13-08-2012 | 31-03-2013 | 09-08-2013 | 40 | 0.15 | 173 | 282 | 56 | 538.40 |
| Manage quality customer service | CY2 | MKTG6079C | 23-07-2012 | 31-03-2013 | 22-07-2013 | 40 | 0.15 | 173 | 282 | 56 | 538.40 |
| Manage quality customer service | CY2 | MKTG9317C | 09-08-2012 | 31-03-2013 | 02-08-2013 | 40 | 0.15 | 173 | 282 | 56 | 538.40 |
| Ensure team effectiveness | CY2 | EMPL5895C | 13-08-2012 | 31-03-2013 | 09-08-2013 | 60 | 0.23 | 260 | 423 | 85 | 807.60 |
| Ensure team effectiveness | CY2 | EMPL5895C | 23-07-2012 | 31-03-2013 | 22-07-2013 | 60 | 0.23 | 260 | 423 | 85 | 807.60 |
| Ensure team effectiveness | CY2 | EMPL9767C | 09-08-2012 | 31-03-2013 | 02-08-2013 | 60 | 0.23 | 260 | 423 | 85 | 807.60 |
| Manage projects | JUL | BUSM6234C | 25-06-2012 | 31-08-2012 | 26-10-2012 | 60 | 0.23 | 260 | 423 | 85 | 807.60 |
| Manage payroll | JUL | ACCT5270C | 25-06-2012 | 31-08-2012 | 26-10-2012 | 30 | 0.12 | 130 | 212 | 42 | 403.80 |
| Manage meetings | JUL | BUSM6240C | 25-06-2012 | 31-08-2012 | 26-10-2012 | 30 | 0.12 | 130 | 212 | 42 | 403.80 |
| Plan and manage conferences | JUL | BUSM6241C | 25-06-2012 | 31-08-2012 | 26-10-2012 | 30 | 0.12 | 130 | 212 | 42 | 403.80 |
| Plan or review administration systems | JUL | BUSM6242C | 25-06-2012 | 31-08-2012 | 26-10-2012 | 50 | 0.19 | 216 | 352 | 70 | 673.00 |
| Manage business document design and development | JUL | BUSM6243C | 25-06-2012 | 31-08-2012 | 26-10-2012 | 80 | 0.31 | 346 | 564 | 113 | 1,076.80 |
| Recruit, select and induct staff | JUL | EMPL5625C | 25-06-2012 | 31-08-2012 | 26-10-2012 | 50 | 0.19 | 216 | 352 | 70 | 673.00 |
| Manage personal work priorities and professional development | JUL | EMPL5626C | 25-06-2012 | 31-08-2012 | 26-10-2012 | 60 | 0.23 | 260 | 423 | 85 | 807.60 |
| Ensure team effectiveness | JUL | EMPL5627C | 25-06-2012 | 31-08-2012 | 26-10-2012 | 60 | 0.23 | 260 | 423 | 85 | 807.60 |
| Manage people performance | JUL | EMPL5632C | 25-06-2012 | 31-08-2012 | 26-10-2012 | 70 | 0.27 | 303 | 494 | 99 | 942.20 |
| Develop workplace policy and procedures for sustainability | JUL | BUSM6394C | 25-06-2012 | 31-08-2012 | 09-11-2012 | 50 | 0.19 | 216 | 352 | 70 | 673.00 |
| Develop workplace policy and procedures for sustainability | JUL | BUSM6394C | 25-06-2012 | 31-08-2012 | 26-10-2012 | 50 | 0.19 | 216 | 352 | 70 | 673.00 |
| Manage personal work priorities and professional development | JUL | EMPL5878C | 25-06-2012 | 31-08-2012 | 26-10-2012 | 60 | 0.23 | 260 | 423 | 85 | 807.60 |
| Ensure team effectiveness | JUL | EMPL5897C | 25-06-2012 | 31-08-2012 | 25-10-2012 | 60 | 0.23 | 260 | 423 | 85 | 807.60 |
| Ensure team effectiveness | JUL | EMPL5897C | 25-06-2012 | 31-08-2012 | 26-10-2012 | 60 | 0.23 | 260 | 423 | 85 | 807.60 |
| Ensure team effectiveness | JUL | EMPL5897C | 25-06-2012 | 31-08-2012 | 31-08-2012 | 60 | 0.23 | 260 | 423 | 85 | 807.60 |
| Manage quality customer service | SEP | MKTG6081C | 03-09-2012 | 31-10-2012 | 20-12-2012 | 40 | 0.15 | 173 | 282 | 56 | 538.40 |
| Manage quality customer service | SEP | MKTG6081C | 04-09-2012 | 31-10-2012 | 18-09-2012 | 40 | 0.15 | 173 | 282 | 56 | 538.40 |
| Ensure team effectiveness | SEP | EMPL5897C | 03-09-2012 | 31-10-2012 | 14-12-2012 | 60 | 0.23 | 260 | 423 | 85 | 807.60 |
* EFTSL : Equivalent Full Time Study Load
** Concession fees are only available at diploma and advanced diploma level for indigenous students.
Back to Program List
| Unit Of Study (Course) | Session | Course Code | Commencement Date | Census Date | Completion Date | Student Contact Hours (SCH) | EFTSL* | Tuition Fee: Onsite|Distance|RPL | |||
| Government Subsidised Fee | Full Fee (Non Government Subsidised) | ||||||||||
| Program commenced 1 July 2009-30 June 2012 ($) | Program commenced 1 July 2012-31 December 2012 ($) | Program commenced 1 July 2012-31 December 2012 Concession ** ($) | Australian Full Fee Paying ($) | ||||||||
| Manage operational plan | CY2 | BUSM6253C | 19-11-2012 | 31-03-2013 | 28-03-2013 | 60 | 0.13 | 260 | 266 | 53 | 733.20 |
| Ensure a safe workplace | CY2 | OHTH5476C | 19-11-2012 | 31-03-2013 | 28-03-2013 | 60 | 0.13 | 260 | 266 | 53 | 733.20 |
| Manage personal work priorities and professional development | CY2 | EMPL5637C | 19-11-2012 | 31-03-2013 | 28-03-2013 | 60 | 0.13 | 260 | 266 | 53 | 733.20 |
| Facilitate continuous improvement | CY2 | MIET6090C | 19-11-2012 | 31-03-2013 | 28-03-2013 | 60 | 0.13 | 260 | 266 | 53 | 733.20 |
| Ensure team effectiveness | CY2 | EMPL5638C | 19-11-2012 | 31-03-2013 | 28-03-2013 | 60 | 0.13 | 260 | 266 | 53 | 733.20 |
| Manage quality customer service | CY2 | MKTG6973C | 19-11-2012 | 31-03-2013 | 28-03-2013 | 40 | 0.09 | 173 | 178 | 36 | 488.80 |
| Develop a workplace learning environment | CY2 | BUSM6256C | 19-11-2012 | 31-03-2013 | 28-03-2013 | 60 | 0.13 | 260 | 266 | 53 | 733.20 |
| Recruit, select and induct staff | CY2 | EMPL5667C | 19-11-2012 | 31-03-2013 | 28-03-2013 | 50 | 0.11 | 216 | 222 | 44 | 611.00 |
| Manage operational plan | JUL | BUSM6253C | 09-07-2012 | 31-08-2012 | 21-09-2012 | 60 | 0.13 | 260 | 266 | 53 | 733.20 |
| Manage operational plan | JUL | BUSM6253C | 25-06-2012 | 31-08-2012 | 21-12-2012 | 60 | 0.13 | 260 | 266 | 53 | 733.20 |
| Ensure a safe workplace | JUL | OHTH5476C | 09-07-2012 | 31-08-2012 | 21-09-2012 | 60 | 0.13 | 260 | 266 | 53 | 733.20 |
| Ensure a safe workplace | JUL | OHTH5476C | 25-06-2012 | 31-08-2012 | 21-12-2012 | 60 | 0.13 | 260 | 266 | 53 | 733.20 |
| Manage personal work priorities and professional development | JUL | EMPL5637C | 09-07-2012 | 31-08-2012 | 21-09-2012 | 60 | 0.13 | 260 | 266 | 53 | 733.20 |
| Facilitate continuous improvement | JUL | MIET6090C | 09-07-2012 | 31-08-2012 | 21-09-2012 | 60 | 0.13 | 260 | 266 | 53 | 733.20 |
| Facilitate continuous improvement | JUL | MIET6090C | 25-06-2012 | 31-08-2012 | 21-12-2012 | 60 | 0.13 | 260 | 266 | 53 | 733.20 |
| Ensure team effectiveness | JUL | EMPL5638C | 09-07-2012 | 31-08-2012 | 21-09-2012 | 60 | 0.13 | 260 | 266 | 53 | 733.20 |
| Manage quality customer service | JUL | MKTG6973C | 09-07-2012 | 31-08-2012 | 21-09-2012 | 40 | 0.09 | 173 | 178 | 36 | 488.80 |
| Develop a workplace learning environment | JUL | BUSM6256C | 09-07-2012 | 31-08-2012 | 21-09-2012 | 60 | 0.13 | 260 | 266 | 53 | 733.20 |
| Recruit, select and induct staff | JUL | EMPL5667C | 09-07-2012 | 31-08-2012 | 21-09-2012 | 50 | 0.11 | 216 | 222 | 44 | 611.00 |
| Manage diversity in the workplace | JUL | BUSM6457C | 25-06-2012 | 31-08-2012 | 21-12-2012 | 60 | 0.13 | 260 | 266 | 53 | 733.20 |
| Manage operational plan | SEP | BUSM6253C | 10-09-2012 | 31-10-2012 | 29-10-2012 | 60 | 0.13 | 260 | 266 | 53 | 733.20 |
| Ensure a safe workplace | SEP | OHTH5476C | 10-09-2012 | 31-10-2012 | 29-10-2012 | 60 | 0.13 | 260 | 266 | 53 | 733.20 |
| Manage personal work priorities and professional development | SEP | EMPL5637C | 10-09-2012 | 31-10-2012 | 29-10-2012 | 60 | 0.13 | 260 | 266 | 53 | 733.20 |
| Facilitate continuous improvement | SEP | MIET6090C | 10-09-2012 | 31-10-2012 | 29-10-2012 | 60 | 0.13 | 260 | 266 | 53 | 733.20 |
| Ensure team effectiveness | SEP | EMPL5638C | 10-09-2012 | 31-10-2012 | 29-10-2012 | 60 | 0.13 | 260 | 266 | 53 | 733.20 |
| Manage quality customer service | SEP | MKTG6973C | 10-09-2012 | 31-10-2012 | 29-10-2012 | 40 | 0.09 | 173 | 178 | 36 | 488.80 |
| Develop a workplace learning environment | SEP | BUSM6256C | 10-09-2012 | 31-10-2012 | 29-10-2012 | 60 | 0.13 | 260 | 266 | 53 | 733.20 |
| Recruit, select and induct staff | SEP | EMPL5667C | 10-09-2012 | 31-10-2012 | 29-10-2012 | 50 | 0.11 | 216 | 222 | 44 | 611.00 |
* EFTSL : Equivalent Full Time Study Load
** Concession fees are only available at diploma and advanced diploma level for indigenous students.
Back to Program List
| Unit Of Study (Course) | Session | Course Code | Commencement Date | Census Date | Completion Date | Student Contact Hours (SCH) | EFTSL* | Tuition Fee: Onsite|Distance|RPL | |||
| Government Subsidised Fee | Full Fee (Non Government Subsidised) | ||||||||||
| Program commenced 1 July 2009-30 June 2012 ($) | Program commenced 1 July 2012-31 December 2012 ($) | Program commenced 1 July 2012-31 December 2012 Concession ** ($) | Australian Full Fee Paying ($) | ||||||||
| Manage operational plan | AUG | BUSM6233C | 06-08-2012 | 30-09-2012 | 09-11-2012 | 60 | 0.25 | 260 | 390 | 78 | 780.00 |
| Manage projects | AUG | BUSM6234C | 06-08-2012 | 30-09-2012 | 09-11-2012 | 60 | 0.25 | 260 | 390 | 78 | 780.00 |
| Manage projects | AUG | BUSM6234C | 22-08-2012 | 30-09-2012 | 23-11-2012 | 60 | 0.25 | 260 | 390 | 78 | 780.00 |
| Show leadership in the workplace | AUG | BUSM6236C | 01-08-2012 | 30-09-2012 | 20-12-2012 | 50 | 0.21 | 216 | 325 | 65 | 650.00 |
| Show leadership in the workplace | AUG | BUSM6236C | 01-08-2012 | 30-09-2012 | 21-12-2012 | 50 | 0.21 | 216 | 325 | 65 | 650.00 |
| Promote innovation in a team environment | AUG | EMPL5624C | 01-08-2012 | 30-09-2012 | 21-12-2012 | 40 | 0.17 | 173 | 260 | 52 | 520.00 |
| Manage budgets and financial plans | AUG | ACCT5272C | 01-08-2012 | 30-09-2012 | 21-12-2012 | 70 | 0.29 | 303 | 455 | 91 | 910.00 |
| Manage people performance | AUG | EMPL5632C | 21-08-2012 | 30-09-2012 | 22-11-2012 | 70 | 0.29 | 303 | 455 | 91 | 910.00 |
| Manage people performance | AUG | EMPL5632C | 21-08-2012 | 30-09-2012 | 26-10-2012 | 70 | 0.29 | 303 | 455 | 91 | 910.00 |
| Establish and adjust the marketing mix | AUG | MKTG5811C | 27-08-2012 | 30-09-2012 | 30-10-2012 | 60 | 0.25 | 260 | 390 | 78 | 780.00 |
| Report on financial activity | AUG | ACCT5276C | 10-08-2012 | 30-09-2012 | 09-11-2012 | 30 | 0.13 | 130 | 195 | 39 | 390.00 |
| Report on financial activity | AUG | ACCT5276C | 15-08-2012 | 30-09-2012 | 30-11-2012 | 30 | 0.13 | 130 | 195 | 39 | 390.00 |
| Provide leadership across the organisation | AUG | BUSM6355C | 27-08-2012 | 30-09-2012 | 25-11-2012 | 60 | 0.25 | 260 | 390 | 78 | 780.00 |
| Manage industrial relations | AUG | BUSM6407C | 27-08-2012 | 30-09-2012 | 25-11-2012 | 80 | 0.33 | 346 | 520 | 104 | 1,040.00 |
| Facilitate continuous improvement | AUG | MIET6332C | 22-08-2012 | 30-09-2012 | 23-11-2012 | 60 | 0.25 | 260 | 390 | 78 | 780.00 |
| Manage risk | AUG | BUSM6458C | 22-08-2012 | 30-09-2012 | 23-11-2012 | 60 | 0.25 | 260 | 390 | 78 | 780.00 |
| Manage operational plan | CY2 | BUSM7814C | 13-08-2012 | 31-03-2013 | 09-08-2013 | 60 | 0.25 | 260 | 390 | 78 | 780.00 |
| Manage operational plan | CY2 | BUSM7814C | 23-07-2012 | 31-03-2013 | 22-07-2013 | 60 | 0.25 | 260 | 390 | 78 | 780.00 |
| Manage operational plan | CY2 | BUSM8708C | 09-08-2012 | 31-03-2013 | 02-08-2013 | 60 | 0.25 | 260 | 390 | 78 | 780.00 |
| Show leadership in the workplace | CY2 | BUSM6236C | 01-08-2012 | 31-03-2013 | 13-02-2013 | 50 | 0.21 | 216 | 325 | 65 | 650.00 |
| Show leadership in the workplace | CY2 | BUSM6236C | 01-11-2012 | 31-03-2013 | 28-02-2013 | 50 | 0.21 | 216 | 325 | 65 | 650.00 |
| Show leadership in the workplace | CY2 | BUSM6442C | 01-08-2012 | 31-03-2013 | 31-07-2013 | 50 | 0.21 | 216 | 325 | 65 | 650.00 |
| Show leadership in the workplace | CY2 | BUSM6442C | 12-07-2012 | 31-03-2013 | 11-07-2013 | 50 | 0.21 | 216 | 325 | 65 | 650.00 |
| Show leadership in the workplace | CY2 | BUSM6442C | 16-08-2012 | 31-03-2013 | 15-08-2013 | 50 | 0.21 | 216 | 325 | 65 | 650.00 |
| Show leadership in the workplace | CY2 | BUSM6442C | 17-09-2012 | 31-03-2013 | 16-09-2013 | 50 | 0.21 | 216 | 325 | 65 | 650.00 |
| Show leadership in the workplace | CY2 | BUSM6443C | 03-09-2012 | 31-03-2013 | 02-09-2013 | 50 | 0.21 | 216 | 325 | 65 | 650.00 |
| Show leadership in the workplace | CY2 | BUSM6443C | 07-08-2012 | 31-03-2013 | 06-08-2013 | 50 | 0.21 | 216 | 325 | 65 | 650.00 |
| Show leadership in the workplace | CY2 | BUSM6443C | 17-07-2012 | 31-03-2013 | 16-07-2013 | 50 | 0.21 | 216 | 325 | 65 | 650.00 |
| Promote innovation in a team environment | CY2 | EMPL5624C | 01-08-2012 | 31-03-2013 | 25-01-2013 | 40 | 0.17 | 173 | 260 | 52 | 520.00 |
| Recruit, select and induct staff | CY2 | EMPL5625C | 07-11-2012 | 31-03-2013 | 16-01-2013 | 50 | 0.21 | 216 | 325 | 65 | 650.00 |
| Recruit, select and induct staff | CY2 | EMPL5625C | 15-10-2012 | 31-03-2013 | 28-06-2013 | 50 | 0.21 | 216 | 325 | 65 | 650.00 |
| Manage budgets and financial plans | CY2 | ACCT5329C | 13-08-2012 | 31-03-2013 | 09-08-2013 | 70 | 0.29 | 303 | 455 | 91 | 910.00 |
| Manage budgets and financial plans | CY2 | ACCT5329C | 23-07-2012 | 31-03-2013 | 22-07-2013 | 70 | 0.29 | 303 | 455 | 91 | 910.00 |
| Manage budgets and financial plans | CY2 | ACCT5331C | 09-08-2012 | 31-03-2013 | 02-08-2013 | 70 | 0.29 | 303 | 455 | 91 | 910.00 |
| Manage people performance | CY2 | EMPL5632C | 07-11-2012 | 31-03-2013 | 16-01-2013 | 70 | 0.29 | 303 | 455 | 91 | 910.00 |
| Manage people performance | CY2 | EMPL9757C | 01-08-2012 | 31-03-2013 | 31-07-2013 | 70 | 0.29 | 303 | 455 | 91 | 910.00 |
| Manage people performance | CY2 | EMPL9757C | 12-07-2012 | 31-03-2013 | 11-07-2013 | 70 | 0.29 | 303 | 455 | 91 | 910.00 |
| Manage people performance | CY2 | EMPL9757C | 13-08-2012 | 31-03-2013 | 09-08-2013 | 70 | 0.29 | 303 | 455 | 91 | 910.00 |
| Manage people performance | CY2 | EMPL9757C | 16-08-2012 | 31-03-2013 | 15-08-2013 | 70 | 0.29 | 303 | 455 | 91 | 910.00 |
| Manage people performance | CY2 | EMPL9757C | 17-09-2012 | 31-03-2013 | 16-09-2013 | 70 | 0.29 | 303 | 455 | 91 | 910.00 |
| Manage people performance | CY2 | EMPL9757C | 23-07-2012 | 31-03-2013 | 22-07-2013 | 70 | 0.29 | 303 | 455 | 91 | 910.00 |
| Manage people performance | CY2 | EMPL9758C | 02-07-2012 | 31-03-2013 | 01-07-2013 | 70 | 0.29 | 303 | 455 | 91 | 910.00 |
| Manage people performance | CY2 | EMPL9758C | 03-09-2012 | 31-03-2013 | 02-09-2013 | 70 | 0.29 | 303 | 455 | 91 | 910.00 |
| Manage people performance | CY2 | EMPL9758C | 07-08-2012 | 31-03-2013 | 06-08-2013 | 70 | 0.29 | 303 | 455 | 91 | 910.00 |
| Manage people performance | CY2 | EMPL9758C | 17-07-2012 | 31-03-2013 | 16-07-2013 | 70 | 0.29 | 303 | 455 | 91 | 910.00 |
| Manage people performance | CY2 | EMPL9758C | 23-07-2012 | 31-03-2013 | 22-07-2013 | 70 | 0.29 | 303 | 455 | 91 | 910.00 |
| Manage people performance | CY2 | EMPL9768C | 09-08-2012 | 31-03-2013 | 02-08-2013 | 70 | 0.29 | 303 | 455 | 91 | 910.00 |
| Report on financial activity | CY2 | ACCT5325C | 01-08-2012 | 31-03-2013 | 31-07-2013 | 30 | 0.13 | 130 | 195 | 39 | 390.00 |
| Report on financial activity | CY2 | ACCT5325C | 12-07-2012 | 31-03-2013 | 11-07-2013 | 30 | 0.13 | 130 | 195 | 39 | 390.00 |
| Report on financial activity | CY2 | ACCT5325C | 16-08-2012 | 31-03-2013 | 15-08-2013 | 30 | 0.13 | 130 | 195 | 39 | 390.00 |
| Report on financial activity | CY2 | ACCT5325C | 17-09-2012 | 31-03-2013 | 16-09-2013 | 30 | 0.13 | 130 | 195 | 39 | 390.00 |
| Report on financial activity | CY2 | ACCT5326C | 02-07-2012 | 31-03-2013 | 01-07-2013 | 30 | 0.13 | 130 | 195 | 39 | 390.00 |
| Report on financial activity | CY2 | ACCT5326C | 03-09-2012 | 31-03-2013 | 02-09-2013 | 30 | 0.13 | 130 | 195 | 39 | 390.00 |
| Report on financial activity | CY2 | ACCT5326C | 07-08-2012 | 31-03-2013 | 06-08-2013 | 30 | 0.13 | 130 | 195 | 39 | 390.00 |
| Report on financial activity | CY2 | ACCT5326C | 17-07-2012 | 31-03-2013 | 16-07-2013 | 30 | 0.13 | 130 | 195 | 39 | 390.00 |
| Report on financial activity | CY2 | ACCT5326C | 23-07-2012 | 31-03-2013 | 22-07-2013 | 30 | 0.13 | 130 | 195 | 39 | 390.00 |
| Manage risk | CY2 | BUSM6445C | 13-08-2012 | 31-03-2013 | 09-08-2013 | 60 | 0.25 | 260 | 390 | 78 | 780.00 |
| Manage risk | CY2 | BUSM6445C | 23-07-2012 | 31-03-2013 | 22-07-2013 | 60 | 0.25 | 260 | 390 | 78 | 780.00 |
| Manage risk | CY2 | BUSM7816C | 09-08-2012 | 31-03-2013 | 02-08-2013 | 60 | 0.25 | 260 | 390 | 78 | 780.00 |
| Manage risk | CY2 | BUSM8701C | 26-11-2012 | 31-03-2013 | 24-02-2013 | 60 | 0.25 | 260 | 390 | 78 | 780.00 |
| Provide leadership across the organisation | CY2 | BUSM7813C | 13-08-2012 | 31-03-2013 | 09-08-2013 | 60 | 0.25 | 260 | 390 | 78 | 780.00 |
| Provide leadership across the organisation | CY2 | BUSM7813C | 23-07-2012 | 31-03-2013 | 22-07-2013 | 60 | 0.25 | 260 | 390 | 78 | 780.00 |
| Provide leadership across the organisation | CY2 | BUSM8709C | 09-08-2012 | 31-03-2013 | 02-08-2013 | 60 | 0.25 | 260 | 390 | 78 | 780.00 |
| Ensure a safe workplace | CY2 | OHTH5592C | 26-11-2012 | 31-03-2013 | 24-02-2013 | 60 | 0.25 | 260 | 390 | 78 | 780.00 |
| Manage personal work priorities and professional development | CY2 | EMPL5878C | 07-11-2012 | 31-03-2013 | 16-01-2013 | 60 | 0.25 | 260 | 390 | 78 | 780.00 |
| Facilitate continuous improvement | CY2 | MIET6330C | 13-08-2012 | 31-03-2013 | 09-08-2013 | 60 | 0.25 | 260 | 390 | 78 | 780.00 |
| Facilitate continuous improvement | CY2 | MIET6330C | 23-07-2012 | 31-03-2013 | 22-07-2013 | 60 | 0.25 | 260 | 390 | 78 | 780.00 |
| Facilitate continuous improvement | CY2 | MIET7519C | 09-08-2012 | 31-03-2013 | 02-08-2013 | 60 | 0.25 | 260 | 390 | 78 | 780.00 |
| Manage quality customer service | CY2 | MKTG6079C | 13-08-2012 | 31-03-2013 | 09-08-2013 | 40 | 0.17 | 173 | 260 | 52 | 520.00 |
| Manage quality customer service | CY2 | MKTG6079C | 23-07-2012 | 31-03-2013 | 22-07-2013 | 40 | 0.17 | 173 | 260 | 52 | 520.00 |
| Manage quality customer service | CY2 | MKTG9317C | 09-08-2012 | 31-03-2013 | 02-08-2013 | 40 | 0.17 | 173 | 260 | 52 | 520.00 |
| Ensure team effectiveness | CY2 | EMPL5895C | 13-08-2012 | 31-03-2013 | 09-08-2013 | 60 | 0.25 | 260 | 390 | 78 | 780.00 |
| Ensure team effectiveness | CY2 | EMPL5895C | 23-07-2012 | 31-03-2013 | 22-07-2013 | 60 | 0.25 | 260 | 390 | 78 | 780.00 |
| Ensure team effectiveness | CY2 | EMPL9767C | 09-08-2012 | 31-03-2013 | 02-08-2013 | 60 | 0.25 | 260 | 390 | 78 | 780.00 |
| Manage operational plan | JUL | BUSM6233C | 18-07-2012 | 31-08-2012 | 15-10-2012 | 60 | 0.25 | 260 | 390 | 78 | 780.00 |
| Manage projects | JUL | BUSM6234C | 25-06-2012 | 31-08-2012 | 26-10-2012 | 60 | 0.25 | 260 | 390 | 78 | 780.00 |
| Show leadership in the workplace | JUL | BUSM6236C | 25-06-2012 | 31-08-2012 | 26-10-2012 | 50 | 0.21 | 216 | 325 | 65 | 650.00 |
| Recruit, select and induct staff | JUL | EMPL5625C | 25-06-2012 | 31-08-2012 | 26-10-2012 | 50 | 0.21 | 216 | 325 | 65 | 650.00 |
| Manage personal work priorities and professional development | JUL | EMPL5626C | 25-06-2012 | 31-08-2012 | 26-10-2012 | 60 | 0.25 | 260 | 390 | 78 | 780.00 |
| Ensure team effectiveness | JUL | EMPL5627C | 25-06-2012 | 31-08-2012 | 26-10-2012 | 60 | 0.25 | 260 | 390 | 78 | 780.00 |
| Facilitate continuous improvement | JUL | MIET7508C | 25-06-2012 | 31-08-2012 | 26-10-2012 | 60 | 0.25 | 260 | 390 | 78 | 780.00 |
| Manage budgets and financial plans | JUL | ACCT5272C | 18-07-2012 | 31-08-2012 | 15-10-2012 | 70 | 0.29 | 303 | 455 | 91 | 910.00 |
| Manage budgets and financial plans | JUL | ACCT5272C | 25-06-2012 | 31-08-2012 | 09-11-2012 | 70 | 0.29 | 303 | 455 | 91 | 910.00 |
| Manage budgets and financial plans | JUL | ACCT5272C | 25-06-2012 | 31-08-2012 | 26-10-2012 | 70 | 0.29 | 303 | 455 | 91 | 910.00 |
| Manage people performance | JUL | EMPL5632C | 25-06-2012 | 31-08-2012 | 26-10-2012 | 70 | 0.29 | 303 | 455 | 91 | 910.00 |
| Establish and adjust the marketing mix | JUL | MKTG5811C | 25-06-2012 | 31-08-2012 | 26-10-2012 | 60 | 0.25 | 260 | 390 | 78 | 780.00 |
| Report on financial activity | JUL | ACCT5276C | 23-07-2012 | 31-08-2012 | 30-10-2012 | 30 | 0.13 | 130 | 195 | 39 | 390.00 |
| Report on financial activity | JUL | ACCT5276C | 25-06-2012 | 31-08-2012 | 26-10-2012 | 30 | 0.13 | 130 | 195 | 39 | 390.00 |
| Manage risk | JUL | BUSM8701C | 25-06-2012 | 31-08-2012 | 26-10-2012 | 60 | 0.25 | 260 | 390 | 78 | 780.00 |
| Provide leadership across the organisation | JUL | BUSM6355C | 25-06-2012 | 31-08-2012 | 26-10-2012 | 60 | 0.25 | 260 | 390 | 78 | 780.00 |
| Develop workplace policy and procedures for sustainability | JUL | BUSM6394C | 25-06-2012 | 31-08-2012 | 09-11-2012 | 50 | 0.21 | 216 | 325 | 65 | 650.00 |
| Develop workplace policy and procedures for sustainability | JUL | BUSM6394C | 25-06-2012 | 31-08-2012 | 26-10-2012 | 50 | 0.21 | 216 | 325 | 65 | 650.00 |
| Ensure a safe workplace | JUL | OHTH5592C | 25-06-2012 | 31-08-2012 | 26-10-2012 | 60 | 0.25 | 260 | 390 | 78 | 780.00 |
| Manage industrial relations | JUL | BUSM6407C | 25-06-2012 | 31-08-2012 | 26-10-2012 | 80 | 0.33 | 346 | 520 | 104 | 1,040.00 |
| Manage personal work priorities and professional development | JUL | EMPL5878C | 25-06-2012 | 31-08-2012 | 26-10-2012 | 60 | 0.25 | 260 | 390 | 78 | 780.00 |
| Ensure team effectiveness | JUL | EMPL5897C | 25-06-2012 | 31-08-2012 | 25-10-2012 | 60 | 0.25 | 260 | 390 | 78 | 780.00 |
| Ensure team effectiveness | JUL | EMPL5897C | 25-06-2012 | 31-08-2012 | 26-10-2012 | 60 | 0.25 | 260 | 390 | 78 | 780.00 |
| Ensure team effectiveness | JUL | EMPL5897C | 25-06-2012 | 31-08-2012 | 31-08-2012 | 60 | 0.25 | 260 | 390 | 78 | 780.00 |
| Manage quality customer service | JUL | MKTG7233C | 25-06-2012 | 31-08-2012 | 01-08-2012 | 40 | 0.17 | 173 | 260 | 52 | 520.00 |
| Manage quality customer service | JUL | MKTG7233C | 25-06-2012 | 31-08-2012 | 30-08-2012 | 40 | 0.17 | 173 | 260 | 52 | 520.00 |
| Ensure a safe workplace | NOV | OHTH5592C | 29-11-2012 | 31-12-2012 | 21-12-2012 | 60 | 0.25 | 260 | 390 | 78 | 780.00 |
| Ensure a safe workplace | NOV | OHTH5592C | 29-11-2012 | 31-12-2012 | 31-12-2012 | 60 | 0.25 | 260 | 390 | 78 | 780.00 |
| Establish and adjust the marketing mix | OCT | MKTG5811C | 01-10-2012 | 30-11-2012 | 21-12-2012 | 60 | 0.25 | 260 | 390 | 78 | 780.00 |
| Report on financial activity | OCT | ACCT5276C | 09-10-2012 | 30-11-2012 | 14-12-2012 | 30 | 0.13 | 130 | 195 | 39 | 390.00 |
| Manage risk | OCT | BUSM6458C | 31-10-2012 | 30-11-2012 | 20-12-2012 | 60 | 0.25 | 260 | 390 | 78 | 780.00 |
| Manage risk | OCT | BUSM6458C | 31-10-2012 | 30-11-2012 | 23-11-2012 | 60 | 0.25 | 260 | 390 | 78 | 780.00 |
| Manage operational plan | SEP | BUSM6233C | 01-09-2012 | 31-10-2012 | 21-12-2012 | 60 | 0.25 | 260 | 390 | 78 | 780.00 |
| Show leadership in the workplace | SEP | BUSM6236C | 03-09-2012 | 31-10-2012 | 14-12-2012 | 50 | 0.21 | 216 | 325 | 65 | 650.00 |
| Report on financial activity | SEP | ACCT5276C | 14-09-2012 | 31-10-2012 | 30-11-2012 | 30 | 0.13 | 130 | 195 | 39 | 390.00 |
| Report on financial activity | SEP | ACCT5277C | 05-09-2012 | 31-10-2012 | 09-11-2012 | 30 | 0.13 | 130 | 195 | 39 | 390.00 |
| Build and sustain an innovative work environment | SEP | BUSM6393C | 03-09-2012 | 31-10-2012 | 20-12-2012 | 50 | 0.21 | 216 | 325 | 65 | 650.00 |
| Build and sustain an innovative work environment | SEP | BUSM6393C | 04-09-2012 | 31-10-2012 | 18-09-2012 | 50 | 0.21 | 216 | 325 | 65 | 650.00 |
| Develop a workplace learning environment | SEP | EMPL9751C | 04-09-2012 | 31-10-2012 | 18-09-2012 | 60 | 0.25 | 260 | 390 | 78 | 780.00 |
| Facilitate continuous improvement | SEP | MIET6332C | 01-09-2012 | 31-10-2012 | 21-12-2012 | 60 | 0.25 | 260 | 390 | 78 | 780.00 |
| Manage quality customer service | SEP | MKTG6081C | 03-09-2012 | 31-10-2012 | 20-12-2012 | 40 | 0.17 | 173 | 260 | 52 | 520.00 |
| Manage quality customer service | SEP | MKTG6081C | 04-09-2012 | 31-10-2012 | 18-09-2012 | 40 | 0.17 | 173 | 260 | 52 | 520.00 |
| Ensure team effectiveness | SEP | EMPL5897C | 03-09-2012 | 31-10-2012 | 14-12-2012 | 60 | 0.25 | 260 | 390 | 78 | 780.00 |
| Manage quality customer service | SEP | MKTG7233C | 03-09-2012 | 31-10-2012 | 14-12-2012 | 40 | 0.17 | 173 | 260 | 52 | 520.00 |
* EFTSL : Equivalent Full Time Study Load
** Concession fees are only available at diploma and advanced diploma level for indigenous students.
Back to Program List
| Unit Of Study (Course) | Session | Course Code | Commencement Date | Census Date | Completion Date | Student Contact Hours (SCH) | EFTSL* | Tuition Fee: Onsite|Distance|RPL | |||
| Government Subsidised Fee | Full Fee (Non Government Subsidised) | ||||||||||
| Program commenced 1 July 2009-30 June 2012 ($) | Program commenced 1 July 2012-31 December 2012 ($) | Program commenced 1 July 2012-31 December 2012 Concession ** ($) | Australian Full Fee Paying ($) | ||||||||
| Make a presentation | AUG | COMM5928C | 01-08-2012 | 30-09-2012 | 21-12-2012 | 30 | 0.04 | 130 | 203 | 40 | 445.80 |
| Make a presentation | CY2 | COMM5928C | 01-08-2012 | 31-03-2013 | 13-02-2013 | 30 | 0.04 | 130 | 203 | 40 | 445.80 |
| Make a presentation | CY2 | COMM5928C | 15-10-2012 | 31-03-2013 | 28-06-2013 | 30 | 0.04 | 130 | 203 | 40 | 445.80 |
| Develop a media plan | JUL | MKTG7167C | 25-06-2012 | 31-08-2012 | 26-10-2012 | 60 | 0.08 | 260 | 406 | 81 | 891.60 |
| Make a presentation | JUL | COMM5928C | 25-06-2012 | 31-08-2012 | 26-10-2012 | 30 | 0.04 | 130 | 203 | 40 | 445.80 |
| Apply media analysis and processing tools | JUL | MKTG5821C | 25-06-2012 | 31-08-2012 | 26-10-2012 | 50 | 0.07 | 216 | 338 | 68 | 743.00 |
| Coordinate advertising research | JUL | MKTG7823C | 25-06-2012 | 31-08-2012 | 26-10-2012 | 50 | 0.07 | 216 | 338 | 68 | 743.00 |
| Create mass print media advertisements | JUL | MKTG7824C | 25-06-2012 | 31-08-2012 | 26-10-2012 | 30 | 0.04 | 130 | 203 | 40 | 445.80 |
| Create mass electronic media advertisements | JUL | MKTG7825C | 25-06-2012 | 31-08-2012 | 26-10-2012 | 50 | 0.07 | 216 | 338 | 68 | 743.00 |
| Interpret market trends and developments | JUL | MKTG5834C | 25-06-2012 | 31-08-2012 | 26-10-2012 | 50 | 0.07 | 216 | 338 | 68 | 743.00 |
| Write persuasive copy | JUL | MKTG6045C | 25-06-2012 | 31-08-2012 | 26-10-2012 | 50 | 0.07 | 216 | 338 | 68 | 743.00 |
* EFTSL : Equivalent Full Time Study Load
** Concession fees are only available at diploma and advanced diploma level for indigenous students.
Back to Program List
| Unit Of Study (Course) | Session | Course Code | Commencement Date | Census Date | Completion Date | Student Contact Hours (SCH) | EFTSL* | Tuition Fee: Onsite|Distance|RPL | |||
| Government Subsidised Fee | Full Fee (Non Government Subsidised) | ||||||||||
| Program commenced 1 July 2009-30 June 2012 ($) | Program commenced 1 July 2012-31 December 2012 ($) | Program commenced 1 July 2012-31 December 2012 Concession ** ($) | Australian Full Fee Paying ($) | ||||||||
| Manage personal work priorities and professional development | JUL | BUSM6202C | 25-06-2012 | 31-08-2012 | 16-11-2012 | 60 | 0.11 | 260 | 143 | 29 | 703.20 |
| Design web environments | JUL | COSC5949C | 25-06-2012 | 31-08-2012 | 23-11-2012 | 50 | 0.10 | 216 | 120 | 24 | 586.00 |
| Research role and use of the photoimage in visual communication | JUL | VART5950C | 25-06-2012 | 31-08-2012 | 16-11-2012 | 50 | 0.10 | 216 | 120 | 24 | 586.00 |
| Employ colour management in a digital imaging workplace | JUL | VART5952C | 25-06-2012 | 31-08-2012 | 16-11-2012 | 50 | 0.10 | 216 | 120 | 24 | 586.00 |
| Produce an innovative presentation of professional work | JUL | VART5960C | 25-06-2012 | 31-08-2012 | 16-11-2012 | 160 | 0.31 | 693 | 382 | 77 | 1,875.20 |
| Produce commercial photoimages | JUL | VART5962C | 25-06-2012 | 31-08-2012 | 16-11-2012 | 50 | 0.10 | 216 | 120 | 24 | 586.00 |
| Produce media photoimages | JUL | VART5963C | 25-06-2012 | 31-08-2012 | 16-11-2012 | 50 | 0.10 | 216 | 120 | 24 | 586.00 |
| Manage a small team | JUL | BUSM6261C | 25-06-2012 | 31-08-2012 | 16-11-2012 | 40 | 0.08 | 173 | 96 | 19 | 468.80 |
| Author interactive media | JUL | VART5967C | 25-06-2012 | 31-08-2012 | 16-11-2012 | 50 | 0.10 | 216 | 120 | 24 | 586.00 |
* EFTSL : Equivalent Full Time Study Load
** Concession fees are only available at diploma and advanced diploma level for indigenous students.
Back to Program List
| Unit Of Study (Course) | Session | Course Code | Commencement Date | Census Date | Completion Date | Student Contact Hours (SCH) | EFTSL* | Tuition Fee: Onsite|Distance|RPL | |||
| Government Subsidised Fee | Full Fee (Non Government Subsidised) | ||||||||||
| Program commenced 1 July 2009-30 June 2012 ($) | Program commenced 1 July 2012-31 December 2012 ($) | Program commenced 1 July 2012-31 December 2012 Concession ** ($) | Australian Full Fee Paying ($) | ||||||||
| Implement and monitor marketing activities | JUL | MKTG5831C | 25-06-2012 | 31-08-2012 | 09-11-2012 | 50 | 0.18 | 216 | 303 | 60 | 656.50 |
| Identify and evaluate marketing opportunities | JUL | MKTG5832C | 25-06-2012 | 31-08-2012 | 26-10-2012 | 70 | 0.25 | 303 | 424 | 85 | 919.10 |
| Interpret market trends and developments | JUL | MKTG5834C | 25-06-2012 | 31-08-2012 | 26-10-2012 | 50 | 0.18 | 216 | 303 | 60 | 656.50 |
| Develop a sales plan | JUL | MKTG5836C | 25-06-2012 | 31-08-2012 | 09-11-2012 | 70 | 0.25 | 303 | 424 | 85 | 919.10 |
| Research and apply concepts and theories of creativity | JUL | EMPL5644C | 25-06-2012 | 31-08-2012 | 09-11-2012 | 65 | 0.23 | 281 | 394 | 79 | 853.45 |
* EFTSL : Equivalent Full Time Study Load
** Concession fees are only available at diploma and advanced diploma level for indigenous students.
Back to Program List
| Unit Of Study (Course) | Session | Course Code | Commencement Date | Census Date | Completion Date | Student Contact Hours (SCH) | EFTSL* | Tuition Fee: Onsite|Distance|RPL | |||
| Government Subsidised Fee | Full Fee (Non Government Subsidised) | ||||||||||
| Program commenced 1 July 2009-30 June 2012 ($) | Program commenced 1 July 2012-31 December 2012 ($) | Program commenced 1 July 2012-31 December 2012 Concession ** ($) | Australian Full Fee Paying ($) | ||||||||
| Output images | JUL | MANU7225C | 25-06-2012 | 31-08-2012 | 16-11-2012 | 30 | 0.04 | 130 | 165 | 33 | 385.50 |
| Analyse and implement sustainable work practices | JUL | OHTH5481 | 25-06-2012 | 31-08-2012 | 23-11-2012 | 15 | 0.02 | 65 | 83 | 16 | 192.75 |
| Manage creative and professional self | JUL | BUSM6267 | 25-06-2012 | 31-08-2012 | 12-10-2012 | 60 | 0.07 | 260 | 331 | 66 | 771.00 |
| Manage creative and professional self | JUL | BUSM6274 | 25-06-2012 | 31-08-2012 | 23-11-2012 | 60 | 0.07 | 260 | 331 | 66 | 771.00 |
| Produce files for multimedia production and display | JUL | GRAP5266 | 25-06-2012 | 31-08-2012 | 16-11-2012 | 40 | 0.05 | 173 | 220 | 44 | 514.00 |
| Produce and scan complex digital images for reproduction | JUL | COSC5955 | 25-06-2012 | 31-08-2012 | 23-11-2012 | 54 | 0.07 | 234 | 298 | 59 | 693.90 |
* EFTSL : Equivalent Full Time Study Load
** Concession fees are only available at diploma and advanced diploma level for indigenous students.
Back to Program List
| Unit Of Study (Course) | Session | Course Code | Commencement Date | Census Date | Completion Date | Student Contact Hours (SCH) | EFTSL* | Tuition Fee: Onsite|Distance|RPL | |||
| Government Subsidised Fee | Full Fee (Non Government Subsidised) | ||||||||||
| Program commenced 1 July 2009-30 June 2012 ($) | Program commenced 1 July 2012-31 December 2012 ($) | Program commenced 1 July 2012-31 December 2012 Concession ** ($) | Australian Full Fee Paying ($) | ||||||||
| Specify sound systems | JUL | VART5745C | 25-06-2012 | 31-08-2012 | 23-11-2012 | 35 | 0.07 | 152 | 148 | 30 | 453.60 |
| Manage projects | JUL | BUSM6223C | 25-06-2012 | 31-08-2012 | 23-11-2012 | 60 | 0.13 | 260 | 254 | 51 | 777.60 |
| Edit screen content for fast turnaround | JUL | VART5930C | 25-06-2012 | 31-08-2012 | 23-11-2012 | 30 | 0.06 | 130 | 127 | 26 | 388.80 |
| Shoot a wide range of television content | JUL | VART5931C | 25-06-2012 | 31-08-2012 | 23-11-2012 | 70 | 0.15 | 303 | 296 | 60 | 907.20 |
| Develop a budget | JUL | ACCT5275C | 25-06-2012 | 31-08-2012 | 23-11-2012 | 30 | 0.06 | 130 | 127 | 26 | 388.80 |
| Provide quality service to customers | JUL | MKTG5849C | 25-06-2012 | 31-08-2012 | 17-08-2012 | 20 | 0.04 | 87 | 85 | 17 | 259.20 |
| Manage locations for film and media productions | JUL | PERF5066C | 25-06-2012 | 31-08-2012 | 23-11-2012 | 40 | 0.08 | 173 | 169 | 34 | 518.40 |
| Compile production schedules | JUL | VART5973C | 25-06-2012 | 31-08-2012 | 23-11-2012 | 40 | 0.08 | 173 | 169 | 34 | 518.40 |
* EFTSL : Equivalent Full Time Study Load
** Concession fees are only available at diploma and advanced diploma level for indigenous students.
Back to Program List
| Unit Of Study (Course) | Session | Course Code | Commencement Date | Census Date | Completion Date | Student Contact Hours (SCH) | EFTSL* | Tuition Fee: Onsite|Distance|RPL | |||
| Government Subsidised Fee | Full Fee (Non Government Subsidised) | ||||||||||
| Program commenced 1 July 2009-30 June 2012 ($) | Program commenced 1 July 2012-31 December 2012 ($) | Program commenced 1 July 2012-31 December 2012 Concession ** ($) | Australian Full Fee Paying ($) | ||||||||
| Communicate and apply standard industry procedures and policies in an engineering design office | JUL | CIVE5654 | 25-06-2012 | 31-08-2012 | 09-11-2012 | 60 | 0.10 | 260 | 242 | 49 | 886.80 |
| Prepare basic mechanical and structural engineering drawings to AS 1100 | JUL | CIVE5655 | 25-06-2012 | 31-08-2012 | 26-10-2012 | 40 | 0.06 | 173 | 161 | 32 | 591.20 |
| Apply knowledge of environmental issues | JUL | CIVE5656 | 25-06-2012 | 31-08-2012 | 09-11-2012 | 40 | 0.06 | 173 | 161 | 32 | 591.20 |
| Apply knowledge of environmental issues | JUL | CIVE5656 | 25-06-2012 | 31-08-2012 | 24-08-2012 | 40 | 0.06 | 173 | 161 | 32 | 591.20 |
| Use computer aided drafting systems to produce basic engineering drawings | JUL | MIET6093C | 25-06-2012 | 31-08-2012 | 07-09-2012 | 60 | 0.10 | 260 | 242 | 49 | 886.80 |
| Use technical mathematics (basic) | JUL | CIVE5658 | 25-06-2012 | 31-08-2012 | 09-11-2012 | 60 | 0.10 | 260 | 242 | 49 | 886.80 |
| Use standard office computer software for technical applications | JUL | CIVE5659 | 25-06-2012 | 31-08-2012 | 03-08-2012 | 20 | 0.03 | 87 | 81 | 16 | 295.60 |
| Apply knowledge of civil construction processes | JUL | CIVE5661 | 25-06-2012 | 31-08-2012 | 07-09-2012 | 40 | 0.06 | 173 | 161 | 32 | 591.20 |
| Apply knowledge of civil construction processes | JUL | CIVE5661 | 25-06-2012 | 31-08-2012 | 09-11-2012 | 40 | 0.06 | 173 | 161 | 32 | 591.20 |
| Prepare reinforced concrete drawings | JUL | CIVE5662 | 25-06-2012 | 31-08-2012 | 07-09-2012 | 60 | 0.10 | 260 | 242 | 49 | 886.80 |
| Prepare structural steel design drawings | JUL | CIVE5663 | 25-06-2012 | 31-08-2012 | 07-09-2012 | 40 | 0.06 | 173 | 161 | 32 | 591.20 |
| Apply knowledge of concrete technology | JUL | CIVE5664 | 25-06-2012 | 31-08-2012 | 09-11-2012 | 40 | 0.06 | 173 | 161 | 32 | 591.20 |
| Apply timber technology to engineering | JUL | CIVE5665 | 02-07-2012 | 31-08-2012 | 24-08-2012 | 40 | 0.06 | 173 | 161 | 32 | 591.20 |
| Prepare drawings required in the construction of urban roads | JUL | CIVE5666 | 25-06-2012 | 31-08-2012 | 24-08-2012 | 40 | 0.06 | 173 | 161 | 32 | 591.20 |
| Carry out geotechnical site investigation | JUL | CIVE5670 | 25-06-2012 | 31-08-2012 | 09-11-2012 | 40 | 0.06 | 173 | 161 | 32 | 591.20 |
| Analyse force systems (basic) | JUL | CIVE5671 | 25-06-2012 | 31-08-2012 | 09-11-2012 | 60 | 0.10 | 260 | 242 | 49 | 886.80 |
| Prepare cost estimates | JUL | CIVE5673 | 02-07-2012 | 31-08-2012 | 09-11-2012 | 20 | 0.03 | 87 | 81 | 16 | 295.60 |
| Prepare cost estimates | JUL | CIVE5673 | 25-06-2012 | 31-08-2012 | 09-11-2012 | 20 | 0.03 | 87 | 81 | 16 | 295.60 |
| Use technical mathematics (advanced) | JUL | CIVE5674 | 25-06-2012 | 31-08-2012 | 09-11-2012 | 60 | 0.10 | 260 | 242 | 49 | 886.80 |
| Analyse force systems (advanced) | JUL | CIVE5675 | 25-06-2012 | 31-08-2012 | 09-11-2012 | 60 | 0.10 | 260 | 242 | 49 | 886.80 |
| Select common engineering materials | JUL | PROC5277C | 25-06-2012 | 31-08-2012 | 09-11-2012 | 40 | 0.06 | 173 | 161 | 32 | 591.20 |
| Carry out geometric road design | JUL | CIVE5678 | 25-06-2012 | 31-08-2012 | 09-11-2012 | 40 | 0.06 | 173 | 161 | 32 | 591.20 |
| Apply basic survey methods to engineering | JUL | MIET6333 | 25-06-2012 | 31-08-2012 | 07-09-2012 | 40 | 0.06 | 173 | 161 | 32 | 591.20 |
| Apply basic survey methods to engineering | JUL | MIET6333 | 25-06-2012 | 31-08-2012 | 24-08-2012 | 40 | 0.06 | 173 | 161 | 32 | 591.20 |
| Select common engineering materials | OCT | PROC5277C | 10-10-2012 | 30-11-2012 | 09-11-2012 | 40 | 0.06 | 173 | 161 | 32 | 591.20 |
| Prepare basic mechanical and structural engineering drawings to AS 1100 | SEP | CIVE5655 | 17-09-2012 | 31-10-2012 | 09-11-2012 | 40 | 0.06 | 173 | 161 | 32 | 591.20 |
| Use computer aided drafting systems to produce basic engineering drawings | SEP | MIET6093C | 17-09-2012 | 31-10-2012 | 09-11-2012 | 60 | 0.10 | 260 | 242 | 49 | 886.80 |
| Use extended features of CAD | SEP | CIVE5657 | 10-09-2012 | 31-10-2012 | 09-11-2012 | 60 | 0.10 | 260 | 242 | 49 | 886.80 |
| Use extended features of CAD | SEP | CIVE5657 | 17-09-2012 | 31-10-2012 | 09-11-2012 | 60 | 0.10 | 260 | 242 | 49 | 886.80 |
| Use standard office computer software for technical applications | SEP | CIVE5659 | 17-09-2012 | 31-10-2012 | 09-11-2012 | 20 | 0.03 | 87 | 81 | 16 | 295.60 |
| Interpret and process survey data | SEP | CIVE5660 | 03-09-2012 | 31-10-2012 | 09-11-2012 | 40 | 0.06 | 173 | 161 | 32 | 591.20 |
| Interpret and process survey data | SEP | CIVE5660 | 10-09-2012 | 31-10-2012 | 09-11-2012 | 40 | 0.06 | 173 | 161 | 32 | 591.20 |
| Apply knowledge of civil construction processes | SEP | CIVE5661 | 03-09-2012 | 31-10-2012 | 09-11-2012 | 40 | 0.06 | 173 | 161 | 32 | 591.20 |
| Prepare reinforced concrete drawings | SEP | CIVE5662 | 10-09-2012 | 31-10-2012 | 09-11-2012 | 60 | 0.10 | 260 | 242 | 49 | 886.80 |
| Prepare structural steel design drawings | SEP | CIVE5663 | 10-09-2012 | 31-10-2012 | 09-11-2012 | 40 | 0.06 | 173 | 161 | 32 | 591.20 |
| Apply timber technology to engineering | SEP | CIVE5665 | 03-09-2012 | 31-10-2012 | 09-11-2012 | 40 | 0.06 | 173 | 161 | 32 | 591.20 |
| Prepare drawings for reticulatation systems | SEP | CIVE5667 | 03-09-2012 | 31-10-2012 | 09-11-2012 | 40 | 0.06 | 173 | 161 | 32 | 591.20 |
| Prepare cost estimates | SEP | CIVE5673 | 03-09-2012 | 31-10-2012 | 09-11-2012 | 20 | 0.03 | 87 | 81 | 16 | 295.60 |
| Manage an engineering project | SEP | CIVE5696 | 07-09-2012 | 31-10-2012 | 09-11-2012 | 40 | 0.06 | 173 | 161 | 32 | 591.20 |
* EFTSL : Equivalent Full Time Study Load
** Concession fees are only available at diploma and advanced diploma level for indigenous students.
Back to Program List
| Unit Of Study (Course) | Session | Course Code | Commencement Date | Census Date | Completion Date | Student Contact Hours (SCH) | EFTSL* | Tuition Fee: Onsite|Distance|RPL | |||
| Government Subsidised Fee | Full Fee (Non Government Subsidised) | ||||||||||
| Program commenced 1 July 2009-30 June 2012 ($) | Program commenced 1 July 2012-31 December 2012 ($) | Program commenced 1 July 2012-31 December 2012 Concession ** ($) | Australian Full Fee Paying ($) | ||||||||
| Generate and transfer complex computer-aided drawings and specifications | JUL | MKTG9234C | 25-06-2012 | 31-08-2012 | 23-11-2012 | 72 | 0.08 | 312 | 393 | 78 | 869.04 |
| Apply the design process to 2-dimensional work in response to a brief | JUL | GRAP5147C | 25-06-2012 | 31-08-2012 | 23-11-2012 | 50 | 0.06 | 216 | 273 | 54 | 603.50 |
| Produce computer-aided drawings | JUL | VART5768C | 25-06-2012 | 31-08-2012 | 23-11-2012 | 50 | 0.06 | 216 | 273 | 54 | 603.50 |
| Analyse and implement sustainable work practices | JUL | OHTH5481 | 25-06-2012 | 31-08-2012 | 23-11-2012 | 15 | 0.02 | 65 | 82 | 16 | 181.05 |
| Manage creative and professional self | JUL | BUSM6267 | 25-06-2012 | 31-08-2012 | 12-10-2012 | 60 | 0.07 | 260 | 328 | 65 | 724.20 |
| Manage creative and professional self | JUL | BUSM6274 | 25-06-2012 | 31-08-2012 | 23-11-2012 | 60 | 0.07 | 260 | 328 | 65 | 724.20 |
| Produce and scan complex digital images for reproduction | JUL | COSC5955 | 25-06-2012 | 31-08-2012 | 23-11-2012 | 54 | 0.06 | 234 | 295 | 59 | 651.78 |
| Design and construct 3-dimensional object(s) | JUL | GRAP5277 | 25-06-2012 | 31-08-2012 | 23-11-2012 | 55 | 0.06 | 238 | 300 | 60 | 663.85 |
| Create 3D surface models using computer aided design systems | JUL | GRAP5278 | 25-06-2012 | 31-08-2012 | 23-11-2012 | 55 | 0.06 | 238 | 300 | 60 | 663.85 |
| Design and produce a commercial product from a brief | JUL | VART5981 | 25-06-2012 | 31-08-2012 | 23-11-2012 | 195 | 0.22 | 844 | 1,065 | 213 | 2,353.65 |
| Design and produce a product incorporating mechanical/electrical devices | JUL | VART5980 | 25-06-2012 | 31-08-2012 | 23-11-2012 | 180 | 0.21 | 779 | 983 | 196 | 2,172.60 |
* EFTSL : Equivalent Full Time Study Load
** Concession fees are only available at diploma and advanced diploma level for indigenous students.
Back to Program List
| Unit Of Study (Course) | Session | Course Code | Commencement Date | Census Date | Completion Date | Student Contact Hours (SCH) | EFTSL* | Tuition Fee: Onsite|Distance|RPL | |||
| Government Subsidised Fee | Full Fee (Non Government Subsidised) | ||||||||||
| Program commenced 1 July 2009-30 June 2012 ($) | Program commenced 1 July 2012-31 December 2012 ($) | Program commenced 1 July 2012-31 December 2012 Concession ** ($) | Australian Full Fee Paying ($) | ||||||||
| Produce digital images | JUL | VART5740C | 25-06-2012 | 31-08-2012 | 16-11-2012 | 50 | 0.06 | 216 | 224 | 45 | 589.50 |
| Produce digital images | JUL | VART5984C | 25-06-2012 | 31-08-2012 | 16-11-2012 | 50 | 0.06 | 216 | 224 | 45 | 589.50 |
| Analyse and implement sustainable work practices | JUL | OHTH5490 | 25-06-2012 | 31-08-2012 | 16-11-2012 | 15 | 0.02 | 65 | 67 | 14 | 176.85 |
| Address legal and administrative requirements | JUL | BUSM6299C | 25-06-2012 | 31-08-2012 | 16-11-2012 | 50 | 0.06 | 216 | 224 | 45 | 589.50 |
| Promote the business | JUL | MKTG5859C | 25-06-2012 | 31-08-2012 | 16-11-2012 | 50 | 0.06 | 216 | 224 | 45 | 589.50 |
| Promote the business | JUL | MKTG5901C | 25-06-2012 | 31-08-2012 | 16-11-2012 | 50 | 0.06 | 216 | 224 | 45 | 589.50 |
| Apply techniques to produce paintings | JUL | VART5988C | 25-06-2012 | 31-08-2012 | 30-11-2012 | 50 | 0.06 | 216 | 224 | 45 | 589.50 |
| Produce paintings | JUL | VART5989C | 25-06-2012 | 31-08-2012 | 16-11-2012 | 50 | 0.06 | 216 | 224 | 45 | 589.50 |
| Produce paintings | JUL | VART6007C | 25-06-2012 | 31-08-2012 | 16-11-2012 | 50 | 0.06 | 216 | 224 | 45 | 589.50 |
| Apply techniques to produce prints | JUL | VART5993C | 10-07-2012 | 31-08-2012 | 30-11-2012 | 50 | 0.06 | 216 | 224 | 45 | 589.50 |
| Produce prints | JUL | VART5994C | 10-07-2012 | 31-08-2012 | 30-11-2012 | 50 | 0.06 | 216 | 224 | 45 | 589.50 |
| Produce prints | JUL | VART5994C | 25-06-2012 | 31-08-2012 | 16-11-2012 | 50 | 0.06 | 216 | 224 | 45 | 589.50 |
| Produce prints | JUL | VART6009C | 25-06-2012 | 31-08-2012 | 16-11-2012 | 50 | 0.06 | 216 | 224 | 45 | 589.50 |
| Produce sculpture | JUL | VART5999C | 10-07-2012 | 31-08-2012 | 30-11-2012 | 50 | 0.06 | 216 | 224 | 45 | 589.50 |
| Produce sculpture | JUL | VART5999C | 25-06-2012 | 31-08-2012 | 16-11-2012 | 50 | 0.06 | 216 | 224 | 45 | 589.50 |
| Produce sculpture | JUL | VART6011C | 25-06-2012 | 31-08-2012 | 16-11-2012 | 50 | 0.06 | 216 | 224 | 45 | 589.50 |
| Produce sculpture | JUL | VART6011C | 25-06-2012 | 31-08-2012 | 30-11-2012 | 50 | 0.06 | 216 | 224 | 45 | 589.50 |
| Apply techniques to produce prints | OCT | VART6008C | 01-10-2012 | 30-11-2012 | 30-11-2012 | 50 | 0.06 | 216 | 224 | 45 | 589.50 |
| Produce prints | OCT | VART6009C | 01-10-2012 | 30-11-2012 | 30-11-2012 | 50 | 0.06 | 216 | 224 | 45 | 589.50 |
* EFTSL : Equivalent Full Time Study Load
** Concession fees are only available at diploma and advanced diploma level for indigenous students.
Back to Program List
| Unit Of Study (Course) | Session | Course Code | Commencement Date | Census Date | Completion Date | Student Contact Hours (SCH) | EFTSL* | Tuition Fee: Onsite|Distance|RPL | |||
| Government Subsidised Fee | Full Fee (Non Government Subsidised) | ||||||||||
| Program commenced 1 July 2009-30 June 2012 ($) | Program commenced 1 July 2012-31 December 2012 ($) | Program commenced 1 July 2012-31 December 2012 Concession ** ($) | Australian Full Fee Paying ($) | ||||||||
| Apply the design process to 2-dimensional work in response to a brief | JUL | GRAP5147C | 25-06-2012 | 31-08-2012 | 23-11-2012 | 50 | 0.06 | 216 | 276 | 55 | 644.00 |
| Apply the design process to 3-dimensional work in response to a brief | JUL | GRAP5148C | 25-06-2012 | 31-08-2012 | 23-11-2012 | 50 | 0.06 | 216 | 276 | 55 | 644.00 |
| Apply colour theory in response to a brief | JUL | GRAP5146C | 25-06-2012 | 31-08-2012 | 23-11-2012 | 30 | 0.04 | 130 | 166 | 33 | 386.40 |
| Research and apply the history and theory of design to design practice | JUL | GRAP5149C | 25-06-2012 | 31-08-2012 | 23-11-2012 | 65 | 0.08 | 281 | 359 | 72 | 837.20 |
| Create, manipulate and incorporate 2D graphics | JUL | COSC5232C | 09-07-2012 | 31-08-2012 | 23-11-2012 | 25 | 0.03 | 108 | 138 | 28 | 322.00 |
| Create, manipulate and incorporate 2D graphics | JUL | COSC5232C | 25-06-2012 | 31-08-2012 | 23-11-2012 | 25 | 0.03 | 108 | 138 | 28 | 322.00 |
| Use a 35mm SLR camera or digital equivalent | JUL | VART5766C | 25-06-2012 | 31-08-2012 | 23-11-2012 | 50 | 0.06 | 216 | 276 | 55 | 644.00 |
| Produce computer-aided drawings | JUL | VART5768C | 25-06-2012 | 31-08-2012 | 23-11-2012 | 50 | 0.06 | 216 | 276 | 55 | 644.00 |
| Produce retail visual illustrations | JUL | MKTG5860C | 25-06-2012 | 31-08-2012 | 23-11-2012 | 30 | 0.04 | 130 | 166 | 33 | 386.40 |
| Manufacture visual merchandising support structures | JUL | MKTG5861C | 25-06-2012 | 31-08-2012 | 23-11-2012 | 30 | 0.04 | 130 | 166 | 33 | 386.40 |
| Produce perspective drawings, plans and elevations | JUL | MKTG5862C | 25-06-2012 | 31-08-2012 | 23-11-2012 | 45 | 0.06 | 195 | 248 | 50 | 579.60 |
| Profile a retail market | JUL | MKTG5863C | 25-06-2012 | 31-08-2012 | 23-11-2012 | 35 | 0.04 | 152 | 193 | 38 | 450.80 |
| Work effectively as a visual merchandiser | JUL | MKTG5864C | 25-06-2012 | 31-08-2012 | 23-11-2012 | 30 | 0.04 | 130 | 166 | 33 | 386.40 |
| Apply lettering | JUL | MKTG5865C | 25-06-2012 | 31-08-2012 | 23-11-2012 | 70 | 0.09 | 303 | 386 | 77 | 901.60 |
| Present products | JUL | MKTG5866C | 25-06-2012 | 31-08-2012 | 23-11-2012 | 45 | 0.06 | 195 | 248 | 50 | 579.60 |
| Develop concept visuals | JUL | MKTG5867C | 25-06-2012 | 31-08-2012 | 23-11-2012 | 45 | 0.06 | 195 | 248 | 50 | 579.60 |
| Produce working drawings | JUL | MKTG5868C | 25-06-2012 | 31-08-2012 | 23-11-2012 | 45 | 0.06 | 195 | 248 | 50 | 579.60 |
| Communicate in the workplace | JUL | EMPL5655C | 25-06-2012 | 31-08-2012 | 23-11-2012 | 40 | 0.05 | 173 | 221 | 44 | 515.20 |
| Apply safe working practices | JUL | OHTH5484C | 09-07-2012 | 31-08-2012 | 23-11-2012 | 20 | 0.03 | 87 | 110 | 22 | 257.60 |
| Apply safe working practices | JUL | OHTH5484C | 25-06-2012 | 31-08-2012 | 23-11-2012 | 20 | 0.03 | 87 | 110 | 22 | 257.60 |
| Demonstrate merchandising and category presentation skills | JUL | MKTG5874C | 09-07-2012 | 31-08-2012 | 23-11-2012 | 90 | 0.11 | 390 | 497 | 99 | 1,159.20 |
| Demonstrate merchandising and category presentation skills | JUL | MKTG5874C | 25-06-2012 | 31-08-2012 | 23-11-2012 | 90 | 0.11 | 390 | 497 | 99 | 1,159.20 |
| Manage merchandise and store presentation | JUL | MKTG5926C | 09-07-2012 | 31-08-2012 | 23-11-2012 | 35 | 0.04 | 152 | 193 | 38 | 450.80 |
| Manage merchandise and store presentation | JUL | MKTG5926C | 25-06-2012 | 31-08-2012 | 23-11-2012 | 35 | 0.04 | 152 | 193 | 38 | 450.80 |
| Produce perspective drawings, plans and elevations | SEP | MKTG5862C | 03-09-2012 | 31-10-2012 | 12-10-2012 | 45 | 0.06 | 195 | 248 | 50 | 579.60 |
| Produce working drawings | SEP | MKTG5868C | 03-09-2012 | 31-10-2012 | 12-10-2012 | 45 | 0.06 | 195 | 248 | 50 | 579.60 |
* EFTSL : Equivalent Full Time Study Load
** Concession fees are only available at diploma and advanced diploma level for indigenous students.
Back to Program List
| Unit Of Study (Course) | Session | Course Code | Commencement Date | Census Date | Completion Date | Student Contact Hours (SCH) | EFTSL* | Tuition Fee: Onsite|Distance|RPL | |||
| Government Subsidised Fee | Full Fee (Non Government Subsidised) | ||||||||||
| Program commenced 1 July 2009-30 June 2012 ($) | Program commenced 1 July 2012-31 December 2012 ($) | Program commenced 1 July 2012-31 December 2012 Concession ** ($) | Australian Full Fee Paying ($) | ||||||||
| Conduct an advanced GPS data collection and set out survey | JUL | GEOM5091C | 25-06-2012 | 31-08-2012 | 09-11-2012 | 40 | 0.04 | 173 | 207 | 42 | 542.40 |
| Conduct an engineering survey | JUL | GEOM5092C | 25-06-2012 | 31-08-2012 | 09-11-2012 | 40 | 0.04 | 173 | 207 | 42 | 542.40 |
| Conduct geodetic surveying | JUL | GEOM5093C | 25-06-2012 | 31-08-2012 | 09-11-2012 | 60 | 0.06 | 260 | 311 | 62 | 813.60 |
| Conduct an engineering surveying project | JUL | GEOM5094C | 25-06-2012 | 31-08-2012 | 09-11-2012 | 60 | 0.06 | 260 | 311 | 62 | 813.60 |
| Produce maps for land management purposes | JUL | GEOM5096C | 25-06-2012 | 31-08-2012 | 09-11-2012 | 120 | 0.11 | 520 | 622 | 125 | 1,627.20 |
| Design road and railway | JUL | CIVE5710C | 25-06-2012 | 31-08-2012 | 09-11-2012 | 100 | 0.09 | 433 | 518 | 104 | 1,356.00 |
| Create engineering drawings | JUL | MIET6150C | 25-06-2012 | 31-08-2012 | 09-11-2012 | 80 | 0.08 | 346 | 414 | 83 | 1,084.80 |
* EFTSL : Equivalent Full Time Study Load
** Concession fees are only available at diploma and advanced diploma level for indigenous students.
Back to Program List
| Unit Of Study (Course) | Session | Course Code | Commencement Date | Census Date | Completion Date | Student Contact Hours (SCH) | EFTSL* | Tuition Fee: Onsite|Distance|RPL | |||
| Government Subsidised Fee | Full Fee (Non Government Subsidised) | ||||||||||
| Program commenced 1 July 2009-30 June 2012 ($) | Program commenced 1 July 2012-31 December 2012 ($) | Program commenced 1 July 2012-31 December 2012 Concession ** ($) | Australian Full Fee Paying ($) | ||||||||
| Produce digital images | JUL | VART5740C | 25-06-2012 | 31-08-2012 | 16-11-2012 | 50 | 0.06 | 216 | 232 | 46 | 610.00 |
| Produce digital images | JUL | VART5984C | 25-06-2012 | 31-08-2012 | 16-11-2012 | 50 | 0.06 | 216 | 232 | 46 | 610.00 |
| Analyse and implement sustainable work practices | JUL | OHTH5490 | 25-06-2012 | 31-08-2012 | 16-11-2012 | 15 | 0.02 | 65 | 70 | 14 | 183.00 |
| Address legal and administrative requirements | JUL | BUSM6299C | 25-06-2012 | 31-08-2012 | 16-11-2012 | 50 | 0.06 | 216 | 232 | 46 | 610.00 |
| Promote the business | JUL | MKTG5859C | 25-06-2012 | 31-08-2012 | 16-11-2012 | 50 | 0.06 | 216 | 232 | 46 | 610.00 |
| Promote the business | JUL | MKTG5901C | 25-06-2012 | 31-08-2012 | 16-11-2012 | 50 | 0.06 | 216 | 232 | 46 | 610.00 |
| Apply techniques to produce paintings | JUL | VART5988C | 25-06-2012 | 31-08-2012 | 30-11-2012 | 50 | 0.06 | 216 | 232 | 46 | 610.00 |
| Produce paintings | JUL | VART5989C | 25-06-2012 | 31-08-2012 | 16-11-2012 | 50 | 0.06 | 216 | 232 | 46 | 610.00 |
| Produce paintings | JUL | VART6007C | 25-06-2012 | 31-08-2012 | 16-11-2012 | 50 | 0.06 | 216 | 232 | 46 | 610.00 |
| Apply techniques to produce prints | JUL | VART5993C | 10-07-2012 | 31-08-2012 | 30-11-2012 | 50 | 0.06 | 216 | 232 | 46 | 610.00 |
| Produce prints | JUL | VART5994C | 10-07-2012 | 31-08-2012 | 30-11-2012 | 50 | 0.06 | 216 | 232 | 46 | 610.00 |
| Produce prints | JUL | VART5994C | 25-06-2012 | 31-08-2012 | 16-11-2012 | 50 | 0.06 | 216 | 232 | 46 | 610.00 |
| Produce prints | JUL | VART6009C | 25-06-2012 | 31-08-2012 | 16-11-2012 | 50 | 0.06 | 216 | 232 | 46 | 610.00 |
| Produce sculpture | JUL | VART5999C | 10-07-2012 | 31-08-2012 | 30-11-2012 | 50 | 0.06 | 216 | 232 | 46 | 610.00 |
| Produce sculpture | JUL | VART5999C | 25-06-2012 | 31-08-2012 | 16-11-2012 | 50 | 0.06 | 216 | 232 | 46 | 610.00 |
| Produce sculpture | JUL | VART6011C | 25-06-2012 | 31-08-2012 | 16-11-2012 | 50 | 0.06 | 216 | 232 | 46 | 610.00 |
| Produce sculpture | JUL | VART6011C | 25-06-2012 | 31-08-2012 | 30-11-2012 | 50 | 0.06 | 216 | 232 | 46 | 610.00 |
| Produce work which expresses own Aboriginal or Torres Strait Islander identity | JUL | VART6004C | 25-06-2012 | 31-08-2012 | 16-11-2012 | 50 | 0.06 | 216 | 232 | 46 | 610.00 |
| Apply techniques to produce prints | OCT | VART6008C | 01-10-2012 | 30-11-2012 | 30-11-2012 | 50 | 0.06 | 216 | 232 | 46 | 610.00 |
| Produce prints | OCT | VART6009C | 01-10-2012 | 30-11-2012 | 30-11-2012 | 50 | 0.06 | 216 | 232 | 46 | 610.00 |
* EFTSL : Equivalent Full Time Study Load
** Concession fees are only available at diploma and advanced diploma level for indigenous students.
Back to Program List
| Unit Of Study (Course) | Session | Course Code | Commencement Date | Census Date | Completion Date | Student Contact Hours (SCH) | EFTSL* | Tuition Fee: Onsite|Distance|RPL | |||
| Government Subsidised Fee | Full Fee (Non Government Subsidised) | ||||||||||
| Program commenced 1 July 2009-30 June 2012 ($) | Program commenced 1 July 2012-31 December 2012 ($) | Program commenced 1 July 2012-31 December 2012 Concession ** ($) | Australian Full Fee Paying ($) | ||||||||
| Facilitate the application of principles of occupational health to control OHS risk | AUG | OHTH5505C | 18-08-2012 | 30-09-2012 | 14-12-2012 | 40 | 0.11 | 173 | 250 | 50 | 350.00 |
| Participate in the coordination and maintenance of a systematic approach to managing OHS | JUL | OHTH5498C | 25-06-2012 | 31-08-2012 | 14-12-2012 | 50 | 0.14 | 216 | 312 | 62 | 437.50 |
| Participate in the management of the OHS information and data systems | JUL | OHTH5499C | 25-06-2012 | 31-08-2012 | 14-12-2012 | 50 | 0.14 | 216 | 312 | 62 | 437.50 |
| Apply principles of OHS risk management | JUL | OHTH5501C | 25-06-2012 | 31-08-2012 | 14-12-2012 | 40 | 0.11 | 173 | 250 | 50 | 350.00 |
| Monitor and facilitate the management of hazards associated with plant | JUL | OHTH5504C | 25-06-2012 | 31-08-2012 | 14-12-2012 | 60 | 0.16 | 260 | 375 | 75 | 525.00 |
| Manage hazards in the work environment | JUL | OHTH5634C | 25-06-2012 | 31-08-2012 | 14-12-2012 | 60 | 0.16 | 260 | 375 | 75 | 525.00 |
| Participate in the investigation of incidents | SEP | OHTH5503C | 03-09-2012 | 31-10-2012 | 14-12-2012 | 50 | 0.14 | 216 | 312 | 62 | 437.50 |
| Participate in the investigation of incidents | SEP | OHTH5503C | 15-09-2012 | 31-10-2012 | 14-12-2012 | 50 | 0.14 | 216 | 312 | 62 | 437.50 |
| Monitor and facilitate the management of hazards associated with plant | SEP | OHTH5504C | 03-09-2012 | 31-10-2012 | 14-12-2012 | 60 | 0.16 | 260 | 375 | 75 | 525.00 |
| Facilitate the application of principles of occupational health to control OHS risk | SEP | OHTH5505C | 03-09-2012 | 31-10-2012 | 14-12-2012 | 40 | 0.11 | 173 | 250 | 50 | 350.00 |
| Manage rehabilitation or return to work programs | SEP | EMPL5664C | 03-09-2012 | 31-10-2012 | 14-12-2012 | 50 | 0.14 | 216 | 312 | 62 | 437.50 |
* EFTSL : Equivalent Full Time Study Load
** Concession fees are only available at diploma and advanced diploma level for indigenous students.
Back to Program List
| Unit Of Study (Course) | Session | Course Code | Commencement Date | Census Date | Completion Date | Student Contact Hours (SCH) | EFTSL* | Tuition Fee: Onsite|Distance|RPL | |||
| Government Subsidised Fee | Full Fee (Non Government Subsidised) | ||||||||||
| Program commenced 1 July 2009-30 June 2012 ($) | Program commenced 1 July 2012-31 December 2012 ($) | Program commenced 1 July 2012-31 December 2012 Concession ** ($) | Australian Full Fee Paying ($) | ||||||||
| Manage operational plan | CY2 | BUSM6227C | 23-08-2012 | 31-03-2013 | 17-04-2013 | 60 | 0.13 | 260 | 467 | 94 | 733.20 |
* EFTSL : Equivalent Full Time Study Load
** Concession fees are only available at diploma and advanced diploma level for indigenous students.
Back to Program List
| Unit Of Study (Course) | Session | Course Code | Commencement Date | Census Date | Completion Date | Student Contact Hours (SCH) | EFTSL* | Tuition Fee: Onsite|Distance|RPL | |||
| Government Subsidised Fee | Full Fee (Non Government Subsidised) | ||||||||||
| Program commenced 1 July 2009-30 June 2012 ($) | Program commenced 1 July 2012-31 December 2012 ($) | Program commenced 1 July 2012-31 December 2012 Concession ** ($) | Australian Full Fee Paying ($) | ||||||||
| Apply first aid | AUG | OHTH5661C | 29-08-2012 | 30-09-2012 | 29-08-2012 | 18 | 0.03 | 78 | 62 | 12 | 175.68 |
| Support the rights and safety of children and young people | CY2 | JUST5166C | 25-06-2012 | 31-03-2013 | 28-06-2013 | 40 | 0.06 | 173 | 139 | 28 | 390.40 |
| Develop, implement and promote effective workplace communication | CY2 | HWSS5431C | 23-08-2012 | 31-03-2013 | 17-04-2013 | 80 | 0.13 | 346 | 278 | 55 | 780.80 |
| Develop, implement and promote effective workplace communication | CY2 | HWSS5431C | 25-06-2012 | 31-03-2013 | 28-06-2013 | 80 | 0.13 | 346 | 278 | 55 | 780.80 |
| Develop, implement and review services and programs to meet client needs | CY2 | MKTG5953C | 25-06-2012 | 31-03-2013 | 28-06-2013 | 70 | 0.11 | 303 | 243 | 48 | 683.20 |
| Plan and conduct group activities | CY2 | EMPL5720C | 25-06-2012 | 31-03-2013 | 28-06-2013 | 50 | 0.08 | 216 | 174 | 34 | 488.00 |
| Facilitate links with other services | CY2 | HWSS5433C | 25-06-2012 | 31-03-2013 | 28-06-2013 | 70 | 0.11 | 303 | 243 | 48 | 683.20 |
| Support young people to take collective action | CY2 | HWSS5434C | 25-06-2012 | 31-03-2013 | 28-06-2013 | 55 | 0.09 | 238 | 191 | 38 | 536.80 |
| Support youth programs | CY2 | HWSS5435C | 25-06-2012 | 31-03-2013 | 28-06-2013 | 150 | 0.24 | 650 | 520 | 104 | 1,464.00 |
| Manage service response to young people in crisis | CY2 | HWSS5436C | 25-06-2012 | 31-03-2013 | 28-06-2013 | 150 | 0.24 | 650 | 520 | 104 | 1,464.00 |
| Maintain OHS processes | CY2 | OHTH5536C | 24-07-2012 | 31-03-2013 | 21-06-2013 | 40 | 0.06 | 173 | 139 | 28 | 390.40 |
| Maintain OHS processes | CY2 | OHTH5536C | 25-06-2012 | 31-03-2013 | 28-06-2013 | 40 | 0.06 | 173 | 139 | 28 | 390.40 |
| Develop and implement procedures to enable young people to address their needs | CY2 | HWSS5437C | 25-06-2012 | 31-03-2013 | 28-06-2013 | 55 | 0.09 | 238 | 191 | 38 | 536.80 |
| Provide services to clients with complex needs | CY2 | HWSS5439C | 24-07-2012 | 31-03-2013 | 21-06-2013 | 60 | 0.10 | 260 | 208 | 41 | 585.60 |
| Provide services to clients with complex needs | CY2 | HWSS5439C | 25-06-2012 | 31-03-2013 | 28-06-2013 | 60 | 0.10 | 260 | 208 | 41 | 585.60 |
| Reflect on and improve own professional practice | CY2 | EMPL5721C | 23-08-2012 | 31-03-2013 | 17-04-2013 | 120 | 0.19 | 520 | 416 | 83 | 1,171.20 |
| Reflect on and improve own professional practice | CY2 | EMPL5721C | 24-07-2012 | 31-03-2013 | 21-06-2013 | 120 | 0.19 | 520 | 416 | 83 | 1,171.20 |
| Reflect on and improve own professional practice | CY2 | EMPL5721C | 25-06-2012 | 31-03-2013 | 28-06-2013 | 120 | 0.19 | 520 | 416 | 83 | 1,171.20 |
| Develop, facilitate and monitor all aspects of case management | CY2 | HWSS5440C | 25-06-2012 | 31-03-2013 | 28-06-2013 | 75 | 0.12 | 325 | 260 | 52 | 732.00 |
| Develop new networks | CY2 | HWSS5441C | 23-08-2012 | 31-03-2013 | 17-04-2013 | 75 | 0.12 | 325 | 260 | 52 | 732.00 |
| Maintain legal and ethical work practices | CY2 | LAW5204C | 25-06-2012 | 31-03-2013 | 28-06-2013 | 70 | 0.11 | 303 | 243 | 48 | 683.20 |
| Maintain an effective community sector work environment | CY2 | HWSS5667C | 25-06-2012 | 31-03-2013 | 28-06-2013 | 45 | 0.07 | 195 | 156 | 31 | 439.20 |
| Assess needs of clients with alcohol and/or other drugs issues | JUL | HWSS5443C | 19-07-2012 | 31-08-2012 | 11-10-2012 | 125 | 0.20 | 541 | 434 | 86 | 1,220.00 |
| Apply first aid | JUL | OHTH5661C | 03-07-2012 | 31-08-2012 | 03-07-2012 | 18 | 0.03 | 78 | 62 | 12 | 175.68 |
| Apply first aid | JUL | OHTH5661C | 10-07-2012 | 31-08-2012 | 10-07-2012 | 18 | 0.03 | 78 | 62 | 12 | 175.68 |
| Apply first aid | JUL | OHTH5661C | 24-07-2012 | 31-08-2012 | 25-07-2012 | 18 | 0.03 | 78 | 62 | 12 | 175.68 |
| Plan and conduct group activities | OCT | EMPL5720C | 15-10-2012 | 30-11-2012 | 14-12-2012 | 50 | 0.08 | 216 | 174 | 34 | 488.00 |
| Apply first aid | OCT | OHTH5661C | 09-10-2012 | 30-11-2012 | 09-10-2012 | 18 | 0.03 | 78 | 62 | 12 | 175.68 |
| Apply first aid | SEP | OHTH5661C | 15-09-2012 | 31-10-2012 | 22-09-2012 | 18 | 0.03 | 78 | 62 | 12 | 175.68 |
* EFTSL : Equivalent Full Time Study Load
** Concession fees are only available at diploma and advanced diploma level for indigenous students.
Back to Program List
| Unit Of Study (Course) | Session | Course Code | Commencement Date | Census Date | Completion Date | Student Contact Hours (SCH) | EFTSL* | Tuition Fee: Onsite|Distance|RPL | |||
| Government Subsidised Fee | Full Fee (Non Government Subsidised) | ||||||||||
| Program commenced 1 July 2009-30 June 2012 ($) | Program commenced 1 July 2012-31 December 2012 ($) | Program commenced 1 July 2012-31 December 2012 Concession ** ($) | Australian Full Fee Paying ($) | ||||||||
| Implement and monitor nursing care for older clients | AUG | NURS5182C | 01-08-2012 | 30-09-2012 | 31-12-2012 | 75 | 0.11 | 325 | 257 | 52 | 951.00 |
| Implement and monitor nursing care for older clients | AUG | NURS5183C | 29-08-2012 | 30-09-2012 | 21-11-2012 | 75 | 0.11 | 325 | 257 | 52 | 951.00 |
| Apply research skills within a contemporary health environment | AUG | NURS5189C | 08-08-2012 | 30-09-2012 | 10-10-2012 | 20 | 0.03 | 87 | 69 | 14 | 253.60 |
| Apply research skills within a contemporary health environment | AUG | NURS5189C | 22-08-2012 | 30-09-2012 | 10-10-2012 | 20 | 0.03 | 87 | 69 | 14 | 253.60 |
| Administer and monitor intravenous medication in the nursing environment | AUG | NURS5190C | 03-08-2012 | 30-09-2012 | 21-12-2012 | 100 | 0.15 | 433 | 343 | 69 | 1,268.00 |
| Administer and monitor intravenous medication in the nursing environment | AUG | NURS5190C | 03-08-2012 | 30-09-2012 | 31-12-2012 | 100 | 0.15 | 433 | 343 | 69 | 1,268.00 |
| Administer and monitor intravenous medication in the nursing environment | AUG | NURS5191C | 06-08-2012 | 30-09-2012 | 14-12-2012 | 100 | 0.15 | 433 | 343 | 69 | 1,268.00 |
| Administer and monitor intravenous medication in the nursing environment | AUG | NURS5191C | 20-08-2012 | 30-09-2012 | 14-12-2012 | 100 | 0.15 | 433 | 343 | 69 | 1,268.00 |
| Comply with infection control policies and procedures | AUG | HWSS5655C | 14-08-2012 | 30-09-2012 | 14-12-2012 | 20 | 0.03 | 87 | 69 | 14 | 253.60 |
| Comply with infection control policies and procedures | AUG | HWSS5670C | 01-08-2012 | 30-09-2012 | 31-08-2012 | 20 | 0.03 | 87 | 69 | 14 | 253.60 |
| Contribute to OHS processes | AUG | OHTH5674C | 01-08-2012 | 30-09-2012 | 31-08-2012 | 20 | 0.03 | 87 | 69 | 14 | 253.60 |
| Work effectively with culturally diverse clients and co-workers | AUG | EMPL5937C | 01-08-2012 | 30-09-2012 | 31-08-2012 | 20 | 0.03 | 87 | 69 | 14 | 253.60 |
| Analyse health information | AUG | NURS5259C | 01-08-2012 | 30-09-2012 | 31-08-2012 | 30 | 0.04 | 130 | 103 | 21 | 380.40 |
| Confirm physical health status | AUG | NURS5242C | 01-08-2012 | 30-09-2012 | 31-08-2012 | 90 | 0.13 | 390 | 309 | 62 | 1,141.20 |
| Apply first aid | AUG | OHTH5673C | 01-08-2012 | 30-09-2012 | 31-08-2012 | 18 | 0.03 | 78 | 62 | 12 | 228.24 |
| Work in the nursing profession | AUG | NURS5244C | 01-08-2012 | 30-09-2012 | 31-08-2012 | 90 | 0.13 | 390 | 309 | 62 | 1,141.20 |
| Apply legal and ethical parameters to nursing practice | AUG | NURS5258C | 01-08-2012 | 30-09-2012 | 31-08-2012 | 30 | 0.04 | 130 | 103 | 21 | 380.40 |
| Work effectively with Aboriginal and/or Torres Strait Islander people | AUG | EMPL5939C | 01-08-2012 | 30-09-2012 | 31-08-2012 | 20 | 0.03 | 87 | 69 | 14 | 253.60 |
| Administer and monitor medications in the work environment | AUG | NURS5261C | 01-08-2012 | 30-09-2012 | 31-08-2012 | 180 | 0.26 | 779 | 617 | 124 | 2,282.40 |
| Implement and monitor nursing care for clients with chronic health problems | AUG | NURS5263C | 01-08-2012 | 30-09-2012 | 31-08-2012 | 50 | 0.07 | 216 | 172 | 34 | 634.00 |
| Contribute to the complex nursing care of clients | AUG | NURS5265C | 01-08-2012 | 30-09-2012 | 31-08-2012 | 90 | 0.13 | 390 | 309 | 62 | 1,141.20 |
| Apply effective communication skills in nursing practice | AUG | NURS5267C | 01-08-2012 | 30-09-2012 | 31-08-2012 | 40 | 0.06 | 173 | 137 | 28 | 507.20 |
| Apply principles of wound management in the clinical environment | AUG | NURS5278C | 01-08-2012 | 30-09-2012 | 31-10-2012 | 45 | 0.07 | 195 | 154 | 31 | 570.60 |
| Implement and monitor nursing care for older clients | AUG | NURS5289C | 01-08-2012 | 30-09-2012 | 31-10-2012 | 75 | 0.11 | 325 | 257 | 52 | 951.00 |
| Provide nursing care for clients requiring palliative care | AUG | NURS5293C | 07-08-2012 | 30-09-2012 | 30-11-2012 | 50 | 0.07 | 216 | 172 | 34 | 634.00 |
| Administer and monitor intravenous medication in the nursing environment | AUG | NURS5295C | 03-08-2012 | 30-09-2012 | 21-12-2012 | 100 | 0.15 | 433 | 343 | 69 | 1,268.00 |
| Apply first aid | CY2 | NURS5115C | 02-11-2012 | 31-03-2013 | 07-06-2013 | 18 | 0.03 | 78 | 62 | 12 | 228.24 |
| Apply first aid | CY2 | NURS5115C | 05-10-2012 | 31-03-2013 | 24-05-2013 | 18 | 0.03 | 78 | 62 | 12 | 228.24 |
| Apply first aid | CY2 | NURS5115C | 10-08-2012 | 31-03-2013 | 19-04-2013 | 18 | 0.03 | 78 | 62 | 12 | 228.24 |
| Apply first aid | CY2 | NURS5115C | 13-07-2012 | 31-03-2013 | 22-03-2013 | 18 | 0.03 | 78 | 62 | 12 | 228.24 |
| Apply first aid | CY2 | NURS5115C | 14-09-2012 | 31-03-2013 | 10-05-2013 | 18 | 0.03 | 78 | 62 | 12 | 228.24 |
| Apply first aid | CY2 | NURS5115C | 23-11-2012 | 31-03-2013 | 21-06-2013 | 18 | 0.03 | 78 | 62 | 12 | 228.24 |
| Confirm physical health status | CY2 | NURS5117C | 01-08-2012 | 31-03-2013 | 21-06-2013 | 90 | 0.13 | 390 | 309 | 62 | 1,141.20 |
| Comply with infection control policies and procedures in health work | CY2 | NURS5119C | 01-10-2012 | 31-03-2013 | 30-09-2013 | 20 | 0.03 | 87 | 69 | 14 | 253.60 |
| Comply with infection control policies and procedures in health work | CY2 | NURS5119C | 06-08-2012 | 31-03-2013 | 05-08-2013 | 20 | 0.03 | 87 | 69 | 14 | 253.60 |
| Comply with infection control policies and procedures in health work | CY2 | NURS5119C | 09-07-2012 | 31-03-2013 | 08-07-2013 | 20 | 0.03 | 87 | 69 | 14 | 253.60 |
| Comply with infection control policies and procedures in health work | CY2 | NURS5119C | 10-09-2012 | 31-03-2013 | 09-09-2013 | 20 | 0.03 | 87 | 69 | 14 | 253.60 |
| Comply with infection control policies and procedures in health work | CY2 | NURS5119C | 19-11-2012 | 31-03-2013 | 18-11-2013 | 20 | 0.03 | 87 | 69 | 14 | 253.60 |
| Comply with infection control policies and procedures in health work | CY2 | NURS5119C | 29-10-2012 | 31-03-2013 | 28-10-2013 | 20 | 0.03 | 87 | 69 | 14 | 253.60 |
| Work effectively with culturally diverse clients and co-workers | CY2 | NURS5137C | 07-12-2012 | 31-03-2013 | 15-02-2013 | 20 | 0.03 | 87 | 69 | 14 | 253.60 |
| Implement and monitor nursing care for clients with chronic health problems | CY2 | NURS5145C | 24-08-2012 | 31-03-2013 | 29-03-2013 | 50 | 0.07 | 216 | 172 | 34 | 634.00 |
| Implement and monitor nursing care for clients with chronic health problems | CY2 | NURS5145C | 25-06-2012 | 31-03-2013 | 12-04-2013 | 50 | 0.07 | 216 | 172 | 34 | 634.00 |
| Administer and monitor medications in the work environment | CY2 | NURS5147C | 03-08-2012 | 31-03-2013 | 29-03-2013 | 180 | 0.26 | 779 | 617 | 124 | 2,282.40 |
| Contribute to the complex nursing care of clients | CY2 | NURS5149C | 03-08-2012 | 31-03-2013 | 15-03-2013 | 90 | 0.13 | 390 | 309 | 62 | 1,141.20 |
| Contribute to the complex nursing care of clients | CY2 | NURS5149C | 04-12-2012 | 31-03-2013 | 01-03-2013 | 90 | 0.13 | 390 | 309 | 62 | 1,141.20 |
| Contribute to the complex nursing care of clients | CY2 | NURS5150C | 25-06-2012 | 31-03-2013 | 31-01-2013 | 90 | 0.13 | 390 | 309 | 62 | 1,141.20 |
| Apply principles of wound management in the clinical environment | CY2 | NURS5179C | 14-11-2012 | 31-03-2013 | 31-05-2013 | 45 | 0.07 | 195 | 154 | 31 | 570.60 |
| Administer and monitor intravenous medication in the nursing environment | CY2 | NURS5190C | 08-10-2012 | 31-03-2013 | 31-01-2013 | 100 | 0.15 | 433 | 343 | 69 | 1,268.00 |
| Comply with infection control policies and procedures | CY2 | HWSS5655C | 01-10-2012 | 31-03-2013 | 04-04-2013 | 20 | 0.03 | 87 | 69 | 14 | 253.60 |
| Comply with infection control policies and procedures | CY2 | HWSS5655C | 01-10-2012 | 31-03-2013 | 30-01-2013 | 20 | 0.03 | 87 | 69 | 14 | 253.60 |
| Comply with infection control policies and procedures | CY2 | HWSS5655C | 01-10-2012 | 31-03-2013 | 30-09-2013 | 20 | 0.03 | 87 | 69 | 14 | 253.60 |
| Comply with infection control policies and procedures | CY2 | HWSS5655C | 06-08-2012 | 31-03-2013 | 05-08-2013 | 20 | 0.03 | 87 | 69 | 14 | 253.60 |
| Comply with infection control policies and procedures | CY2 | HWSS5655C | 09-07-2012 | 31-03-2013 | 08-07-2013 | 20 | 0.03 | 87 | 69 | 14 | 253.60 |
| Comply with infection control policies and procedures | CY2 | HWSS5655C | 10-07-2012 | 31-03-2013 | 25-03-2013 | 20 | 0.03 | 87 | 69 | 14 | 253.60 |
| Comply with infection control policies and procedures | CY2 | HWSS5655C | 10-09-2012 | 31-03-2013 | 09-09-2013 | 20 | 0.03 | 87 | 69 | 14 | 253.60 |
| Comply with infection control policies and procedures | CY2 | HWSS5655C | 19-11-2012 | 31-03-2013 | 18-11-2013 | 20 | 0.03 | 87 | 69 | 14 | 253.60 |
| Comply with infection control policies and procedures | CY2 | HWSS5655C | 29-10-2012 | 31-03-2013 | 28-10-2013 | 20 | 0.03 | 87 | 69 | 14 | 253.60 |
| Contribute to OHS processes | CY2 | OHTH5650C | 06-08-2012 | 31-03-2013 | 03-05-2013 | 20 | 0.03 | 87 | 69 | 14 | 253.60 |
| Contribute to OHS processes | CY2 | OHTH5650C | 10-09-2012 | 31-03-2013 | 07-06-2013 | 20 | 0.03 | 87 | 69 | 14 | 253.60 |
| Contribute to OHS processes | CY2 | OHTH5650C | 19-11-2012 | 31-03-2013 | 16-08-2013 | 20 | 0.03 | 87 | 69 | 14 | 253.60 |
| Contribute to OHS processes | CY2 | OHTH5650C | 22-10-2012 | 31-03-2013 | 19-07-2013 | 20 | 0.03 | 87 | 69 | 14 | 253.60 |
| Contribute to OHS processes | CY2 | OHTH5650C | 26-11-2012 | 31-03-2013 | 23-08-2013 | 20 | 0.03 | 87 | 69 | 14 | 253.60 |
| Analyse health information | CY2 | NURS5233C | 25-06-2012 | 31-03-2013 | 31-01-2013 | 30 | 0.04 | 130 | 103 | 21 | 380.40 |
| Administer and monitor medications in the work environment | CY2 | NURS5260C | 25-06-2012 | 31-03-2013 | 31-01-2013 | 180 | 0.26 | 779 | 617 | 124 | 2,282.40 |
| Contribute to the complex nursing care of clients | CY2 | NURS5276C | 25-06-2012 | 31-03-2013 | 31-01-2013 | 90 | 0.13 | 390 | 309 | 62 | 1,141.20 |
| Administer and monitor intravenous medication in the nursing environment | CY2 | NURS5295C | 08-10-2012 | 31-03-2013 | 31-01-2013 | 100 | 0.15 | 433 | 343 | 69 | 1,268.00 |
| Administer and monitor intravenous medication in the nursing environment | CY2 | NURS5295C | 17-09-2012 | 31-03-2013 | 31-01-2013 | 100 | 0.15 | 433 | 343 | 69 | 1,268.00 |
| Comply with infection control policies and procedures | DEC | HWSS5670C | 03-12-2012 | 31-12-2012 | 28-12-2012 | 20 | 0.03 | 87 | 69 | 14 | 253.60 |
| Contribute to OHS processes | DEC | OHTH5674C | 03-12-2012 | 31-12-2012 | 28-12-2012 | 20 | 0.03 | 87 | 69 | 14 | 253.60 |
| Work effectively with culturally diverse clients and co-workers | DEC | EMPL5937C | 03-12-2012 | 31-12-2012 | 28-12-2012 | 20 | 0.03 | 87 | 69 | 14 | 253.60 |
| Analyse health information | DEC | NURS5259C | 03-12-2012 | 31-12-2012 | 28-12-2012 | 30 | 0.04 | 130 | 103 | 21 | 380.40 |
| Confirm physical health status | DEC | NURS5242C | 03-12-2012 | 31-12-2012 | 28-12-2012 | 90 | 0.13 | 390 | 309 | 62 | 1,141.20 |
| Apply first aid | DEC | OHTH5673C | 03-12-2012 | 31-12-2012 | 28-12-2012 | 18 | 0.03 | 78 | 62 | 12 | 228.24 |
| Work in the nursing profession | DEC | NURS5244C | 03-12-2012 | 31-12-2012 | 28-12-2012 | 90 | 0.13 | 390 | 309 | 62 | 1,141.20 |
| Apply legal and ethical parameters to nursing practice | DEC | NURS5258C | 03-12-2012 | 31-12-2012 | 28-12-2012 | 30 | 0.04 | 130 | 103 | 21 | 380.40 |
| Work effectively with Aboriginal and/or Torres Strait Islander people | DEC | EMPL5939C | 03-12-2012 | 31-12-2012 | 28-12-2012 | 20 | 0.03 | 87 | 69 | 14 | 253.60 |
| Administer and monitor medications in the work environment | DEC | NURS5261C | 03-12-2012 | 31-12-2012 | 28-12-2012 | 180 | 0.26 | 779 | 617 | 124 | 2,282.40 |
| Implement and monitor nursing care for clients with chronic health problems | DEC | NURS5263C | 03-12-2012 | 31-12-2012 | 28-12-2012 | 50 | 0.07 | 216 | 172 | 34 | 634.00 |
| Contribute to the complex nursing care of clients | DEC | NURS5265C | 03-12-2012 | 31-12-2012 | 28-12-2012 | 90 | 0.13 | 390 | 309 | 62 | 1,141.20 |
| Apply effective communication skills in nursing practice | DEC | NURS5267C | 03-12-2012 | 31-12-2012 | 28-12-2012 | 40 | 0.06 | 173 | 137 | 28 | 507.20 |
| Work in the nursing profession | JUL | NURS5114C | 25-06-2012 | 31-08-2012 | 31-12-2012 | 90 | 0.13 | 390 | 309 | 62 | 1,141.20 |
| Apply first aid | JUL | NURS5115C | 25-06-2012 | 31-08-2012 | 03-12-2012 | 18 | 0.03 | 78 | 62 | 12 | 228.24 |
| Contribute to OHS processes | JUL | NURS5121C | 25-06-2012 | 31-08-2012 | 07-09-2012 | 20 | 0.03 | 87 | 69 | 14 | 253.60 |
| Work effectively with Aboriginal and/or Torres Strait Islander people | JUL | NURS5125C | 25-06-2012 | 31-08-2012 | 16-11-2012 | 20 | 0.03 | 87 | 69 | 14 | 253.60 |
| Work effectively with culturally diverse clients and co-workers | JUL | NURS5137C | 25-06-2012 | 31-08-2012 | 16-11-2012 | 20 | 0.03 | 87 | 69 | 14 | 253.60 |
| Analyse health information | JUL | NURS5143C | 20-07-2012 | 31-08-2012 | 09-08-2012 | 30 | 0.04 | 130 | 103 | 21 | 380.40 |
| Analyse health information | JUL | NURS5143C | 25-06-2012 | 31-08-2012 | 30-11-2012 | 30 | 0.04 | 130 | 103 | 21 | 380.40 |
| Administer and monitor medications in the work environment | JUL | NURS5147C | 25-06-2012 | 31-08-2012 | 30-11-2012 | 180 | 0.26 | 779 | 617 | 124 | 2,282.40 |
| Implement and monitor nursing care for older clients | JUL | NURS5182C | 25-06-2012 | 31-08-2012 | 23-11-2012 | 75 | 0.11 | 325 | 257 | 52 | 951.00 |
| Apply reflective practice, critical thinking and analysis in health | JUL | NURS5187C | 16-07-2012 | 31-08-2012 | 14-09-2012 | 20 | 0.03 | 87 | 69 | 14 | 253.60 |
| Apply understanding of the Australian health care system | JUL | OHTH5540C | 16-07-2012 | 31-08-2012 | 31-08-2012 | 20 | 0.03 | 87 | 69 | 14 | 253.60 |
| Assess clients and manage client care | JUL | NURS5192C | 25-06-2012 | 31-08-2012 | 30-09-2012 | 30 | 0.04 | 130 | 103 | 21 | 380.40 |
| Provide nursing care for clients requiring palliative care | JUL | NURS5197C | 17-07-2012 | 31-08-2012 | 15-08-2012 | 50 | 0.07 | 216 | 172 | 34 | 634.00 |
| Provide nursing care for clients requiring palliative care | JUL | NURS5197C | 17-07-2012 | 31-08-2012 | 21-09-2012 | 50 | 0.07 | 216 | 172 | 34 | 634.00 |
| Co-ordinate the work environment | JUL | EMPL5821C | 17-07-2012 | 31-08-2012 | 17-10-2012 | 90 | 0.13 | 390 | 309 | 62 | 1,141.20 |
| Comply with infection control policies and procedures | JUL | HWSS5655C | 25-06-2012 | 31-08-2012 | 09-11-2012 | 20 | 0.03 | 87 | 69 | 14 | 253.60 |
| Comply with infection control policies and procedures | JUL | HWSS5655C | 25-06-2012 | 31-08-2012 | 21-12-2012 | 20 | 0.03 | 87 | 69 | 14 | 253.60 |
| Comply with infection control policies and procedures | JUL | HWSS5655C | 25-06-2012 | 31-08-2012 | 23-08-2012 | 20 | 0.03 | 87 | 69 | 14 | 253.60 |
| Comply with infection control policies and procedures | JUL | HWSS5670C | 02-07-2012 | 31-08-2012 | 31-07-2012 | 20 | 0.03 | 87 | 69 | 14 | 253.60 |
| Contribute to OHS processes | JUL | OHTH5650C | 02-07-2012 | 31-08-2012 | 30-11-2012 | 20 | 0.03 | 87 | 69 | 14 | 253.60 |
| Contribute to OHS processes | JUL | OHTH5650C | 25-06-2012 | 31-08-2012 | 09-11-2012 | 20 | 0.03 | 87 | 69 | 14 | 253.60 |
| Contribute to OHS processes | JUL | OHTH5650C | 25-06-2012 | 31-08-2012 | 14-12-2012 | 20 | 0.03 | 87 | 69 | 14 | 253.60 |
| Contribute to OHS processes | JUL | OHTH5650C | 25-06-2012 | 31-08-2012 | 21-12-2012 | 20 | 0.03 | 87 | 69 | 14 | 253.60 |
| Contribute to OHS processes | JUL | OHTH5650C | 25-06-2012 | 31-08-2012 | 27-09-2012 | 20 | 0.03 | 87 | 69 | 14 | 253.60 |
| Contribute to OHS processes | JUL | OHTH5674C | 02-07-2012 | 31-08-2012 | 31-07-2012 | 20 | 0.03 | 87 | 69 | 14 | 253.60 |
| Work effectively with culturally diverse clients and co-workers | JUL | EMPL5937C | 02-07-2012 | 31-08-2012 | 31-07-2012 | 20 | 0.03 | 87 | 69 | 14 | 253.60 |
| Analyse health information | JUL | NURS5233C | 25-06-2012 | 31-08-2012 | 09-11-2012 | 30 | 0.04 | 130 | 103 | 21 | 380.40 |
| Analyse health information | JUL | NURS5259C | 02-07-2012 | 31-08-2012 | 31-07-2012 | 30 | 0.04 | 130 | 103 | 21 | 380.40 |
| Analyse health information | JUL | NURS5270C | 25-06-2012 | 31-08-2012 | 31-10-2012 | 30 | 0.04 | 130 | 103 | 21 | 380.40 |
| Confirm physical health status | JUL | NURS5236C | 02-07-2012 | 31-08-2012 | 30-11-2012 | 90 | 0.13 | 390 | 309 | 62 | 1,141.20 |
| Confirm physical health status | JUL | NURS5236C | 10-07-2012 | 31-08-2012 | 01-11-2012 | 90 | 0.13 | 390 | 309 | 62 | 1,141.20 |
| Confirm physical health status | JUL | NURS5236C | 25-06-2012 | 31-08-2012 | 09-11-2012 | 90 | 0.13 | 390 | 309 | 62 | 1,141.20 |
| Confirm physical health status | JUL | NURS5242C | 02-07-2012 | 31-08-2012 | 31-07-2012 | 90 | 0.13 | 390 | 309 | 62 | 1,141.20 |
| Apply first aid | JUL | OHTH5654C | 25-06-2012 | 31-08-2012 | 09-11-2012 | 18 | 0.03 | 78 | 62 | 12 | 228.24 |
| Apply first aid | JUL | OHTH5654C | 25-06-2012 | 31-08-2012 | 13-12-2012 | 18 | 0.03 | 78 | 62 | 12 | 228.24 |
| Apply first aid | JUL | OHTH5654C | 25-06-2012 | 31-08-2012 | 14-12-2012 | 18 | 0.03 | 78 | 62 | 12 | 228.24 |
| Apply first aid | JUL | OHTH5654C | 25-06-2012 | 31-08-2012 | 24-10-2012 | 18 | 0.03 | 78 | 62 | 12 | 228.24 |
| Apply first aid | JUL | OHTH5673C | 02-07-2012 | 31-08-2012 | 31-07-2012 | 18 | 0.03 | 78 | 62 | 12 | 228.24 |
| Work in the nursing profession | JUL | NURS5243C | 04-07-2012 | 31-08-2012 | 13-11-2012 | 90 | 0.13 | 390 | 309 | 62 | 1,141.20 |
| Work in the nursing profession | JUL | NURS5244C | 02-07-2012 | 31-08-2012 | 31-07-2012 | 90 | 0.13 | 390 | 309 | 62 | 1,141.20 |
| Work in the nursing profession | JUL | NURS5269C | 25-06-2012 | 31-08-2012 | 30-09-2012 | 90 | 0.13 | 390 | 309 | 62 | 1,141.20 |
| Work in the nursing profession | JUL | NURS5269C | 25-06-2012 | 31-08-2012 | 31-08-2012 | 90 | 0.13 | 390 | 309 | 62 | 1,141.20 |
| Apply legal and ethical parameters to nursing practice | JUL | NURS5257C | 12-07-2012 | 31-08-2012 | 21-12-2012 | 30 | 0.04 | 130 | 103 | 21 | 380.40 |
| Apply legal and ethical parameters to nursing practice | JUL | NURS5258C | 02-07-2012 | 31-08-2012 | 31-07-2012 | 30 | 0.04 | 130 | 103 | 21 | 380.40 |
| Work effectively with Aboriginal and/or Torres Strait Islander people | JUL | EMPL5939C | 02-07-2012 | 31-08-2012 | 31-07-2012 | 20 | 0.03 | 87 | 69 | 14 | 253.60 |
| Administer and monitor medications in the work environment | JUL | NURS5261C | 02-07-2012 | 31-08-2012 | 31-07-2012 | 180 | 0.26 | 779 | 617 | 124 | 2,282.40 |
| Implement and monitor nursing care for clients with chronic health problems | JUL | NURS5263C | 02-07-2012 | 31-08-2012 | 31-07-2012 | 50 | 0.07 | 216 | 172 | 34 | 634.00 |
| Contribute to the complex nursing care of clients | JUL | NURS5265C | 02-07-2012 | 31-08-2012 | 31-07-2012 | 90 | 0.13 | 390 | 309 | 62 | 1,141.20 |
| Apply effective communication skills in nursing practice | JUL | NURS5266C | 03-07-2012 | 31-08-2012 | 29-10-2012 | 40 | 0.06 | 173 | 137 | 28 | 507.20 |
| Apply effective communication skills in nursing practice | JUL | NURS5267C | 02-07-2012 | 31-08-2012 | 31-07-2012 | 40 | 0.06 | 173 | 137 | 28 | 507.20 |
| Implement and evaluate a plan of nursing care | JUL | NURS5274C | 03-07-2012 | 31-08-2012 | 21-12-2012 | 100 | 0.15 | 433 | 343 | 69 | 1,268.00 |
| Implement and monitor nursing care for older clients | JUL | NURS5288C | 06-07-2012 | 31-08-2012 | 21-12-2012 | 75 | 0.11 | 325 | 257 | 52 | 951.00 |
| Assess clients and manage client care | JUL | NURS5297C | 25-06-2012 | 31-08-2012 | 28-09-2012 | 30 | 0.04 | 130 | 103 | 21 | 380.40 |
| Comply with infection control policies and procedures | NOV | HWSS5670C | 01-11-2012 | 31-12-2012 | 30-11-2012 | 20 | 0.03 | 87 | 69 | 14 | 253.60 |
| Contribute to OHS processes | NOV | OHTH5674C | 01-11-2012 | 31-12-2012 | 30-11-2012 | 20 | 0.03 | 87 | 69 | 14 | 253.60 |
| Work effectively with culturally diverse clients and co-workers | NOV | EMPL5937C | 01-11-2012 | 31-12-2012 | 30-11-2012 | 20 | 0.03 | 87 | 69 | 14 | 253.60 |
| Analyse health information | NOV | NURS5259C | 01-11-2012 | 31-12-2012 | 30-11-2012 | 30 | 0.04 | 130 | 103 | 21 | 380.40 |
| Confirm physical health status | NOV | NURS5236C | 02-11-2012 | 31-12-2012 | 21-12-2012 | 90 | 0.13 | 390 | 309 | 62 | 1,141.20 |
| Confirm physical health status | NOV | NURS5242C | 01-11-2012 | 31-12-2012 | 30-11-2012 | 90 | 0.13 | 390 | 309 | 62 | 1,141.20 |
| Apply first aid | NOV | OHTH5673C | 01-11-2012 | 31-12-2012 | 30-11-2012 | 18 | 0.03 | 78 | 62 | 12 | 228.24 |
| Work in the nursing profession | NOV | NURS5244C | 01-11-2012 | 31-12-2012 | 30-11-2012 | 90 | 0.13 | 390 | 309 | 62 | 1,141.20 |
| Apply legal and ethical parameters to nursing practice | NOV | NURS5258C | 01-11-2012 | 31-12-2012 | 30-11-2012 | 30 | 0.04 | 130 | 103 | 21 | 380.40 |
| Work effectively with Aboriginal and/or Torres Strait Islander people | NOV | EMPL5939C | 01-11-2012 | 31-12-2012 | 30-11-2012 | 20 | 0.03 | 87 | 69 | 14 | 253.60 |
| Administer and monitor medications in the work environment | NOV | NURS5261C | 01-11-2012 | 31-12-2012 | 30-11-2012 | 180 | 0.26 | 779 | 617 | 124 | 2,282.40 |
| Implement and monitor nursing care for clients with chronic health problems | NOV | NURS5263C | 01-11-2012 | 31-12-2012 | 30-11-2012 | 50 | 0.07 | 216 | 172 | 34 | 634.00 |
| Contribute to the complex nursing care of clients | NOV | NURS5265C | 01-11-2012 | 31-12-2012 | 30-11-2012 | 90 | 0.13 | 390 | 309 | 62 | 1,141.20 |
| Apply effective communication skills in nursing practice | NOV | NURS5267C | 01-11-2012 | 31-12-2012 | 30-11-2012 | 40 | 0.06 | 173 | 137 | 28 | 507.20 |
| Implement and monitor nursing care for older clients | NOV | NURS5288C | 05-11-2012 | 31-12-2012 | 24-12-2012 | 75 | 0.11 | 325 | 257 | 52 | 951.00 |
| Contribute to OHS processes | OCT | NURS5121C | 03-10-2012 | 30-11-2012 | 03-12-2012 | 20 | 0.03 | 87 | 69 | 14 | 253.60 |
| Work effectively with Aboriginal and/or Torres Strait Islander people | OCT | NURS5125C | 05-10-2012 | 30-11-2012 | 21-12-2012 | 20 | 0.03 | 87 | 69 | 14 | 253.60 |
| Work effectively with culturally diverse clients and co-workers | OCT | NURS5137C | 05-10-2012 | 30-11-2012 | 21-12-2012 | 20 | 0.03 | 87 | 69 | 14 | 253.60 |
| Work effectively with culturally diverse clients and co-workers | OCT | NURS5138C | 03-10-2012 | 30-11-2012 | 31-12-2012 | 20 | 0.03 | 87 | 69 | 14 | 253.60 |
| Assess clients and manage client care | OCT | NURS5193C | 03-10-2012 | 30-11-2012 | 24-12-2012 | 30 | 0.04 | 130 | 103 | 21 | 380.40 |
| Comply with infection control policies and procedures | OCT | HWSS5670C | 01-10-2012 | 30-11-2012 | 31-10-2012 | 20 | 0.03 | 87 | 69 | 14 | 253.60 |
| Comply with infection control policies and procedures | OCT | HWSS5670C | 15-10-2012 | 30-11-2012 | 09-11-2012 | 20 | 0.03 | 87 | 69 | 14 | 253.60 |
| Contribute to OHS processes | OCT | OHTH5650C | 01-10-2012 | 30-11-2012 | 14-12-2012 | 20 | 0.03 | 87 | 69 | 14 | 253.60 |
| Contribute to OHS processes | OCT | OHTH5674C | 01-10-2012 | 30-11-2012 | 31-10-2012 | 20 | 0.03 | 87 | 69 | 14 | 253.60 |
| Contribute to OHS processes | OCT | OHTH5674C | 15-10-2012 | 30-11-2012 | 09-11-2012 | 20 | 0.03 | 87 | 69 | 14 | 253.60 |
| Work effectively with culturally diverse clients and co-workers | OCT | EMPL5909C | 03-10-2012 | 30-11-2012 | 21-12-2012 | 20 | 0.03 | 87 | 69 | 14 | 253.60 |
| Work effectively with culturally diverse clients and co-workers | OCT | EMPL5937C | 01-10-2012 | 30-11-2012 | 31-10-2012 | 20 | 0.03 | 87 | 69 | 14 | 253.60 |
| Work effectively with culturally diverse clients and co-workers | OCT | EMPL5937C | 15-10-2012 | 30-11-2012 | 09-11-2012 | 20 | 0.03 | 87 | 69 | 14 | 253.60 |
| Analyse health information | OCT | NURS5259C | 01-10-2012 | 30-11-2012 | 31-10-2012 | 30 | 0.04 | 130 | 103 | 21 | 380.40 |
| Analyse health information | OCT | NURS5259C | 15-10-2012 | 30-11-2012 | 09-11-2012 | 30 | 0.04 | 130 | 103 | 21 | 380.40 |
| Confirm physical health status | OCT | NURS5242C | 01-10-2012 | 30-11-2012 | 31-10-2012 | 90 | 0.13 | 390 | 309 | 62 | 1,141.20 |
| Confirm physical health status | OCT | NURS5242C | 15-10-2012 | 30-11-2012 | 09-11-2012 | 90 | 0.13 | 390 | 309 | 62 | 1,141.20 |
| Apply first aid | OCT | OHTH5654C | 15-10-2012 | 30-11-2012 | 21-11-2012 | 18 | 0.03 | 78 | 62 | 12 | 228.24 |
| Apply first aid | OCT | OHTH5673C | 01-10-2012 | 30-11-2012 | 31-10-2012 | 18 | 0.03 | 78 | 62 | 12 | 228.24 |
| Apply first aid | OCT | OHTH5673C | 15-10-2012 | 30-11-2012 | 09-11-2012 | 18 | 0.03 | 78 | 62 | 12 | 228.24 |
| Work in the nursing profession | OCT | NURS5244C | 01-10-2012 | 30-11-2012 | 31-10-2012 | 90 | 0.13 | 390 | 309 | 62 | 1,141.20 |
| Work in the nursing profession | OCT | NURS5244C | 15-10-2012 | 30-11-2012 | 09-11-2012 | 90 | 0.13 | 390 | 309 | 62 | 1,141.20 |
| Apply legal and ethical parameters to nursing practice | OCT | NURS5258C | 01-10-2012 | 30-11-2012 | 31-10-2012 | 30 | 0.04 | 130 | 103 | 21 | 380.40 |
| Apply legal and ethical parameters to nursing practice | OCT | NURS5258C | 15-10-2012 | 30-11-2012 | 09-11-2012 | 30 | 0.04 | 130 | 103 | 21 | 380.40 |
| Work effectively with Aboriginal and/or Torres Strait Islander people | OCT | EMPL5939C | 01-10-2012 | 30-11-2012 | 31-10-2012 | 20 | 0.03 | 87 | 69 | 14 | 253.60 |
| Work effectively with Aboriginal and/or Torres Strait Islander people | OCT | EMPL5939C | 15-10-2012 | 30-11-2012 | 09-11-2012 | 20 | 0.03 | 87 | 69 | 14 | 253.60 |
| Administer and monitor medications in the work environment | OCT | NURS5261C | 01-10-2012 | 30-11-2012 | 31-10-2012 | 180 | 0.26 | 779 | 617 | 124 | 2,282.40 |
| Administer and monitor medications in the work environment | OCT | NURS5261C | 15-10-2012 | 30-11-2012 | 09-11-2012 | 180 | 0.26 | 779 | 617 | 124 | 2,282.40 |
| Implement and monitor nursing care for clients with chronic health problems | OCT | NURS5263C | 01-10-2012 | 30-11-2012 | 31-10-2012 | 50 | 0.07 | 216 | 172 | 34 | 634.00 |
| Implement and monitor nursing care for clients with chronic health problems | OCT | NURS5263C | 15-10-2012 | 30-11-2012 | 09-11-2012 | 50 | 0.07 | 216 | 172 | 34 | 634.00 |
| Contribute to the complex nursing care of clients | OCT | NURS5265C | 01-10-2012 | 30-11-2012 | 31-10-2012 | 90 | 0.13 | 390 | 309 | 62 | 1,141.20 |
| Contribute to the complex nursing care of clients | OCT | NURS5265C | 15-10-2012 | 30-11-2012 | 09-11-2012 | 90 | 0.13 | 390 | 309 | 62 | 1,141.20 |
| Apply effective communication skills in nursing practice | OCT | NURS5267C | 01-10-2012 | 30-11-2012 | 31-10-2012 | 40 | 0.06 | 173 | 137 | 28 | 507.20 |
| Apply effective communication skills in nursing practice | OCT | NURS5267C | 15-10-2012 | 30-11-2012 | 09-11-2012 | 40 | 0.06 | 173 | 137 | 28 | 507.20 |
| Apply understanding of the Australian health care system | OCT | OHTH5677C | 01-10-2012 | 30-11-2012 | 31-10-2012 | 20 | 0.03 | 87 | 69 | 14 | 253.60 |
| Implement and monitor nursing care for older clients | OCT | NURS5288C | 29-10-2012 | 30-11-2012 | 21-12-2012 | 75 | 0.11 | 325 | 257 | 52 | 951.00 |
| Work effectively with Aboriginal and/or Torres Strait Islander people | SEP | NURS5126C | 05-09-2012 | 31-10-2012 | 31-12-2012 | 20 | 0.03 | 87 | 69 | 14 | 253.60 |
| Work effectively with Aboriginal and/or Torres Strait Islander people | SEP | NURS5126C | 26-09-2012 | 31-10-2012 | 31-12-2012 | 20 | 0.03 | 87 | 69 | 14 | 253.60 |
| Work effectively with culturally diverse clients and co-workers | SEP | NURS5138C | 05-09-2012 | 31-10-2012 | 31-12-2012 | 20 | 0.03 | 87 | 69 | 14 | 253.60 |
| Analyse health information | SEP | NURS5144C | 10-09-2012 | 31-10-2012 | 31-12-2012 | 30 | 0.04 | 130 | 103 | 21 | 380.40 |
| Analyse health information | SEP | NURS5144C | 17-09-2012 | 31-10-2012 | 31-12-2012 | 30 | 0.04 | 130 | 103 | 21 | 380.40 |
| Apply principles of wound management in the clinical environment | SEP | NURS5178C | 03-09-2012 | 31-10-2012 | 31-12-2012 | 45 | 0.07 | 195 | 154 | 31 | 570.60 |
| Assess clients and manage client care | SEP | NURS5193C | 25-09-2012 | 31-10-2012 | 14-12-2012 | 30 | 0.04 | 130 | 103 | 21 | 380.40 |
| Implement and monitor nursing care for consumers with mental health conditions | SEP | NURS5220C | 25-09-2012 | 31-10-2012 | 31-12-2012 | 60 | 0.09 | 260 | 206 | 41 | 760.80 |
| Comply with infection control policies and procedures | SEP | HWSS5660C | 03-09-2012 | 31-10-2012 | 16-11-2012 | 20 | 0.03 | 87 | 69 | 14 | 253.60 |
| Comply with infection control policies and procedures | SEP | HWSS5670C | 03-09-2012 | 31-10-2012 | 28-09-2012 | 20 | 0.03 | 87 | 69 | 14 | 253.60 |
| Contribute to OHS processes | SEP | OHTH5674C | 03-09-2012 | 31-10-2012 | 28-09-2012 | 20 | 0.03 | 87 | 69 | 14 | 253.60 |
| Work effectively with culturally diverse clients and co-workers | SEP | EMPL5937C | 03-09-2012 | 31-10-2012 | 28-09-2012 | 20 | 0.03 | 87 | 69 | 14 | 253.60 |
| Work effectively with culturally diverse clients and co-workers | SEP | EMPL7020C | 01-09-2012 | 31-10-2012 | 30-11-2012 | 20 | 0.03 | 87 | 69 | 14 | 253.60 |
| Work effectively with culturally diverse clients and co-workers | SEP | EMPL7020C | 01-09-2012 | 31-10-2012 | 31-10-2012 | 20 | 0.03 | 87 | 69 | 14 | 253.60 |
| Analyse health information | SEP | NURS5259C | 03-09-2012 | 31-10-2012 | 28-09-2012 | 30 | 0.04 | 130 | 103 | 21 | 380.40 |
| Analyse health information | SEP | NURS5270C | 01-09-2012 | 31-10-2012 | 31-10-2012 | 30 | 0.04 | 130 | 103 | 21 | 380.40 |
| Confirm physical health status | SEP | NURS5242C | 03-09-2012 | 31-10-2012 | 28-09-2012 | 90 | 0.13 | 390 | 309 | 62 | 1,141.20 |
| Apply first aid | SEP | OHTH5657C | 03-09-2012 | 31-10-2012 | 16-11-2012 | 18 | 0.03 | 78 | 62 | 12 | 228.24 |
| Apply first aid | SEP | OHTH5673C | 03-09-2012 | 31-10-2012 | 28-09-2012 | 18 | 0.03 | 78 | 62 | 12 | 228.24 |
| Work in the nursing profession | SEP | NURS5244C | 03-09-2012 | 31-10-2012 | 28-09-2012 | 90 | 0.13 | 390 | 309 | 62 | 1,141.20 |
| Apply legal and ethical parameters to nursing practice | SEP | NURS5258C | 03-09-2012 | 31-10-2012 | 28-09-2012 | 30 | 0.04 | 130 | 103 | 21 | 380.40 |
| Work effectively with Aboriginal and/or Torres Strait Islander people | SEP | EMPL5939C | 03-09-2012 | 31-10-2012 | 28-09-2012 | 20 | 0.03 | 87 | 69 | 14 | 253.60 |
| Work effectively with Aboriginal and/or Torres Strait Islander people | SEP | EMPL7021C | 01-09-2012 | 31-10-2012 | 30-11-2012 | 20 | 0.03 | 87 | 69 | 14 | 253.60 |
| Work effectively with Aboriginal and/or Torres Strait Islander people | SEP | EMPL7021C | 01-09-2012 | 31-10-2012 | 31-10-2012 | 20 | 0.03 | 87 | 69 | 14 | 253.60 |
| Administer and monitor medications in the work environment | SEP | NURS5261C | 03-09-2012 | 31-10-2012 | 28-09-2012 | 180 | 0.26 | 779 | 617 | 124 | 2,282.40 |
| Implement and monitor nursing care for clients with chronic health problems | SEP | NURS5263C | 03-09-2012 | 31-10-2012 | 30-09-2012 | 50 | 0.07 | 216 | 172 | 34 | 634.00 |
| Contribute to the complex nursing care of clients | SEP | NURS5265C | 03-09-2012 | 31-10-2012 | 28-09-2012 | 90 | 0.13 | 390 | 309 | 62 | 1,141.20 |
| Apply effective communication skills in nursing practice | SEP | NURS5267C | 01-09-2012 | 31-10-2012 | 28-09-2012 | 40 | 0.06 | 173 | 137 | 28 | 507.20 |
| Implement and evaluate a plan of nursing care | SEP | NURS5274C | 14-09-2012 | 31-10-2012 | 24-12-2012 | 100 | 0.15 | 433 | 343 | 69 | 1,268.00 |
| Apply understanding of the Australian health care system | SEP | OHTH5677C | 01-09-2012 | 31-10-2012 | 30-12-2012 | 20 | 0.03 | 87 | 69 | 14 | 253.60 |
| Provide nursing care for clients requiring palliative care | SEP | NURS5293C | 01-09-2012 | 31-10-2012 | 31-10-2012 | 50 | 0.07 | 216 | 172 | 34 | 634.00 |
* EFTSL : Equivalent Full Time Study Load
** Concession fees are only available at diploma and advanced diploma level for indigenous students.
Back to Program List
| Unit Of Study (Course) | Session | Course Code | Commencement Date | Census Date | Completion Date | Student Contact Hours (SCH) | EFTSL* | Tuition Fee: Onsite|Distance|RPL | |||
| Government Subsidised Fee | Full Fee (Non Government Subsidised) | ||||||||||
| Program commenced 1 July 2009-30 June 2012 ($) | Program commenced 1 July 2012-31 December 2012 ($) | Program commenced 1 July 2012-31 December 2012 Concession ** ($) | Australian Full Fee Paying ($) | ||||||||
| Develop, implement and promote effective workplace communication | CY2 | HWSS5431C | 23-08-2012 | 31-03-2013 | 17-04-2013 | 80 | 0.09 | 346 | 177 | 35 | 786.40 |
| Develop, implement and promote effective workplace communication | CY2 | HWSS5431C | 25-06-2012 | 31-03-2013 | 28-06-2013 | 80 | 0.09 | 346 | 177 | 35 | 786.40 |
| Develop, implement and review services and programs to meet client needs | CY2 | MKTG5953C | 25-06-2012 | 31-03-2013 | 28-06-2013 | 70 | 0.08 | 303 | 155 | 31 | 688.10 |
| Plan and conduct group activities | CY2 | EMPL5720C | 25-06-2012 | 31-03-2013 | 28-06-2013 | 50 | 0.06 | 216 | 110 | 22 | 491.50 |
| Facilitate links with other services | CY2 | HWSS5433C | 25-06-2012 | 31-03-2013 | 28-06-2013 | 70 | 0.08 | 303 | 155 | 31 | 688.10 |
| Reflect on and improve own professional practice | CY2 | EMPL5721C | 23-08-2012 | 31-03-2013 | 17-04-2013 | 120 | 0.13 | 520 | 265 | 53 | 1,179.60 |
| Reflect on and improve own professional practice | CY2 | EMPL5721C | 24-07-2012 | 31-03-2013 | 21-06-2013 | 120 | 0.13 | 520 | 265 | 53 | 1,179.60 |
| Reflect on and improve own professional practice | CY2 | EMPL5721C | 25-06-2012 | 31-03-2013 | 28-06-2013 | 120 | 0.13 | 520 | 265 | 53 | 1,179.60 |
| Develop, facilitate and monitor all aspects of case management | CY2 | HWSS5440C | 25-06-2012 | 31-03-2013 | 28-06-2013 | 75 | 0.08 | 325 | 166 | 33 | 737.25 |
| Develop new networks | CY2 | HWSS5441C | 23-08-2012 | 31-03-2013 | 17-04-2013 | 75 | 0.08 | 325 | 166 | 33 | 737.25 |
| Provide advocacy and representation services | CY2 | JUST5167C | 24-07-2012 | 31-03-2013 | 21-06-2013 | 80 | 0.09 | 346 | 177 | 35 | 786.40 |
| Provide systems advocacy services | CY2 | JUST5168C | 23-08-2012 | 31-03-2013 | 17-04-2013 | 90 | 0.10 | 390 | 199 | 40 | 884.70 |
| Work effectively in the alcohol and other drugs sector | CY2 | HWSS5458C | 24-07-2012 | 31-03-2013 | 21-06-2013 | 50 | 0.06 | 216 | 110 | 22 | 491.50 |
| Provide community focused promotion and prevention strategies | CY2 | HWSS5459C | 24-07-2012 | 31-03-2013 | 21-06-2013 | 60 | 0.07 | 260 | 133 | 26 | 589.80 |
| Work effectively in the alcohol and other drugs sector | JUL | HWSS5458C | 19-07-2012 | 31-08-2012 | 11-10-2012 | 50 | 0.06 | 216 | 110 | 22 | 491.50 |
| Plan and conduct group activities | OCT | EMPL5720C | 15-10-2012 | 30-11-2012 | 14-12-2012 | 50 | 0.06 | 216 | 110 | 22 | 491.50 |
* EFTSL : Equivalent Full Time Study Load
** Concession fees are only available at diploma and advanced diploma level for indigenous students.
Back to Program List
| Unit Of Study (Course) | Session | Course Code | Commencement Date | Census Date | Completion Date | Student Contact Hours (SCH) | EFTSL* | Tuition Fee: Onsite|Distance|RPL | |||
| Government Subsidised Fee | Full Fee (Non Government Subsidised) | ||||||||||
| Program commenced 1 July 2009-30 June 2012 ($) | Program commenced 1 July 2012-31 December 2012 ($) | Program commenced 1 July 2012-31 December 2012 Concession ** ($) | Australian Full Fee Paying ($) | ||||||||
| Develop, implement and promote effective workplace communication | CY2 | HWSS5431C | 23-08-2012 | 31-03-2013 | 17-04-2013 | 80 | 0.09 | 346 | 243 | 49 | 772.80 |
| Develop, implement and promote effective workplace communication | CY2 | HWSS5431C | 25-06-2012 | 31-03-2013 | 28-06-2013 | 80 | 0.09 | 346 | 243 | 49 | 772.80 |
| Develop, implement and review services and programs to meet client needs | CY2 | MKTG5953C | 25-06-2012 | 31-03-2013 | 28-06-2013 | 70 | 0.08 | 303 | 213 | 43 | 676.20 |
| Plan and conduct group activities | CY2 | EMPL5720C | 25-06-2012 | 31-03-2013 | 28-06-2013 | 50 | 0.06 | 216 | 152 | 30 | 483.00 |
| Facilitate links with other services | CY2 | HWSS5433C | 25-06-2012 | 31-03-2013 | 28-06-2013 | 70 | 0.08 | 303 | 213 | 43 | 676.20 |
| Reflect on and improve own professional practice | CY2 | EMPL5721C | 23-08-2012 | 31-03-2013 | 17-04-2013 | 120 | 0.13 | 520 | 365 | 73 | 1,159.20 |
| Reflect on and improve own professional practice | CY2 | EMPL5721C | 24-07-2012 | 31-03-2013 | 21-06-2013 | 120 | 0.13 | 520 | 365 | 73 | 1,159.20 |
| Reflect on and improve own professional practice | CY2 | EMPL5721C | 25-06-2012 | 31-03-2013 | 28-06-2013 | 120 | 0.13 | 520 | 365 | 73 | 1,159.20 |
| Develop, facilitate and monitor all aspects of case management | CY2 | HWSS5440C | 25-06-2012 | 31-03-2013 | 28-06-2013 | 75 | 0.08 | 325 | 228 | 46 | 724.50 |
| Develop new networks | CY2 | HWSS5441C | 23-08-2012 | 31-03-2013 | 17-04-2013 | 75 | 0.08 | 325 | 228 | 46 | 724.50 |
| Provide advocacy and representation services | CY2 | JUST5167C | 24-07-2012 | 31-03-2013 | 21-06-2013 | 80 | 0.09 | 346 | 243 | 49 | 772.80 |
| Provide systems advocacy services | CY2 | JUST5168C | 23-08-2012 | 31-03-2013 | 17-04-2013 | 90 | 0.10 | 390 | 274 | 55 | 869.40 |
| Work effectively in the alcohol and other drugs sector | CY2 | HWSS5458C | 24-07-2012 | 31-03-2013 | 21-06-2013 | 50 | 0.06 | 216 | 152 | 30 | 483.00 |
| Provide community focused promotion and prevention strategies | CY2 | HWSS5459C | 24-07-2012 | 31-03-2013 | 21-06-2013 | 60 | 0.07 | 260 | 182 | 37 | 579.60 |
| Work effectively in the alcohol and other drugs sector | JUL | HWSS5458C | 19-07-2012 | 31-08-2012 | 11-10-2012 | 50 | 0.06 | 216 | 152 | 30 | 483.00 |
| Plan and conduct group activities | OCT | EMPL5720C | 15-10-2012 | 30-11-2012 | 14-12-2012 | 50 | 0.06 | 216 | 152 | 30 | 483.00 |
* EFTSL : Equivalent Full Time Study Load
** Concession fees are only available at diploma and advanced diploma level for indigenous students.
Back to Program List
| Unit Of Study (Course) | Session | Course Code | Commencement Date | Census Date | Completion Date | Student Contact Hours (SCH) | EFTSL* | Tuition Fee: Onsite|Distance|RPL | |||
| Government Subsidised Fee | Full Fee (Non Government Subsidised) | ||||||||||
| Program commenced 1 July 2009-30 June 2012 ($) | Program commenced 1 July 2012-31 December 2012 ($) | Program commenced 1 July 2012-31 December 2012 Concession ** ($) | Australian Full Fee Paying ($) | ||||||||
| Explore and apply the creative design process to 3D forms | CY2 | GRAP5295C | 03-09-2012 | 31-03-2013 | 18-01-2013 | 50 | 0.07 | 216 | 308 | 62 | 680.00 |
| Explore and apply the creative design process to 2D forms | JUL | GRAP5294C | 25-06-2012 | 31-08-2012 | 31-08-2012 | 50 | 0.07 | 216 | 308 | 62 | 680.00 |
| Explore and apply the creative design process to 2D forms | JUL | GRAP5312C | 25-06-2012 | 31-08-2012 | 07-12-2012 | 50 | 0.07 | 216 | 308 | 62 | 680.00 |
| Explore and apply the creative design process to 3D forms | JUL | GRAP5295C | 25-06-2012 | 31-08-2012 | 09-11-2012 | 50 | 0.07 | 216 | 308 | 62 | 680.00 |
| Explore and apply the creative design process to 3D forms | JUL | GRAP5295C | 25-06-2012 | 31-08-2012 | 23-11-2012 | 50 | 0.07 | 216 | 308 | 62 | 680.00 |
| Explore and apply the creative design process to 3D forms | JUL | GRAP5303C | 25-06-2012 | 31-08-2012 | 07-12-2012 | 50 | 0.07 | 216 | 308 | 62 | 680.00 |
| Explore and apply the creative design process to 3D forms | JUL | GRAP5303C | 25-06-2012 | 31-08-2012 | 09-11-2012 | 50 | 0.07 | 216 | 308 | 62 | 680.00 |
| Select and apply drawing techniques and media to represent and communicate the concept | JUL | GRAP5296C | 25-06-2012 | 31-08-2012 | 23-11-2012 | 80 | 0.12 | 346 | 493 | 98 | 1,088.00 |
| Select and apply drawing techniques and media to represent and communicate the concept | JUL | GRAP5311C | 25-06-2012 | 31-08-2012 | 07-12-2012 | 80 | 0.12 | 346 | 493 | 98 | 1,088.00 |
| Produce technical drawings | JUL | GRAP5297C | 25-06-2012 | 31-08-2012 | 14-09-2012 | 50 | 0.07 | 216 | 308 | 62 | 680.00 |
| Produce technical drawings | JUL | GRAP5297C | 25-06-2012 | 31-08-2012 | 23-11-2012 | 50 | 0.07 | 216 | 308 | 62 | 680.00 |
| Research, analyse and apply colour for interior spaces | JUL | ARCH5164C | 25-06-2012 | 31-08-2012 | 09-11-2012 | 80 | 0.12 | 346 | 493 | 98 | 1,088.00 |
| Research, analyse and apply colour for interior spaces | JUL | ARCH5164C | 25-06-2012 | 31-08-2012 | 23-11-2012 | 80 | 0.12 | 346 | 493 | 98 | 1,088.00 |
| Decorate residential interiors | JUL | ARCH5165C | 25-06-2012 | 31-08-2012 | 12-10-2012 | 80 | 0.12 | 346 | 493 | 98 | 1,088.00 |
| Decorate residential interiors | JUL | ARCH5165C | 25-06-2012 | 31-08-2012 | 23-11-2012 | 80 | 0.12 | 346 | 493 | 98 | 1,088.00 |
| Determine occupational health and safety implications of interior effects | JUL | OHTH5541C | 25-06-2012 | 31-08-2012 | 23-11-2012 | 10 | 0.01 | 43 | 62 | 12 | 136.00 |
| Research and recommend soft furnishings for interiors | JUL | ARCH5168C | 25-06-2012 | 31-08-2012 | 09-11-2012 | 50 | 0.07 | 216 | 308 | 62 | 680.00 |
| Research and recommend soft furnishings for interiors | JUL | ARCH5168C | 25-06-2012 | 31-08-2012 | 23-11-2012 | 50 | 0.07 | 216 | 308 | 62 | 680.00 |
| Use CAD applications to complete models and documentation for interior design projects | JUL | ARCH5170C | 25-06-2012 | 31-08-2012 | 23-11-2012 | 80 | 0.12 | 346 | 493 | 98 | 1,088.00 |
| Create 3D digital models | JUL | COSC6010C | 25-06-2012 | 31-08-2012 | 23-11-2012 | 75 | 0.11 | 325 | 462 | 92 | 1,020.00 |
| Design for small to medium scale commercial or institutional interiors | JUL | ARCH5171C | 25-06-2012 | 31-08-2012 | 23-11-2012 | 108 | 0.16 | 468 | 665 | 133 | 1,468.80 |
| Source and apply information on the history and theory of design | JUL | GRAP5299C | 25-06-2012 | 31-08-2012 | 09-11-2012 | 65 | 0.10 | 281 | 400 | 80 | 884.00 |
| Source and apply information on the history and theory of design | JUL | GRAP5299C | 25-06-2012 | 31-08-2012 | 23-11-2012 | 65 | 0.10 | 281 | 400 | 80 | 884.00 |
| Source and apply information on the history and theory of design | JUL | GRAP5305C | 25-06-2012 | 31-08-2012 | 07-12-2012 | 65 | 0.10 | 281 | 400 | 80 | 884.00 |
| Source and apply information on the history and theory of design | JUL | GRAP5305C | 25-06-2012 | 31-08-2012 | 09-11-2012 | 65 | 0.10 | 281 | 400 | 80 | 884.00 |
| Prepare a materials board for client presentation | JUL | ARCH5172C | 25-06-2012 | 31-08-2012 | 23-11-2012 | 20 | 0.03 | 87 | 123 | 25 | 272.00 |
| Assess interior light and recommend light fittings | JUL | ARCH5173C | 25-06-2012 | 31-08-2012 | 09-11-2012 | 36 | 0.05 | 156 | 222 | 44 | 489.60 |
| Assess interior light and recommend light fittings | JUL | ARCH5173C | 25-06-2012 | 31-08-2012 | 23-11-2012 | 36 | 0.05 | 156 | 222 | 44 | 489.60 |
| Research and recommend hard materials and finishes for interiors | JUL | ARCH5174C | 25-06-2012 | 31-08-2012 | 23-11-2012 | 54 | 0.08 | 234 | 333 | 66 | 734.40 |
| Identify materials, construction techniques and methods used in building interiors | JUL | ARCH5175C | 25-06-2012 | 31-08-2012 | 23-11-2012 | 54 | 0.08 | 234 | 333 | 66 | 734.40 |
| Produce computer-aided drawings | JUL | GRAP5300C | 25-06-2012 | 31-08-2012 | 23-11-2012 | 50 | 0.07 | 216 | 308 | 62 | 680.00 |
| Produce and prepare photo images | JUL | VART6036C | 25-06-2012 | 31-08-2012 | 17-08-2012 | 20 | 0.03 | 87 | 123 | 25 | 272.00 |
| Produce and prepare photo images | JUL | VART6043C | 25-06-2012 | 31-08-2012 | 07-12-2012 | 20 | 0.03 | 87 | 123 | 25 | 272.00 |
| Use business technology | JUL | OFFC5215C | 25-06-2012 | 31-08-2012 | 17-08-2012 | 20 | 0.03 | 87 | 123 | 25 | 272.00 |
| Organise and communicate information | JUL | EMPL5731C | 25-06-2012 | 31-08-2012 | 23-11-2012 | 20 | 0.03 | 87 | 123 | 25 | 272.00 |
| Monitor and manage small business operations | JUL | BUSM6328C | 25-06-2012 | 31-08-2012 | 23-11-2012 | 50 | 0.07 | 216 | 308 | 62 | 680.00 |
| Develop and extend design skills and practice | JUL | VART6037C | 25-06-2012 | 31-08-2012 | 23-11-2012 | 30 | 0.04 | 130 | 185 | 37 | 408.00 |
| Research and recommend furniture and accessories | JUL | ARCH5180C | 09-07-2012 | 31-08-2012 | 23-11-2012 | 36 | 0.05 | 156 | 222 | 44 | 489.60 |
| Research and recommend furniture and accessories | JUL | ARCH5180C | 25-06-2012 | 31-08-2012 | 09-11-2012 | 36 | 0.05 | 156 | 222 | 44 | 489.60 |
| Research and recommend furniture and accessories | JUL | ARCH5180C | 25-06-2012 | 31-08-2012 | 23-11-2012 | 36 | 0.05 | 156 | 222 | 44 | 489.60 |
| Participate in environmentally sustainable work practices | JUL | EASC5050C | 25-06-2012 | 31-08-2012 | 09-11-2012 | 30 | 0.04 | 130 | 185 | 37 | 408.00 |
| Participate in environmentally sustainable work practices | JUL | EASC5050C | 25-06-2012 | 31-08-2012 | 23-11-2012 | 30 | 0.04 | 130 | 185 | 37 | 408.00 |
| Prepare a materials board for client presentation | OCT | ARCH5172C | 08-10-2012 | 30-11-2012 | 23-11-2012 | 20 | 0.03 | 87 | 123 | 25 | 272.00 |
| Prepare a materials board for client presentation | OCT | ARCH5172C | 15-10-2012 | 30-11-2012 | 09-11-2012 | 20 | 0.03 | 87 | 123 | 25 | 272.00 |
| Use business technology | OCT | OFFC5215C | 15-10-2012 | 30-11-2012 | 09-11-2012 | 20 | 0.03 | 87 | 123 | 25 | 272.00 |
| Organise and communicate information | OCT | EMPL5731C | 15-10-2012 | 30-11-2012 | 09-11-2012 | 20 | 0.03 | 87 | 123 | 25 | 272.00 |
* EFTSL : Equivalent Full Time Study Load
** Concession fees are only available at diploma and advanced diploma level for indigenous students.
Back to Program List
| Unit Of Study (Course) | Session | Course Code | Commencement Date | Census Date | Completion Date | Student Contact Hours (SCH) | EFTSL* | Tuition Fee: Onsite|Distance|RPL | |||
| Government Subsidised Fee | Full Fee (Non Government Subsidised) | ||||||||||
| Program commenced 1 July 2009-30 June 2012 ($) | Program commenced 1 July 2012-31 December 2012 ($) | Program commenced 1 July 2012-31 December 2012 Concession ** ($) | Australian Full Fee Paying ($) | ||||||||
| Participate in development and follow a personal competency development plan | AUG | BUSM6211C | 21-08-2012 | 30-09-2012 | 21-12-2012 | 20 | 0.04 | 87 | 65 | 13 | 288.00 |
| Participate in development and follow a personal competency development plan | AUG | BUSM6211C | 30-08-2012 | 30-09-2012 | 21-12-2012 | 20 | 0.04 | 87 | 65 | 13 | 288.00 |
| Use basic computer applications relevant to a Part 2.1D - Computer Systems Units workplace | AUG | OFFC5195C | 13-08-2012 | 30-09-2012 | 09-11-2012 | 20 | 0.04 | 87 | 65 | 13 | 288.00 |
| Source and purchase material/parts for installation or service jobs | AUG | BUSM6230C | 06-08-2012 | 30-09-2012 | 21-12-2012 | 20 | 0.04 | 87 | 65 | 13 | 288.00 |
| Provide quotations for installation or service jobs | AUG | BUSM6231C | 13-08-2012 | 30-09-2012 | 17-09-2012 | 20 | 0.04 | 87 | 65 | 13 | 288.00 |
| Deliver a service to customers | AUG | MKTG5787C | 13-08-2012 | 30-09-2012 | 17-09-2012 | 20 | 0.04 | 87 | 65 | 13 | 288.00 |
| Deliver a service to customers | AUG | MKTG5787C | 16-08-2012 | 30-09-2012 | 17-09-2012 | 20 | 0.04 | 87 | 65 | 13 | 288.00 |
| Verify compliance and functionality of general electrical installations | AUG | EEET6825C | 08-08-2012 | 30-09-2012 | 21-12-2012 | 40 | 0.09 | 173 | 130 | 26 | 576.00 |
| Verify compliance and functionality of general electrical installations | AUG | EEET6825C | 09-08-2012 | 30-09-2012 | 21-12-2012 | 40 | 0.09 | 173 | 130 | 26 | 576.00 |
| Verify compliance and functionality of general electrical installations | AUG | EEET6825C | 28-08-2012 | 30-09-2012 | 21-12-2012 | 40 | 0.09 | 173 | 130 | 26 | 576.00 |
| Compile and produce an electrotechnology report | AUG | EEET6874C | 06-08-2012 | 30-09-2012 | 21-12-2012 | 60 | 0.13 | 260 | 196 | 39 | 864.00 |
| Participate in development and follow a personal competency development plan | CY2 | BUSM6211C | 27-09-2012 | 31-03-2013 | 26-09-2013 | 20 | 0.04 | 87 | 65 | 13 | 288.00 |
| Use basic computer applications relevant to a Part 2.1D - Computer Systems Units workplace | CY2 | OFFC5195C | 01-08-2012 | 31-03-2013 | 31-07-2013 | 20 | 0.04 | 87 | 65 | 13 | 288.00 |
| Use basic computer applications relevant to a Part 2.1D - Computer Systems Units workplace | CY2 | OFFC5195C | 02-07-2012 | 31-03-2013 | 28-06-2013 | 20 | 0.04 | 87 | 65 | 13 | 288.00 |
| Use basic computer applications relevant to a Part 2.1D - Computer Systems Units workplace | CY2 | OFFC5195C | 16-07-2012 | 31-03-2013 | 26-04-2013 | 20 | 0.04 | 87 | 65 | 13 | 288.00 |
| Use basic computer applications relevant to a Part 2.1D - Computer Systems Units workplace | CY2 | OFFC5195C | 16-07-2012 | 31-03-2013 | 28-02-2013 | 20 | 0.04 | 87 | 65 | 13 | 288.00 |
| Use basic computer applications relevant to a Part 2.1D - Computer Systems Units workplace | CY2 | OFFC5195C | 16-07-2012 | 31-03-2013 | 31-05-2013 | 20 | 0.04 | 87 | 65 | 13 | 288.00 |
| Use basic computer applications relevant to a Part 2.1D - Computer Systems Units workplace | CY2 | OFFC5195C | 19-07-2012 | 31-03-2013 | 28-02-2013 | 20 | 0.04 | 87 | 65 | 13 | 288.00 |
| Use basic computer applications relevant to a Part 2.1D - Computer Systems Units workplace | CY2 | OFFC5195C | 25-06-2012 | 31-03-2013 | 28-06-2013 | 20 | 0.04 | 87 | 65 | 13 | 288.00 |
| Disconnect and reconnect fixed wired electrical equipment connected to a Low Voltage supply | CY2 | EEET6891C | 01-08-2012 | 31-03-2013 | 31-07-2013 | 80 | 0.17 | 346 | 261 | 52 | 1,152.00 |
| Disconnect and reconnect fixed wired electrical equipment connected to a Low Voltage supply | CY2 | EEET6891C | 25-06-2012 | 31-03-2013 | 28-06-2013 | 80 | 0.17 | 346 | 261 | 52 | 1,152.00 |
| Implement and monitor OHS policies and procedures | JUL | OHTH5465C | 19-07-2012 | 31-08-2012 | 18-10-2012 | 20 | 0.04 | 87 | 65 | 13 | 288.00 |
| Implement and monitor OHS policies and procedures | JUL | OHTH5465C | 25-06-2012 | 31-08-2012 | 09-11-2012 | 20 | 0.04 | 87 | 65 | 13 | 288.00 |
| Implement and monitor OHS policies and procedures | JUL | OHTH5465C | 25-06-2012 | 31-08-2012 | 14-12-2012 | 20 | 0.04 | 87 | 65 | 13 | 288.00 |
| Participate in development and follow a personal competency development plan | JUL | BUSM6211C | 19-07-2012 | 31-08-2012 | 18-10-2012 | 20 | 0.04 | 87 | 65 | 13 | 288.00 |
| Participate in development and follow a personal competency development plan | JUL | BUSM6211C | 25-06-2012 | 31-08-2012 | 09-11-2012 | 20 | 0.04 | 87 | 65 | 13 | 288.00 |
| Participate in development and follow a personal competency development plan | JUL | BUSM6211C | 25-06-2012 | 31-08-2012 | 14-12-2012 | 20 | 0.04 | 87 | 65 | 13 | 288.00 |
| Participate in development and follow a personal competency development plan | JUL | BUSM6211C | 25-07-2012 | 31-08-2012 | 21-12-2012 | 20 | 0.04 | 87 | 65 | 13 | 288.00 |
| Modify-redesign of electronics and communications system | JUL | EEET6742C | 25-06-2012 | 31-08-2012 | 09-11-2012 | 20 | 0.04 | 87 | 65 | 13 | 288.00 |
| Modify-redesign of electronics and communications system | JUL | EEET6742C | 25-06-2012 | 31-08-2012 | 14-12-2012 | 20 | 0.04 | 87 | 65 | 13 | 288.00 |
| Provide basic instruction in the use of electrotechnology apparatus | JUL | EEET6789C | 25-06-2012 | 31-08-2012 | 14-12-2012 | 20 | 0.04 | 87 | 65 | 13 | 288.00 |
| Use basic computer applications relevant to a Part 2.1D - Computer Systems Units workplace | JUL | OFFC5195C | 16-07-2012 | 31-08-2012 | 12-10-2012 | 20 | 0.04 | 87 | 65 | 13 | 288.00 |
| Use basic computer applications relevant to a Part 2.1D - Computer Systems Units workplace | JUL | OFFC5195C | 16-07-2012 | 31-08-2012 | 14-12-2012 | 20 | 0.04 | 87 | 65 | 13 | 288.00 |
| Use basic computer applications relevant to a Part 2.1D - Computer Systems Units workplace | JUL | OFFC5195C | 19-07-2012 | 31-08-2012 | 18-10-2012 | 20 | 0.04 | 87 | 65 | 13 | 288.00 |
| Use basic computer applications relevant to a Part 2.1D - Computer Systems Units workplace | JUL | OFFC5195C | 24-07-2012 | 31-08-2012 | 14-12-2012 | 20 | 0.04 | 87 | 65 | 13 | 288.00 |
| Use basic computer applications relevant to a Part 2.1D - Computer Systems Units workplace | JUL | OFFC5195C | 25-06-2012 | 31-08-2012 | 09-11-2012 | 20 | 0.04 | 87 | 65 | 13 | 288.00 |
| Use basic computer applications relevant to a Part 2.1D - Computer Systems Units workplace | JUL | OFFC5195C | 25-06-2012 | 31-08-2012 | 14-12-2012 | 20 | 0.04 | 87 | 65 | 13 | 288.00 |
| Maintain documentation | JUL | BUSM6229C | 19-07-2012 | 31-08-2012 | 18-10-2012 | 20 | 0.04 | 87 | 65 | 13 | 288.00 |
| Maintain documentation | JUL | BUSM6229C | 25-06-2012 | 31-08-2012 | 14-12-2012 | 20 | 0.04 | 87 | 65 | 13 | 288.00 |
| Evaluate performance of electrical apparatus | JUL | EEET6804C | 25-06-2012 | 31-08-2012 | 14-12-2012 | 40 | 0.09 | 173 | 130 | 26 | 576.00 |
| Source and purchase material/parts for installation or service jobs | JUL | BUSM6230C | 25-06-2012 | 31-08-2012 | 14-12-2012 | 20 | 0.04 | 87 | 65 | 13 | 288.00 |
| Provide quotations for installation or service jobs | JUL | BUSM6231C | 16-07-2012 | 31-08-2012 | 21-12-2012 | 20 | 0.04 | 87 | 65 | 13 | 288.00 |
| Provide quotations for installation or service jobs | JUL | BUSM6231C | 24-07-2012 | 31-08-2012 | 21-12-2012 | 20 | 0.04 | 87 | 65 | 13 | 288.00 |
| Provide quotations for installation or service jobs | JUL | BUSM6231C | 25-06-2012 | 31-08-2012 | 14-12-2012 | 20 | 0.04 | 87 | 65 | 13 | 288.00 |
| Provide quotations for installation or service jobs | JUL | BUSM6231C | 30-07-2012 | 31-08-2012 | 21-12-2012 | 20 | 0.04 | 87 | 65 | 13 | 288.00 |
| Deliver a service to customers | JUL | MKTG5787C | 16-07-2012 | 31-08-2012 | 21-12-2012 | 20 | 0.04 | 87 | 65 | 13 | 288.00 |
| Deliver a service to customers | JUL | MKTG5787C | 20-07-2012 | 31-08-2012 | 21-12-2012 | 20 | 0.04 | 87 | 65 | 13 | 288.00 |
| Deliver a service to customers | JUL | MKTG5787C | 24-07-2012 | 31-08-2012 | 21-12-2012 | 20 | 0.04 | 87 | 65 | 13 | 288.00 |
| Deliver a service to customers | JUL | MKTG5787C | 25-06-2012 | 31-08-2012 | 14-12-2012 | 20 | 0.04 | 87 | 65 | 13 | 288.00 |
| Deliver a service to customers | JUL | MKTG5787C | 26-07-2012 | 31-08-2012 | 21-12-2012 | 20 | 0.04 | 87 | 65 | 13 | 288.00 |
| Comply with scheduled and preventative maintenance program processes | JUL | EEET6820C | 25-06-2012 | 31-08-2012 | 14-12-2012 | 20 | 0.04 | 87 | 65 | 13 | 288.00 |
| Verify compliance and functionality of general electrical installations | JUL | EEET6825C | 16-07-2012 | 31-08-2012 | 21-12-2012 | 40 | 0.09 | 173 | 130 | 26 | 576.00 |
| Verify compliance and functionality of general electrical installations | JUL | EEET6825C | 19-07-2012 | 31-08-2012 | 21-12-2012 | 40 | 0.09 | 173 | 130 | 26 | 576.00 |
| Verify compliance and functionality of general electrical installations | JUL | EEET6825C | 25-06-2012 | 31-08-2012 | 14-12-2012 | 40 | 0.09 | 173 | 130 | 26 | 576.00 |
| Compile and produce an electrotechnology report | JUL | EEET6874C | 17-07-2012 | 31-08-2012 | 21-12-2012 | 60 | 0.13 | 260 | 196 | 39 | 864.00 |
| Compile and produce an electrotechnology report | JUL | EEET6874C | 18-07-2012 | 31-08-2012 | 21-12-2012 | 60 | 0.13 | 260 | 196 | 39 | 864.00 |
| Compile and produce an electrotechnology report | JUL | EEET6874C | 19-07-2012 | 31-08-2012 | 21-12-2012 | 60 | 0.13 | 260 | 196 | 39 | 864.00 |
| Compile and produce an electrotechnology report | JUL | EEET6874C | 25-06-2012 | 31-08-2012 | 14-12-2012 | 60 | 0.13 | 260 | 196 | 39 | 864.00 |
| Disconnect and reconnect fixed wired electrical equipment connected to a Low Voltage supply | JUL | EEET6891C | 25-06-2012 | 31-08-2012 | 14-12-2012 | 80 | 0.17 | 346 | 261 | 52 | 1,152.00 |
| Disconnect and reconnect fixed wired electrical equipment connected to a Low Voltage supply | JUL | EEET6891C | 26-07-2012 | 31-08-2012 | 14-12-2012 | 80 | 0.17 | 346 | 261 | 52 | 1,152.00 |
| Set up and configure basic data communications systems | JUL | EEET6925C | 25-06-2012 | 31-08-2012 | 14-12-2012 | 40 | 0.09 | 173 | 130 | 26 | 576.00 |
| Assist in commissioning process control systems | JUL | EEET6926C | 25-06-2012 | 31-08-2012 | 14-12-2012 | 40 | 0.09 | 173 | 130 | 26 | 576.00 |
| Set up and place electrical apparatus and associated circuits into service | JUL | EEET6927C | 25-06-2012 | 31-08-2012 | 14-12-2012 | 40 | 0.09 | 173 | 130 | 26 | 576.00 |
| Contribute to the application of a proactive maintenance strategy | JUL | EMPL5779C | 25-06-2012 | 31-08-2012 | 14-12-2012 | 30 | 0.07 | 130 | 98 | 20 | 432.00 |
| Undertake root cause analysis | JUL | MIET6231C | 25-06-2012 | 31-08-2012 | 14-12-2012 | 50 | 0.11 | 216 | 163 | 32 | 720.00 |
| Develop and implement maintenance programs | JUL | EEET6929C | 25-06-2012 | 31-08-2012 | 14-12-2012 | 60 | 0.13 | 260 | 196 | 39 | 864.00 |
| Evaluate performance of electrical machines | JUL | EEET6930C | 25-06-2012 | 31-08-2012 | 14-12-2012 | 40 | 0.09 | 173 | 130 | 26 | 576.00 |
| Find and rectify faults in energy supply network equipment | JUL | EEET6931C | 25-06-2012 | 31-08-2012 | 14-12-2012 | 120 | 0.26 | 520 | 391 | 78 | 1,728.00 |
| Use structured problem solving tools | JUL | GEDU5930C | 25-06-2012 | 31-08-2012 | 14-12-2012 | 40 | 0.09 | 173 | 130 | 26 | 576.00 |
| Diagnose and rectify faults in a.c. motor drive systems | JUL | EEET6932C | 25-06-2012 | 31-08-2012 | 14-12-2012 | 60 | 0.13 | 260 | 196 | 39 | 864.00 |
| Diagnose and rectify faults in d.c. motor drive systems | JUL | EEET6933C | 25-06-2012 | 31-08-2012 | 14-12-2012 | 60 | 0.13 | 260 | 196 | 39 | 864.00 |
| Diagnose and rectify faults in servo drive systems | JUL | EEET6934C | 25-06-2012 | 31-08-2012 | 14-12-2012 | 60 | 0.13 | 260 | 196 | 39 | 864.00 |
| Write specifications for electrical engineering projects | JUL | BUSM6358C | 25-06-2012 | 31-08-2012 | 14-12-2012 | 40 | 0.09 | 173 | 130 | 26 | 576.00 |
| Deliver a service to customers | NOV | MKTG5787C | 09-11-2012 | 31-12-2012 | 21-12-2012 | 20 | 0.04 | 87 | 65 | 13 | 288.00 |
| Use basic computer applications relevant to a Part 2.1D - Computer Systems Units workplace | OCT | OFFC5195C | 08-10-2012 | 30-11-2012 | 14-12-2012 | 20 | 0.04 | 87 | 65 | 13 | 288.00 |
| Provide quotations for installation or service jobs | OCT | BUSM6231C | 16-10-2012 | 30-11-2012 | 21-12-2012 | 20 | 0.04 | 87 | 65 | 13 | 288.00 |
| Provide quotations for installation or service jobs | OCT | BUSM6231C | 17-10-2012 | 30-11-2012 | 15-12-2012 | 20 | 0.04 | 87 | 65 | 13 | 288.00 |
| Deliver a service to customers | OCT | MKTG5787C | 16-10-2012 | 30-11-2012 | 21-12-2012 | 20 | 0.04 | 87 | 65 | 13 | 288.00 |
| Deliver a service to customers | OCT | MKTG5787C | 17-10-2012 | 30-11-2012 | 15-12-2012 | 20 | 0.04 | 87 | 65 | 13 | 288.00 |
| Disconnect and reconnect fixed wired electrical equipment connected to a Low Voltage supply | OCT | EEET6891C | 22-10-2012 | 30-11-2012 | 14-12-2012 | 80 | 0.17 | 346 | 261 | 52 | 1,152.00 |
| Set up and place electrical apparatus and associated circuits into service | OCT | EEET6927C | 08-10-2012 | 30-11-2012 | 21-12-2012 | 40 | 0.09 | 173 | 130 | 26 | 576.00 |
| Implement and monitor OHS policies and procedures | SEP | OHTH5465C | 06-09-2012 | 31-10-2012 | 21-12-2012 | 20 | 0.04 | 87 | 65 | 13 | 288.00 |
| Implement and monitor OHS policies and procedures | SEP | OHTH5465C | 13-09-2012 | 31-10-2012 | 21-12-2012 | 20 | 0.04 | 87 | 65 | 13 | 288.00 |
| Implement and monitor OHS policies and procedures | SEP | OHTH5465C | 24-09-2012 | 31-10-2012 | 02-11-2012 | 20 | 0.04 | 87 | 65 | 13 | 288.00 |
| Participate in development and follow a personal competency development plan | SEP | BUSM6211C | 06-09-2012 | 31-10-2012 | 21-12-2012 | 20 | 0.04 | 87 | 65 | 13 | 288.00 |
| Participate in development and follow a personal competency development plan | SEP | BUSM6211C | 13-09-2012 | 31-10-2012 | 21-12-2012 | 20 | 0.04 | 87 | 65 | 13 | 288.00 |
| Participate in development and follow a personal competency development plan | SEP | BUSM6211C | 24-09-2012 | 31-10-2012 | 02-11-2012 | 20 | 0.04 | 87 | 65 | 13 | 288.00 |
| Use basic computer applications relevant to a Part 2.1D - Computer Systems Units workplace | SEP | OFFC5195C | 06-09-2012 | 31-10-2012 | 21-12-2012 | 20 | 0.04 | 87 | 65 | 13 | 288.00 |
| Use basic computer applications relevant to a Part 2.1D - Computer Systems Units workplace | SEP | OFFC5195C | 13-09-2012 | 31-10-2012 | 21-12-2012 | 20 | 0.04 | 87 | 65 | 13 | 288.00 |
| Use basic computer applications relevant to a Part 2.1D - Computer Systems Units workplace | SEP | OFFC5195C | 24-09-2012 | 31-10-2012 | 02-11-2012 | 20 | 0.04 | 87 | 65 | 13 | 288.00 |
| Maintain documentation | SEP | BUSM6229C | 06-09-2012 | 31-10-2012 | 21-12-2012 | 20 | 0.04 | 87 | 65 | 13 | 288.00 |
| Maintain documentation | SEP | BUSM6229C | 13-09-2012 | 31-10-2012 | 21-12-2012 | 20 | 0.04 | 87 | 65 | 13 | 288.00 |
| Maintain documentation | SEP | BUSM6229C | 24-09-2012 | 31-10-2012 | 02-11-2012 | 20 | 0.04 | 87 | 65 | 13 | 288.00 |
| Disconnect and reconnect fixed wired electrical equipment connected to a Low Voltage supply | SEP | EEET6891C | 03-09-2012 | 31-10-2012 | 14-12-2012 | 80 | 0.17 | 346 | 261 | 52 | 1,152.00 |
* EFTSL : Equivalent Full Time Study Load
** Concession fees are only available at diploma and advanced diploma level for indigenous students.
Back to Program List
| Unit Of Study (Course) | Session | Course Code | Commencement Date | Census Date | Completion Date | Student Contact Hours (SCH) | EFTSL* | Tuition Fee: Onsite|Distance|RPL | |||
| Government Subsidised Fee | Full Fee (Non Government Subsidised) | ||||||||||
| Program commenced 1 July 2009-30 June 2012 ($) | Program commenced 1 July 2012-31 December 2012 ($) | Program commenced 1 July 2012-31 December 2012 Concession ** ($) | Australian Full Fee Paying ($) | ||||||||
| Develop workplace policy and procedures for sustainability | AUG | BUSM6352C | 22-08-2012 | 30-09-2012 | 09-11-2012 | 50 | 0.20 | 216 | 370 | 74 | 532.00 |
| Manage operational plan | JUL | BUSM6367C | 25-06-2012 | 31-08-2012 | 16-10-2012 | 60 | 0.24 | 260 | 445 | 89 | 638.40 |
| Manage budgets and financial plans | JUL | ACCT5299C | 25-06-2012 | 31-08-2012 | 16-10-2012 | 70 | 0.27 | 303 | 519 | 104 | 744.80 |
| Coordinate fit-out of premises for user occupation | JUL | MKTG6018C | 25-06-2012 | 31-08-2012 | 21-08-2012 | 40 | 0.16 | 173 | 296 | 59 | 425.60 |
| Advise on use and design of facilities | JUL | MKTG6029C | 25-06-2012 | 31-08-2012 | 21-08-2012 | 20 | 0.08 | 87 | 148 | 30 | 212.80 |
| Coordinate construction or renovation of facilities | JUL | BUIL5982C | 25-06-2012 | 31-08-2012 | 21-08-2012 | 25 | 0.10 | 108 | 185 | 37 | 266.00 |
| Implement facilities management plan | OCT | MKTG6030C | 09-10-2012 | 30-11-2012 | 09-11-2012 | 25 | 0.10 | 108 | 185 | 37 | 266.00 |
| Monitor performance of property or facility portfolio | OCT | MKTG6032C | 09-10-2012 | 30-11-2012 | 09-11-2012 | 20 | 0.08 | 87 | 148 | 30 | 212.80 |
* EFTSL : Equivalent Full Time Study Load
** Concession fees are only available at diploma and advanced diploma level for indigenous students.
Back to Program List
| Unit Of Study (Course) | Session | Course Code | Commencement Date | Census Date | Completion Date | Student Contact Hours (SCH) | EFTSL* | Tuition Fee: Onsite|Distance|RPL | |||
| Government Subsidised Fee | Full Fee (Non Government Subsidised) | ||||||||||
| Program commenced 1 July 2009-30 June 2012 ($) | Program commenced 1 July 2012-31 December 2012 ($) | Program commenced 1 July 2012-31 December 2012 Concession ** ($) | Australian Full Fee Paying ($) | ||||||||
| Apply building codes and standards to the construction process for low rise building projects | CY2 | BUIL5988C | 25-06-2012 | 31-03-2013 | 21-06-2013 | 40 | 0.04 | 173 | 138 | 28 | 582.00 |
| Select and prepare a construction contract | CY2 | BUIL5984C | 25-06-2012 | 31-03-2013 | 21-06-2013 | 40 | 0.04 | 173 | 138 | 28 | 582.00 |
| Identify and produce estimated costs for building and construction projects | CY2 | BUIL5985C | 25-06-2012 | 31-03-2013 | 21-06-2013 | 60 | 0.06 | 260 | 206 | 41 | 873.00 |
| Apply structural principles to residential low rise constructions | CY2 | BUIL5986C | 25-06-2012 | 31-03-2013 | 21-06-2013 | 160 | 0.17 | 693 | 550 | 110 | 2,328.00 |
| Prepare and evaluate tender documentation | CY2 | BUIL5987C | 25-06-2012 | 31-03-2013 | 21-06-2013 | 20 | 0.02 | 87 | 69 | 14 | 291.00 |
| Apply building codes and standards to the construction process for medium rise building projects | CY2 | BUIL5989C | 25-06-2012 | 31-03-2013 | 21-06-2013 | 200 | 0.21 | 866 | 688 | 138 | 2,910.00 |
| Monitor costing systems on medium rise building and construction projects | CY2 | BUIL5990C | 25-06-2012 | 31-03-2013 | 21-06-2013 | 60 | 0.06 | 260 | 206 | 41 | 873.00 |
| Supervise the planning of on-site medium rise building or construction work | CY2 | BUIL5991C | 25-06-2012 | 31-03-2013 | 21-06-2013 | 200 | 0.21 | 866 | 688 | 138 | 2,910.00 |
| Manage construction work | CY2 | BUIL5992C | 25-06-2012 | 31-03-2013 | 21-06-2013 | 150 | 0.16 | 650 | 516 | 104 | 2,182.50 |
| Apply structural principles to the construction of medium rise buildings | CY2 | BUIL5993C | 25-06-2012 | 31-03-2013 | 21-06-2013 | 300 | 0.32 | 1,299 | 1,032 | 207 | 4,365.00 |
| Apply principles of OHS risk management | CY2 | OHTH5587C | 25-06-2012 | 31-03-2013 | 21-06-2013 | 40 | 0.04 | 173 | 138 | 28 | 582.00 |
| Manage project quality | CY2 | BUSM6371C | 25-06-2012 | 31-03-2013 | 21-06-2013 | 40 | 0.04 | 173 | 138 | 28 | 582.00 |
| Manage project risk | CY2 | BUSM6372C | 25-06-2012 | 31-03-2013 | 21-06-2013 | 40 | 0.04 | 173 | 138 | 28 | 582.00 |
| Build thermally efficient and sustainable structures | CY2 | BUIL5994C | 25-06-2012 | 31-03-2013 | 21-06-2013 | 40 | 0.04 | 173 | 138 | 28 | 582.00 |
| Apply site surveys and set-out procedures to medium rise building projects | CY2 | BUIL5995C | 25-06-2012 | 31-03-2013 | 21-06-2013 | 110 | 0.12 | 476 | 378 | 76 | 1,600.50 |
| Administer the legal obligations of a building or construction contract | CY2 | BUIL5996C | 25-06-2012 | 31-03-2013 | 21-06-2013 | 100 | 0.11 | 433 | 344 | 69 | 1,455.00 |
| Identify services layout and connection methods to medium rise construction projects | CY2 | BUIL5997C | 25-06-2012 | 31-03-2013 | 21-06-2013 | 140 | 0.15 | 606 | 482 | 97 | 2,037.00 |
| Manage environmental management practices and processes in building and construction | CY2 | CIVE5712C | 25-06-2012 | 31-03-2013 | 21-06-2013 | 150 | 0.16 | 650 | 516 | 104 | 2,182.50 |
| Manage operational plan | JUL | BUSM6367C | 25-06-2012 | 31-08-2012 | 16-10-2012 | 60 | 0.06 | 260 | 206 | 41 | 873.00 |
| Manage budgets and financial plans | JUL | ACCT5299C | 25-06-2012 | 31-08-2012 | 16-10-2012 | 70 | 0.07 | 303 | 241 | 48 | 1,018.50 |
| Apply site surveys and set-out procedures to medium rise building projects | JUL | BUIL5995C | 25-06-2012 | 31-08-2012 | 09-11-2012 | 110 | 0.12 | 476 | 378 | 76 | 1,600.50 |
| Ensure team effectiveness | JUL | EMPL5813C | 25-06-2012 | 31-08-2012 | 09-11-2012 | 60 | 0.06 | 260 | 206 | 41 | 873.00 |
* EFTSL : Equivalent Full Time Study Load
** Concession fees are only available at diploma and advanced diploma level for indigenous students.
Back to Program List
| Unit Of Study (Course) | Session | Course Code | Commencement Date | Census Date | Completion Date | Student Contact Hours (SCH) | EFTSL* | Tuition Fee: Onsite|Distance|RPL | |||
| Government Subsidised Fee | Full Fee (Non Government Subsidised) | ||||||||||
| Program commenced 1 July 2009-30 June 2012 ($) | Program commenced 1 July 2012-31 December 2012 ($) | Program commenced 1 July 2012-31 December 2012 Concession ** ($) | Australian Full Fee Paying ($) | ||||||||
| Apply OHS practices in the workplace | AUG | OHTH5464C | 08-08-2012 | 30-09-2012 | 21-12-2012 | 20 | 0.02 | 87 | 66 | 13 | 196.80 |
| Apply OHS practices in the workplace | AUG | OHTH5464C | 28-08-2012 | 30-09-2012 | 21-12-2012 | 20 | 0.02 | 87 | 66 | 13 | 196.80 |
| Participate in development and follow a personal competency development plan | AUG | BUSM6211C | 21-08-2012 | 30-09-2012 | 21-12-2012 | 20 | 0.02 | 87 | 66 | 13 | 196.80 |
| Participate in development and follow a personal competency development plan | AUG | BUSM6211C | 30-08-2012 | 30-09-2012 | 21-12-2012 | 20 | 0.02 | 87 | 66 | 13 | 196.80 |
| Dismantle, assemble and fabricate electrotechnology components | AUG | EEET6747C | 13-08-2012 | 30-09-2012 | 09-11-2012 | 40 | 0.04 | 173 | 131 | 26 | 393.60 |
| Fix and secure equipment | AUG | EEET6748C | 13-08-2012 | 30-09-2012 | 09-11-2012 | 20 | 0.02 | 87 | 66 | 13 | 196.80 |
| Use drawings, diagrams, schedules and manuals | AUG | EEET6749C | 13-08-2012 | 30-09-2012 | 09-11-2012 | 40 | 0.04 | 173 | 131 | 26 | 393.60 |
| Use drawings, diagrams, schedules and manuals | AUG | EEET6749C | 13-08-2012 | 30-09-2012 | 14-12-2012 | 40 | 0.04 | 173 | 131 | 26 | 393.60 |
| Solve problems in extra-low voltage single path circuits | AUG | EEET6775C | 13-08-2012 | 30-09-2012 | 09-11-2012 | 40 | 0.04 | 173 | 131 | 26 | 393.60 |
| Solve problems in extra-low voltage single path circuits | AUG | EEET6775C | 13-08-2012 | 30-09-2012 | 14-12-2012 | 40 | 0.04 | 173 | 131 | 26 | 393.60 |
| Solve problems in multiple path d.c. circuits | AUG | EEET6780C | 01-08-2012 | 30-09-2012 | 19-09-2012 | 40 | 0.04 | 173 | 131 | 26 | 393.60 |
| Solve problems in multiple path d.c. circuits | AUG | EEET6780C | 13-08-2012 | 30-09-2012 | 09-11-2012 | 40 | 0.04 | 173 | 131 | 26 | 393.60 |
| Solve problems in multiple path d.c. circuits | AUG | EEET6780C | 30-08-2012 | 30-09-2012 | 21-12-2012 | 40 | 0.04 | 173 | 131 | 26 | 393.60 |
| Use basic computer applications relevant to a Part 2.1D - Computer Systems Units workplace | AUG | OFFC5195C | 13-08-2012 | 30-09-2012 | 09-11-2012 | 20 | 0.02 | 87 | 66 | 13 | 196.80 |
| Install process control apparatus and associated equipment | AUG | EEET6816C | 06-08-2012 | 30-09-2012 | 21-12-2012 | 40 | 0.04 | 173 | 131 | 26 | 393.60 |
| Verify compliance and functionality of process control installations | AUG | EEET6818C | 06-08-2012 | 30-09-2012 | 21-12-2012 | 40 | 0.04 | 173 | 131 | 26 | 393.60 |
| Verify compliance and functionality of process control installations | AUG | EEET6818C | 21-08-2012 | 30-09-2012 | 21-12-2012 | 40 | 0.04 | 173 | 131 | 26 | 393.60 |
| Source and purchase material/parts for installation or service jobs | AUG | BUSM6230C | 06-08-2012 | 30-09-2012 | 21-12-2012 | 20 | 0.02 | 87 | 66 | 13 | 196.80 |
| Provide quotations for installation or service jobs | AUG | BUSM6231C | 13-08-2012 | 30-09-2012 | 17-09-2012 | 20 | 0.02 | 87 | 66 | 13 | 196.80 |
| Deliver a service to customers | AUG | MKTG5787C | 13-08-2012 | 30-09-2012 | 17-09-2012 | 20 | 0.02 | 87 | 66 | 13 | 196.80 |
| Deliver a service to customers | AUG | MKTG5787C | 16-08-2012 | 30-09-2012 | 17-09-2012 | 20 | 0.02 | 87 | 66 | 13 | 196.80 |
| Locate and rectify faults in electrical low voltage equipment following prescribed procedures | AUG | EEET6894C | 14-08-2012 | 30-09-2012 | 28-11-2012 | 20 | 0.02 | 87 | 66 | 13 | 196.80 |
| Supervise and coordinate work activities | AUG | EMPL5814C | 21-08-2012 | 30-09-2012 | 21-12-2012 | 40 | 0.04 | 173 | 131 | 26 | 393.60 |
| Apply OHS practices in the workplace | CY2 | OHTH5464C | 01-08-2012 | 31-03-2013 | 31-07-2013 | 20 | 0.02 | 87 | 66 | 13 | 196.80 |
| Apply OHS practices in the workplace | CY2 | OHTH5464C | 02-07-2012 | 31-03-2013 | 28-06-2013 | 20 | 0.02 | 87 | 66 | 13 | 196.80 |
| Apply OHS practices in the workplace | CY2 | OHTH5464C | 16-07-2012 | 31-03-2013 | 26-04-2013 | 20 | 0.02 | 87 | 66 | 13 | 196.80 |
| Apply OHS practices in the workplace | CY2 | OHTH5464C | 25-06-2012 | 31-03-2013 | 28-06-2013 | 20 | 0.02 | 87 | 66 | 13 | 196.80 |
| Participate in development and follow a personal competency development plan | CY2 | BUSM6211C | 27-09-2012 | 31-03-2013 | 26-09-2013 | 20 | 0.02 | 87 | 66 | 13 | 196.80 |
| Dismantle, assemble and fabricate electrotechnology components | CY2 | EEET6747C | 01-08-2012 | 31-03-2013 | 31-07-2013 | 40 | 0.04 | 173 | 131 | 26 | 393.60 |
| Dismantle, assemble and fabricate electrotechnology components | CY2 | EEET6747C | 02-07-2012 | 31-03-2013 | 28-06-2013 | 40 | 0.04 | 173 | 131 | 26 | 393.60 |
| Dismantle, assemble and fabricate electrotechnology components | CY2 | EEET6747C | 16-07-2012 | 31-03-2013 | 28-02-2013 | 40 | 0.04 | 173 | 131 | 26 | 393.60 |
| Dismantle, assemble and fabricate electrotechnology components | CY2 | EEET6747C | 16-07-2012 | 31-03-2013 | 31-05-2013 | 40 | 0.04 | 173 | 131 | 26 | 393.60 |
| Dismantle, assemble and fabricate electrotechnology components | CY2 | EEET6747C | 25-06-2012 | 31-03-2013 | 28-06-2013 | 40 | 0.04 | 173 | 131 | 26 | 393.60 |
| Fix and secure equipment | CY2 | EEET6748C | 01-08-2012 | 31-03-2013 | 31-07-2013 | 20 | 0.02 | 87 | 66 | 13 | 196.80 |
| Fix and secure equipment | CY2 | EEET6748C | 02-07-2012 | 31-03-2013 | 28-06-2013 | 20 | 0.02 | 87 | 66 | 13 | 196.80 |
| Fix and secure equipment | CY2 | EEET6748C | 16-07-2012 | 31-03-2013 | 26-04-2013 | 20 | 0.02 | 87 | 66 | 13 | 196.80 |
| Fix and secure equipment | CY2 | EEET6748C | 16-07-2012 | 31-03-2013 | 31-05-2013 | 20 | 0.02 | 87 | 66 | 13 | 196.80 |
| Fix and secure equipment | CY2 | EEET6748C | 25-06-2012 | 31-03-2013 | 28-06-2013 | 20 | 0.02 | 87 | 66 | 13 | 196.80 |
| Use drawings, diagrams, schedules and manuals | CY2 | EEET6749C | 01-08-2012 | 31-03-2013 | 31-07-2013 | 40 | 0.04 | 173 | 131 | 26 | 393.60 |
| Use drawings, diagrams, schedules and manuals | CY2 | EEET6749C | 02-07-2012 | 31-03-2013 | 28-06-2013 | 40 | 0.04 | 173 | 131 | 26 | 393.60 |
| Use drawings, diagrams, schedules and manuals | CY2 | EEET6749C | 16-07-2012 | 31-03-2013 | 26-04-2013 | 40 | 0.04 | 173 | 131 | 26 | 393.60 |
| Use drawings, diagrams, schedules and manuals | CY2 | EEET6749C | 16-07-2012 | 31-03-2013 | 28-02-2013 | 40 | 0.04 | 173 | 131 | 26 | 393.60 |
| Use drawings, diagrams, schedules and manuals | CY2 | EEET6749C | 16-07-2012 | 31-03-2013 | 31-05-2013 | 40 | 0.04 | 173 | 131 | 26 | 393.60 |
| Use drawings, diagrams, schedules and manuals | CY2 | EEET6749C | 19-10-2012 | 31-03-2013 | 28-02-2013 | 40 | 0.04 | 173 | 131 | 26 | 393.60 |
| Use drawings, diagrams, schedules and manuals | CY2 | EEET6749C | 25-06-2012 | 31-03-2013 | 28-06-2013 | 40 | 0.04 | 173 | 131 | 26 | 393.60 |
| Solve problems in extra-low voltage single path circuits | CY2 | EEET6775C | 01-08-2012 | 31-03-2013 | 31-07-2013 | 40 | 0.04 | 173 | 131 | 26 | 393.60 |
| Solve problems in extra-low voltage single path circuits | CY2 | EEET6775C | 02-07-2012 | 31-03-2013 | 28-06-2013 | 40 | 0.04 | 173 | 131 | 26 | 393.60 |
| Solve problems in extra-low voltage single path circuits | CY2 | EEET6775C | 16-07-2012 | 31-03-2013 | 26-04-2013 | 40 | 0.04 | 173 | 131 | 26 | 393.60 |
| Solve problems in extra-low voltage single path circuits | CY2 | EEET6775C | 16-07-2012 | 31-03-2013 | 28-02-2013 | 40 | 0.04 | 173 | 131 | 26 | 393.60 |
| Solve problems in extra-low voltage single path circuits | CY2 | EEET6775C | 16-07-2012 | 31-03-2013 | 31-05-2013 | 40 | 0.04 | 173 | 131 | 26 | 393.60 |
| Solve problems in extra-low voltage single path circuits | CY2 | EEET6775C | 19-10-2012 | 31-03-2013 | 28-02-2013 | 40 | 0.04 | 173 | 131 | 26 | 393.60 |
| Solve problems in extra-low voltage single path circuits | CY2 | EEET6775C | 25-06-2012 | 31-03-2013 | 28-06-2013 | 40 | 0.04 | 173 | 131 | 26 | 393.60 |
| Use basic computer applications relevant to a Part 2.1D - Computer Systems Units workplace | CY2 | OFFC5195C | 01-08-2012 | 31-03-2013 | 31-07-2013 | 20 | 0.02 | 87 | 66 | 13 | 196.80 |
| Use basic computer applications relevant to a Part 2.1D - Computer Systems Units workplace | CY2 | OFFC5195C | 02-07-2012 | 31-03-2013 | 28-06-2013 | 20 | 0.02 | 87 | 66 | 13 | 196.80 |
| Use basic computer applications relevant to a Part 2.1D - Computer Systems Units workplace | CY2 | OFFC5195C | 16-07-2012 | 31-03-2013 | 26-04-2013 | 20 | 0.02 | 87 | 66 | 13 | 196.80 |
| Use basic computer applications relevant to a Part 2.1D - Computer Systems Units workplace | CY2 | OFFC5195C | 16-07-2012 | 31-03-2013 | 28-02-2013 | 20 | 0.02 | 87 | 66 | 13 | 196.80 |
| Use basic computer applications relevant to a Part 2.1D - Computer Systems Units workplace | CY2 | OFFC5195C | 16-07-2012 | 31-03-2013 | 31-05-2013 | 20 | 0.02 | 87 | 66 | 13 | 196.80 |
| Use basic computer applications relevant to a Part 2.1D - Computer Systems Units workplace | CY2 | OFFC5195C | 19-07-2012 | 31-03-2013 | 28-02-2013 | 20 | 0.02 | 87 | 66 | 13 | 196.80 |
| Use basic computer applications relevant to a Part 2.1D - Computer Systems Units workplace | CY2 | OFFC5195C | 25-06-2012 | 31-03-2013 | 28-06-2013 | 20 | 0.02 | 87 | 66 | 13 | 196.80 |
| Disconnect and reconnect fixed wired electrical equipment connected to a Low Voltage supply | CY2 | EEET6891C | 01-08-2012 | 31-03-2013 | 31-07-2013 | 80 | 0.08 | 346 | 262 | 53 | 787.20 |
| Disconnect and reconnect fixed wired electrical equipment connected to a Low Voltage supply | CY2 | EEET6891C | 25-06-2012 | 31-03-2013 | 28-06-2013 | 80 | 0.08 | 346 | 262 | 53 | 787.20 |
| Locate and rectify faults in electrical low voltage equipment following prescribed procedures | CY2 | EEET6894C | 01-08-2012 | 31-03-2013 | 31-07-2013 | 20 | 0.02 | 87 | 66 | 13 | 196.80 |
| Locate and rectify faults in electrical low voltage equipment following prescribed procedures | CY2 | EEET6894C | 25-06-2012 | 31-03-2013 | 28-06-2013 | 20 | 0.02 | 87 | 66 | 13 | 196.80 |
| Apply OHS practices in the workplace | JUL | OHTH5464C | 16-07-2012 | 31-08-2012 | 14-12-2012 | 20 | 0.02 | 87 | 66 | 13 | 196.80 |
| Apply OHS practices in the workplace | JUL | OHTH5464C | 16-07-2012 | 31-08-2012 | 21-12-2012 | 20 | 0.02 | 87 | 66 | 13 | 196.80 |
| Apply OHS practices in the workplace | JUL | OHTH5464C | 18-07-2012 | 31-08-2012 | 21-12-2012 | 20 | 0.02 | 87 | 66 | 13 | 196.80 |
| Apply OHS practices in the workplace | JUL | OHTH5464C | 25-06-2012 | 31-08-2012 | 09-11-2012 | 20 | 0.02 | 87 | 66 | 13 | 196.80 |
| Apply OHS practices in the workplace | JUL | OHTH5464C | 25-06-2012 | 31-08-2012 | 14-12-2012 | 20 | 0.02 | 87 | 66 | 13 | 196.80 |
| Implement and monitor OHS policies and procedures | JUL | OHTH5465C | 19-07-2012 | 31-08-2012 | 18-10-2012 | 20 | 0.02 | 87 | 66 | 13 | 196.80 |
| Implement and monitor OHS policies and procedures | JUL | OHTH5465C | 25-06-2012 | 31-08-2012 | 09-11-2012 | 20 | 0.02 | 87 | 66 | 13 | 196.80 |
| Implement and monitor OHS policies and procedures | JUL | OHTH5465C | 25-06-2012 | 31-08-2012 | 14-12-2012 | 20 | 0.02 | 87 | 66 | 13 | 196.80 |
| Document occupational hazards and risks in electronics | JUL | OHTH5466C | 25-06-2012 | 31-08-2012 | 09-11-2012 | 20 | 0.02 | 87 | 66 | 13 | 196.80 |
| Document occupational hazards and risks in electronics | JUL | OHTH5466C | 25-06-2012 | 31-08-2012 | 14-12-2012 | 20 | 0.02 | 87 | 66 | 13 | 196.80 |
| Participate in development and follow a personal competency development plan | JUL | BUSM6211C | 19-07-2012 | 31-08-2012 | 18-10-2012 | 20 | 0.02 | 87 | 66 | 13 | 196.80 |
| Participate in development and follow a personal competency development plan | JUL | BUSM6211C | 25-06-2012 | 31-08-2012 | 09-11-2012 | 20 | 0.02 | 87 | 66 | 13 | 196.80 |
| Participate in development and follow a personal competency development plan | JUL | BUSM6211C | 25-06-2012 | 31-08-2012 | 14-12-2012 | 20 | 0.02 | 87 | 66 | 13 | 196.80 |
| Participate in development and follow a personal competency development plan | JUL | BUSM6211C | 25-07-2012 | 31-08-2012 | 21-12-2012 | 20 | 0.02 | 87 | 66 | 13 | 196.80 |
| Commission electronics and communications systems | JUL | EEET6741C | 25-06-2012 | 31-08-2012 | 09-11-2012 | 20 | 0.02 | 87 | 66 | 13 | 196.80 |
| Commission electronics and communications systems | JUL | EEET6741C | 25-06-2012 | 31-08-2012 | 14-12-2012 | 20 | 0.02 | 87 | 66 | 13 | 196.80 |
| Modify-redesign of electronics and communications system | JUL | EEET6742C | 25-06-2012 | 31-08-2012 | 09-11-2012 | 20 | 0.02 | 87 | 66 | 13 | 196.80 |
| Modify-redesign of electronics and communications system | JUL | EEET6742C | 25-06-2012 | 31-08-2012 | 14-12-2012 | 20 | 0.02 | 87 | 66 | 13 | 196.80 |
| Dismantle, assemble and fabricate electrotechnology components | JUL | EEET6747C | 16-07-2012 | 31-08-2012 | 10-10-2012 | 40 | 0.04 | 173 | 131 | 26 | 393.60 |
| Dismantle, assemble and fabricate electrotechnology components | JUL | EEET6747C | 25-06-2012 | 31-08-2012 | 09-11-2012 | 40 | 0.04 | 173 | 131 | 26 | 393.60 |
| Dismantle, assemble and fabricate electrotechnology components | JUL | EEET6747C | 25-06-2012 | 31-08-2012 | 14-12-2012 | 40 | 0.04 | 173 | 131 | 26 | 393.60 |
| Dismantle, assemble and fabricate electrotechnology components | JUL | EEET6747C | 25-07-2012 | 31-08-2012 | 17-10-2012 | 40 | 0.04 | 173 | 131 | 26 | 393.60 |
| Fix and secure equipment | JUL | EEET6748C | 02-07-2012 | 31-08-2012 | 09-11-2012 | 20 | 0.02 | 87 | 66 | 13 | 196.80 |
| Fix and secure equipment | JUL | EEET6748C | 16-07-2012 | 31-08-2012 | 12-10-2012 | 20 | 0.02 | 87 | 66 | 13 | 196.80 |
| Fix and secure equipment | JUL | EEET6748C | 16-07-2012 | 31-08-2012 | 14-12-2012 | 20 | 0.02 | 87 | 66 | 13 | 196.80 |
| Fix and secure equipment | JUL | EEET6748C | 25-06-2012 | 31-08-2012 | 14-12-2012 | 20 | 0.02 | 87 | 66 | 13 | 196.80 |
| Fix and secure equipment | JUL | EEET6748C | 25-07-2012 | 31-08-2012 | 17-10-2012 | 20 | 0.02 | 87 | 66 | 13 | 196.80 |
| Use drawings, diagrams, schedules and manuals | JUL | EEET6749C | 16-07-2012 | 31-08-2012 | 12-10-2012 | 40 | 0.04 | 173 | 131 | 26 | 393.60 |
| Use drawings, diagrams, schedules and manuals | JUL | EEET6749C | 16-07-2012 | 31-08-2012 | 14-12-2012 | 40 | 0.04 | 173 | 131 | 26 | 393.60 |
| Use drawings, diagrams, schedules and manuals | JUL | EEET6749C | 25-06-2012 | 31-08-2012 | 09-11-2012 | 40 | 0.04 | 173 | 131 | 26 | 393.60 |
| Use drawings, diagrams, schedules and manuals | JUL | EEET6749C | 25-07-2012 | 31-08-2012 | 17-10-2012 | 40 | 0.04 | 173 | 131 | 26 | 393.60 |
| Carry out basic repairs to electronic apparatus by replacement of components | JUL | EEET6750C | 25-06-2012 | 31-08-2012 | 09-11-2012 | 40 | 0.04 | 173 | 131 | 26 | 393.60 |
| Carry out basic repairs to electronic apparatus by replacement of components | JUL | EEET6750C | 25-06-2012 | 31-08-2012 | 14-12-2012 | 40 | 0.04 | 173 | 131 | 26 | 393.60 |
| Troubleshoot amplifiers | JUL | EEET6752C | 25-06-2012 | 31-08-2012 | 09-11-2012 | 80 | 0.08 | 346 | 262 | 53 | 787.20 |
| Troubleshoot amplifiers | JUL | EEET6752C | 25-06-2012 | 31-08-2012 | 14-12-2012 | 80 | 0.08 | 346 | 262 | 53 | 787.20 |
| Assemble, set up and test personal computers | JUL | ISYS5668C | 25-06-2012 | 31-08-2012 | 09-11-2012 | 80 | 0.08 | 346 | 262 | 53 | 787.20 |
| Solve problems in extra-low voltage single path circuits | JUL | EEET6775C | 16-07-2012 | 31-08-2012 | 12-10-2012 | 40 | 0.04 | 173 | 131 | 26 | 393.60 |
| Solve problems in extra-low voltage single path circuits | JUL | EEET6775C | 16-07-2012 | 31-08-2012 | 14-12-2012 | 40 | 0.04 | 173 | 131 | 26 | 393.60 |
| Solve problems in extra-low voltage single path circuits | JUL | EEET6775C | 25-06-2012 | 31-08-2012 | 09-11-2012 | 40 | 0.04 | 173 | 131 | 26 | 393.60 |
| Solve problems in extra-low voltage single path circuits | JUL | EEET6775C | 25-06-2012 | 31-08-2012 | 14-12-2012 | 40 | 0.04 | 173 | 131 | 26 | 393.60 |
| Solve problems in multiple path d.c. circuits | JUL | EEET6780C | 16-07-2012 | 31-08-2012 | 12-10-2012 | 40 | 0.04 | 173 | 131 | 26 | 393.60 |
| Solve problems in multiple path d.c. circuits | JUL | EEET6780C | 16-07-2012 | 31-08-2012 | 21-12-2012 | 40 | 0.04 | 173 | 131 | 26 | 393.60 |
| Solve problems in multiple path d.c. circuits | JUL | EEET6780C | 19-07-2012 | 31-08-2012 | 21-12-2012 | 40 | 0.04 | 173 | 131 | 26 | 393.60 |
| Solve problems in multiple path d.c. circuits | JUL | EEET6780C | 24-07-2012 | 31-08-2012 | 21-12-2012 | 40 | 0.04 | 173 | 131 | 26 | 393.60 |
| Solve problems in multiple path d.c. circuits | JUL | EEET6780C | 25-06-2012 | 31-08-2012 | 09-11-2012 | 40 | 0.04 | 173 | 131 | 26 | 393.60 |
| Solve problems in multiple path d.c. circuits | JUL | EEET6780C | 25-06-2012 | 31-08-2012 | 14-12-2012 | 40 | 0.04 | 173 | 131 | 26 | 393.60 |
| Provide basic instruction in the use of electrotechnology apparatus | JUL | EEET6789C | 25-06-2012 | 31-08-2012 | 14-12-2012 | 20 | 0.02 | 87 | 66 | 13 | 196.80 |
| Use basic computer applications relevant to a Part 2.1D - Computer Systems Units workplace | JUL | OFFC5195C | 16-07-2012 | 31-08-2012 | 12-10-2012 | 20 | 0.02 | 87 | 66 | 13 | 196.80 |
| Use basic computer applications relevant to a Part 2.1D - Computer Systems Units workplace | JUL | OFFC5195C | 16-07-2012 | 31-08-2012 | 14-12-2012 | 20 | 0.02 | 87 | 66 | 13 | 196.80 |
| Use basic computer applications relevant to a Part 2.1D - Computer Systems Units workplace | JUL | OFFC5195C | 19-07-2012 | 31-08-2012 | 18-10-2012 | 20 | 0.02 | 87 | 66 | 13 | 196.80 |
| Use basic computer applications relevant to a Part 2.1D - Computer Systems Units workplace | JUL | OFFC5195C | 24-07-2012 | 31-08-2012 | 14-12-2012 | 20 | 0.02 | 87 | 66 | 13 | 196.80 |
| Use basic computer applications relevant to a Part 2.1D - Computer Systems Units workplace | JUL | OFFC5195C | 25-06-2012 | 31-08-2012 | 09-11-2012 | 20 | 0.02 | 87 | 66 | 13 | 196.80 |
| Use basic computer applications relevant to a Part 2.1D - Computer Systems Units workplace | JUL | OFFC5195C | 25-06-2012 | 31-08-2012 | 14-12-2012 | 20 | 0.02 | 87 | 66 | 13 | 196.80 |
| Maintain documentation | JUL | BUSM6229C | 19-07-2012 | 31-08-2012 | 18-10-2012 | 20 | 0.02 | 87 | 66 | 13 | 196.80 |
| Maintain documentation | JUL | BUSM6229C | 25-06-2012 | 31-08-2012 | 14-12-2012 | 20 | 0.02 | 87 | 66 | 13 | 196.80 |
| Develop engineering solutions for induction motor problems | JUL | EEET6800C | 25-06-2012 | 31-08-2012 | 09-11-2012 | 60 | 0.06 | 260 | 197 | 40 | 590.40 |
| Evaluate performance of electrical apparatus | JUL | EEET6804C | 25-06-2012 | 31-08-2012 | 14-12-2012 | 40 | 0.04 | 173 | 131 | 26 | 393.60 |
| Install and set up transducers and sensing devices | JUL | EEET6809C | 18-07-2012 | 31-08-2012 | 21-12-2012 | 40 | 0.04 | 173 | 131 | 26 | 393.60 |
| Install and set up transducers and sensing devices | JUL | EEET6809C | 19-07-2012 | 31-08-2012 | 18-10-2012 | 40 | 0.04 | 173 | 131 | 26 | 393.60 |
| Install and set up transducers and sensing devices | JUL | EEET6809C | 25-06-2012 | 31-08-2012 | 14-12-2012 | 40 | 0.04 | 173 | 131 | 26 | 393.60 |
| Install and set up transducers and sensing devices | JUL | EEET6809C | 25-07-2012 | 31-08-2012 | 21-12-2012 | 40 | 0.04 | 173 | 131 | 26 | 393.60 |
| Install process control apparatus and associated equipment | JUL | EEET6816C | 25-06-2012 | 31-08-2012 | 14-12-2012 | 40 | 0.04 | 173 | 131 | 26 | 393.60 |
| Verify compliance and functionality of process control installations | JUL | EEET6818C | 17-07-2012 | 31-08-2012 | 21-12-2012 | 40 | 0.04 | 173 | 131 | 26 | 393.60 |
| Verify compliance and functionality of process control installations | JUL | EEET6818C | 18-07-2012 | 31-08-2012 | 21-12-2012 | 40 | 0.04 | 173 | 131 | 26 | 393.60 |
| Verify compliance and functionality of process control installations | JUL | EEET6818C | 25-06-2012 | 31-08-2012 | 14-12-2012 | 40 | 0.04 | 173 | 131 | 26 | 393.60 |
| Source and purchase material/parts for installation or service jobs | JUL | BUSM6230C | 25-06-2012 | 31-08-2012 | 14-12-2012 | 20 | 0.02 | 87 | 66 | 13 | 196.80 |
| Provide quotations for installation or service jobs | JUL | BUSM6231C | 16-07-2012 | 31-08-2012 | 21-12-2012 | 20 | 0.02 | 87 | 66 | 13 | 196.80 |
| Provide quotations for installation or service jobs | JUL | BUSM6231C | 24-07-2012 | 31-08-2012 | 21-12-2012 | 20 | 0.02 | 87 | 66 | 13 | 196.80 |
| Provide quotations for installation or service jobs | JUL | BUSM6231C | 25-06-2012 | 31-08-2012 | 14-12-2012 | 20 | 0.02 | 87 | 66 | 13 | 196.80 |
| Provide quotations for installation or service jobs | JUL | BUSM6231C | 30-07-2012 | 31-08-2012 | 21-12-2012 | 20 | 0.02 | 87 | 66 | 13 | 196.80 |
| Deliver a service to customers | JUL | MKTG5787C | 16-07-2012 | 31-08-2012 | 21-12-2012 | 20 | 0.02 | 87 | 66 | 13 | 196.80 |
| Deliver a service to customers | JUL | MKTG5787C | 20-07-2012 | 31-08-2012 | 21-12-2012 | 20 | 0.02 | 87 | 66 | 13 | 196.80 |
| Deliver a service to customers | JUL | MKTG5787C | 24-07-2012 | 31-08-2012 | 21-12-2012 | 20 | 0.02 | 87 | 66 | 13 | 196.80 |
| Deliver a service to customers | JUL | MKTG5787C | 25-06-2012 | 31-08-2012 | 14-12-2012 | 20 | 0.02 | 87 | 66 | 13 | 196.80 |
| Deliver a service to customers | JUL | MKTG5787C | 26-07-2012 | 31-08-2012 | 21-12-2012 | 20 | 0.02 | 87 | 66 | 13 | 196.80 |
| Comply with scheduled and preventative maintenance program processes | JUL | EEET6820C | 25-06-2012 | 31-08-2012 | 14-12-2012 | 20 | 0.02 | 87 | 66 | 13 | 196.80 |
| Disconnect and reconnect fixed wired electrical equipment connected to a Low Voltage supply | JUL | EEET6891C | 25-06-2012 | 31-08-2012 | 14-12-2012 | 80 | 0.08 | 346 | 262 | 53 | 787.20 |
| Disconnect and reconnect fixed wired electrical equipment connected to a Low Voltage supply | JUL | EEET6891C | 26-07-2012 | 31-08-2012 | 14-12-2012 | 80 | 0.08 | 346 | 262 | 53 | 787.20 |
| Locate and rectify faults in electrical low voltage equipment following prescribed procedures | JUL | EEET6894C | 16-07-2012 | 31-08-2012 | 14-12-2012 | 20 | 0.02 | 87 | 66 | 13 | 196.80 |
| Locate and rectify faults in electrical low voltage equipment following prescribed procedures | JUL | EEET6894C | 25-06-2012 | 31-08-2012 | 14-12-2012 | 20 | 0.02 | 87 | 66 | 13 | 196.80 |
| Set up and configure basic data communications systems | JUL | EEET6925C | 25-06-2012 | 31-08-2012 | 14-12-2012 | 40 | 0.04 | 173 | 131 | 26 | 393.60 |
| Assist in commissioning process control systems | JUL | EEET6926C | 25-06-2012 | 31-08-2012 | 14-12-2012 | 40 | 0.04 | 173 | 131 | 26 | 393.60 |
| Contribute to the application of a proactive maintenance strategy | JUL | EMPL5779C | 25-06-2012 | 31-08-2012 | 14-12-2012 | 30 | 0.03 | 130 | 98 | 20 | 295.20 |
| Fault find micro-controller based hardware | JUL | EEET6928C | 25-06-2012 | 31-08-2012 | 14-12-2012 | 40 | 0.04 | 173 | 131 | 26 | 393.60 |
| Undertake root cause analysis | JUL | MIET6231C | 25-06-2012 | 31-08-2012 | 14-12-2012 | 50 | 0.05 | 216 | 164 | 33 | 492.00 |
| Develop and implement maintenance programs | JUL | EEET6929C | 25-06-2012 | 31-08-2012 | 14-12-2012 | 60 | 0.06 | 260 | 197 | 40 | 590.40 |
| Evaluate performance of electrical machines | JUL | EEET6930C | 25-06-2012 | 31-08-2012 | 14-12-2012 | 40 | 0.04 | 173 | 131 | 26 | 393.60 |
| Use structured problem solving tools | JUL | GEDU5930C | 25-06-2012 | 31-08-2012 | 14-12-2012 | 40 | 0.04 | 173 | 131 | 26 | 393.60 |
| Diagnose and rectify faults in a.c. motor drive systems | JUL | EEET6932C | 25-06-2012 | 31-08-2012 | 14-12-2012 | 60 | 0.06 | 260 | 197 | 40 | 590.40 |
| Diagnose and rectify faults in d.c. motor drive systems | JUL | EEET6933C | 25-06-2012 | 31-08-2012 | 14-12-2012 | 60 | 0.06 | 260 | 197 | 40 | 590.40 |
| Diagnose and rectify faults in servo drive systems | JUL | EEET6934C | 25-06-2012 | 31-08-2012 | 14-12-2012 | 60 | 0.06 | 260 | 197 | 40 | 590.40 |
| Supervise and coordinate work activities | JUL | EMPL5814C | 25-06-2012 | 31-08-2012 | 14-12-2012 | 40 | 0.04 | 173 | 131 | 26 | 393.60 |
| Troubleshoot d.c. power supplies with single phase input | JUL | EEET6948C | 25-06-2012 | 31-08-2012 | 14-12-2012 | 40 | 0.04 | 173 | 131 | 26 | 393.60 |
| Apply 5S procedures in a manufacturing environment | JUL | EMPL5834C | 25-06-2012 | 31-08-2012 | 14-12-2012 | 40 | 0.04 | 173 | 131 | 26 | 393.60 |
| Manage electrotechnology projects | JUL | BUSM6422C | 25-06-2012 | 31-08-2012 | 14-12-2012 | 40 | 0.04 | 173 | 131 | 26 | 393.60 |
| Plan electrotechnology projects | JUL | BUSM6423C | 25-06-2012 | 31-08-2012 | 14-12-2012 | 60 | 0.06 | 260 | 197 | 40 | 590.40 |
| Write specifications for electrotechnology projects | JUL | BUSM6424C | 25-06-2012 | 31-08-2012 | 14-12-2012 | 40 | 0.04 | 173 | 131 | 26 | 393.60 |
| Assess compliance of electronic apparatus | JUL | EEET6951C | 25-06-2012 | 31-08-2012 | 14-12-2012 | 60 | 0.06 | 260 | 197 | 40 | 590.40 |
| Use drawings, diagrams, schedules and manuals | NOV | EEET6749C | 02-11-2012 | 31-12-2012 | 21-12-2012 | 40 | 0.04 | 173 | 131 | 26 | 393.60 |
| Deliver a service to customers | NOV | MKTG5787C | 09-11-2012 | 31-12-2012 | 21-12-2012 | 20 | 0.02 | 87 | 66 | 13 | 196.80 |
| Fix and secure equipment | OCT | EEET6748C | 08-10-2012 | 30-11-2012 | 14-12-2012 | 20 | 0.02 | 87 | 66 | 13 | 196.80 |
| Use drawings, diagrams, schedules and manuals | OCT | EEET6749C | 22-10-2012 | 30-11-2012 | 14-12-2012 | 40 | 0.04 | 173 | 131 | 26 | 393.60 |
| Solve problems in extra-low voltage single path circuits | OCT | EEET6775C | 22-10-2012 | 30-11-2012 | 14-12-2012 | 40 | 0.04 | 173 | 131 | 26 | 393.60 |
| Solve problems in extra-low voltage single path circuits | OCT | EEET6775C | 24-10-2012 | 30-11-2012 | 19-12-2012 | 40 | 0.04 | 173 | 131 | 26 | 393.60 |
| Solve problems in multiple path d.c. circuits | OCT | EEET6780C | 24-10-2012 | 30-11-2012 | 19-12-2012 | 40 | 0.04 | 173 | 131 | 26 | 393.60 |
| Use basic computer applications relevant to a Part 2.1D - Computer Systems Units workplace | OCT | OFFC5195C | 08-10-2012 | 30-11-2012 | 14-12-2012 | 20 | 0.02 | 87 | 66 | 13 | 196.80 |
| Provide quotations for installation or service jobs | OCT | BUSM6231C | 16-10-2012 | 30-11-2012 | 21-12-2012 | 20 | 0.02 | 87 | 66 | 13 | 196.80 |
| Provide quotations for installation or service jobs | OCT | BUSM6231C | 17-10-2012 | 30-11-2012 | 15-12-2012 | 20 | 0.02 | 87 | 66 | 13 | 196.80 |
| Deliver a service to customers | OCT | MKTG5787C | 16-10-2012 | 30-11-2012 | 21-12-2012 | 20 | 0.02 | 87 | 66 | 13 | 196.80 |
| Deliver a service to customers | OCT | MKTG5787C | 17-10-2012 | 30-11-2012 | 15-12-2012 | 20 | 0.02 | 87 | 66 | 13 | 196.80 |
| Disconnect and reconnect fixed wired electrical equipment connected to a Low Voltage supply | OCT | EEET6891C | 22-10-2012 | 30-11-2012 | 14-12-2012 | 80 | 0.08 | 346 | 262 | 53 | 787.20 |
| Implement and monitor OHS policies and procedures | SEP | OHTH5465C | 06-09-2012 | 31-10-2012 | 21-12-2012 | 20 | 0.02 | 87 | 66 | 13 | 196.80 |
| Implement and monitor OHS policies and procedures | SEP | OHTH5465C | 13-09-2012 | 31-10-2012 | 21-12-2012 | 20 | 0.02 | 87 | 66 | 13 | 196.80 |
| Implement and monitor OHS policies and procedures | SEP | OHTH5465C | 24-09-2012 | 31-10-2012 | 02-11-2012 | 20 | 0.02 | 87 | 66 | 13 | 196.80 |
| Participate in development and follow a personal competency development plan | SEP | BUSM6211C | 06-09-2012 | 31-10-2012 | 21-12-2012 | 20 | 0.02 | 87 | 66 | 13 | 196.80 |
| Participate in development and follow a personal competency development plan | SEP | BUSM6211C | 13-09-2012 | 31-10-2012 | 21-12-2012 | 20 | 0.02 | 87 | 66 | 13 | 196.80 |
| Participate in development and follow a personal competency development plan | SEP | BUSM6211C | 24-09-2012 | 31-10-2012 | 02-11-2012 | 20 | 0.02 | 87 | 66 | 13 | 196.80 |
| Use drawings, diagrams, schedules and manuals | SEP | EEET6749C | 03-09-2012 | 31-10-2012 | 07-09-2012 | 40 | 0.04 | 173 | 131 | 26 | 393.60 |
| Use drawings, diagrams, schedules and manuals | SEP | EEET6749C | 03-09-2012 | 31-10-2012 | 14-12-2012 | 40 | 0.04 | 173 | 131 | 26 | 393.60 |
| Use drawings, diagrams, schedules and manuals | SEP | EEET6749C | 05-09-2012 | 31-10-2012 | 17-10-2012 | 40 | 0.04 | 173 | 131 | 26 | 393.60 |
| Use basic computer applications relevant to a Part 2.1D - Computer Systems Units workplace | SEP | OFFC5195C | 06-09-2012 | 31-10-2012 | 21-12-2012 | 20 | 0.02 | 87 | 66 | 13 | 196.80 |
| Use basic computer applications relevant to a Part 2.1D - Computer Systems Units workplace | SEP | OFFC5195C | 13-09-2012 | 31-10-2012 | 21-12-2012 | 20 | 0.02 | 87 | 66 | 13 | 196.80 |
| Use basic computer applications relevant to a Part 2.1D - Computer Systems Units workplace | SEP | OFFC5195C | 24-09-2012 | 31-10-2012 | 02-11-2012 | 20 | 0.02 | 87 | 66 | 13 | 196.80 |
| Maintain documentation | SEP | BUSM6229C | 06-09-2012 | 31-10-2012 | 21-12-2012 | 20 | 0.02 | 87 | 66 | 13 | 196.80 |
| Maintain documentation | SEP | BUSM6229C | 13-09-2012 | 31-10-2012 | 21-12-2012 | 20 | 0.02 | 87 | 66 | 13 | 196.80 |
| Maintain documentation | SEP | BUSM6229C | 24-09-2012 | 31-10-2012 | 02-11-2012 | 20 | 0.02 | 87 | 66 | 13 | 196.80 |
| Install and set up transducers and sensing devices | SEP | EEET6809C | 06-09-2012 | 31-10-2012 | 21-12-2012 | 40 | 0.04 | 173 | 131 | 26 | 393.60 |
| Install and set up transducers and sensing devices | SEP | EEET6809C | 13-09-2012 | 31-10-2012 | 21-12-2012 | 40 | 0.04 | 173 | 131 | 26 | 393.60 |
| Install and set up transducers and sensing devices | SEP | EEET6809C | 24-09-2012 | 31-10-2012 | 02-11-2012 | 40 | 0.04 | 173 | 131 | 26 | 393.60 |
| Disconnect and reconnect fixed wired electrical equipment connected to a Low Voltage supply | SEP | EEET6891C | 03-09-2012 | 31-10-2012 | 14-12-2012 | 80 | 0.08 | 346 | 262 | 53 | 787.20 |
* EFTSL : Equivalent Full Time Study Load
** Concession fees are only available at diploma and advanced diploma level for indigenous students.
Back to Program List
| Unit Of Study (Course) | Session | Course Code | Commencement Date | Census Date | Completion Date | Student Contact Hours (SCH) | EFTSL* | Tuition Fee: Onsite|Distance|RPL | |||
| Government Subsidised Fee | Full Fee (Non Government Subsidised) | ||||||||||
| Program commenced 1 July 2009-30 June 2012 ($) | Program commenced 1 July 2012-31 December 2012 ($) | Program commenced 1 July 2012-31 December 2012 Concession ** ($) | Australian Full Fee Paying ($) | ||||||||
| Develop and use complex spreadsheets | JUL | COSC5946C | 25-06-2012 | 31-08-2012 | 26-10-2012 | 50 | 0.05 | 216 | 230 | 46 | 637.50 |
| Provide financial and business performance information | JUL | ACCT5310C | 25-06-2012 | 31-08-2012 | 26-10-2012 | 60 | 0.06 | 260 | 275 | 55 | 765.00 |
| Prepare income tax returns for individuals | JUL | ACCT5311C | 25-06-2012 | 31-08-2012 | 26-10-2012 | 60 | 0.06 | 260 | 275 | 55 | 765.00 |
| Manage budgets and forecasts | JUL | ACCT5312C | 25-06-2012 | 31-08-2012 | 26-10-2012 | 40 | 0.04 | 173 | 184 | 37 | 510.00 |
| Prepare financial reports for corporate entities | JUL | ACCT5313C | 25-06-2012 | 31-08-2012 | 26-10-2012 | 70 | 0.07 | 303 | 321 | 64 | 892.50 |
| Implement and maintain internal control procedures | JUL | COTH5002C | 25-06-2012 | 31-08-2012 | 26-10-2012 | 40 | 0.04 | 173 | 184 | 37 | 510.00 |
| Provide management accounting information | JUL | ACCT5314C | 25-06-2012 | 31-08-2012 | 26-10-2012 | 60 | 0.06 | 260 | 275 | 55 | 765.00 |
| Prepare financial reports to meet statutory requirements | JUL | BAFI5186C | 25-06-2012 | 31-08-2012 | 26-10-2012 | 40 | 0.04 | 173 | 184 | 37 | 510.00 |
| Prepare financial forecasts and projections | JUL | ACCT5315C | 25-06-2012 | 31-08-2012 | 26-10-2012 | 70 | 0.07 | 303 | 321 | 64 | 892.50 |
* EFTSL : Equivalent Full Time Study Load
** Concession fees are only available at diploma and advanced diploma level for indigenous students.
Back to Program List
| Unit Of Study (Course) | Session | Course Code | Commencement Date | Census Date | Completion Date | Student Contact Hours (SCH) | EFTSL* | Tuition Fee: Onsite|Distance|RPL | |||
| Government Subsidised Fee | Full Fee (Non Government Subsidised) | ||||||||||
| Program commenced 1 July 2009-30 June 2012 ($) | Program commenced 1 July 2012-31 December 2012 ($) | Program commenced 1 July 2012-31 December 2012 Concession ** ($) | Australian Full Fee Paying ($) | ||||||||
| Apply principles of professional practice to work in the financial services industry | CY2 | EMPL5892C | 13-08-2012 | 31-03-2013 | 15-03-2013 | 30 | 0.05 | 130 | 135 | 27 | 395.70 |
| Determine client requirements and expectations | CY2 | BAFI5187C | 13-08-2012 | 31-03-2013 | 15-03-2013 | 60 | 0.10 | 260 | 271 | 54 | 791.40 |
| Determine client requirements and expectations | CY2 | MKTG6074C | 29-08-2012 | 31-03-2013 | 29-03-2013 | 70 | 0.12 | 303 | 316 | 63 | 923.30 |
| Conduct product research to support recommendations | CY2 | BAFI5194C | 29-08-2012 | 31-03-2013 | 29-03-2013 | 80 | 0.13 | 346 | 361 | 72 | 1,055.20 |
| Provide advice in Superannuation | CY2 | BAFI5195C | 29-08-2012 | 31-03-2013 | 29-03-2013 | 50 | 0.08 | 216 | 226 | 45 | 659.50 |
| Provide appropriate services, advice and products to clients | CY2 | MKTG6075C | 29-08-2012 | 31-03-2013 | 29-03-2013 | 150 | 0.25 | 650 | 676 | 135 | 1,978.50 |
| Record and implement client instructions | CY2 | MKTG6076C | 29-08-2012 | 31-03-2013 | 29-03-2013 | 75 | 0.13 | 325 | 338 | 68 | 989.25 |
| Develop and use complex spreadsheets | JUL | COSC5946C | 25-06-2012 | 31-08-2012 | 26-10-2012 | 50 | 0.08 | 216 | 226 | 45 | 659.50 |
| Contribute to OHS hazard identification and risk assessment | JUL | OHTH5630C | 25-06-2012 | 31-08-2012 | 26-10-2012 | 30 | 0.05 | 130 | 135 | 27 | 395.70 |
| Apply principles of professional practice to work in the financial services industry | JUL | EMPL5892C | 25-06-2012 | 31-08-2012 | 21-12-2012 | 30 | 0.05 | 130 | 135 | 27 | 395.70 |
| Apply principles of professional practice to work in the financial services industry | JUL | EMPL5892C | 25-06-2012 | 31-08-2012 | 26-10-2012 | 30 | 0.05 | 130 | 135 | 27 | 395.70 |
| Determine client requirements and expectations | JUL | BAFI5187C | 25-06-2012 | 31-08-2012 | 26-10-2012 | 60 | 0.10 | 260 | 271 | 54 | 791.40 |
| Review financial plans and provide ongoing service | JUL | BAFI5188C | 25-06-2012 | 31-08-2012 | 26-10-2012 | 40 | 0.07 | 173 | 180 | 36 | 527.60 |
| Provide advice in Financial Planning | JUL | BAFI5189C | 25-06-2012 | 31-08-2012 | 26-10-2012 | 50 | 0.08 | 216 | 226 | 45 | 659.50 |
| Conduct financial planning analysis and research | JUL | BAFI5190C | 25-06-2012 | 31-08-2012 | 26-10-2012 | 50 | 0.08 | 216 | 226 | 45 | 659.50 |
| Develop and prepare financial plan | JUL | BAFI5191C | 25-06-2012 | 31-08-2012 | 26-10-2012 | 60 | 0.10 | 260 | 271 | 54 | 791.40 |
| Implement financial plan | JUL | BAFI5192C | 25-06-2012 | 31-08-2012 | 26-10-2012 | 50 | 0.08 | 216 | 226 | 45 | 659.50 |
| Comply with financial planning practice ethical and operational guidelines and regulations | JUL | BAFI5193C | 25-06-2012 | 31-08-2012 | 26-10-2012 | 50 | 0.08 | 216 | 226 | 45 | 659.50 |
| Determine client requirements and expectations | JUL | MKTG6074C | 25-06-2012 | 31-08-2012 | 26-10-2012 | 70 | 0.12 | 303 | 316 | 63 | 923.30 |
| Conduct product research to support recommendations | JUL | BAFI5194C | 25-06-2012 | 31-08-2012 | 26-10-2012 | 80 | 0.13 | 346 | 361 | 72 | 1,055.20 |
| Provide advice in Superannuation | JUL | BAFI5195C | 25-06-2012 | 31-08-2012 | 26-10-2012 | 50 | 0.08 | 216 | 226 | 45 | 659.50 |
| Provide appropriate services, advice and products to clients | JUL | MKTG6075C | 25-06-2012 | 31-08-2012 | 26-10-2012 | 150 | 0.25 | 650 | 676 | 135 | 1,978.50 |
| Record and implement client instructions | JUL | MKTG6076C | 25-06-2012 | 31-08-2012 | 26-10-2012 | 75 | 0.13 | 325 | 338 | 68 | 989.25 |
| Provide advice in Life Insurance | JUL | BAFI5199C | 25-06-2012 | 31-08-2012 | 26-10-2012 | 50 | 0.08 | 216 | 226 | 45 | 659.50 |
| Advise clients on financial risk | JUL | ACCT5332C | 25-06-2012 | 31-08-2012 | 26-10-2012 | 60 | 0.10 | 260 | 271 | 54 | 791.40 |
| Provide advice in Managed Investments | JUL | BAFI5200C | 25-06-2012 | 31-08-2012 | 26-10-2012 | 50 | 0.08 | 216 | 226 | 45 | 659.50 |
| Provide advice in Securities | JUL | BAFI5201C | 25-06-2012 | 31-08-2012 | 26-10-2012 | 50 | 0.08 | 216 | 226 | 45 | 659.50 |
| Provide advice in Derivatives | JUL | BAFI5202C | 25-06-2012 | 31-08-2012 | 26-10-2012 | 50 | 0.08 | 216 | 226 | 45 | 659.50 |
| Analyse financial market products for client | JUL | ACCT5336C | 25-06-2012 | 31-08-2012 | 26-10-2012 | 50 | 0.08 | 216 | 226 | 45 | 659.50 |
* EFTSL : Equivalent Full Time Study Load
** Concession fees are only available at diploma and advanced diploma level for indigenous students.
Back to Program List
| Unit Of Study (Course) | Session | Course Code | Commencement Date | Census Date | Completion Date | Student Contact Hours (SCH) | EFTSL* | Tuition Fee: Onsite|Distance|RPL | |||
| Government Subsidised Fee | Full Fee (Non Government Subsidised) | ||||||||||
| Program commenced 1 July 2009-30 June 2012 ($) | Program commenced 1 July 2012-31 December 2012 ($) | Program commenced 1 July 2012-31 December 2012 Concession ** ($) | Australian Full Fee Paying ($) | ||||||||
| Manage projects | AUG | BUSM6234C | 06-08-2012 | 30-09-2012 | 09-11-2012 | 60 | 0.11 | 260 | 348 | 70 | 803.40 |
| Manage projects | AUG | BUSM6234C | 22-08-2012 | 30-09-2012 | 23-11-2012 | 60 | 0.11 | 260 | 348 | 70 | 803.40 |
| Make a presentation | AUG | COMM5928C | 01-08-2012 | 30-09-2012 | 21-12-2012 | 30 | 0.05 | 130 | 174 | 35 | 401.70 |
| Analyse consumer behaviour for specific markets | AUG | MKTG5814C | 10-08-2012 | 30-09-2012 | 09-11-2012 | 60 | 0.11 | 260 | 348 | 70 | 803.40 |
| Analyse consumer behaviour for specific markets | AUG | MKTG5814C | 15-08-2012 | 30-09-2012 | 30-11-2012 | 60 | 0.11 | 260 | 348 | 70 | 803.40 |
| Make a presentation | CY2 | COMM5928C | 01-08-2012 | 31-03-2013 | 13-02-2013 | 30 | 0.05 | 130 | 174 | 35 | 401.70 |
| Make a presentation | CY2 | COMM5928C | 15-10-2012 | 31-03-2013 | 28-06-2013 | 30 | 0.05 | 130 | 174 | 35 | 401.70 |
| Analyse consumer behaviour for specific markets | CY2 | MKTG9306C | 01-08-2012 | 31-03-2013 | 31-07-2013 | 60 | 0.11 | 260 | 348 | 70 | 803.40 |
| Analyse consumer behaviour for specific markets | CY2 | MKTG9306C | 12-07-2012 | 31-03-2013 | 11-07-2013 | 60 | 0.11 | 260 | 348 | 70 | 803.40 |
| Analyse consumer behaviour for specific markets | CY2 | MKTG9306C | 16-08-2012 | 31-03-2013 | 15-08-2013 | 60 | 0.11 | 260 | 348 | 70 | 803.40 |
| Analyse consumer behaviour for specific markets | CY2 | MKTG9306C | 17-09-2012 | 31-03-2013 | 16-09-2013 | 60 | 0.11 | 260 | 348 | 70 | 803.40 |
| Analyse consumer behaviour for specific markets | CY2 | MKTG9307C | 02-07-2012 | 31-03-2013 | 01-07-2013 | 60 | 0.11 | 260 | 348 | 70 | 803.40 |
| Analyse consumer behaviour for specific markets | CY2 | MKTG9307C | 03-09-2012 | 31-03-2013 | 02-09-2013 | 60 | 0.11 | 260 | 348 | 70 | 803.40 |
| Analyse consumer behaviour for specific markets | CY2 | MKTG9307C | 07-08-2012 | 31-03-2013 | 06-08-2013 | 60 | 0.11 | 260 | 348 | 70 | 803.40 |
| Manage projects | JUL | BUSM6234C | 25-06-2012 | 31-08-2012 | 26-10-2012 | 60 | 0.11 | 260 | 348 | 70 | 803.40 |
| Make a presentation | JUL | COMM5928C | 25-06-2012 | 31-08-2012 | 26-10-2012 | 30 | 0.05 | 130 | 174 | 35 | 401.70 |
| Analyse consumer behaviour for specific markets | JUL | MKTG5814C | 23-07-2012 | 31-08-2012 | 30-10-2012 | 60 | 0.11 | 260 | 348 | 70 | 803.40 |
| Analyse consumer behaviour for specific markets | JUL | MKTG5814C | 25-06-2012 | 31-08-2012 | 09-11-2012 | 60 | 0.11 | 260 | 348 | 70 | 803.40 |
| Analyse consumer behaviour for specific markets | JUL | MKTG5814C | 25-06-2012 | 31-08-2012 | 26-10-2012 | 60 | 0.11 | 260 | 348 | 70 | 803.40 |
| Create mass electronic media advertisements | JUL | MKTG7825C | 25-06-2012 | 31-08-2012 | 26-10-2012 | 50 | 0.09 | 216 | 290 | 58 | 669.50 |
| Conduct market research | JUL | MKTG5830C | 25-06-2012 | 31-08-2012 | 26-10-2012 | 60 | 0.11 | 260 | 348 | 70 | 803.40 |
| Implement and monitor marketing activities | JUL | MKTG5831C | 25-06-2012 | 31-08-2012 | 09-11-2012 | 50 | 0.09 | 216 | 290 | 58 | 669.50 |
| Identify and evaluate marketing opportunities | JUL | MKTG5832C | 25-06-2012 | 31-08-2012 | 26-10-2012 | 70 | 0.13 | 303 | 406 | 81 | 937.30 |
| Interpret market trends and developments | JUL | MKTG5834C | 25-06-2012 | 31-08-2012 | 26-10-2012 | 50 | 0.09 | 216 | 290 | 58 | 669.50 |
| Develop and apply knowledge of public relations industry | JUL | MKTG5844C | 25-06-2012 | 31-08-2012 | 26-10-2012 | 80 | 0.14 | 346 | 464 | 93 | 1,071.20 |
| Develop public relations documents | JUL | MKTG5845C | 25-06-2012 | 31-08-2012 | 26-10-2012 | 80 | 0.14 | 346 | 464 | 93 | 1,071.20 |
| Develop public relations campaigns | JUL | MKTG5846C | 25-06-2012 | 31-08-2012 | 26-10-2012 | 50 | 0.09 | 216 | 290 | 58 | 669.50 |
| Write persuasive copy | JUL | MKTG6045C | 25-06-2012 | 31-08-2012 | 26-10-2012 | 50 | 0.09 | 216 | 290 | 58 | 669.50 |
| Use advanced features of computer applications | JUL | COSC6002C | 25-06-2012 | 31-08-2012 | 26-10-2012 | 40 | 0.07 | 173 | 232 | 46 | 535.60 |
| Use development software and IT tools to build a basic website | JUL | COSC6003C | 25-06-2012 | 31-08-2012 | 26-10-2012 | 20 | 0.04 | 87 | 116 | 23 | 267.80 |
| Develop workplace policy and procedures for sustainability | JUL | BUSM6394C | 25-06-2012 | 31-08-2012 | 09-11-2012 | 50 | 0.09 | 216 | 290 | 58 | 669.50 |
| Develop workplace policy and procedures for sustainability | JUL | BUSM6394C | 25-06-2012 | 31-08-2012 | 26-10-2012 | 50 | 0.09 | 216 | 290 | 58 | 669.50 |
| Analyse consumer behaviour for specific markets | OCT | MKTG5814C | 09-10-2012 | 30-11-2012 | 14-12-2012 | 60 | 0.11 | 260 | 348 | 70 | 803.40 |
| Analyse consumer behaviour for specific markets | SEP | MKTG5814C | 14-09-2012 | 31-10-2012 | 30-11-2012 | 60 | 0.11 | 260 | 348 | 70 | 803.40 |
| Analyse consumer behaviour for specific markets | SEP | MKTG5883C | 05-09-2012 | 31-10-2012 | 09-11-2012 | 60 | 0.11 | 260 | 348 | 70 | 803.40 |
| Build and sustain an innovative work environment | SEP | BUSM6393C | 03-09-2012 | 31-10-2012 | 20-12-2012 | 50 | 0.09 | 216 | 290 | 58 | 669.50 |
| Build and sustain an innovative work environment | SEP | BUSM6393C | 04-09-2012 | 31-10-2012 | 18-09-2012 | 50 | 0.09 | 216 | 290 | 58 | 669.50 |
* EFTSL : Equivalent Full Time Study Load
** Concession fees are only available at diploma and advanced diploma level for indigenous students.
Back to Program List
| Unit Of Study (Course) | Session | Course Code | Commencement Date | Census Date | Completion Date | Student Contact Hours (SCH) | EFTSL* | Tuition Fee: Onsite|Distance|RPL | |||
| Government Subsidised Fee | Full Fee (Non Government Subsidised) | ||||||||||
| Program commenced 1 July 2009-30 June 2012 ($) | Program commenced 1 July 2012-31 December 2012 ($) | Program commenced 1 July 2012-31 December 2012 Concession ** ($) | Australian Full Fee Paying ($) | ||||||||
| Implement and monitor environmentally sustainable work practices | JUL | EASC5042C | 25-06-2012 | 31-08-2012 | 09-11-2012 | 40 | 0.05 | 173 | 212 | 42 | 524.80 |
| Implement and monitor environmentally sustainable work practices | JUL | EASC5042C | 25-06-2012 | 31-08-2012 | 16-11-2012 | 40 | 0.05 | 173 | 212 | 42 | 524.80 |
| Provide information to customers | JUL | MKTG7831C | 25-06-2012 | 31-08-2012 | 09-11-2012 | 30 | 0.04 | 130 | 159 | 32 | 393.60 |
| Analyse data and report results | JUL | MATH5334C | 25-06-2012 | 31-08-2012 | 09-11-2012 | 80 | 0.10 | 346 | 425 | 85 | 1,049.60 |
| Plan and conduct laboratory/field work | JUL | ONPS5654C | 25-06-2012 | 31-08-2012 | 09-11-2012 | 40 | 0.05 | 173 | 212 | 42 | 524.80 |
| Apply quality system and continuous improvement processes | JUL | MIET6280C | 25-06-2012 | 31-08-2012 | 09-11-2012 | 80 | 0.10 | 346 | 425 | 85 | 1,049.60 |
| Prepare, standardise and use solutions | JUL | ONPS5657C | 25-06-2012 | 31-08-2012 | 09-11-2012 | 100 | 0.13 | 433 | 531 | 106 | 1,312.00 |
| Apply routine chromatographic techniques | JUL | ONPS5663C | 25-06-2012 | 31-08-2012 | 09-11-2012 | 120 | 0.15 | 520 | 637 | 127 | 1,574.40 |
| Perform tissue and cell culture techniques | JUL | ONPS5664C | 25-06-2012 | 31-08-2012 | 09-11-2012 | 100 | 0.13 | 433 | 531 | 106 | 1,312.00 |
| Produce research reports and make presentations | JUL | COMM5467C | 25-06-2012 | 31-08-2012 | 09-11-2012 | 40 | 0.05 | 173 | 212 | 42 | 524.80 |
* EFTSL : Equivalent Full Time Study Load
** Concession fees are only available at diploma and advanced diploma level for indigenous students.
Back to Program List
| Unit Of Study (Course) | Session | Course Code | Commencement Date | Census Date | Completion Date | Student Contact Hours (SCH) | EFTSL* | Tuition Fee: Onsite|Distance|RPL | |||
| Government Subsidised Fee | Full Fee (Non Government Subsidised) | ||||||||||
| Program commenced 1 July 2009-30 June 2012 ($) | Program commenced 1 July 2012-31 December 2012 ($) | Program commenced 1 July 2012-31 December 2012 Concession ** ($) | Australian Full Fee Paying ($) | ||||||||
| Implement and monitor environmentally sustainable work practices | JUL | EASC5042C | 25-06-2012 | 31-08-2012 | 09-11-2012 | 40 | 0.05 | 173 | 211 | 42 | 521.60 |
| Implement and monitor environmentally sustainable work practices | JUL | EASC5042C | 25-06-2012 | 31-08-2012 | 16-11-2012 | 40 | 0.05 | 173 | 211 | 42 | 521.60 |
| Provide information to customers | JUL | MKTG7831C | 25-06-2012 | 31-08-2012 | 09-11-2012 | 30 | 0.04 | 130 | 158 | 32 | 391.20 |
| Analyse data and report results | JUL | MATH5334C | 25-06-2012 | 31-08-2012 | 09-11-2012 | 80 | 0.10 | 346 | 422 | 85 | 1,043.20 |
| Plan and conduct laboratory/field work | JUL | ONPS5654C | 25-06-2012 | 31-08-2012 | 09-11-2012 | 40 | 0.05 | 173 | 211 | 42 | 521.60 |
| Apply quality system and continuous improvement processes | JUL | MIET6280C | 25-06-2012 | 31-08-2012 | 09-11-2012 | 80 | 0.10 | 346 | 422 | 85 | 1,043.20 |
| Prepare, standardise and use solutions | JUL | ONPS5657C | 25-06-2012 | 31-08-2012 | 09-11-2012 | 100 | 0.12 | 433 | 528 | 106 | 1,304.00 |
| Perform tissue and cell culture techniques | JUL | ONPS5664C | 25-06-2012 | 31-08-2012 | 09-11-2012 | 100 | 0.12 | 433 | 528 | 106 | 1,304.00 |
| Produce research reports and make presentations | JUL | COMM5467C | 25-06-2012 | 31-08-2012 | 09-11-2012 | 40 | 0.05 | 173 | 211 | 42 | 521.60 |
| Perform histological procedures | JUL | ONPS5669C | 25-06-2012 | 31-08-2012 | 09-11-2012 | 40 | 0.05 | 173 | 211 | 42 | 521.60 |
* EFTSL : Equivalent Full Time Study Load
** Concession fees are only available at diploma and advanced diploma level for indigenous students.
Back to Program List
| Unit Of Study (Course) | Session | Course Code | Commencement Date | Census Date | Completion Date | Student Contact Hours (SCH) | EFTSL* | Tuition Fee: Onsite|Distance|RPL | |||
| Government Subsidised Fee | Full Fee (Non Government Subsidised) | ||||||||||
| Program commenced 1 July 2009-30 June 2012 ($) | Program commenced 1 July 2012-31 December 2012 ($) | Program commenced 1 July 2012-31 December 2012 Concession ** ($) | Australian Full Fee Paying ($) | ||||||||
| Maintain OHS processes | CY2 | OHTH5536C | 24-07-2012 | 31-03-2013 | 21-06-2013 | 40 | 0.05 | 173 | 87 | 17 | 389.60 |
| Maintain OHS processes | CY2 | OHTH5536C | 25-06-2012 | 31-03-2013 | 28-06-2013 | 40 | 0.05 | 173 | 87 | 17 | 389.60 |
| Provide services to clients with complex needs | CY2 | HWSS5439C | 24-07-2012 | 31-03-2013 | 21-06-2013 | 60 | 0.07 | 260 | 130 | 26 | 584.40 |
| Provide services to clients with complex needs | CY2 | HWSS5439C | 25-06-2012 | 31-03-2013 | 28-06-2013 | 60 | 0.07 | 260 | 130 | 26 | 584.40 |
| Reflect on and improve own professional practice | CY2 | EMPL5721C | 23-08-2012 | 31-03-2013 | 17-04-2013 | 120 | 0.14 | 520 | 260 | 52 | 1,168.80 |
| Reflect on and improve own professional practice | CY2 | EMPL5721C | 24-07-2012 | 31-03-2013 | 21-06-2013 | 120 | 0.14 | 520 | 260 | 52 | 1,168.80 |
| Reflect on and improve own professional practice | CY2 | EMPL5721C | 25-06-2012 | 31-03-2013 | 28-06-2013 | 120 | 0.14 | 520 | 260 | 52 | 1,168.80 |
| Provide advocacy and representation services | CY2 | JUST5167C | 24-07-2012 | 31-03-2013 | 21-06-2013 | 80 | 0.09 | 346 | 174 | 34 | 779.20 |
| Work effectively in the alcohol and other drugs sector | CY2 | HWSS5458C | 24-07-2012 | 31-03-2013 | 21-06-2013 | 50 | 0.06 | 216 | 108 | 22 | 487.00 |
| Provide community focused promotion and prevention strategies | CY2 | HWSS5459C | 24-07-2012 | 31-03-2013 | 21-06-2013 | 60 | 0.07 | 260 | 130 | 26 | 584.40 |
| Use targeted communication skills to build relationships | CY2 | MKTG5957C | 24-07-2012 | 31-03-2013 | 21-06-2013 | 55 | 0.06 | 238 | 119 | 24 | 535.70 |
| Work intensively with clients | CY2 | HWSS5472C | 24-07-2012 | 31-03-2013 | 21-06-2013 | 75 | 0.09 | 325 | 163 | 32 | 730.50 |
| Apply understanding of mental health issues and recovery processes | CY2 | OHTH5553C | 24-07-2012 | 31-03-2013 | 21-06-2013 | 60 | 0.07 | 260 | 130 | 26 | 584.40 |
| Work effectively in mental health settings | CY2 | HWSS5533C | 24-07-2012 | 31-03-2013 | 21-06-2013 | 45 | 0.05 | 195 | 98 | 19 | 438.30 |
| Work effectively with clients with complex alcohol and/or other drugs issues | CY2 | HWSS5623C | 24-07-2012 | 31-03-2013 | 21-06-2013 | 75 | 0.09 | 325 | 163 | 32 | 730.50 |
| Provide advanced interventions to meet the needs of clients with alcohol and/or other drug issues | CY2 | HWSS5624C | 24-07-2012 | 31-03-2013 | 21-06-2013 | 90 | 0.11 | 390 | 195 | 39 | 876.60 |
| Provide relapse prevention strategies | CY2 | HWSS5625C | 24-07-2012 | 31-03-2013 | 21-06-2013 | 55 | 0.06 | 238 | 119 | 24 | 535.70 |
| Conduct assessment and planning as part of the recovery process | CY2 | OHTH5604C | 24-07-2012 | 31-03-2013 | 21-06-2013 | 40 | 0.05 | 173 | 87 | 17 | 389.60 |
| Facilitate consumer, family and carer participation in the recovery process | CY2 | OHTH5605C | 24-07-2012 | 31-03-2013 | 21-06-2013 | 50 | 0.06 | 216 | 108 | 22 | 487.00 |
| Provide advanced supports to facilitate recovery | CY2 | OHTH5606C | 24-07-2012 | 31-03-2013 | 21-06-2013 | 50 | 0.06 | 216 | 108 | 22 | 487.00 |
| Provide a range of services to people with mental health issues | CY2 | OHTH5607C | 24-07-2012 | 31-03-2013 | 21-06-2013 | 150 | 0.18 | 650 | 326 | 64 | 1,461.00 |
| Access evidence and apply in practice | CY2 | MIET6288C | 24-07-2012 | 31-03-2013 | 21-06-2013 | 55 | 0.06 | 238 | 119 | 24 | 535.70 |
| Develop and implement a behaviour response plan | CY2 | HWSS5626C | 24-07-2012 | 31-03-2013 | 21-06-2013 | 60 | 0.07 | 260 | 130 | 26 | 584.40 |
| Work effectively in the alcohol and other drugs sector | JUL | HWSS5458C | 19-07-2012 | 31-08-2012 | 11-10-2012 | 50 | 0.06 | 216 | 108 | 22 | 487.00 |
| Work effectively in mental health settings | JUL | HWSS5533C | 17-07-2012 | 31-08-2012 | 09-10-2012 | 45 | 0.05 | 195 | 98 | 19 | 438.30 |
| Use targeted communication skills to build relationships | OCT | MKTG5957C | 15-10-2012 | 30-11-2012 | 14-12-2012 | 55 | 0.06 | 238 | 119 | 24 | 535.70 |
* EFTSL : Equivalent Full Time Study Load
** Concession fees are only available at diploma and advanced diploma level for indigenous students.
Back to Program List
| Unit Of Study (Course) | Session | Course Code | Commencement Date | Census Date | Completion Date | Student Contact Hours (SCH) | EFTSL* | Tuition Fee: Onsite|Distance|RPL | |||
| Government Subsidised Fee | Full Fee (Non Government Subsidised) | ||||||||||
| Program commenced 1 July 2009-30 June 2012 ($) | Program commenced 1 July 2012-31 December 2012 ($) | Program commenced 1 July 2012-31 December 2012 Concession ** ($) | Australian Full Fee Paying ($) | ||||||||
| Work effectively with Aboriginal and/or Torres Strait Islander people | CY2 | EMPL5846C | 16-07-2012 | 31-03-2013 | 28-06-2013 | 20 | 0.03 | 87 | 109 | 22 | 193.20 |
| Foster physical development in middle childhood | CY2 | TCHE5724C | 16-07-2012 | 31-03-2013 | 28-06-2013 | 40 | 0.07 | 173 | 218 | 44 | 386.40 |
* EFTSL : Equivalent Full Time Study Load
** Concession fees are only available at diploma and advanced diploma level for indigenous students.
Back to Program List
| Unit Of Study (Course) | Session | Course Code | Commencement Date | Census Date | Completion Date | Student Contact Hours (SCH) | EFTSL* | Tuition Fee: Onsite|Distance|RPL | |||
| Government Subsidised Fee | Full Fee (Non Government Subsidised) | ||||||||||
| Program commenced 1 July 2009-30 June 2012 ($) | Program commenced 1 July 2012-31 December 2012 ($) | Program commenced 1 July 2012-31 December 2012 Concession ** ($) | Australian Full Fee Paying ($) | ||||||||
| Interpret and apply medical terminology appropriately | CY2 | HWSS5654C | 25-06-2012 | 31-03-2013 | 21-06-2013 | 60 | 0.07 | 260 | 357 | 71 | 642.60 |
| Work effectively in the community sector | JUL | HWSS5505C | 25-06-2012 | 31-08-2012 | 09-11-2012 | 40 | 0.05 | 173 | 238 | 48 | 428.40 |
| Negotiate translating and interpreting assignments | JUL | LANG5760C | 25-06-2012 | 31-08-2012 | 09-11-2012 | 25 | 0.03 | 108 | 149 | 30 | 267.75 |
| Prepare to translate and interpret | JUL | LANG5761C | 25-06-2012 | 31-08-2012 | 09-11-2012 | 25 | 0.03 | 108 | 149 | 30 | 267.75 |
| Apply codes and standards to ethical practice | JUL | LANG5762C | 25-06-2012 | 31-08-2012 | 09-11-2012 | 30 | 0.04 | 130 | 178 | 36 | 321.30 |
| Interpret in general dialogue settings (LOTE) | JUL | LANG5763C | 25-06-2012 | 31-08-2012 | 09-11-2012 | 100 | 0.12 | 433 | 595 | 119 | 1,071.00 |
| Manage discourses in general settings | JUL | LANG5764C | 25-06-2012 | 31-08-2012 | 09-11-2012 | 20 | 0.02 | 87 | 119 | 24 | 214.20 |
| Analyse, recall and reproduce source messages (LOTE) | JUL | LANG5765C | 25-06-2012 | 31-08-2012 | 09-11-2012 | 30 | 0.04 | 130 | 178 | 36 | 321.30 |
| Demonstrate language proficiency in different subjects and cultural contexts | JUL | LANG5766C | 25-06-2012 | 31-08-2012 | 09-11-2012 | 70 | 0.08 | 303 | 416 | 83 | 749.70 |
| Maintain and enhance professional practice | JUL | LANG5767C | 25-06-2012 | 31-08-2012 | 09-11-2012 | 20 | 0.02 | 87 | 119 | 24 | 214.20 |
| Sight translate (LOTE) | JUL | LANG5782C | 25-06-2012 | 31-08-2012 | 09-11-2012 | 60 | 0.07 | 260 | 357 | 71 | 642.60 |
| Interpret through communication media | JUL | LANG5783C | 25-06-2012 | 31-08-2012 | 09-11-2012 | 40 | 0.05 | 173 | 238 | 48 | 428.40 |
| Interpret and apply medical terminology appropriately | JUL | HWSS5654C | 25-06-2012 | 31-08-2012 | 14-12-2012 | 60 | 0.07 | 260 | 357 | 71 | 642.60 |
| Interpret and apply medical terminology appropriately | JUL | HWSS5654C | 25-06-2012 | 31-08-2012 | 21-12-2012 | 60 | 0.07 | 260 | 357 | 71 | 642.60 |
| Interpret and apply medical terminology appropriately | JUL | HWSS5654C | 25-06-2012 | 31-08-2012 | 23-11-2012 | 60 | 0.07 | 260 | 357 | 71 | 642.60 |
| Interpret and apply medical terminology appropriately | SEP | HWSS5659C | 03-09-2012 | 31-10-2012 | 16-11-2012 | 60 | 0.07 | 260 | 357 | 71 | 642.60 |
* EFTSL : Equivalent Full Time Study Load
** Concession fees are only available at diploma and advanced diploma level for indigenous students.
Back to Program List
| Unit Of Study (Course) | Session | Course Code | Commencement Date | Census Date | Completion Date | Student Contact Hours (SCH) | EFTSL* | Tuition Fee: Onsite|Distance|RPL | |||
| Government Subsidised Fee | Full Fee (Non Government Subsidised) | ||||||||||
| Program commenced 1 July 2009-30 June 2012 ($) | Program commenced 1 July 2012-31 December 2012 ($) | Program commenced 1 July 2012-31 December 2012 Concession ** ($) | Australian Full Fee Paying ($) | ||||||||
| Identify and apply the legal framework | JUL | JUST5189C | 25-06-2012 | 31-08-2012 | 26-10-2012 | 60 | 0.12 | 260 | 398 | 80 | 826.20 |
| Identify and interpret compliance requirements | JUL | JUST5197C | 25-06-2012 | 31-08-2012 | 26-10-2012 | 20 | 0.04 | 87 | 133 | 27 | 275.40 |
| Develop and nurture relationships | JUL | EMPL9753C | 25-06-2012 | 31-08-2012 | 26-10-2012 | 40 | 0.08 | 173 | 265 | 53 | 550.80 |
| Maintain and enhance professional practice | JUL | EMPL9754C | 25-06-2012 | 31-08-2012 | 26-10-2012 | 30 | 0.06 | 130 | 199 | 40 | 413.10 |
| Research legal information using secondary sources | JUL | JUST5198C | 25-06-2012 | 31-08-2012 | 26-10-2012 | 40 | 0.08 | 173 | 265 | 53 | 550.80 |
| Apply legal principles in family law matters | JUL | JUST5199C | 25-06-2012 | 31-08-2012 | 26-10-2012 | 60 | 0.12 | 260 | 398 | 80 | 826.20 |
| Apply legal principles in criminal law matters | JUL | JUST5200C | 25-06-2012 | 31-08-2012 | 26-10-2012 | 60 | 0.12 | 260 | 398 | 80 | 826.20 |
| Apply legal principles in property law matters | JUL | JUST5201C | 25-06-2012 | 31-08-2012 | 26-10-2012 | 60 | 0.12 | 260 | 398 | 80 | 826.20 |
| Assist with civil procedure | JUL | JUST5202C | 25-06-2012 | 31-08-2012 | 26-10-2012 | 60 | 0.12 | 260 | 398 | 80 | 826.20 |
| Apply legal principles in wills and probate matters | JUL | JUST5203C | 25-06-2012 | 31-08-2012 | 26-10-2012 | 60 | 0.12 | 260 | 398 | 80 | 826.20 |
* EFTSL : Equivalent Full Time Study Load
** Concession fees are only available at diploma and advanced diploma level for indigenous students.
Back to Program List
| Unit Of Study (Course) | Session | Course Code | Commencement Date | Census Date | Completion Date | Student Contact Hours (SCH) | EFTSL* | Tuition Fee: Onsite|Distance|RPL | |||
| Government Subsidised Fee | Full Fee (Non Government Subsidised) | ||||||||||
| Program commenced 1 July 2009-30 June 2012 ($) | Program commenced 1 July 2012-31 December 2012 ($) | Program commenced 1 July 2012-31 December 2012 Concession ** ($) | Australian Full Fee Paying ($) | ||||||||
| Organise and communicate information | CY2 | EMPL6985C | 01-08-2012 | 31-03-2013 | 31-07-2013 | 20 | 0.03 | 87 | 71 | 14 | 201.60 |
| Organise and communicate information | CY2 | EMPL6985C | 02-07-2012 | 31-03-2013 | 28-06-2013 | 20 | 0.03 | 87 | 71 | 14 | 201.60 |
| Organise and communicate information | CY2 | EMPL6985C | 16-07-2012 | 31-03-2013 | 26-04-2013 | 20 | 0.03 | 87 | 71 | 14 | 201.60 |
| Organise and communicate information | CY2 | EMPL6985C | 16-07-2012 | 31-03-2013 | 28-02-2013 | 20 | 0.03 | 87 | 71 | 14 | 201.60 |
| Organise and communicate information | CY2 | EMPL6985C | 16-07-2012 | 31-03-2013 | 31-05-2013 | 20 | 0.03 | 87 | 71 | 14 | 201.60 |
| Organise and communicate information | CY2 | EMPL6985C | 25-06-2012 | 31-03-2013 | 28-06-2013 | 20 | 0.03 | 87 | 71 | 14 | 201.60 |
| Participate in environmentally sustainable work practices | CY2 | EASC5047C | 16-07-2012 | 31-03-2013 | 28-06-2013 | 30 | 0.05 | 130 | 107 | 21 | 302.40 |
| Interact with computing technology | JUL | COSC5319C | 23-07-2012 | 31-08-2012 | 21-12-2012 | 20 | 0.03 | 87 | 71 | 14 | 201.60 |
| Interact with computing technology | JUL | COSC5319C | 25-06-2012 | 31-08-2012 | 09-11-2012 | 20 | 0.03 | 87 | 71 | 14 | 201.60 |
| Organise and communicate information | JUL | EMPL6985C | 16-07-2012 | 31-08-2012 | 14-12-2012 | 20 | 0.03 | 87 | 71 | 14 | 201.60 |
| Organise and communicate information | JUL | EMPL6985C | 25-06-2012 | 31-08-2012 | 09-11-2012 | 20 | 0.03 | 87 | 71 | 14 | 201.60 |
| Apply mathematical techniques in a manufacturing engineering or related environment | JUL | MATH5268C | 25-06-2012 | 31-08-2012 | 09-11-2012 | 40 | 0.07 | 173 | 143 | 28 | 403.20 |
| Select common engineering materials | JUL | PROC5277C | 25-06-2012 | 31-08-2012 | 09-11-2012 | 40 | 0.07 | 173 | 143 | 28 | 403.20 |
| Interpret occupational health and safety practices in aviation maintenance | JUL | OHTH5522C | 25-06-2012 | 31-08-2012 | 09-11-2012 | 40 | 0.07 | 173 | 143 | 28 | 403.20 |
| Apply quality standards applicable to aviation maintenance processes | JUL | MIET6171C | 25-06-2012 | 31-08-2012 | 09-11-2012 | 20 | 0.03 | 87 | 71 | 14 | 201.60 |
| Interpret and use aviation maintenance industry manuals and specifications | JUL | AERO5798C | 25-06-2012 | 31-08-2012 | 09-11-2012 | 20 | 0.03 | 87 | 71 | 14 | 201.60 |
| Complete aviation maintenance industry documentation | JUL | AERO5799C | 25-06-2012 | 31-08-2012 | 09-11-2012 | 20 | 0.03 | 87 | 71 | 14 | 201.60 |
| Perform basic hand skills, standard trade practices and fundamentals in aviation maintenance | JUL | MIET6172C | 25-06-2012 | 31-08-2012 | 09-11-2012 | 80 | 0.13 | 346 | 286 | 57 | 806.40 |
| Apply calculus in engineering situations | JUL | MATH5323C | 25-06-2012 | 31-08-2012 | 09-11-2012 | 80 | 0.13 | 346 | 286 | 57 | 806.40 |
| Apply basic aircraft design characteristics | JUL | AERO5819C | 25-06-2012 | 31-08-2012 | 09-11-2012 | 120 | 0.20 | 520 | 428 | 85 | 1,209.60 |
| Apply basic aircraft power plant design characteristics | JUL | AERO5820C | 25-06-2012 | 31-08-2012 | 09-11-2012 | 120 | 0.20 | 520 | 428 | 85 | 1,209.60 |
| Apply basic scientific principles and techniques in aeronautical engineering situations | JUL | AERO5821C | 25-06-2012 | 31-08-2012 | 09-11-2012 | 120 | 0.20 | 520 | 428 | 85 | 1,209.60 |
| Select and test aeronautical engineering materials | JUL | AERO5822C | 25-06-2012 | 31-08-2012 | 09-11-2012 | 80 | 0.13 | 346 | 286 | 57 | 806.40 |
| Produce basic engineering graphics | JUL | MIET6314C | 25-06-2012 | 31-08-2012 | 09-11-2012 | 40 | 0.07 | 173 | 143 | 28 | 403.20 |
| Participate in environmentally sustainable work practices | JUL | EASC5047C | 16-07-2012 | 31-08-2012 | 12-12-2012 | 30 | 0.05 | 130 | 107 | 21 | 302.40 |
| Participate in environmentally sustainable work practices | JUL | EASC5047C | 23-07-2012 | 31-08-2012 | 21-12-2012 | 30 | 0.05 | 130 | 107 | 21 | 302.40 |
| Participate in environmentally sustainable work practices | JUL | EASC5047C | 25-06-2012 | 31-08-2012 | 09-11-2012 | 30 | 0.05 | 130 | 107 | 21 | 302.40 |
| Represent aeronautical engineering designs | JUL | MIET6324C | 25-06-2012 | 31-08-2012 | 09-11-2012 | 80 | 0.13 | 346 | 286 | 57 | 806.40 |
| Apply basic electro and control scientific principles and techniques in aeronautical engineering sit | JUL | MIET6326C | 25-06-2012 | 31-08-2012 | 09-11-2012 | 60 | 0.10 | 260 | 214 | 43 | 604.80 |
| Interact with computing technology | OCT | COSC5319C | 10-10-2012 | 30-11-2012 | 09-11-2012 | 20 | 0.03 | 87 | 71 | 14 | 201.60 |
| Organise and communicate information | OCT | EMPL6985C | 10-10-2012 | 30-11-2012 | 09-11-2012 | 20 | 0.03 | 87 | 71 | 14 | 201.60 |
| Apply mathematical techniques in a manufacturing engineering or related environment | OCT | MATH5268C | 10-10-2012 | 30-11-2012 | 09-11-2012 | 40 | 0.07 | 173 | 143 | 28 | 403.20 |
| Select common engineering materials | OCT | PROC5277C | 10-10-2012 | 30-11-2012 | 09-11-2012 | 40 | 0.07 | 173 | 143 | 28 | 403.20 |
| Apply quality standards applicable to aviation maintenance processes | OCT | MIET6171C | 10-10-2012 | 30-11-2012 | 09-11-2012 | 20 | 0.03 | 87 | 71 | 14 | 201.60 |
| Interpret and use aviation maintenance industry manuals and specifications | OCT | AERO5798C | 10-10-2012 | 30-11-2012 | 09-11-2012 | 20 | 0.03 | 87 | 71 | 14 | 201.60 |
| Complete aviation maintenance industry documentation | OCT | AERO5799C | 10-10-2012 | 30-11-2012 | 09-11-2012 | 20 | 0.03 | 87 | 71 | 14 | 201.60 |
| Perform basic hand skills, standard trade practices and fundamentals in aviation maintenance | OCT | MIET6172C | 10-10-2012 | 30-11-2012 | 09-11-2012 | 80 | 0.13 | 346 | 286 | 57 | 806.40 |
| Apply basic scientific principles and techniques in aeronautical engineering situations | OCT | AERO5821C | 10-10-2012 | 30-11-2012 | 09-11-2012 | 120 | 0.20 | 520 | 428 | 85 | 1,209.60 |
| Produce basic engineering graphics | OCT | MIET6314C | 10-10-2012 | 30-11-2012 | 09-11-2012 | 40 | 0.07 | 173 | 143 | 28 | 403.20 |
| Participate in environmentally sustainable work practices | OCT | EASC5047C | 09-10-2012 | 30-11-2012 | 14-12-2012 | 30 | 0.05 | 130 | 107 | 21 | 302.40 |
| Represent aeronautical engineering designs | OCT | MIET6324C | 10-10-2012 | 30-11-2012 | 09-11-2012 | 80 | 0.13 | 346 | 286 | 57 | 806.40 |
| Apply aeronautical engineering fundamentals to support design and development of engineering project | OCT | MIET6325C | 10-10-2012 | 30-11-2012 | 09-11-2012 | 60 | 0.10 | 260 | 214 | 43 | 604.80 |
| Apply basic electro and control scientific principles and techniques in aeronautical engineering sit | OCT | MIET6326C | 10-10-2012 | 30-11-2012 | 09-11-2012 | 60 | 0.10 | 260 | 214 | 43 | 604.80 |
| Select and apply aeronautical engineering methods, processes and construction techniques | OCT | MIET6327C | 10-10-2012 | 30-11-2012 | 09-11-2012 | 60 | 0.10 | 260 | 214 | 43 | 604.80 |
| Apply scientific principles and techniques in aeronautical engineering situations | OCT | AERO5955C | 10-10-2012 | 30-11-2012 | 09-11-2012 | 60 | 0.10 | 260 | 214 | 43 | 604.80 |
| Organise and communicate information | SEP | EMPL6985C | 03-09-2012 | 31-10-2012 | 14-12-2012 | 20 | 0.03 | 87 | 71 | 14 | 201.60 |
| Organise and communicate information | SEP | EMPL6985C | 19-09-2012 | 31-10-2012 | 14-12-2012 | 20 | 0.03 | 87 | 71 | 14 | 201.60 |
* EFTSL : Equivalent Full Time Study Load
** Concession fees are only available at diploma and advanced diploma level for indigenous students.
Back to Program List
| Unit Of Study (Course) | Session | Course Code | Commencement Date | Census Date | Completion Date | Student Contact Hours (SCH) | EFTSL* | Tuition Fee: Onsite|Distance|RPL | |||
| Government Subsidised Fee | Full Fee (Non Government Subsidised) | ||||||||||
| Program commenced 1 July 2009-30 June 2012 ($) | Program commenced 1 July 2012-31 December 2012 ($) | Program commenced 1 July 2012-31 December 2012 Concession ** ($) | Australian Full Fee Paying ($) | ||||||||
| Manage operational plan | AUG | BUSM6233C | 06-08-2012 | 30-09-2012 | 09-11-2012 | 60 | 0.09 | 260 | 419 | 84 | 726.60 |
| Provide leadership across the organisation | AUG | BUSM6355C | 27-08-2012 | 30-09-2012 | 25-11-2012 | 60 | 0.09 | 260 | 419 | 84 | 726.60 |
| Manage industrial relations | AUG | BUSM6407C | 27-08-2012 | 30-09-2012 | 25-11-2012 | 80 | 0.12 | 346 | 559 | 112 | 968.80 |
| Manage customer service | AUG | BUSM7821C | 27-08-2012 | 30-09-2012 | 25-11-2012 | 40 | 0.06 | 173 | 280 | 56 | 484.40 |
| Manage a supply chain | AUG | BUSM7822C | 27-08-2012 | 30-09-2012 | 25-11-2012 | 60 | 0.09 | 260 | 419 | 84 | 726.60 |
| Manage operational plan | CY2 | BUSM7814C | 13-08-2012 | 31-03-2013 | 09-08-2013 | 60 | 0.09 | 260 | 419 | 84 | 726.60 |
| Manage operational plan | CY2 | BUSM7814C | 23-07-2012 | 31-03-2013 | 22-07-2013 | 60 | 0.09 | 260 | 419 | 84 | 726.60 |
| Manage operational plan | CY2 | BUSM8708C | 09-08-2012 | 31-03-2013 | 02-08-2013 | 60 | 0.09 | 260 | 419 | 84 | 726.60 |
| Manage risk | CY2 | BUSM6445C | 13-08-2012 | 31-03-2013 | 09-08-2013 | 60 | 0.09 | 260 | 419 | 84 | 726.60 |
| Manage risk | CY2 | BUSM6445C | 23-07-2012 | 31-03-2013 | 22-07-2013 | 60 | 0.09 | 260 | 419 | 84 | 726.60 |
| Manage risk | CY2 | BUSM7816C | 09-08-2012 | 31-03-2013 | 02-08-2013 | 60 | 0.09 | 260 | 419 | 84 | 726.60 |
| Manage risk | CY2 | BUSM8701C | 26-11-2012 | 31-03-2013 | 24-02-2013 | 60 | 0.09 | 260 | 419 | 84 | 726.60 |
| Provide leadership across the organisation | CY2 | BUSM7813C | 13-08-2012 | 31-03-2013 | 09-08-2013 | 60 | 0.09 | 260 | 419 | 84 | 726.60 |
| Provide leadership across the organisation | CY2 | BUSM7813C | 23-07-2012 | 31-03-2013 | 22-07-2013 | 60 | 0.09 | 260 | 419 | 84 | 726.60 |
| Provide leadership across the organisation | CY2 | BUSM8709C | 09-08-2012 | 31-03-2013 | 02-08-2013 | 60 | 0.09 | 260 | 419 | 84 | 726.60 |
| Ensure a safe workplace | CY2 | OHTH5592C | 26-11-2012 | 31-03-2013 | 24-02-2013 | 60 | 0.09 | 260 | 419 | 84 | 726.60 |
| Develop and evaluate strategies for transport and logistics enterprises | CY2 | BUSM6462C | 26-11-2012 | 31-03-2013 | 24-02-2013 | 150 | 0.22 | 650 | 1,048 | 210 | 1,816.50 |
| Develop a transport and logistics business plan | CY2 | BUSM6464C | 26-11-2012 | 31-03-2013 | 24-02-2013 | 150 | 0.22 | 650 | 1,048 | 210 | 1,816.50 |
| Conduct environmental audits | CY2 | OHTH5645C | 26-11-2012 | 31-03-2013 | 24-02-2013 | 80 | 0.12 | 346 | 559 | 112 | 968.80 |
| Develop workplace policy and procedures for sustainability | CY2 | EMPL5905C | 26-11-2012 | 31-03-2013 | 24-02-2013 | 50 | 0.07 | 216 | 350 | 70 | 605.50 |
| Manage operational plan | JUL | BUSM6233C | 18-07-2012 | 31-08-2012 | 15-10-2012 | 60 | 0.09 | 260 | 419 | 84 | 726.60 |
| Manage risk | JUL | BUSM8701C | 25-06-2012 | 31-08-2012 | 26-10-2012 | 60 | 0.09 | 260 | 419 | 84 | 726.60 |
| Provide leadership across the organisation | JUL | BUSM6355C | 25-06-2012 | 31-08-2012 | 26-10-2012 | 60 | 0.09 | 260 | 419 | 84 | 726.60 |
| Ensure a safe workplace | JUL | OHTH5592C | 25-06-2012 | 31-08-2012 | 26-10-2012 | 60 | 0.09 | 260 | 419 | 84 | 726.60 |
| Manage industrial relations | JUL | BUSM6407C | 25-06-2012 | 31-08-2012 | 26-10-2012 | 80 | 0.12 | 346 | 559 | 112 | 968.80 |
| Manage suppliers | JUL | BUSM7820C | 25-06-2012 | 31-08-2012 | 26-10-2012 | 60 | 0.09 | 260 | 419 | 84 | 726.60 |
| Manage customer service | JUL | BUSM7821C | 25-06-2012 | 31-08-2012 | 26-10-2012 | 40 | 0.06 | 173 | 280 | 56 | 484.40 |
| Conduct environmental audits | JUL | OHTH5645C | 25-06-2012 | 31-08-2012 | 26-10-2012 | 80 | 0.12 | 346 | 559 | 112 | 968.80 |
| Develop workplace policy and procedures for sustainability | JUL | EMPL5905C | 25-06-2012 | 31-08-2012 | 26-10-2012 | 50 | 0.07 | 216 | 350 | 70 | 605.50 |
| Ensure a safe workplace | NOV | OHTH5592C | 29-11-2012 | 31-12-2012 | 21-12-2012 | 60 | 0.09 | 260 | 419 | 84 | 726.60 |
| Ensure a safe workplace | NOV | OHTH5592C | 29-11-2012 | 31-12-2012 | 31-12-2012 | 60 | 0.09 | 260 | 419 | 84 | 726.60 |
| Manage operational plan | SEP | BUSM6233C | 01-09-2012 | 31-10-2012 | 21-12-2012 | 60 | 0.09 | 260 | 419 | 84 | 726.60 |
* EFTSL : Equivalent Full Time Study Load
** Concession fees are only available at diploma and advanced diploma level for indigenous students.
Back to Program List
| Unit Of Study (Course) | Session | Course Code | Commencement Date | Census Date | Completion Date | Student Contact Hours (SCH) | EFTSL* | Tuition Fee: Onsite|Distance|RPL | |||
| Government Subsidised Fee | Full Fee (Non Government Subsidised) | ||||||||||
| Program commenced 1 July 2009-30 June 2012 ($) | Program commenced 1 July 2012-31 December 2012 ($) | Program commenced 1 July 2012-31 December 2012 Concession ** ($) | Australian Full Fee Paying ($) | ||||||||
| Write scripts | JUL | COMM5907C | 25-06-2012 | 31-08-2012 | 23-11-2012 | 50 | 0.08 | 216 | 297 | 60 | 629.00 |
| Collaborate in a creative process | JUL | MKTG5778C | 25-06-2012 | 31-08-2012 | 23-11-2012 | 40 | 0.06 | 173 | 238 | 48 | 503.20 |
| Manage projects | JUL | BUSM6223C | 25-06-2012 | 31-08-2012 | 23-11-2012 | 60 | 0.10 | 260 | 356 | 71 | 754.80 |
| Interpret and respond to a design brief | JUL | BUSM5879C | 25-06-2012 | 31-08-2012 | 16-11-2012 | 20 | 0.03 | 87 | 119 | 24 | 251.60 |
| Write extended stories | JUL | COMM5911C | 25-06-2012 | 31-08-2012 | 23-11-2012 | 40 | 0.06 | 173 | 238 | 48 | 503.20 |
| Edit scripts | JUL | COMM5912C | 25-06-2012 | 31-08-2012 | 23-11-2012 | 50 | 0.08 | 216 | 297 | 60 | 629.00 |
| Develop and apply creative arts industry knowledge | OCT | EMPL5645C | 18-10-2012 | 30-11-2012 | 15-12-2012 | 20 | 0.03 | 87 | 119 | 24 | 251.60 |
| Produce and prepare photo images | OCT | VART5969C | 18-10-2012 | 30-11-2012 | 15-12-2012 | 20 | 0.03 | 87 | 119 | 24 | 251.60 |
* EFTSL : Equivalent Full Time Study Load
** Concession fees are only available at diploma and advanced diploma level for indigenous students.
Back to Program List
| Unit Of Study (Course) | Session | Course Code | Commencement Date | Census Date | Completion Date | Student Contact Hours (SCH) | EFTSL* | Tuition Fee: Onsite|Distance|RPL |
| Full Fee (Non Government Subsidised) | ||||||||
| Australian Full Fee Paying ($) | ||||||||
| Commercial Pilot's Licence (CPL) Flight Test | AVN | AERO5147 | 01-09-2012 | 30-09-2012 | 14-01-2013 | 6 | 0.01 | 399.12 |
| 3.06 Pilot Licence Theory Examination (CPL) | CY2 | AERO5145 | 16-07-2012 | 31-03-2013 | 31-05-2013 | 30 | 0.05 | 1,995.60 |
| 3.07 Flying Training To CPL | CY2 | AERO5146 | 16-07-2012 | 31-03-2013 | 31-05-2013 | 150 | 0.25 | 9,978.00 |
| 4.05 Flight Planning And Performance 3 | CY2 | AERO5152 | 03-09-2012 | 31-03-2013 | 08-02-2013 | 84 | 0.14 | 5,587.68 |
| 4.06 Meteorology 3 | CY2 | EASC5021 | 03-09-2012 | 31-03-2013 | 08-02-2013 | 15 | 0.03 | 997.80 |
| 4.07 Human Factors 3 | CY2 | AERO5153 | 03-09-2012 | 31-03-2013 | 08-02-2013 | 21 | 0.04 | 1,396.92 |
| Air Transport Pilot's Licence (ATPL) Theory Exam | CY2 | AERO5154 | 03-09-2012 | 31-03-2013 | 08-02-2013 | 60 | 0.10 | 3,991.20 |
| 1.09 Flying Training To GFPT | OCT | AERO5129 | 01-10-2012 | 30-11-2012 | 21-12-2012 | 120 | 0.20 | 7,982.40 |
| General Flyig Progress Test (GPFT) | OCT | AERO5130 | 01-10-2012 | 30-11-2012 | 21-12-2012 | 4 | 0.01 | 266.08 |
| 2.10 Flying Training To PPL | OCT | AERO5138 | 01-10-2012 | 30-11-2012 | 21-12-2012 | 196 | 0.33 | 13,037.92 |
| 2.11 Pilot Licence Flying Examination (PPL) | OCT | AERO5139 | 01-10-2012 | 30-11-2012 | 21-12-2012 | 6 | 0.01 | 399.12 |
| 3.04 Dangerous Goods Awareness Training | OCT | AERO5143 | 01-10-2012 | 30-11-2012 | 21-12-2012 | 5 | 0.01 | 332.60 |
| 3.07 Flying Training To CPL | OCT | AERO5146 | 01-10-2012 | 30-11-2012 | 21-12-2012 | 150 | 0.25 | 9,978.00 |
| Commercial Pilot's Licence (CPL) Flight Test | OCT | AERO5147 | 01-10-2012 | 30-11-2012 | 21-12-2012 | 6 | 0.01 | 399.12 |
| 4.01 Instrument Rating Theory And Examination | OCT | AERO5148 | 01-10-2012 | 30-11-2012 | 21-12-2012 | 54 | 0.09 | 3,592.08 |
| 4.02 Aircraft General Knowledge 4 | OCT | AERO5149 | 01-10-2012 | 30-11-2012 | 21-12-2012 | 66 | 0.11 | 4,390.32 |
| 4.03 Flight Rules And Air Law 3 | OCT | AERO5150 | 01-10-2012 | 30-11-2012 | 21-12-2012 | 18 | 0.03 | 1,197.36 |
| 4.04 Navigation 3 | OCT | AERO5151 | 01-10-2012 | 30-11-2012 | 21-12-2012 | 42 | 0.07 | 2,793.84 |
| 4.05 Flight Planning And Performance 3 | OCT | AERO5152 | 01-10-2012 | 30-11-2012 | 21-12-2012 | 84 | 0.14 | 5,587.68 |
| 4.06 Meteorology 3 | OCT | EASC5021 | 01-10-2012 | 30-11-2012 | 21-12-2012 | 15 | 0.03 | 997.80 |
| 4.07 Human Factors 3 | OCT | AERO5153 | 01-10-2012 | 30-11-2012 | 21-12-2012 | 21 | 0.04 | 1,396.92 |
| Air Transport Pilot's Licence (ATPL) Theory Exam | OCT | AERO5154 | 01-10-2012 | 30-11-2012 | 21-12-2012 | 60 | 0.10 | 3,991.20 |
| 3.03 Global Positioning System | SEP | AERO5142 | 14-09-2012 | 31-10-2012 | 19-10-2012 | 6 | 0.01 | 399.12 |
| 4.01 Instrument Rating Theory And Examination | SEP | AERO5148 | 03-09-2012 | 31-10-2012 | 28-12-2012 | 54 | 0.09 | 3,592.08 |
| 4.02 Aircraft General Knowledge 4 | SEP | AERO5149 | 03-09-2012 | 31-10-2012 | 30-11-2012 | 66 | 0.11 | 4,390.32 |
| 4.03 Flight Rules And Air Law 3 | SEP | AERO5150 | 03-09-2012 | 31-10-2012 | 28-12-2012 | 18 | 0.03 | 1,197.36 |
| 4.04 Navigation 3 | SEP | AERO5151 | 03-09-2012 | 31-10-2012 | 28-12-2012 | 42 | 0.07 | 2,793.84 |
* EFTSL : Equivalent Full Time Study Load
** Concession fees are only available at diploma and advanced diploma level for indigenous students.
Back to Program List
| Unit Of Study (Course) | Session | Course Code | Commencement Date | Census Date | Completion Date | Student Contact Hours (SCH) | EFTSL* | Tuition Fee: Onsite|Distance|RPL | |||
| Government Subsidised Fee | Full Fee (Non Government Subsidised) | ||||||||||
| Program commenced 1 July 2009-30 June 2012 ($) | Program commenced 1 July 2012-31 December 2012 ($) | Program commenced 1 July 2012-31 December 2012 Concession ** ($) | Australian Full Fee Paying ($) | ||||||||
| Advanced Engineering Mathematics 1 | AUG | MATH5153 | 06-08-2012 | 30-09-2012 | 16-11-2012 | 60 | 0.10 | 260 | 325 | 65 | 1,050.00 |
| Advanced Engineering Mathematics 2 | AUG | MATH5155 | 06-08-2012 | 30-09-2012 | 16-11-2012 | 60 | 0.10 | 260 | 325 | 65 | 1,050.00 |
| Numerical Methods | AUG | OENG5210 | 15-08-2012 | 30-09-2012 | 09-11-2012 | 60 | 0.10 | 260 | 325 | 65 | 1,050.00 |
| Advanced Dynamics | JUL | MIET5255 | 25-06-2012 | 31-08-2012 | 09-11-2012 | 40 | 0.07 | 173 | 217 | 43 | 700.00 |
| Introduction to Financial Management | JUL | ACCT5072 | 25-06-2012 | 31-08-2012 | 09-11-2012 | 60 | 0.10 | 260 | 325 | 65 | 1,050.00 |
| Dynamics of Industrial Machines | JUL | ARCH5022 | 25-06-2012 | 31-08-2012 | 09-11-2012 | 40 | 0.07 | 173 | 217 | 43 | 700.00 |
| Advanced AC Machines | JUL | EEET5368 | 25-06-2012 | 31-08-2012 | 09-11-2012 | 80 | 0.13 | 346 | 434 | 86 | 1,400.00 |
| Computer Applications (1999) | JUL | ISYS5415 | 25-06-2012 | 31-08-2012 | 09-11-2012 | 40 | 0.07 | 173 | 217 | 43 | 700.00 |
| Mechanics of Machines 2 | JUL | OENG5195 | 25-06-2012 | 31-08-2012 | 09-11-2012 | 60 | 0.10 | 260 | 325 | 65 | 1,050.00 |
| Advanced Statics | JUL | OENG5196 | 25-06-2012 | 31-08-2012 | 09-11-2012 | 60 | 0.10 | 260 | 325 | 65 | 1,050.00 |
| Mechanics of Solids | JUL | OENG5197 | 25-06-2012 | 31-08-2012 | 09-11-2012 | 60 | 0.10 | 260 | 325 | 65 | 1,050.00 |
| Thermodynamics 3 | JUL | OENG5198 | 25-06-2012 | 31-08-2012 | 09-11-2012 | 60 | 0.10 | 260 | 325 | 65 | 1,050.00 |
| Fluid Mechanics 3 | JUL | OENG5199 | 25-06-2012 | 31-08-2012 | 09-11-2012 | 60 | 0.10 | 260 | 325 | 65 | 1,050.00 |
| Advanced Engineering Mathematics 1 | JUL | MATH5153 | 25-06-2012 | 31-08-2012 | 09-11-2012 | 60 | 0.10 | 260 | 325 | 65 | 1,050.00 |
| Differential Equations | JUL | OENG5209 | 25-06-2012 | 31-08-2012 | 31-08-2012 | 60 | 0.10 | 260 | 325 | 65 | 1,050.00 |
| Industry Research Project 3 | SEP | OENG5193 | 14-09-2012 | 31-10-2012 | 21-11-2012 | 120 | 0.20 | 520 | 650 | 130 | 2,100.00 |
| Numerical Methods | SEP | OENG5210 | 03-09-2012 | 31-10-2012 | 09-11-2012 | 60 | 0.10 | 260 | 325 | 65 | 1,050.00 |
* EFTSL : Equivalent Full Time Study Load
** Concession fees are only available at diploma and advanced diploma level for indigenous students.
Back to Program List
| Unit Of Study (Course) | Session | Course Code | Commencement Date | Census Date | Completion Date | Student Contact Hours (SCH) | EFTSL* | Tuition Fee: Onsite|Distance|RPL | |||
| Government Subsidised Fee | Full Fee (Non Government Subsidised) | ||||||||||
| Program commenced 1 July 2009-30 June 2012 ($) | Program commenced 1 July 2012-31 December 2012 ($) | Program commenced 1 July 2012-31 December 2012 Concession ** ($) | Australian Full Fee Paying ($) | ||||||||
| Use hand tools | CY2 | MIET7353C | 01-08-2012 | 31-03-2013 | 31-07-2013 | 20 | 0.03 | 87 | 100 | 20 | 350.00 |
| Use hand tools | CY2 | MIET7353C | 02-07-2012 | 31-03-2013 | 28-06-2013 | 20 | 0.03 | 87 | 100 | 20 | 350.00 |
| Use hand tools | CY2 | MIET7353C | 16-07-2012 | 31-03-2013 | 26-04-2013 | 20 | 0.03 | 87 | 100 | 20 | 350.00 |
| Use hand tools | CY2 | MIET7353C | 16-07-2012 | 31-03-2013 | 28-06-2013 | 20 | 0.03 | 87 | 100 | 20 | 350.00 |
| Use hand tools | CY2 | MIET7353C | 16-07-2012 | 31-03-2013 | 31-05-2013 | 20 | 0.03 | 87 | 100 | 20 | 350.00 |
| Use hand tools | CY2 | MIET7353C | 25-06-2012 | 31-03-2013 | 28-06-2013 | 20 | 0.03 | 87 | 100 | 20 | 350.00 |
| Use power tools/hand held operations | CY2 | MIET7354C | 01-08-2012 | 31-03-2013 | 31-07-2013 | 20 | 0.03 | 87 | 100 | 20 | 350.00 |
| Use power tools/hand held operations | CY2 | MIET7354C | 02-07-2012 | 31-03-2013 | 28-06-2013 | 20 | 0.03 | 87 | 100 | 20 | 350.00 |
| Use power tools/hand held operations | CY2 | MIET7354C | 16-07-2012 | 31-03-2013 | 26-04-2013 | 20 | 0.03 | 87 | 100 | 20 | 350.00 |
| Use power tools/hand held operations | CY2 | MIET7354C | 16-07-2012 | 31-03-2013 | 28-06-2013 | 20 | 0.03 | 87 | 100 | 20 | 350.00 |
| Use power tools/hand held operations | CY2 | MIET7354C | 16-07-2012 | 31-03-2013 | 31-05-2013 | 20 | 0.03 | 87 | 100 | 20 | 350.00 |
| Use power tools/hand held operations | CY2 | MIET7354C | 25-06-2012 | 31-03-2013 | 28-06-2013 | 20 | 0.03 | 87 | 100 | 20 | 350.00 |
| Apply principles of occupational health and safety in the work environment | CY2 | OHTH5402C | 01-08-2012 | 31-03-2013 | 31-07-2013 | 10 | 0.01 | 43 | 50 | 10 | 175.00 |
| Apply principles of occupational health and safety in the work environment | CY2 | OHTH5402C | 02-07-2012 | 31-03-2013 | 28-06-2013 | 10 | 0.01 | 43 | 50 | 10 | 175.00 |
| Apply principles of occupational health and safety in the work environment | CY2 | OHTH5402C | 16-07-2012 | 31-03-2013 | 26-04-2013 | 10 | 0.01 | 43 | 50 | 10 | 175.00 |
| Apply principles of occupational health and safety in the work environment | CY2 | OHTH5402C | 16-07-2012 | 31-03-2013 | 28-06-2013 | 10 | 0.01 | 43 | 50 | 10 | 175.00 |
| Apply principles of occupational health and safety in the work environment | CY2 | OHTH5402C | 16-07-2012 | 31-03-2013 | 30-04-2013 | 10 | 0.01 | 43 | 50 | 10 | 175.00 |
| Apply principles of occupational health and safety in the work environment | CY2 | OHTH5402C | 25-06-2012 | 31-03-2013 | 28-06-2013 | 10 | 0.01 | 43 | 50 | 10 | 175.00 |
| Develop an individual career plan for the engineering industry | JUL | OENG7310 | 25-06-2012 | 31-08-2012 | 02-11-2012 | 20 | 0.03 | 87 | 100 | 20 | 350.00 |
| Develop an individual career plan for the engineering industry | JUL | OENG7310 | 25-06-2012 | 31-08-2012 | 09-11-2012 | 20 | 0.03 | 87 | 100 | 20 | 350.00 |
| Perform basic machining processes | JUL | OENG7311 | 25-06-2012 | 31-08-2012 | 02-11-2012 | 40 | 0.06 | 173 | 200 | 40 | 700.00 |
| Perform basic machining processes | JUL | OENG7311 | 25-06-2012 | 31-08-2012 | 09-11-2012 | 40 | 0.06 | 173 | 200 | 40 | 700.00 |
| Apply basic fabrication techniques | JUL | OENG7312 | 25-06-2012 | 31-08-2012 | 02-11-2012 | 40 | 0.06 | 173 | 200 | 40 | 700.00 |
| Apply basic fabrication techniques | JUL | OENG7312 | 25-06-2012 | 31-08-2012 | 09-11-2012 | 40 | 0.06 | 173 | 200 | 40 | 700.00 |
| Apply electrotechnology principles in an engineering work environment | JUL | OENG7313 | 18-07-2012 | 31-08-2012 | 31-10-2012 | 20 | 0.03 | 87 | 100 | 20 | 350.00 |
| Apply electrotechnology principles in an engineering work environment | JUL | OENG7313 | 25-06-2012 | 31-08-2012 | 02-11-2012 | 20 | 0.03 | 87 | 100 | 20 | 350.00 |
| Produce basic engineering sketches and drawings | JUL | OENG7315 | 25-06-2012 | 31-08-2012 | 02-11-2012 | 20 | 0.03 | 87 | 100 | 20 | 350.00 |
| Produce basic engineering sketches and drawings | JUL | OENG7315 | 25-06-2012 | 31-08-2012 | 09-11-2012 | 20 | 0.03 | 87 | 100 | 20 | 350.00 |
| Use basic engineering concepts to plan the manufacture of engineering components | JUL | OENG7326 | 25-06-2012 | 31-08-2012 | 02-11-2012 | 20 | 0.03 | 87 | 100 | 20 | 350.00 |
| Handle engineering materials | JUL | OENG7327 | 25-06-2012 | 31-08-2012 | 02-11-2012 | 20 | 0.03 | 87 | 100 | 20 | 350.00 |
| Perform cutting, grinding and turning operations | JUL | OENG7329 | 25-06-2012 | 31-08-2012 | 02-11-2012 | 60 | 0.09 | 260 | 300 | 60 | 1,050.00 |
| Perform cutting, grinding and turning operations | JUL | OENG7329 | 25-06-2012 | 31-08-2012 | 09-11-2012 | 60 | 0.09 | 260 | 300 | 60 | 1,050.00 |
| Apply Mathematical Solutions to Engineering Problems | JUL | MATH7040 | 25-06-2012 | 31-08-2012 | 09-11-2012 | 80 | 0.11 | 346 | 400 | 80 | 1,400.00 |
| Apply Calculus to Engineering Problems | JUL | MIET7299 | 25-06-2012 | 31-08-2012 | 09-11-2012 | 40 | 0.06 | 173 | 200 | 40 | 700.00 |
| Use 2D Computer Aided Drafting Systems | JUL | PROC5229 | 25-06-2012 | 31-08-2012 | 09-11-2012 | 80 | 0.11 | 346 | 400 | 80 | 1,400.00 |
| Apply Principles of Mechanics to Engineering Structures | JUL | MIET7300 | 25-06-2012 | 31-08-2012 | 09-11-2012 | 40 | 0.06 | 173 | 200 | 40 | 700.00 |
| Apply Communications Management Techniques | JUL | COMM7292C | 25-06-2012 | 31-08-2012 | 09-11-2012 | 40 | 0.06 | 173 | 200 | 40 | 700.00 |
| Manage Projects | JUL | BUSM7769C | 25-06-2012 | 31-08-2012 | 09-11-2012 | 60 | 0.09 | 260 | 300 | 60 | 1,050.00 |
| Apply quality management techniques | JUL | MIET7301C | 25-06-2012 | 31-08-2012 | 09-11-2012 | 40 | 0.06 | 173 | 200 | 40 | 700.00 |
| Produce Drawings Manually | JUL | MIET7302C | 25-06-2012 | 31-08-2012 | 09-11-2012 | 40 | 0.06 | 173 | 200 | 40 | 700.00 |
| Plan for the implementation of mechanical drive systems | JUL | MIET7303 | 25-06-2012 | 31-08-2012 | 09-11-2012 | 60 | 0.09 | 260 | 300 | 60 | 1,050.00 |
| Annotate and create assemblies using solid models | JUL | PROC5233 | 25-06-2012 | 31-08-2012 | 09-11-2012 | 80 | 0.11 | 346 | 400 | 80 | 1,400.00 |
| Apply Advanced Principles of Material Science to Engineering Applications | JUL | PROC5234 | 25-06-2012 | 31-08-2012 | 09-11-2012 | 60 | 0.09 | 260 | 300 | 60 | 1,050.00 |
| Design Mechanical Machines | JUL | PROC5235 | 25-06-2012 | 31-08-2012 | 09-11-2012 | 80 | 0.11 | 346 | 400 | 80 | 1,400.00 |
| Use hand tools | JUL | MIET7353C | 16-07-2012 | 31-08-2012 | 14-12-2012 | 20 | 0.03 | 87 | 100 | 20 | 350.00 |
| Use hand tools | JUL | MIET7353C | 25-06-2012 | 31-08-2012 | 02-11-2012 | 20 | 0.03 | 87 | 100 | 20 | 350.00 |
| Use hand tools | JUL | MIET7353C | 25-06-2012 | 31-08-2012 | 09-11-2012 | 20 | 0.03 | 87 | 100 | 20 | 350.00 |
| Use power tools/hand held operations | JUL | MIET7354C | 16-07-2012 | 31-08-2012 | 14-12-2012 | 20 | 0.03 | 87 | 100 | 20 | 350.00 |
| Use power tools/hand held operations | JUL | MIET7354C | 25-06-2012 | 31-08-2012 | 02-11-2012 | 20 | 0.03 | 87 | 100 | 20 | 350.00 |
| Apply principles of occupational health and safety in the work environment | JUL | OHTH5402C | 16-07-2012 | 31-08-2012 | 14-12-2012 | 10 | 0.01 | 43 | 50 | 10 | 175.00 |
| Perform ultrasonic thickness testing | JUL | PROC5248C | 25-06-2012 | 31-08-2012 | 09-11-2012 | 20 | 0.03 | 87 | 100 | 20 | 350.00 |
| Apply principles of occupational health and safety in the work environment | JUL | OHTH5438C | 25-06-2012 | 31-08-2012 | 02-11-2012 | 10 | 0.01 | 43 | 50 | 10 | 175.00 |
| Apply principles of occupational health and safety in the work environment | JUL | OHTH5438C | 25-06-2012 | 31-08-2012 | 09-11-2012 | 10 | 0.01 | 43 | 50 | 10 | 175.00 |
| Write reports | JUL | COMM5879C | 25-06-2012 | 31-08-2012 | 09-11-2012 | 20 | 0.03 | 87 | 100 | 20 | 350.00 |
| Apply principles of advanced metrology in manufacturing | JUL | MIET7500 | 25-06-2012 | 31-08-2012 | 09-11-2012 | 60 | 0.09 | 260 | 300 | 60 | 1,050.00 |
| Apply advanced static principles to engineering problems | JUL | MIET7501 | 25-06-2012 | 31-08-2012 | 09-11-2012 | 60 | 0.09 | 260 | 300 | 60 | 1,050.00 |
| Apply advanced dynamics principle to engineering problems | JUL | MIET7502 | 25-06-2012 | 31-08-2012 | 09-11-2012 | 80 | 0.11 | 346 | 400 | 80 | 1,400.00 |
| Set up manufacturing processes for engineering applications | JUL | MIET7503 | 25-06-2012 | 31-08-2012 | 09-11-2012 | 40 | 0.06 | 173 | 200 | 40 | 700.00 |
| Perform basic penetrant testing | JUL | PROC5253C | 25-06-2012 | 31-08-2012 | 09-11-2012 | 20 | 0.03 | 87 | 100 | 20 | 350.00 |
| Perform basic magnetic particle testing | JUL | PROC5254C | 25-06-2012 | 31-08-2012 | 09-11-2012 | 40 | 0.06 | 173 | 200 | 40 | 700.00 |
| Design a basic single zone duct distribution system | JUL | MIET6131 | 25-06-2012 | 31-08-2012 | 07-09-2012 | 40 | 0.06 | 173 | 200 | 40 | 700.00 |
| Complete a building thermal performance survey | JUL | CIVE5709 | 25-06-2012 | 31-08-2012 | 09-11-2012 | 80 | 0.11 | 346 | 400 | 80 | 1,400.00 |
| Design a commercial refrigeration system | JUL | MIET6135 | 25-06-2012 | 31-08-2012 | 09-11-2012 | 100 | 0.14 | 433 | 500 | 100 | 1,750.00 |
| Design industrial refrigeration systems | JUL | MIET6137 | 25-06-2012 | 31-08-2012 | 09-11-2012 | 80 | 0.11 | 346 | 400 | 80 | 1,400.00 |
| Design hydronic systems | JUL | MIET6138 | 25-06-2012 | 31-08-2012 | 09-11-2012 | 40 | 0.06 | 173 | 200 | 40 | 700.00 |
| Develop energy management solutions | JUL | MIET6139 | 25-06-2012 | 31-08-2012 | 09-11-2012 | 40 | 0.06 | 173 | 200 | 40 | 700.00 |
| Commission HVAC/R systems | JUL | MIET6142 | 25-06-2012 | 31-08-2012 | 09-11-2012 | 40 | 0.06 | 173 | 200 | 40 | 700.00 |
| Analyse and service HVAC/R control systems | JUL | MIET6146 | 25-06-2012 | 31-08-2012 | 09-11-2012 | 80 | 0.11 | 346 | 400 | 80 | 1,400.00 |
| Use hand tools | OCT | MIET7353C | 09-10-2012 | 30-11-2012 | 14-12-2012 | 20 | 0.03 | 87 | 100 | 20 | 350.00 |
| Use power tools/hand held operations | OCT | MIET7354C | 09-10-2012 | 30-11-2012 | 14-12-2012 | 20 | 0.03 | 87 | 100 | 20 | 350.00 |
| Apply principles of occupational health and safety in the work environment | OCT | OHTH5402C | 09-10-2012 | 30-11-2012 | 14-12-2012 | 10 | 0.01 | 43 | 50 | 10 | 175.00 |
| Apply electrotechnology principles in an engineering work environment | SEP | OENG7313 | 17-09-2012 | 31-10-2012 | 23-11-2012 | 20 | 0.03 | 87 | 100 | 20 | 350.00 |
| Apply Scientific Principles to Engineering Problems | SEP | MIET7296 | 17-09-2012 | 31-10-2012 | 23-11-2012 | 60 | 0.09 | 260 | 300 | 60 | 1,050.00 |
| Apply Calculus to Engineering Problems | SEP | MIET7299 | 17-09-2012 | 31-10-2012 | 23-11-2012 | 40 | 0.06 | 173 | 200 | 40 | 700.00 |
| Use 2D Computer Aided Drafting Systems | SEP | PROC5229 | 17-09-2012 | 31-10-2012 | 23-11-2012 | 80 | 0.11 | 346 | 400 | 80 | 1,400.00 |
| Apply Basic Principles of Materials Science to Engineering Applications | SEP | PROC5230 | 17-09-2012 | 31-10-2012 | 23-11-2012 | 40 | 0.06 | 173 | 200 | 40 | 700.00 |
| Manage Projects | SEP | BUSM7769C | 17-09-2012 | 31-10-2012 | 23-11-2012 | 60 | 0.09 | 260 | 300 | 60 | 1,050.00 |
| Produce Drawings Manually | SEP | MIET7302C | 17-09-2012 | 31-10-2012 | 23-11-2012 | 40 | 0.06 | 173 | 200 | 40 | 700.00 |
| Develop, Manage and Maintain Quality Systems | SEP | MIET7304C | 17-09-2012 | 31-10-2012 | 23-11-2012 | 100 | 0.14 | 433 | 500 | 100 | 1,750.00 |
| Use Advanced 2D and 3D CAD Techniques | SEP | PROC5232 | 17-09-2012 | 31-10-2012 | 23-11-2012 | 80 | 0.11 | 346 | 400 | 80 | 1,400.00 |
| Apply Fluid Mechanic Principles in Mechanical Engineering | SEP | MIET7317 | 17-09-2012 | 31-10-2012 | 23-11-2012 | 80 | 0.11 | 346 | 400 | 80 | 1,400.00 |
| Design Mechanical Engineering Systems | SEP | MIET7321 | 17-09-2012 | 31-10-2012 | 23-11-2012 | 60 | 0.09 | 260 | 300 | 60 | 1,050.00 |
| Use hand tools | SEP | MIET7353C | 03-09-2012 | 31-10-2012 | 14-12-2012 | 20 | 0.03 | 87 | 100 | 20 | 350.00 |
| Use hand tools | SEP | MIET7353C | 19-09-2012 | 31-10-2012 | 14-12-2012 | 20 | 0.03 | 87 | 100 | 20 | 350.00 |
| Use power tools/hand held operations | SEP | MIET7354C | 03-09-2012 | 31-10-2012 | 14-12-2012 | 20 | 0.03 | 87 | 100 | 20 | 350.00 |
| Use power tools/hand held operations | SEP | MIET7354C | 19-09-2012 | 31-10-2012 | 14-12-2012 | 20 | 0.03 | 87 | 100 | 20 | 350.00 |
| Apply principles of occupational health and safety in the work environment | SEP | OHTH5402C | 03-09-2012 | 31-10-2012 | 14-12-2012 | 10 | 0.01 | 43 | 50 | 10 | 175.00 |
| Apply principles of strength of materials to engineering problems | SEP | MIET6043 | 17-09-2012 | 31-10-2012 | 23-11-2012 | 60 | 0.09 | 260 | 300 | 60 | 1,050.00 |
| Apply thermodynamic principles in engineering | SEP | MIET6044 | 17-09-2012 | 31-10-2012 | 23-11-2012 | 80 | 0.11 | 346 | 400 | 80 | 1,400.00 |
| Analyse a simple electrical system circuit | SEP | EEET6716C | 17-09-2012 | 31-10-2012 | 23-11-2012 | 40 | 0.06 | 173 | 200 | 40 | 700.00 |
| Apply principles of metrology in manufacturing | SEP | MIET7505 | 17-09-2012 | 31-10-2012 | 23-11-2012 | 60 | 0.09 | 260 | 300 | 60 | 1,050.00 |
| Operate computing packages | SEP | COSC6082C | 04-09-2012 | 31-10-2012 | 09-11-2012 | 60 | 0.09 | 260 | 300 | 60 | 1,050.00 |
| Apply principles of mechanics to engineering problems | SEP | MIET6335 | 17-09-2012 | 31-10-2012 | 23-11-2012 | 60 | 0.09 | 260 | 300 | 60 | 1,050.00 |
* EFTSL : Equivalent Full Time Study Load
** Concession fees are only available at diploma and advanced diploma level for indigenous students.
Back to Program List
| Unit Of Study (Course) | Session | Course Code | Commencement Date | Census Date | Completion Date | Student Contact Hours (SCH) | EFTSL* | Tuition Fee: Onsite|Distance|RPL | |||
| Government Subsidised Fee | Full Fee (Non Government Subsidised) | ||||||||||
| Program commenced 1 July 2009-30 June 2012 ($) | Program commenced 1 July 2012-31 December 2012 ($) | Program commenced 1 July 2012-31 December 2012 Concession ** ($) | Australian Full Fee Paying ($) | ||||||||
| Address legal and administrative requirements | JUL | BUSM5794C | 25-06-2012 | 31-08-2012 | 26-10-2012 | 50 | 0.14 | 216 | 300 | 60 | 651.00 |
| Develop and apply industry knowledge | JUL | EMPL5392C | 25-06-2012 | 31-08-2012 | 26-10-2012 | 15 | 0.04 | 65 | 90 | 18 | 195.30 |
| Develop and implement crisis management plans | JUL | MKTG7828C | 25-06-2012 | 31-08-2012 | 26-10-2012 | 40 | 0.11 | 173 | 240 | 48 | 520.80 |
| Manage fundraising and sponsorship activities | JUL | MKTG7829C | 25-06-2012 | 31-08-2012 | 26-10-2012 | 50 | 0.14 | 216 | 300 | 60 | 651.00 |
* EFTSL : Equivalent Full Time Study Load
** Concession fees are only available at diploma and advanced diploma level for indigenous students.
Back to Program List
| Unit Of Study (Course) | Session | Course Code | Commencement Date | Census Date | Completion Date | Student Contact Hours (SCH) | EFTSL* | Tuition Fee: Onsite|Distance|RPL | |||
| Government Subsidised Fee | Full Fee (Non Government Subsidised) | ||||||||||
| Program commenced 1 July 2009-30 June 2012 ($) | Program commenced 1 July 2012-31 December 2012 ($) | Program commenced 1 July 2012-31 December 2012 Concession ** ($) | Australian Full Fee Paying ($) | ||||||||
| Apply health and safety practices in the workplace | AUG | OHTH5450C | 01-08-2012 | 30-09-2012 | 17-08-2012 | 25 | 0.06 | 108 | 106 | 21 | 332.25 |
| Maintain financial records | AUG | ACCT5286C | 01-08-2012 | 30-09-2012 | 30-11-2012 | 60 | 0.14 | 260 | 256 | 51 | 797.40 |
| Maintain financial records | CY2 | ACCT5286C | 01-08-2012 | 31-03-2013 | 25-01-2013 | 60 | 0.14 | 260 | 256 | 51 | 797.40 |
| Maintain financial records | CY2 | ACCT5286C | 17-12-2012 | 31-03-2013 | 06-06-2013 | 60 | 0.14 | 260 | 256 | 51 | 797.40 |
| Maintain financial records | CY2 | ACCT5286C | 17-12-2012 | 31-03-2013 | 22-04-2013 | 60 | 0.14 | 260 | 256 | 51 | 797.40 |
| Communicate in the workplace | JUL | EMPL5580C | 25-06-2012 | 31-08-2012 | 28-09-2012 | 30 | 0.07 | 130 | 128 | 26 | 398.70 |
| Use technology in the workplace | JUL | EMPL5581C | 25-06-2012 | 31-08-2012 | 09-11-2012 | 50 | 0.11 | 216 | 213 | 42 | 664.50 |
| Prepare financial statements | JUL | ACCT5237C | 25-06-2012 | 31-08-2012 | 26-10-2012 | 60 | 0.14 | 260 | 256 | 51 | 797.40 |
| Provide financial and business performance information | JUL | ACCT5240C | 25-06-2012 | 31-08-2012 | 26-12-2012 | 60 | 0.14 | 260 | 256 | 51 | 797.40 |
| Produce job costing information | JUL | COSC5937C | 25-06-2012 | 31-08-2012 | 24-08-2012 | 40 | 0.09 | 173 | 170 | 34 | 531.60 |
| Maintain asset and inventory records | JUL | ACCT5251C | 25-06-2012 | 31-08-2012 | 24-08-2012 | 30 | 0.07 | 130 | 128 | 26 | 398.70 |
| Develop and use complex spreadsheets | JUL | COSC5946C | 25-06-2012 | 31-08-2012 | 26-10-2012 | 50 | 0.11 | 216 | 213 | 42 | 664.50 |
| Prepare financial reports | JUL | ACCT5287C | 25-06-2012 | 31-08-2012 | 26-10-2012 | 50 | 0.11 | 216 | 213 | 42 | 664.50 |
| Price financial transactions | JUL | ACCT5284C | 25-06-2012 | 31-08-2012 | 26-10-2012 | 60 | 0.14 | 260 | 256 | 51 | 797.40 |
| Set up and operate a computerised accounting system | OCT | COSC5939C | 08-10-2012 | 30-11-2012 | 19-10-2012 | 80 | 0.18 | 346 | 341 | 68 | 1,063.20 |
| Communicate in the workplace | SEP | EMPL5580C | 17-09-2012 | 31-10-2012 | 29-09-2012 | 30 | 0.07 | 130 | 128 | 26 | 398.70 |
| Apply principles of professional practice to work in the financial services industry | SEP | SOSK5182C | 17-09-2012 | 31-10-2012 | 29-09-2012 | 30 | 0.07 | 130 | 128 | 26 | 398.70 |
| Prepare operational budgets | SEP | COSC5938C | 03-09-2012 | 31-10-2012 | 26-10-2012 | 40 | 0.09 | 173 | 170 | 34 | 531.60 |
* EFTSL : Equivalent Full Time Study Load
** Concession fees are only available at diploma and advanced diploma level for indigenous students.
Back to Program List
| Unit Of Study (Course) | Session | Course Code | Commencement Date | Census Date | Completion Date | Student Contact Hours (SCH) | EFTSL* | Tuition Fee: Onsite|Distance|RPL | |||
| Government Subsidised Fee | Full Fee (Non Government Subsidised) | ||||||||||
| Program commenced 1 July 2009-30 June 2012 ($) | Program commenced 1 July 2012-31 December 2012 ($) | Program commenced 1 July 2012-31 December 2012 Concession ** ($) | Australian Full Fee Paying ($) | ||||||||
| Work in Legal Environment | CY2 | JUST5142 | 10-12-2012 | 31-03-2013 | 18-01-2013 | 75 | 0.11 | 325 | 486 | 98 | 810.00 |
| Apply Research Techniques within a Justice Framework | CY2 | LAW5162 | 03-12-2012 | 31-03-2013 | 11-01-2013 | 60 | 0.09 | 260 | 389 | 78 | 648.00 |
| Implement workplace safety procedures and programs | CY2 | OHTH5425C | 09-07-2012 | 31-03-2013 | 08-07-2013 | 35 | 0.05 | 152 | 227 | 46 | 378.00 |
| Uphold and support the values and principles of public service | CY2 | HWSS5407C | 09-07-2012 | 31-03-2013 | 08-07-2013 | 40 | 0.06 | 173 | 259 | 52 | 432.00 |
| Develop, facilitate and monitor all aspects of case management | CY2 | HWSS5440C | 25-06-2012 | 31-03-2013 | 28-06-2013 | 75 | 0.11 | 325 | 486 | 98 | 810.00 |
| Apply Investigative Processes in a Justice Environment | JUL | JUST5143 | 25-06-2012 | 31-08-2012 | 30-11-2012 | 75 | 0.11 | 325 | 486 | 98 | 810.00 |
| Introduction to Criminal Justice System | JUL | LAW5161 | 25-06-2012 | 31-08-2012 | 09-11-2012 | 68 | 0.10 | 294 | 441 | 88 | 734.40 |
| Implement workplace safety procedures and programs | JUL | OHTH5425C | 25-06-2012 | 31-08-2012 | 09-11-2012 | 35 | 0.05 | 152 | 227 | 46 | 378.00 |
| Uphold and support the values and principles of public service | JUL | HWSS5407C | 25-06-2012 | 31-08-2012 | 09-11-2012 | 40 | 0.06 | 173 | 259 | 52 | 432.00 |
| Apply Oral and Written Communication Skills in a Justice Environment | JUL | EMPL5505 | 25-06-2012 | 31-08-2012 | 09-11-2012 | 20 | 0.03 | 87 | 130 | 26 | 216.00 |
| Apply Principles and Practices of Management and Leadership in a Justice Environment | JUL | BUSM7804 | 25-06-2012 | 31-08-2012 | 09-11-2012 | 54 | 0.08 | 234 | 350 | 70 | 583.20 |
| Apply Policing Principles and Practices in a Justice Environment | JUL | JUST5148 | 25-06-2012 | 31-08-2012 | 09-11-2012 | 54 | 0.08 | 234 | 350 | 70 | 583.20 |
| Work with Culturally Diverse Clients in a Justice Environment | JUL | HUSO5133 | 25-06-2012 | 31-08-2012 | 09-11-2012 | 54 | 0.08 | 234 | 350 | 70 | 583.20 |
| Formulate and Apply Crime Prevention Strategies | JUL | JUST5151 | 25-06-2012 | 31-08-2012 | 09-11-2012 | 54 | 0.08 | 234 | 350 | 70 | 583.20 |
| Sociology | JUL | HUSO5134 | 25-06-2012 | 31-08-2012 | 09-11-2012 | 68 | 0.10 | 294 | 441 | 88 | 734.40 |
| Plan and Organise Human Resource in a Justice Environment | JUL | BUSM7806 | 25-06-2012 | 31-08-2012 | 09-11-2012 | 20 | 0.03 | 87 | 130 | 26 | 216.00 |
| Implement Human Rights Principles in a Justice Environment | JUL | SOSK5176 | 25-06-2012 | 31-08-2012 | 09-11-2012 | 54 | 0.08 | 234 | 350 | 70 | 583.20 |
| Arrange Legal Representation for Criminal Justice Clients | JUL | JUST5152 | 25-06-2012 | 31-08-2012 | 09-11-2012 | 54 | 0.08 | 234 | 350 | 70 | 583.20 |
| Manage Risk | JUL | BUSM7807C | 25-06-2012 | 31-08-2012 | 09-11-2012 | 60 | 0.09 | 260 | 389 | 78 | 648.00 |
| Provide Support/Supervision to Young Offenders within a Youth Justice Framework | JUL | JUST5153 | 25-06-2012 | 31-08-2012 | 09-11-2012 | 54 | 0.08 | 234 | 350 | 70 | 583.20 |
| Work within the Current Industrial Relations Climate | JUL | JUST5180 | 25-06-2012 | 31-08-2012 | 09-11-2012 | 54 | 0.08 | 234 | 350 | 70 | 583.20 |
* EFTSL : Equivalent Full Time Study Load
** Concession fees are only available at diploma and advanced diploma level for indigenous students.
Back to Program List
| Unit Of Study (Course) | Session | Course Code | Commencement Date | Census Date | Completion Date | Student Contact Hours (SCH) | EFTSL* | Tuition Fee: Onsite|Distance|RPL | |||
| Government Subsidised Fee | Full Fee (Non Government Subsidised) | ||||||||||
| Program commenced 1 July 2009-30 June 2012 ($) | Program commenced 1 July 2012-31 December 2012 ($) | Program commenced 1 July 2012-31 December 2012 Concession ** ($) | Australian Full Fee Paying ($) | ||||||||
| Undertake remote repair of network faults | JUL | EEET6558C | 02-07-2012 | 31-08-2012 | 31-08-2012 | 60 | 0.06 | 260 | 158 | 32 | 789.00 |
| Complete equipment/software upgrades | JUL | EEET6704C | 02-07-2012 | 31-08-2012 | 31-08-2012 | 80 | 0.08 | 346 | 210 | 42 | 1,052.00 |
| Monitor, analyse and action telecommunications network alarms | JUL | EEET6719C | 02-07-2012 | 31-08-2012 | 31-08-2012 | 60 | 0.06 | 260 | 158 | 32 | 789.00 |
| Commission telecommunications network equipment | JUL | EEET6721C | 02-07-2012 | 31-08-2012 | 09-11-2012 | 150 | 0.16 | 650 | 394 | 80 | 1,972.50 |
| Integrate new systems and equipment into the telecommunications network | JUL | EEET6722C | 02-07-2012 | 31-08-2012 | 09-11-2012 | 150 | 0.16 | 650 | 394 | 80 | 1,972.50 |
| Undertake network traffic management | OCT | EEET6725C | 08-10-2012 | 30-11-2012 | 09-11-2012 | 150 | 0.16 | 650 | 394 | 80 | 1,972.50 |
| Undertake network performance analysis | OCT | EEET6726C | 08-10-2012 | 30-11-2012 | 09-11-2012 | 150 | 0.16 | 650 | 394 | 80 | 1,972.50 |
| Conduct field tests of radio/wireless networks | SEP | EEET6554C | 05-09-2012 | 31-10-2012 | 16-11-2012 | 60 | 0.06 | 260 | 158 | 32 | 789.00 |
* EFTSL : Equivalent Full Time Study Load
** Concession fees are only available at diploma and advanced diploma level for indigenous students.
Back to Program List
| Unit Of Study (Course) | Session | Course Code | Commencement Date | Census Date | Completion Date | Student Contact Hours (SCH) | EFTSL* | Tuition Fee: Onsite|Distance|RPL |
| Full Fee (Non Government Subsidised) | ||||||||
| Australian Full Fee Paying ($) | ||||||||
| Comply with infection control policies and procedures | AUG | HWSS5655C | 14-08-2012 | 30-09-2012 | 14-12-2012 | 20 | 0.04 | 516.40 |
| Comply with infection control policies and procedures | AUG | HWSS5670C | 01-08-2012 | 30-09-2012 | 31-08-2012 | 20 | 0.04 | 516.40 |
| Maintain financial records | CY2 | ACCT5150C | 25-06-2012 | 31-03-2013 | 20-02-2013 | 60 | 0.11 | 1,549.20 |
| Apply first aid | CY2 | NURS5115C | 02-11-2012 | 31-03-2013 | 07-06-2013 | 18 | 0.03 | 464.76 |
| Apply first aid | CY2 | NURS5115C | 05-10-2012 | 31-03-2013 | 24-05-2013 | 18 | 0.03 | 464.76 |
| Apply first aid | CY2 | NURS5115C | 10-08-2012 | 31-03-2013 | 19-04-2013 | 18 | 0.03 | 464.76 |
| Apply first aid | CY2 | NURS5115C | 13-07-2012 | 31-03-2013 | 22-03-2013 | 18 | 0.03 | 464.76 |
| Apply first aid | CY2 | NURS5115C | 14-09-2012 | 31-03-2013 | 10-05-2013 | 18 | 0.03 | 464.76 |
| Apply first aid | CY2 | NURS5115C | 23-11-2012 | 31-03-2013 | 21-06-2013 | 18 | 0.03 | 464.76 |
| Comply with infection control policies and procedures in health work | CY2 | NURS5119C | 01-10-2012 | 31-03-2013 | 30-09-2013 | 20 | 0.04 | 516.40 |
| Comply with infection control policies and procedures in health work | CY2 | NURS5119C | 06-08-2012 | 31-03-2013 | 05-08-2013 | 20 | 0.04 | 516.40 |
| Comply with infection control policies and procedures in health work | CY2 | NURS5119C | 09-07-2012 | 31-03-2013 | 08-07-2013 | 20 | 0.04 | 516.40 |
| Comply with infection control policies and procedures in health work | CY2 | NURS5119C | 10-09-2012 | 31-03-2013 | 09-09-2013 | 20 | 0.04 | 516.40 |
| Comply with infection control policies and procedures in health work | CY2 | NURS5119C | 19-11-2012 | 31-03-2013 | 18-11-2013 | 20 | 0.04 | 516.40 |
| Comply with infection control policies and procedures in health work | CY2 | NURS5119C | 29-10-2012 | 31-03-2013 | 28-10-2013 | 20 | 0.04 | 516.40 |
| Process reusable instruments and equipment in health work | CY2 | DENT5190C | 06-09-2012 | 31-03-2013 | 03-06-2013 | 30 | 0.05 | 774.60 |
| Process reusable instruments and equipment in health work | CY2 | DENT5190C | 11-10-2012 | 31-03-2013 | 08-07-2013 | 30 | 0.05 | 774.60 |
| Process reusable instruments and equipment in health work | CY2 | DENT5190C | 16-08-2012 | 31-03-2013 | 06-05-2013 | 30 | 0.05 | 774.60 |
| Process reusable instruments and equipment in health work | CY2 | DENT5190C | 16-08-2012 | 31-03-2013 | 12-03-2013 | 30 | 0.05 | 774.60 |
| Process reusable instruments and equipment in health work | CY2 | DENT5190C | 19-07-2012 | 31-03-2013 | 04-02-2013 | 30 | 0.05 | 774.60 |
| Process reusable instruments and equipment in health work | CY2 | DENT5190C | 23-08-2012 | 31-03-2013 | 20-05-2013 | 30 | 0.05 | 774.60 |
| Process reusable instruments and equipment in health work | CY2 | DENT5190C | 25-10-2012 | 31-03-2013 | 05-08-2013 | 30 | 0.05 | 774.60 |
| Process reusable instruments and equipment in health work | CY2 | DENT5190C | 29-11-2012 | 31-03-2013 | 09-09-2013 | 30 | 0.05 | 774.60 |
| Identify, select and prepare instruments, equipment, materials | CY2 | DENT5214C | 25-06-2012 | 31-03-2013 | 28-06-2013 | 75 | 0.13 | 1,936.50 |
| Gather data and history, conduct dental prosthetic examination and develop a treatment plan | CY2 | DENT5215C | 25-06-2012 | 31-03-2013 | 28-06-2013 | 180 | 0.32 | 4,647.60 |
| Take impressions | CY2 | DENT5216C | 25-06-2012 | 31-03-2013 | 28-06-2013 | 75 | 0.13 | 1,936.50 |
| Maintain financial records | CY2 | ACCT5334C | 12-11-2012 | 31-03-2013 | 07-10-2013 | 60 | 0.11 | 1,549.20 |
| Identify, select and prepare instruments, equipment, materials | CY2 | DENT5246C | 25-06-2012 | 31-03-2013 | 28-06-2013 | 75 | 0.13 | 1,936.50 |
| Gather data, conduct dental prosthetic examination and develop treatment plan | CY2 | DENT5247C | 25-06-2012 | 31-03-2013 | 28-06-2013 | 180 | 0.32 | 4,647.60 |
| Take impressions | CY2 | DENT5248C | 25-06-2012 | 31-03-2013 | 28-06-2013 | 75 | 0.13 | 1,936.50 |
| Apply first aid | CY2 | OHTH5648C | 02-11-2012 | 31-03-2013 | 07-06-2013 | 18 | 0.03 | 464.76 |
| Apply first aid | CY2 | OHTH5648C | 05-10-2012 | 31-03-2013 | 04-04-2013 | 18 | 0.03 | 464.76 |
| Apply first aid | CY2 | OHTH5648C | 05-10-2012 | 31-03-2013 | 24-05-2013 | 18 | 0.03 | 464.76 |
| Apply first aid | CY2 | OHTH5648C | 10-08-2012 | 31-03-2013 | 19-04-2013 | 18 | 0.03 | 464.76 |
| Apply first aid | CY2 | OHTH5648C | 13-07-2012 | 31-03-2013 | 22-03-2013 | 18 | 0.03 | 464.76 |
| Apply first aid | CY2 | OHTH5648C | 14-09-2012 | 31-03-2013 | 10-05-2013 | 18 | 0.03 | 464.76 |
| Apply first aid | CY2 | OHTH5648C | 23-11-2012 | 31-03-2013 | 21-06-2013 | 18 | 0.03 | 464.76 |
| Comply with infection control policies and procedures | CY2 | HWSS5655C | 01-10-2012 | 31-03-2013 | 04-04-2013 | 20 | 0.04 | 516.40 |
| Comply with infection control policies and procedures | CY2 | HWSS5655C | 01-10-2012 | 31-03-2013 | 30-01-2013 | 20 | 0.04 | 516.40 |
| Comply with infection control policies and procedures | CY2 | HWSS5655C | 01-10-2012 | 31-03-2013 | 30-09-2013 | 20 | 0.04 | 516.40 |
| Comply with infection control policies and procedures | CY2 | HWSS5655C | 06-08-2012 | 31-03-2013 | 05-08-2013 | 20 | 0.04 | 516.40 |
| Comply with infection control policies and procedures | CY2 | HWSS5655C | 09-07-2012 | 31-03-2013 | 08-07-2013 | 20 | 0.04 | 516.40 |
| Comply with infection control policies and procedures | CY2 | HWSS5655C | 10-07-2012 | 31-03-2013 | 25-03-2013 | 20 | 0.04 | 516.40 |
| Comply with infection control policies and procedures | CY2 | HWSS5655C | 10-09-2012 | 31-03-2013 | 09-09-2013 | 20 | 0.04 | 516.40 |
| Comply with infection control policies and procedures | CY2 | HWSS5655C | 19-11-2012 | 31-03-2013 | 18-11-2013 | 20 | 0.04 | 516.40 |
| Comply with infection control policies and procedures | CY2 | HWSS5655C | 29-10-2012 | 31-03-2013 | 28-10-2013 | 20 | 0.04 | 516.40 |
| Comply with infection control policies and procedures | DEC | HWSS5670C | 03-12-2012 | 31-12-2012 | 28-12-2012 | 20 | 0.04 | 516.40 |
| Maintain business resources | JUL | BUSM9930C | 02-07-2012 | 31-08-2012 | 07-12-2012 | 20 | 0.04 | 516.40 |
| Maintain business resources | JUL | BUSM9930C | 13-07-2012 | 31-08-2012 | 03-12-2012 | 20 | 0.04 | 516.40 |
| Maintain financial records | JUL | ACCT5150C | 02-07-2012 | 31-08-2012 | 07-12-2012 | 60 | 0.11 | 1,549.20 |
| Maintain financial records | JUL | ACCT5150C | 13-07-2012 | 31-08-2012 | 03-12-2012 | 60 | 0.11 | 1,549.20 |
| Analyse and present research information | JUL | BUSM7648C | 02-07-2012 | 31-08-2012 | 07-12-2012 | 40 | 0.07 | 1,032.80 |
| Apply first aid | JUL | NURS5115C | 25-06-2012 | 31-08-2012 | 03-12-2012 | 18 | 0.03 | 464.76 |
| Construct and insert an implant retained overdenture | JUL | DENT5221C | 10-07-2012 | 31-08-2012 | 07-12-2012 | 75 | 0.13 | 1,936.50 |
| Maintain business resources | JUL | OFFC5267C | 13-07-2012 | 31-08-2012 | 03-12-2012 | 15 | 0.03 | 387.30 |
| Maintain financial records | JUL | ACCT5334C | 13-07-2012 | 31-08-2012 | 03-12-2012 | 60 | 0.11 | 1,549.20 |
| Maintain financial records | JUL | ACCT5334C | 25-06-2012 | 31-08-2012 | 07-12-2012 | 60 | 0.11 | 1,549.20 |
| Apply first aid | JUL | OHTH5648C | 25-06-2012 | 31-08-2012 | 03-12-2012 | 18 | 0.03 | 464.76 |
| Comply with infection control policies and procedures | JUL | HWSS5655C | 25-06-2012 | 31-08-2012 | 09-11-2012 | 20 | 0.04 | 516.40 |
| Comply with infection control policies and procedures | JUL | HWSS5655C | 25-06-2012 | 31-08-2012 | 21-12-2012 | 20 | 0.04 | 516.40 |
| Comply with infection control policies and procedures | JUL | HWSS5655C | 25-06-2012 | 31-08-2012 | 23-08-2012 | 20 | 0.04 | 516.40 |
| Comply with infection control policies and procedures | JUL | HWSS5670C | 02-07-2012 | 31-08-2012 | 31-07-2012 | 20 | 0.04 | 516.40 |
| Comply with infection control policies and procedures | NOV | HWSS5670C | 01-11-2012 | 31-12-2012 | 30-11-2012 | 20 | 0.04 | 516.40 |
| Comply with infection control policies and procedures | OCT | HWSS5670C | 01-10-2012 | 30-11-2012 | 31-10-2012 | 20 | 0.04 | 516.40 |
| Comply with infection control policies and procedures | OCT | HWSS5670C | 15-10-2012 | 30-11-2012 | 09-11-2012 | 20 | 0.04 | 516.40 |
| Comply with infection control policies and procedures | SEP | HWSS5660C | 03-09-2012 | 31-10-2012 | 16-11-2012 | 20 | 0.04 | 516.40 |
| Comply with infection control policies and procedures | SEP | HWSS5670C | 03-09-2012 | 31-10-2012 | 28-09-2012 | 20 | 0.04 | 516.40 |
* EFTSL : Equivalent Full Time Study Load
** Concession fees are only available at diploma and advanced diploma level for indigenous students.
Back to Program List
| Unit Of Study (Course) | Session | Course Code | Commencement Date | Census Date | Completion Date | Student Contact Hours (SCH) | EFTSL* | Tuition Fee: Onsite|Distance|RPL | |||
| Government Subsidised Fee | Full Fee (Non Government Subsidised) | ||||||||||
| Program commenced 1 July 2009-30 June 2012 ($) | Program commenced 1 July 2012-31 December 2012 ($) | Program commenced 1 July 2012-31 December 2012 Concession ** ($) | Australian Full Fee Paying ($) | ||||||||
| Work in the Textiles, Clothing and Footwear industry | CY2 | EMPL5588C | 02-07-2012 | 31-03-2013 | 28-06-2013 | 40 | 0.04 | 173 | 178 | 36 | 678.40 |
| Work in the Textiles, Clothing and Footwear industry | CY2 | EMPL5588C | 03-09-2012 | 31-03-2013 | 30-08-2013 | 40 | 0.04 | 173 | 178 | 36 | 678.40 |
| Work in the Textiles, Clothing and Footwear industry | CY2 | EMPL5588C | 08-10-2012 | 31-03-2013 | 07-10-2013 | 40 | 0.04 | 173 | 178 | 36 | 678.40 |
| Work in the Textiles, Clothing and Footwear industry | CY2 | EMPL5588C | 16-07-2012 | 31-03-2013 | 28-06-2013 | 40 | 0.04 | 173 | 178 | 36 | 678.40 |
| Work in the Textiles, Clothing and Footwear industry | CY2 | EMPL5588C | 25-06-2012 | 31-03-2013 | 28-06-2013 | 40 | 0.04 | 173 | 178 | 36 | 678.40 |
| Work in the Textiles, Clothing and Footwear industry | CY2 | EMPL5588C | 26-11-2012 | 31-03-2013 | 27-02-2013 | 40 | 0.04 | 173 | 178 | 36 | 678.40 |
| Work in the Textiles, Clothing and Footwear industry | CY2 | EMPL5588C | 29-08-2012 | 31-03-2013 | 28-08-2013 | 40 | 0.04 | 173 | 178 | 36 | 678.40 |
| Identify fibres, yarns and textile materials and their uses in textile production | CY2 | MKTG5756C | 26-11-2012 | 31-03-2013 | 27-02-2013 | 50 | 0.06 | 216 | 223 | 44 | 848.00 |
| Organise and plan own work to achieve planned outcomes | CY2 | MANU5919C | 06-08-2012 | 31-03-2013 | 02-08-2013 | 30 | 0.03 | 130 | 134 | 27 | 508.80 |
| Organise and plan own work to achieve planned outcomes | CY2 | MANU5919C | 25-06-2012 | 31-03-2013 | 28-06-2013 | 30 | 0.03 | 130 | 134 | 27 | 508.80 |
| Organise and plan own work to achieve planned outcomes | CY2 | MANU5919C | 26-11-2012 | 31-03-2013 | 27-02-2013 | 30 | 0.03 | 130 | 134 | 27 | 508.80 |
| Implement and monitor OH&S in the workplace | CY2 | OHTH5451C | 26-11-2012 | 31-03-2013 | 27-02-2013 | 50 | 0.06 | 216 | 223 | 44 | 848.00 |
| Contribute to the development of products or processes | CY2 | MANU5914C | 26-11-2012 | 31-03-2013 | 27-02-2013 | 50 | 0.06 | 216 | 223 | 44 | 848.00 |
| Select dyes and develop dye specification and recipe for production | CY2 | MANU5915C | 26-11-2012 | 31-03-2013 | 27-02-2013 | 60 | 0.07 | 260 | 268 | 53 | 1,017.60 |
| Operate computing technology in a Textiles, Clothing and Footwear workplace | CY2 | MIET6060C | 26-11-2012 | 31-03-2013 | 27-02-2013 | 50 | 0.06 | 216 | 223 | 44 | 848.00 |
| Select raw materials | CY2 | MANU5918C | 26-11-2012 | 31-03-2013 | 27-02-2013 | 40 | 0.04 | 173 | 178 | 36 | 678.40 |
| Identify opportunities in the textiles, clothing and footwear market | CY2 | MKTG5755C | 26-11-2012 | 31-03-2013 | 27-02-2013 | 70 | 0.08 | 303 | 312 | 62 | 1,187.20 |
| Identify fibres and fabrics | CY2 | VART5902C | 02-07-2012 | 31-03-2013 | 28-06-2013 | 50 | 0.06 | 216 | 223 | 44 | 848.00 |
| Identify fibres and fabrics | CY2 | VART5902C | 03-09-2012 | 31-03-2013 | 30-08-2013 | 50 | 0.06 | 216 | 223 | 44 | 848.00 |
| Identify fibres and fabrics | CY2 | VART5902C | 08-10-2012 | 31-03-2013 | 07-10-2013 | 50 | 0.06 | 216 | 223 | 44 | 848.00 |
| Identify fibres and fabrics | CY2 | VART5902C | 09-10-2012 | 31-03-2013 | 08-10-2013 | 50 | 0.06 | 216 | 223 | 44 | 848.00 |
| Identify fibres and fabrics | CY2 | VART5902C | 10-09-2012 | 31-03-2013 | 06-09-2013 | 50 | 0.06 | 216 | 223 | 44 | 848.00 |
| Identify fibres and fabrics | CY2 | VART5902C | 16-07-2012 | 31-03-2013 | 28-06-2013 | 50 | 0.06 | 216 | 223 | 44 | 848.00 |
| Identify fibres and fabrics | CY2 | VART5902C | 25-06-2012 | 31-03-2013 | 28-06-2013 | 50 | 0.06 | 216 | 223 | 44 | 848.00 |
| Identify fibres and fabrics | CY2 | VART5902C | 29-08-2012 | 31-03-2013 | 28-08-2013 | 50 | 0.06 | 216 | 223 | 44 | 848.00 |
| Identify fibres and fabrics | CY2 | VART5902C | 29-10-2012 | 31-03-2013 | 25-10-2013 | 50 | 0.06 | 216 | 223 | 44 | 848.00 |
| Participate in environmentally sustainable work practices | CY2 | EASC5049C | 02-07-2012 | 31-03-2013 | 28-06-2013 | 30 | 0.03 | 130 | 134 | 27 | 508.80 |
| Participate in environmentally sustainable work practices | CY2 | EASC5049C | 25-06-2012 | 31-03-2013 | 28-06-2013 | 30 | 0.03 | 130 | 134 | 27 | 508.80 |
| Participate in environmentally sustainable work practices | CY2 | EASC5049C | 26-11-2012 | 31-03-2013 | 27-02-2013 | 30 | 0.03 | 130 | 134 | 27 | 508.80 |
| Select and apply drawing techniques and media to represent and communicate the concept | JUL | VART5770C | 25-06-2012 | 31-08-2012 | 02-11-2012 | 80 | 0.09 | 346 | 357 | 71 | 1,356.80 |
| Work in the Textiles, Clothing and Footwear industry | JUL | EMPL5588C | 25-07-2012 | 31-08-2012 | 23-11-2012 | 40 | 0.04 | 173 | 178 | 36 | 678.40 |
| Identify fibres, yarns and textile materials and their uses in textile production | JUL | MKTG5756C | 25-06-2012 | 31-08-2012 | 16-11-2012 | 50 | 0.06 | 216 | 223 | 44 | 848.00 |
| Identify fibres, yarns and textile materials and their uses in textile production | JUL | MKTG5756C | 25-07-2012 | 31-08-2012 | 23-11-2012 | 50 | 0.06 | 216 | 223 | 44 | 848.00 |
| Organise and plan own work to achieve planned outcomes | JUL | MANU5919C | 25-06-2012 | 31-08-2012 | 02-11-2012 | 30 | 0.03 | 130 | 134 | 27 | 508.80 |
| Organise and plan own work to achieve planned outcomes | JUL | MANU5919C | 25-07-2012 | 31-08-2012 | 23-11-2012 | 30 | 0.03 | 130 | 134 | 27 | 508.80 |
| Implement and monitor OH&S in the workplace | JUL | OHTH5451C | 09-07-2012 | 31-08-2012 | 26-07-2012 | 50 | 0.06 | 216 | 223 | 44 | 848.00 |
| Implement and monitor OH&S in the workplace | JUL | OHTH5451C | 25-07-2012 | 31-08-2012 | 23-11-2012 | 50 | 0.06 | 216 | 223 | 44 | 848.00 |
| Contribute to the development of products or processes | JUL | MANU5914C | 25-06-2012 | 31-08-2012 | 02-11-2012 | 50 | 0.06 | 216 | 223 | 44 | 848.00 |
| Contribute to the development of products or processes | JUL | MANU5914C | 25-07-2012 | 31-08-2012 | 23-11-2012 | 50 | 0.06 | 216 | 223 | 44 | 848.00 |
| Select dyes and develop dye specification and recipe for production | JUL | MANU5915C | 25-06-2012 | 31-08-2012 | 02-11-2012 | 60 | 0.07 | 260 | 268 | 53 | 1,017.60 |
| Select dyes and develop dye specification and recipe for production | JUL | MANU5915C | 25-07-2012 | 31-08-2012 | 23-11-2012 | 60 | 0.07 | 260 | 268 | 53 | 1,017.60 |
| Operate computing technology in a Textiles, Clothing and Footwear workplace | JUL | MIET6060C | 25-06-2012 | 31-08-2012 | 16-11-2012 | 50 | 0.06 | 216 | 223 | 44 | 848.00 |
| Operate computing technology in a Textiles, Clothing and Footwear workplace | JUL | MIET6060C | 25-07-2012 | 31-08-2012 | 23-11-2012 | 50 | 0.06 | 216 | 223 | 44 | 848.00 |
| Select raw materials | JUL | MANU5918C | 25-06-2012 | 31-08-2012 | 02-11-2012 | 40 | 0.04 | 173 | 178 | 36 | 678.40 |
| Select raw materials | JUL | MANU5918C | 25-07-2012 | 31-08-2012 | 23-11-2012 | 40 | 0.04 | 173 | 178 | 36 | 678.40 |
| Identify opportunities in the textiles, clothing and footwear market | JUL | MKTG5755C | 25-06-2012 | 31-08-2012 | 16-11-2012 | 70 | 0.08 | 303 | 312 | 62 | 1,187.20 |
| Identify opportunities in the textiles, clothing and footwear market | JUL | MKTG5755C | 25-07-2012 | 31-08-2012 | 23-11-2012 | 70 | 0.08 | 303 | 312 | 62 | 1,187.20 |
| Work with international textiles, clothing and footwear supply chains | JUL | MKTG5757C | 25-06-2012 | 31-08-2012 | 02-11-2012 | 60 | 0.07 | 260 | 268 | 53 | 1,017.60 |
| Operate a weaving loom | JUL | MANU7211C | 25-06-2012 | 31-08-2012 | 02-11-2012 | 50 | 0.06 | 216 | 223 | 44 | 848.00 |
| Perform knitting operations | JUL | MANU7212C | 25-06-2012 | 31-08-2012 | 02-11-2012 | 50 | 0.06 | 216 | 223 | 44 | 848.00 |
| Assist in the development of textile designs | JUL | VART5904C | 25-06-2012 | 31-08-2012 | 02-11-2012 | 50 | 0.06 | 216 | 223 | 44 | 848.00 |
| Analyse use of colour in textiles | JUL | VART5905C | 25-06-2012 | 31-08-2012 | 02-11-2012 | 30 | 0.03 | 130 | 134 | 27 | 508.80 |
| Produce knitted textile samples | JUL | VART5906C | 25-06-2012 | 31-08-2012 | 02-11-2012 | 80 | 0.09 | 346 | 357 | 71 | 1,356.80 |
| Produce woven textile samples | JUL | VART5907C | 25-06-2012 | 31-08-2012 | 02-11-2012 | 80 | 0.09 | 346 | 357 | 71 | 1,356.80 |
| Produce screen printed textiles | JUL | MANU5921C | 25-06-2012 | 31-08-2012 | 02-11-2012 | 80 | 0.09 | 346 | 357 | 71 | 1,356.80 |
| Prepare stencils and screens for textile printing | JUL | MANU5922C | 25-06-2012 | 31-08-2012 | 02-11-2012 | 60 | 0.07 | 260 | 268 | 53 | 1,017.60 |
| Source textile materials and resources | JUL | MANU5923C | 25-06-2012 | 31-08-2012 | 02-11-2012 | 20 | 0.02 | 87 | 89 | 18 | 339.20 |
| Present and promote textile design concepts | JUL | VART5909C | 25-06-2012 | 31-08-2012 | 02-11-2012 | 50 | 0.06 | 216 | 223 | 44 | 848.00 |
| Apply manipulation techniques to create experimental textile samples | JUL | VART5910C | 25-06-2012 | 31-08-2012 | 02-11-2012 | 60 | 0.07 | 260 | 268 | 53 | 1,017.60 |
| Perform industrial sewing on textile products | JUL | GRAP5215C | 25-06-2012 | 31-08-2012 | 02-11-2012 | 50 | 0.06 | 216 | 223 | 44 | 848.00 |
| Implement and monitor environmentally sustainable work practices | JUL | OHTH5461C | 25-06-2012 | 31-08-2012 | 02-11-2012 | 40 | 0.04 | 173 | 178 | 36 | 678.40 |
| Market design product to local outlets | JUL | MKTG5769C | 25-06-2012 | 31-08-2012 | 02-11-2012 | 30 | 0.03 | 130 | 134 | 27 | 508.80 |
| Communicate and sell design concepts | JUL | VART5913C | 25-06-2012 | 31-08-2012 | 02-11-2012 | 30 | 0.03 | 130 | 134 | 27 | 508.80 |
| Communicate and sell design concepts | JUL | VART5913C | 25-06-2012 | 31-08-2012 | 16-11-2012 | 30 | 0.03 | 130 | 134 | 27 | 508.80 |
| Exhibit textile designs or products | JUL | VART5918C | 25-06-2012 | 31-08-2012 | 02-11-2012 | 50 | 0.06 | 216 | 223 | 44 | 848.00 |
| Cost production of textile designs | JUL | BUSM6204C | 25-06-2012 | 31-08-2012 | 02-11-2012 | 20 | 0.02 | 87 | 89 | 18 | 339.20 |
| Enhance, manipulate and output photoimages | JUL | VART5919C | 25-06-2012 | 31-08-2012 | 02-11-2012 | 80 | 0.09 | 346 | 357 | 71 | 1,356.80 |
| Research and evaluate processes and products | JUL | GRAP5217C | 25-06-2012 | 31-08-2012 | 16-11-2012 | 80 | 0.09 | 346 | 357 | 71 | 1,356.80 |
| Manage quality system and procedures | JUL | BUSM6207C | 25-06-2012 | 31-08-2012 | 16-11-2012 | 80 | 0.09 | 346 | 357 | 71 | 1,356.80 |
| Participate in production planning processes | JUL | GRAP5232C | 25-06-2012 | 31-08-2012 | 02-11-2012 | 70 | 0.08 | 303 | 312 | 62 | 1,187.20 |
| Apply techniques to produce drawings | JUL | VART5932C | 25-06-2012 | 31-08-2012 | 02-11-2012 | 50 | 0.06 | 216 | 223 | 44 | 848.00 |
| Participate in environmentally sustainable work practices | JUL | EASC5049C | 02-07-2012 | 31-08-2012 | 01-10-2012 | 30 | 0.03 | 130 | 134 | 27 | 508.80 |
| Participate in environmentally sustainable work practices | JUL | EASC5049C | 11-07-2012 | 31-08-2012 | 07-12-2012 | 30 | 0.03 | 130 | 134 | 27 | 508.80 |
| Participate in environmentally sustainable work practices | JUL | EASC5049C | 25-06-2012 | 31-08-2012 | 02-11-2012 | 30 | 0.03 | 130 | 134 | 27 | 508.80 |
| Participate in environmentally sustainable work practices | JUL | EASC5049C | 25-06-2012 | 31-08-2012 | 16-11-2012 | 30 | 0.03 | 130 | 134 | 27 | 508.80 |
| Participate in environmentally sustainable work practices | JUL | EASC5049C | 25-07-2012 | 31-08-2012 | 23-11-2012 | 30 | 0.03 | 130 | 134 | 27 | 508.80 |
| Work in the Textiles, Clothing and Footwear industry | OCT | EMPL5588C | 15-10-2012 | 30-11-2012 | 23-11-2012 | 40 | 0.04 | 173 | 178 | 36 | 678.40 |
| Perform industrial sewing on textile products | OCT | GRAP5215C | 15-10-2012 | 30-11-2012 | 23-11-2012 | 50 | 0.06 | 216 | 223 | 44 | 848.00 |
| Participate in environmentally sustainable work practices | OCT | EASC5049C | 15-10-2012 | 30-11-2012 | 23-11-2012 | 30 | 0.03 | 130 | 134 | 27 | 508.80 |
| Organise and plan own work to achieve planned outcomes | SEP | MANU5919C | 03-09-2012 | 31-10-2012 | 03-12-2012 | 30 | 0.03 | 130 | 134 | 27 | 508.80 |
* EFTSL : Equivalent Full Time Study Load
** Concession fees are only available at diploma and advanced diploma level for indigenous students.
Back to Program List
| Unit Of Study (Course) | Session | Course Code | Commencement Date | Census Date | Completion Date | Student Contact Hours (SCH) | EFTSL* | Tuition Fee: Onsite|Distance|RPL | |||
| Government Subsidised Fee | Full Fee (Non Government Subsidised) | ||||||||||
| Program commenced 1 July 2009-30 June 2012 ($) | Program commenced 1 July 2012-31 December 2012 ($) | Program commenced 1 July 2012-31 December 2012 Concession ** ($) | Australian Full Fee Paying ($) | ||||||||
| Apply OHS practices in the workplace | AUG | OHTH5464C | 08-08-2012 | 30-09-2012 | 21-12-2012 | 20 | 0.02 | 87 | 66 | 13 | 257.40 |
| Apply OHS practices in the workplace | AUG | OHTH5464C | 28-08-2012 | 30-09-2012 | 21-12-2012 | 20 | 0.02 | 87 | 66 | 13 | 257.40 |
| Participate in development and follow a personal competency development plan | AUG | BUSM6211C | 21-08-2012 | 30-09-2012 | 21-12-2012 | 20 | 0.02 | 87 | 66 | 13 | 257.40 |
| Participate in development and follow a personal competency development plan | AUG | BUSM6211C | 30-08-2012 | 30-09-2012 | 21-12-2012 | 20 | 0.02 | 87 | 66 | 13 | 257.40 |
| Dismantle, assemble and fabricate electrotechnology components | AUG | EEET6747C | 13-08-2012 | 30-09-2012 | 09-11-2012 | 40 | 0.04 | 173 | 131 | 26 | 514.80 |
| Fix and secure equipment | AUG | EEET6748C | 13-08-2012 | 30-09-2012 | 09-11-2012 | 20 | 0.02 | 87 | 66 | 13 | 257.40 |
| Use drawings, diagrams, schedules and manuals | AUG | EEET6749C | 13-08-2012 | 30-09-2012 | 09-11-2012 | 40 | 0.04 | 173 | 131 | 26 | 514.80 |
| Use drawings, diagrams, schedules and manuals | AUG | EEET6749C | 13-08-2012 | 30-09-2012 | 14-12-2012 | 40 | 0.04 | 173 | 131 | 26 | 514.80 |
| Troubleshoot frequency dependent circuits | AUG | EEET6753C | 27-08-2012 | 30-09-2012 | 21-12-2012 | 80 | 0.08 | 346 | 262 | 53 | 1,029.60 |
| Apply OHS practices in the workplace | CY2 | OHTH5464C | 01-08-2012 | 31-03-2013 | 31-07-2013 | 20 | 0.02 | 87 | 66 | 13 | 257.40 |
| Apply OHS practices in the workplace | CY2 | OHTH5464C | 02-07-2012 | 31-03-2013 | 28-06-2013 | 20 | 0.02 | 87 | 66 | 13 | 257.40 |
| Apply OHS practices in the workplace | CY2 | OHTH5464C | 16-07-2012 | 31-03-2013 | 26-04-2013 | 20 | 0.02 | 87 | 66 | 13 | 257.40 |
| Apply OHS practices in the workplace | CY2 | OHTH5464C | 25-06-2012 | 31-03-2013 | 28-06-2013 | 20 | 0.02 | 87 | 66 | 13 | 257.40 |
| Participate in development and follow a personal competency development plan | CY2 | BUSM6211C | 27-09-2012 | 31-03-2013 | 26-09-2013 | 20 | 0.02 | 87 | 66 | 13 | 257.40 |
| Dismantle, assemble and fabricate electrotechnology components | CY2 | EEET6747C | 01-08-2012 | 31-03-2013 | 31-07-2013 | 40 | 0.04 | 173 | 131 | 26 | 514.80 |
| Dismantle, assemble and fabricate electrotechnology components | CY2 | EEET6747C | 02-07-2012 | 31-03-2013 | 28-06-2013 | 40 | 0.04 | 173 | 131 | 26 | 514.80 |
| Dismantle, assemble and fabricate electrotechnology components | CY2 | EEET6747C | 16-07-2012 | 31-03-2013 | 28-02-2013 | 40 | 0.04 | 173 | 131 | 26 | 514.80 |
| Dismantle, assemble and fabricate electrotechnology components | CY2 | EEET6747C | 16-07-2012 | 31-03-2013 | 31-05-2013 | 40 | 0.04 | 173 | 131 | 26 | 514.80 |
| Dismantle, assemble and fabricate electrotechnology components | CY2 | EEET6747C | 25-06-2012 | 31-03-2013 | 28-06-2013 | 40 | 0.04 | 173 | 131 | 26 | 514.80 |
| Fix and secure equipment | CY2 | EEET6748C | 01-08-2012 | 31-03-2013 | 31-07-2013 | 20 | 0.02 | 87 | 66 | 13 | 257.40 |
| Fix and secure equipment | CY2 | EEET6748C | 02-07-2012 | 31-03-2013 | 28-06-2013 | 20 | 0.02 | 87 | 66 | 13 | 257.40 |
| Fix and secure equipment | CY2 | EEET6748C | 16-07-2012 | 31-03-2013 | 26-04-2013 | 20 | 0.02 | 87 | 66 | 13 | 257.40 |
| Fix and secure equipment | CY2 | EEET6748C | 16-07-2012 | 31-03-2013 | 31-05-2013 | 20 | 0.02 | 87 | 66 | 13 | 257.40 |
| Fix and secure equipment | CY2 | EEET6748C | 25-06-2012 | 31-03-2013 | 28-06-2013 | 20 | 0.02 | 87 | 66 | 13 | 257.40 |
| Use drawings, diagrams, schedules and manuals | CY2 | EEET6749C | 01-08-2012 | 31-03-2013 | 31-07-2013 | 40 | 0.04 | 173 | 131 | 26 | 514.80 |
| Use drawings, diagrams, schedules and manuals | CY2 | EEET6749C | 02-07-2012 | 31-03-2013 | 28-06-2013 | 40 | 0.04 | 173 | 131 | 26 | 514.80 |
| Use drawings, diagrams, schedules and manuals | CY2 | EEET6749C | 16-07-2012 | 31-03-2013 | 26-04-2013 | 40 | 0.04 | 173 | 131 | 26 | 514.80 |
| Use drawings, diagrams, schedules and manuals | CY2 | EEET6749C | 16-07-2012 | 31-03-2013 | 28-02-2013 | 40 | 0.04 | 173 | 131 | 26 | 514.80 |
| Use drawings, diagrams, schedules and manuals | CY2 | EEET6749C | 16-07-2012 | 31-03-2013 | 31-05-2013 | 40 | 0.04 | 173 | 131 | 26 | 514.80 |
| Use drawings, diagrams, schedules and manuals | CY2 | EEET6749C | 19-10-2012 | 31-03-2013 | 28-02-2013 | 40 | 0.04 | 173 | 131 | 26 | 514.80 |
| Use drawings, diagrams, schedules and manuals | CY2 | EEET6749C | 25-06-2012 | 31-03-2013 | 28-06-2013 | 40 | 0.04 | 173 | 131 | 26 | 514.80 |
| Ensure team effectiveness | JUL | EMPL5620C | 25-06-2012 | 31-08-2012 | 09-11-2012 | 60 | 0.06 | 260 | 197 | 40 | 772.20 |
| Apply OHS practices in the workplace | JUL | OHTH5464C | 16-07-2012 | 31-08-2012 | 14-12-2012 | 20 | 0.02 | 87 | 66 | 13 | 257.40 |
| Apply OHS practices in the workplace | JUL | OHTH5464C | 16-07-2012 | 31-08-2012 | 21-12-2012 | 20 | 0.02 | 87 | 66 | 13 | 257.40 |
| Apply OHS practices in the workplace | JUL | OHTH5464C | 18-07-2012 | 31-08-2012 | 21-12-2012 | 20 | 0.02 | 87 | 66 | 13 | 257.40 |
| Apply OHS practices in the workplace | JUL | OHTH5464C | 25-06-2012 | 31-08-2012 | 09-11-2012 | 20 | 0.02 | 87 | 66 | 13 | 257.40 |
| Apply OHS practices in the workplace | JUL | OHTH5464C | 25-06-2012 | 31-08-2012 | 14-12-2012 | 20 | 0.02 | 87 | 66 | 13 | 257.40 |
| Develop design briefs for electrotechnology projects | JUL | EEET6740C | 25-06-2012 | 31-08-2012 | 09-11-2012 | 40 | 0.04 | 173 | 131 | 26 | 514.80 |
| Implement and monitor OHS policies and procedures | JUL | OHTH5465C | 19-07-2012 | 31-08-2012 | 18-10-2012 | 20 | 0.02 | 87 | 66 | 13 | 257.40 |
| Implement and monitor OHS policies and procedures | JUL | OHTH5465C | 25-06-2012 | 31-08-2012 | 09-11-2012 | 20 | 0.02 | 87 | 66 | 13 | 257.40 |
| Implement and monitor OHS policies and procedures | JUL | OHTH5465C | 25-06-2012 | 31-08-2012 | 14-12-2012 | 20 | 0.02 | 87 | 66 | 13 | 257.40 |
| Document occupational hazards and risks in electronics | JUL | OHTH5466C | 25-06-2012 | 31-08-2012 | 09-11-2012 | 20 | 0.02 | 87 | 66 | 13 | 257.40 |
| Document occupational hazards and risks in electronics | JUL | OHTH5466C | 25-06-2012 | 31-08-2012 | 14-12-2012 | 20 | 0.02 | 87 | 66 | 13 | 257.40 |
| Participate in development and follow a personal competency development plan | JUL | BUSM6211C | 19-07-2012 | 31-08-2012 | 18-10-2012 | 20 | 0.02 | 87 | 66 | 13 | 257.40 |
| Participate in development and follow a personal competency development plan | JUL | BUSM6211C | 25-06-2012 | 31-08-2012 | 09-11-2012 | 20 | 0.02 | 87 | 66 | 13 | 257.40 |
| Participate in development and follow a personal competency development plan | JUL | BUSM6211C | 25-06-2012 | 31-08-2012 | 14-12-2012 | 20 | 0.02 | 87 | 66 | 13 | 257.40 |
| Participate in development and follow a personal competency development plan | JUL | BUSM6211C | 25-07-2012 | 31-08-2012 | 21-12-2012 | 20 | 0.02 | 87 | 66 | 13 | 257.40 |
| Contribute to risk management in electrotechnology systems | JUL | BUSM6212C | 25-06-2012 | 31-08-2012 | 09-11-2012 | 20 | 0.02 | 87 | 66 | 13 | 257.40 |
| Manage electronics/computer systems projects | JUL | BUSM6213C | 25-06-2012 | 31-08-2012 | 09-11-2012 | 40 | 0.04 | 173 | 131 | 26 | 514.80 |
| Commission electronics and communications systems | JUL | EEET6741C | 25-06-2012 | 31-08-2012 | 09-11-2012 | 20 | 0.02 | 87 | 66 | 13 | 257.40 |
| Commission electronics and communications systems | JUL | EEET6741C | 25-06-2012 | 31-08-2012 | 14-12-2012 | 20 | 0.02 | 87 | 66 | 13 | 257.40 |
| Modify-redesign of electronics and communications system | JUL | EEET6742C | 25-06-2012 | 31-08-2012 | 09-11-2012 | 20 | 0.02 | 87 | 66 | 13 | 257.40 |
| Modify-redesign of electronics and communications system | JUL | EEET6742C | 25-06-2012 | 31-08-2012 | 14-12-2012 | 20 | 0.02 | 87 | 66 | 13 | 257.40 |
| Design and develop electronics/computer systems projects | JUL | EEET6743C | 25-06-2012 | 31-08-2012 | 09-11-2012 | 40 | 0.04 | 173 | 131 | 26 | 514.80 |
| Facilitate continuous improvement | JUL | BUSM6215C | 25-06-2012 | 31-08-2012 | 14-12-2012 | 60 | 0.06 | 260 | 197 | 40 | 772.20 |
| Use engineering applications software | JUL | ISYS5662C | 25-06-2012 | 31-08-2012 | 09-11-2012 | 40 | 0.04 | 173 | 131 | 26 | 514.80 |
| Enter and verify operating instructions in microprocessor equipped devices | JUL | EEET6744C | 25-06-2012 | 31-08-2012 | 09-11-2012 | 20 | 0.02 | 87 | 66 | 13 | 257.40 |
| Enter and verify operating instructions in microprocessor equipped devices | JUL | EEET6744C | 25-06-2012 | 31-08-2012 | 14-12-2012 | 20 | 0.02 | 87 | 66 | 13 | 257.40 |
| Develop and test code for microcontroller devices | JUL | EEET6745C | 25-06-2012 | 31-08-2012 | 09-11-2012 | 60 | 0.06 | 260 | 197 | 40 | 772.20 |
| Provide programming solution for engineering problems | JUL | ISYS5663C | 25-06-2012 | 31-08-2012 | 09-11-2012 | 60 | 0.06 | 260 | 197 | 40 | 772.20 |
| Design embedded controller systems | JUL | EEET6746C | 25-06-2012 | 31-08-2012 | 09-11-2012 | 80 | 0.08 | 346 | 262 | 53 | 1,029.60 |
| Dismantle, assemble and fabricate electrotechnology components | JUL | EEET6747C | 16-07-2012 | 31-08-2012 | 10-10-2012 | 40 | 0.04 | 173 | 131 | 26 | 514.80 |
| Dismantle, assemble and fabricate electrotechnology components | JUL | EEET6747C | 25-06-2012 | 31-08-2012 | 09-11-2012 | 40 | 0.04 | 173 | 131 | 26 | 514.80 |
| Dismantle, assemble and fabricate electrotechnology components | JUL | EEET6747C | 25-06-2012 | 31-08-2012 | 14-12-2012 | 40 | 0.04 | 173 | 131 | 26 | 514.80 |
| Dismantle, assemble and fabricate electrotechnology components | JUL | EEET6747C | 25-07-2012 | 31-08-2012 | 17-10-2012 | 40 | 0.04 | 173 | 131 | 26 | 514.80 |
| Fix and secure equipment | JUL | EEET6748C | 02-07-2012 | 31-08-2012 | 09-11-2012 | 20 | 0.02 | 87 | 66 | 13 | 257.40 |
| Fix and secure equipment | JUL | EEET6748C | 16-07-2012 | 31-08-2012 | 12-10-2012 | 20 | 0.02 | 87 | 66 | 13 | 257.40 |
| Fix and secure equipment | JUL | EEET6748C | 16-07-2012 | 31-08-2012 | 14-12-2012 | 20 | 0.02 | 87 | 66 | 13 | 257.40 |
| Fix and secure equipment | JUL | EEET6748C | 25-06-2012 | 31-08-2012 | 14-12-2012 | 20 | 0.02 | 87 | 66 | 13 | 257.40 |
| Fix and secure equipment | JUL | EEET6748C | 25-07-2012 | 31-08-2012 | 17-10-2012 | 20 | 0.02 | 87 | 66 | 13 | 257.40 |
| Use drawings, diagrams, schedules and manuals | JUL | EEET6749C | 16-07-2012 | 31-08-2012 | 12-10-2012 | 40 | 0.04 | 173 | 131 | 26 | 514.80 |
| Use drawings, diagrams, schedules and manuals | JUL | EEET6749C | 16-07-2012 | 31-08-2012 | 14-12-2012 | 40 | 0.04 | 173 | 131 | 26 | 514.80 |
| Use drawings, diagrams, schedules and manuals | JUL | EEET6749C | 25-06-2012 | 31-08-2012 | 09-11-2012 | 40 | 0.04 | 173 | 131 | 26 | 514.80 |
| Use drawings, diagrams, schedules and manuals | JUL | EEET6749C | 25-07-2012 | 31-08-2012 | 17-10-2012 | 40 | 0.04 | 173 | 131 | 26 | 514.80 |
| Carry out basic repairs to electronic apparatus by replacement of components | JUL | EEET6750C | 25-06-2012 | 31-08-2012 | 09-11-2012 | 40 | 0.04 | 173 | 131 | 26 | 514.80 |
| Carry out basic repairs to electronic apparatus by replacement of components | JUL | EEET6750C | 25-06-2012 | 31-08-2012 | 14-12-2012 | 40 | 0.04 | 173 | 131 | 26 | 514.80 |
| Troubleshoot digital subsystems | JUL | EEET6751C | 25-06-2012 | 31-08-2012 | 09-11-2012 | 80 | 0.08 | 346 | 262 | 53 | 1,029.60 |
| Troubleshoot digital subsystems | JUL | EEET6751C | 25-06-2012 | 31-08-2012 | 14-12-2012 | 80 | 0.08 | 346 | 262 | 53 | 1,029.60 |
| Troubleshoot amplifiers | JUL | EEET6752C | 25-06-2012 | 31-08-2012 | 09-11-2012 | 80 | 0.08 | 346 | 262 | 53 | 1,029.60 |
| Troubleshoot amplifiers | JUL | EEET6752C | 25-06-2012 | 31-08-2012 | 14-12-2012 | 80 | 0.08 | 346 | 262 | 53 | 1,029.60 |
| Troubleshoot frequency dependent circuits | JUL | EEET6753C | 19-07-2012 | 31-08-2012 | 18-10-2012 | 80 | 0.08 | 346 | 262 | 53 | 1,029.60 |
| Troubleshoot frequency dependent circuits | JUL | EEET6753C | 25-06-2012 | 31-08-2012 | 09-11-2012 | 80 | 0.08 | 346 | 262 | 53 | 1,029.60 |
| Troubleshoot frequency dependent circuits | JUL | EEET6753C | 25-06-2012 | 31-08-2012 | 14-12-2012 | 80 | 0.08 | 346 | 262 | 53 | 1,029.60 |
| Diagnose and rectify faults in global positioning systems | JUL | EEET6755C | 25-06-2012 | 31-08-2012 | 09-11-2012 | 60 | 0.06 | 260 | 197 | 40 | 772.20 |
| Troubleshoot basic amplifiers | JUL | EEET6757C | 25-06-2012 | 31-08-2012 | 09-11-2012 | 40 | 0.04 | 173 | 131 | 26 | 514.80 |
| Troubleshoot basic amplifiers | JUL | EEET6757C | 25-06-2012 | 31-08-2012 | 14-12-2012 | 40 | 0.04 | 173 | 131 | 26 | 514.80 |
| Solve fundamental problems in electronic communications systems | JUL | EEET6759C | 25-06-2012 | 31-08-2012 | 09-11-2012 | 40 | 0.04 | 173 | 131 | 26 | 514.80 |
| Solve fundamental problems in electronic communications systems | JUL | EEET6759C | 25-06-2012 | 31-08-2012 | 14-12-2012 | 40 | 0.04 | 173 | 131 | 26 | 514.80 |
| Solve problems in electronic circuits | JUL | EEET6761C | 25-06-2012 | 31-08-2012 | 09-11-2012 | 100 | 0.10 | 433 | 328 | 66 | 1,287.00 |
| Terminate and connect components, conductors, wiring and cables for electronic circuits | JUL | EEET6762C | 25-06-2012 | 31-08-2012 | 09-11-2012 | 40 | 0.04 | 173 | 131 | 26 | 514.80 |
| Design printed circuit boards | JUL | EEET6764C | 25-06-2012 | 31-08-2012 | 09-11-2012 | 40 | 0.04 | 173 | 131 | 26 | 514.80 |
| Develop solutions to RF amplifiers problems | JUL | EEET6765C | 25-06-2012 | 31-08-2012 | 09-11-2012 | 40 | 0.04 | 173 | 131 | 26 | 514.80 |
| Use advanced computational processes to provide solutions to engineering problems | JUL | EEET6769C | 25-06-2012 | 31-08-2012 | 09-11-2012 | 80 | 0.08 | 346 | 262 | 53 | 1,029.60 |
| Modify DSP based sub-systems | JUL | EEET6774C | 25-06-2012 | 31-08-2012 | 09-11-2012 | 80 | 0.08 | 346 | 262 | 53 | 1,029.60 |
| Use drawings, diagrams, schedules and manuals | NOV | EEET6749C | 02-11-2012 | 31-12-2012 | 21-12-2012 | 40 | 0.04 | 173 | 131 | 26 | 514.80 |
| Manage workplace information systems | OCT | BUSM6214C | 24-10-2012 | 30-11-2012 | 15-11-2012 | 60 | 0.06 | 260 | 197 | 40 | 772.20 |
| Fix and secure equipment | OCT | EEET6748C | 08-10-2012 | 30-11-2012 | 14-12-2012 | 20 | 0.02 | 87 | 66 | 13 | 257.40 |
| Use drawings, diagrams, schedules and manuals | OCT | EEET6749C | 22-10-2012 | 30-11-2012 | 14-12-2012 | 40 | 0.04 | 173 | 131 | 26 | 514.80 |
| Implement and monitor OHS policies and procedures | SEP | OHTH5465C | 06-09-2012 | 31-10-2012 | 21-12-2012 | 20 | 0.02 | 87 | 66 | 13 | 257.40 |
| Implement and monitor OHS policies and procedures | SEP | OHTH5465C | 13-09-2012 | 31-10-2012 | 21-12-2012 | 20 | 0.02 | 87 | 66 | 13 | 257.40 |
| Implement and monitor OHS policies and procedures | SEP | OHTH5465C | 24-09-2012 | 31-10-2012 | 02-11-2012 | 20 | 0.02 | 87 | 66 | 13 | 257.40 |
| Participate in development and follow a personal competency development plan | SEP | BUSM6211C | 06-09-2012 | 31-10-2012 | 21-12-2012 | 20 | 0.02 | 87 | 66 | 13 | 257.40 |
| Participate in development and follow a personal competency development plan | SEP | BUSM6211C | 13-09-2012 | 31-10-2012 | 21-12-2012 | 20 | 0.02 | 87 | 66 | 13 | 257.40 |
| Participate in development and follow a personal competency development plan | SEP | BUSM6211C | 24-09-2012 | 31-10-2012 | 02-11-2012 | 20 | 0.02 | 87 | 66 | 13 | 257.40 |
| Use drawings, diagrams, schedules and manuals | SEP | EEET6749C | 03-09-2012 | 31-10-2012 | 07-09-2012 | 40 | 0.04 | 173 | 131 | 26 | 514.80 |
| Use drawings, diagrams, schedules and manuals | SEP | EEET6749C | 03-09-2012 | 31-10-2012 | 14-12-2012 | 40 | 0.04 | 173 | 131 | 26 | 514.80 |
| Use drawings, diagrams, schedules and manuals | SEP | EEET6749C | 05-09-2012 | 31-10-2012 | 17-10-2012 | 40 | 0.04 | 173 | 131 | 26 | 514.80 |
| Develop software solutions in microcontroller based systems | SEP | ISYS5665C | 24-09-2012 | 31-10-2012 | 09-11-2012 | 60 | 0.06 | 260 | 197 | 40 | 772.20 |
| Develop solutions to analogue electronic problems | SEP | EEET6758C | 24-09-2012 | 31-10-2012 | 09-11-2012 | 80 | 0.08 | 346 | 262 | 53 | 1,029.60 |
| Design and develop advanced digital systems | SEP | EEET6760C | 24-09-2012 | 31-10-2012 | 09-11-2012 | 40 | 0.04 | 173 | 131 | 26 | 514.80 |
* EFTSL : Equivalent Full Time Study Load
** Concession fees are only available at diploma and advanced diploma level for indigenous students.
Back to Program List
| Unit Of Study (Course) | Session | Course Code | Commencement Date | Census Date | Completion Date | Student Contact Hours (SCH) | EFTSL* | Tuition Fee: Onsite|Distance|RPL | |||
| Government Subsidised Fee | Full Fee (Non Government Subsidised) | ||||||||||
| Program commenced 1 July 2009-30 June 2012 ($) | Program commenced 1 July 2012-31 December 2012 ($) | Program commenced 1 July 2012-31 December 2012 Concession ** ($) | Australian Full Fee Paying ($) | ||||||||
| Apply OHS practices in the workplace | AUG | OHTH5464C | 08-08-2012 | 30-09-2012 | 21-12-2012 | 20 | 0.02 | 87 | 51 | 10 | 257.40 |
| Apply OHS practices in the workplace | AUG | OHTH5464C | 28-08-2012 | 30-09-2012 | 21-12-2012 | 20 | 0.02 | 87 | 51 | 10 | 257.40 |
| Participate in development and follow a personal competency development plan | AUG | BUSM6211C | 21-08-2012 | 30-09-2012 | 21-12-2012 | 20 | 0.02 | 87 | 51 | 10 | 257.40 |
| Participate in development and follow a personal competency development plan | AUG | BUSM6211C | 30-08-2012 | 30-09-2012 | 21-12-2012 | 20 | 0.02 | 87 | 51 | 10 | 257.40 |
| Dismantle, assemble and fabricate electrotechnology components | AUG | EEET6747C | 13-08-2012 | 30-09-2012 | 09-11-2012 | 40 | 0.04 | 173 | 101 | 20 | 514.80 |
| Install and administer Unix based computers | AUG | ISYS5671C | 13-08-2012 | 30-09-2012 | 09-11-2012 | 80 | 0.08 | 346 | 202 | 41 | 1,029.60 |
| Solve problems in extra-low voltage single path circuits | AUG | EEET6775C | 13-08-2012 | 30-09-2012 | 09-11-2012 | 40 | 0.04 | 173 | 101 | 20 | 514.80 |
| Solve problems in extra-low voltage single path circuits | AUG | EEET6775C | 13-08-2012 | 30-09-2012 | 14-12-2012 | 40 | 0.04 | 173 | 101 | 20 | 514.80 |
| Apply OHS practices in the workplace | CY2 | OHTH5464C | 01-08-2012 | 31-03-2013 | 31-07-2013 | 20 | 0.02 | 87 | 51 | 10 | 257.40 |
| Apply OHS practices in the workplace | CY2 | OHTH5464C | 02-07-2012 | 31-03-2013 | 28-06-2013 | 20 | 0.02 | 87 | 51 | 10 | 257.40 |
| Apply OHS practices in the workplace | CY2 | OHTH5464C | 16-07-2012 | 31-03-2013 | 26-04-2013 | 20 | 0.02 | 87 | 51 | 10 | 257.40 |
| Apply OHS practices in the workplace | CY2 | OHTH5464C | 25-06-2012 | 31-03-2013 | 28-06-2013 | 20 | 0.02 | 87 | 51 | 10 | 257.40 |
| Participate in development and follow a personal competency development plan | CY2 | BUSM6211C | 27-09-2012 | 31-03-2013 | 26-09-2013 | 20 | 0.02 | 87 | 51 | 10 | 257.40 |
| Dismantle, assemble and fabricate electrotechnology components | CY2 | EEET6747C | 01-08-2012 | 31-03-2013 | 31-07-2013 | 40 | 0.04 | 173 | 101 | 20 | 514.80 |
| Dismantle, assemble and fabricate electrotechnology components | CY2 | EEET6747C | 02-07-2012 | 31-03-2013 | 28-06-2013 | 40 | 0.04 | 173 | 101 | 20 | 514.80 |
| Dismantle, assemble and fabricate electrotechnology components | CY2 | EEET6747C | 16-07-2012 | 31-03-2013 | 28-02-2013 | 40 | 0.04 | 173 | 101 | 20 | 514.80 |
| Dismantle, assemble and fabricate electrotechnology components | CY2 | EEET6747C | 16-07-2012 | 31-03-2013 | 31-05-2013 | 40 | 0.04 | 173 | 101 | 20 | 514.80 |
| Dismantle, assemble and fabricate electrotechnology components | CY2 | EEET6747C | 25-06-2012 | 31-03-2013 | 28-06-2013 | 40 | 0.04 | 173 | 101 | 20 | 514.80 |
| Solve problems in extra-low voltage single path circuits | CY2 | EEET6775C | 01-08-2012 | 31-03-2013 | 31-07-2013 | 40 | 0.04 | 173 | 101 | 20 | 514.80 |
| Solve problems in extra-low voltage single path circuits | CY2 | EEET6775C | 02-07-2012 | 31-03-2013 | 28-06-2013 | 40 | 0.04 | 173 | 101 | 20 | 514.80 |
| Solve problems in extra-low voltage single path circuits | CY2 | EEET6775C | 16-07-2012 | 31-03-2013 | 26-04-2013 | 40 | 0.04 | 173 | 101 | 20 | 514.80 |
| Solve problems in extra-low voltage single path circuits | CY2 | EEET6775C | 16-07-2012 | 31-03-2013 | 28-02-2013 | 40 | 0.04 | 173 | 101 | 20 | 514.80 |
| Solve problems in extra-low voltage single path circuits | CY2 | EEET6775C | 16-07-2012 | 31-03-2013 | 31-05-2013 | 40 | 0.04 | 173 | 101 | 20 | 514.80 |
| Solve problems in extra-low voltage single path circuits | CY2 | EEET6775C | 19-10-2012 | 31-03-2013 | 28-02-2013 | 40 | 0.04 | 173 | 101 | 20 | 514.80 |
| Solve problems in extra-low voltage single path circuits | CY2 | EEET6775C | 25-06-2012 | 31-03-2013 | 28-06-2013 | 40 | 0.04 | 173 | 101 | 20 | 514.80 |
| Ensure team effectiveness | JUL | EMPL5620C | 25-06-2012 | 31-08-2012 | 09-11-2012 | 60 | 0.06 | 260 | 152 | 31 | 772.20 |
| Apply OHS practices in the workplace | JUL | OHTH5464C | 16-07-2012 | 31-08-2012 | 14-12-2012 | 20 | 0.02 | 87 | 51 | 10 | 257.40 |
| Apply OHS practices in the workplace | JUL | OHTH5464C | 16-07-2012 | 31-08-2012 | 21-12-2012 | 20 | 0.02 | 87 | 51 | 10 | 257.40 |
| Apply OHS practices in the workplace | JUL | OHTH5464C | 18-07-2012 | 31-08-2012 | 21-12-2012 | 20 | 0.02 | 87 | 51 | 10 | 257.40 |
| Apply OHS practices in the workplace | JUL | OHTH5464C | 25-06-2012 | 31-08-2012 | 09-11-2012 | 20 | 0.02 | 87 | 51 | 10 | 257.40 |
| Apply OHS practices in the workplace | JUL | OHTH5464C | 25-06-2012 | 31-08-2012 | 14-12-2012 | 20 | 0.02 | 87 | 51 | 10 | 257.40 |
| Develop design briefs for electrotechnology projects | JUL | EEET6740C | 25-06-2012 | 31-08-2012 | 09-11-2012 | 40 | 0.04 | 173 | 101 | 20 | 514.80 |
| Implement and monitor OHS policies and procedures | JUL | OHTH5465C | 19-07-2012 | 31-08-2012 | 18-10-2012 | 20 | 0.02 | 87 | 51 | 10 | 257.40 |
| Implement and monitor OHS policies and procedures | JUL | OHTH5465C | 25-06-2012 | 31-08-2012 | 09-11-2012 | 20 | 0.02 | 87 | 51 | 10 | 257.40 |
| Implement and monitor OHS policies and procedures | JUL | OHTH5465C | 25-06-2012 | 31-08-2012 | 14-12-2012 | 20 | 0.02 | 87 | 51 | 10 | 257.40 |
| Participate in development and follow a personal competency development plan | JUL | BUSM6211C | 19-07-2012 | 31-08-2012 | 18-10-2012 | 20 | 0.02 | 87 | 51 | 10 | 257.40 |
| Participate in development and follow a personal competency development plan | JUL | BUSM6211C | 25-06-2012 | 31-08-2012 | 09-11-2012 | 20 | 0.02 | 87 | 51 | 10 | 257.40 |
| Participate in development and follow a personal competency development plan | JUL | BUSM6211C | 25-06-2012 | 31-08-2012 | 14-12-2012 | 20 | 0.02 | 87 | 51 | 10 | 257.40 |
| Participate in development and follow a personal competency development plan | JUL | BUSM6211C | 25-07-2012 | 31-08-2012 | 21-12-2012 | 20 | 0.02 | 87 | 51 | 10 | 257.40 |
| Contribute to risk management in electrotechnology systems | JUL | BUSM6212C | 25-06-2012 | 31-08-2012 | 09-11-2012 | 20 | 0.02 | 87 | 51 | 10 | 257.40 |
| Manage electronics/computer systems projects | JUL | BUSM6213C | 25-06-2012 | 31-08-2012 | 09-11-2012 | 40 | 0.04 | 173 | 101 | 20 | 514.80 |
| Design and develop electronics/computer systems projects | JUL | EEET6743C | 25-06-2012 | 31-08-2012 | 09-11-2012 | 40 | 0.04 | 173 | 101 | 20 | 514.80 |
| Facilitate continuous improvement | JUL | BUSM6215C | 25-06-2012 | 31-08-2012 | 14-12-2012 | 60 | 0.06 | 260 | 152 | 31 | 772.20 |
| Use engineering applications software | JUL | ISYS5662C | 25-06-2012 | 31-08-2012 | 09-11-2012 | 40 | 0.04 | 173 | 101 | 20 | 514.80 |
| Develop and test code for microcontroller devices | JUL | EEET6745C | 25-06-2012 | 31-08-2012 | 09-11-2012 | 60 | 0.06 | 260 | 152 | 31 | 772.20 |
| Design embedded controller systems | JUL | EEET6746C | 25-06-2012 | 31-08-2012 | 09-11-2012 | 80 | 0.08 | 346 | 202 | 41 | 1,029.60 |
| Dismantle, assemble and fabricate electrotechnology components | JUL | EEET6747C | 16-07-2012 | 31-08-2012 | 10-10-2012 | 40 | 0.04 | 173 | 101 | 20 | 514.80 |
| Dismantle, assemble and fabricate electrotechnology components | JUL | EEET6747C | 25-06-2012 | 31-08-2012 | 09-11-2012 | 40 | 0.04 | 173 | 101 | 20 | 514.80 |
| Dismantle, assemble and fabricate electrotechnology components | JUL | EEET6747C | 25-06-2012 | 31-08-2012 | 14-12-2012 | 40 | 0.04 | 173 | 101 | 20 | 514.80 |
| Dismantle, assemble and fabricate electrotechnology components | JUL | EEET6747C | 25-07-2012 | 31-08-2012 | 17-10-2012 | 40 | 0.04 | 173 | 101 | 20 | 514.80 |
| Use advanced computational processes to provide solutions to engineering problems | JUL | EEET6769C | 25-06-2012 | 31-08-2012 | 09-11-2012 | 80 | 0.08 | 346 | 202 | 41 | 1,029.60 |
| Modify DSP based sub-systems | JUL | EEET6774C | 25-06-2012 | 31-08-2012 | 09-11-2012 | 80 | 0.08 | 346 | 202 | 41 | 1,029.60 |
| Document occupational hazards and risks in computer systems | JUL | OHTH5468C | 25-06-2012 | 31-08-2012 | 09-11-2012 | 20 | 0.02 | 87 | 51 | 10 | 257.40 |
| Commission computer systems | JUL | ISYS5666C | 25-06-2012 | 31-08-2012 | 09-11-2012 | 20 | 0.02 | 87 | 51 | 10 | 257.40 |
| Modify-redesign of computer system | JUL | ISYS5667C | 25-06-2012 | 31-08-2012 | 09-11-2012 | 20 | 0.02 | 87 | 51 | 10 | 257.40 |
| Assemble, set up and test personal computers | JUL | ISYS5668C | 25-06-2012 | 31-08-2012 | 09-11-2012 | 80 | 0.08 | 346 | 202 | 41 | 1,029.60 |
| Set up and create content for a web server | JUL | ISYS5669C | 02-07-2012 | 31-08-2012 | 09-11-2012 | 120 | 0.12 | 520 | 304 | 61 | 1,544.40 |
| Administer user networks | JUL | ISYS5673C | 25-06-2012 | 31-08-2012 | 09-11-2012 | 80 | 0.08 | 346 | 202 | 41 | 1,029.60 |
| Develop network services | JUL | ISYS5674C | 25-06-2012 | 31-08-2012 | 09-11-2012 | 120 | 0.12 | 520 | 304 | 61 | 1,544.40 |
| Install and configure Internetworking systems | JUL | ISYS5675C | 25-06-2012 | 31-08-2012 | 09-11-2012 | 120 | 0.12 | 520 | 304 | 61 | 1,544.40 |
| Integrate multiple computer operating systems on a client server network | JUL | ISYS5677C | 25-06-2012 | 31-08-2012 | 09-11-2012 | 80 | 0.08 | 346 | 202 | 41 | 1,029.60 |
| Install and configure a computer operating system and software | JUL | ISYS5678C | 25-06-2012 | 31-08-2012 | 09-11-2012 | 40 | 0.04 | 173 | 101 | 20 | 514.80 |
| Solve problems in extra-low voltage single path circuits | JUL | EEET6775C | 16-07-2012 | 31-08-2012 | 12-10-2012 | 40 | 0.04 | 173 | 101 | 20 | 514.80 |
| Solve problems in extra-low voltage single path circuits | JUL | EEET6775C | 16-07-2012 | 31-08-2012 | 14-12-2012 | 40 | 0.04 | 173 | 101 | 20 | 514.80 |
| Solve problems in extra-low voltage single path circuits | JUL | EEET6775C | 25-06-2012 | 31-08-2012 | 09-11-2012 | 40 | 0.04 | 173 | 101 | 20 | 514.80 |
| Solve problems in extra-low voltage single path circuits | JUL | EEET6775C | 25-06-2012 | 31-08-2012 | 14-12-2012 | 40 | 0.04 | 173 | 101 | 20 | 514.80 |
| Design and implement Internetworking systems security | JUL | EEET6779C | 25-06-2012 | 31-08-2012 | 09-11-2012 | 100 | 0.10 | 433 | 253 | 51 | 1,287.00 |
| Set up and configure basic local area network | JUL | ISYS5681C | 25-06-2012 | 31-08-2012 | 09-11-2012 | 40 | 0.04 | 173 | 101 | 20 | 514.80 |
| Manage workplace information systems | OCT | BUSM6214C | 24-10-2012 | 30-11-2012 | 15-11-2012 | 60 | 0.06 | 260 | 152 | 31 | 772.20 |
| Solve problems in extra-low voltage single path circuits | OCT | EEET6775C | 22-10-2012 | 30-11-2012 | 14-12-2012 | 40 | 0.04 | 173 | 101 | 20 | 514.80 |
| Solve problems in extra-low voltage single path circuits | OCT | EEET6775C | 24-10-2012 | 30-11-2012 | 19-12-2012 | 40 | 0.04 | 173 | 101 | 20 | 514.80 |
| Design and implement Internetworking systems wireless LANs/WANs | OCT | ISYS5679C | 01-10-2012 | 30-11-2012 | 09-11-2012 | 100 | 0.10 | 433 | 253 | 51 | 1,287.00 |
| Implement and monitor OHS policies and procedures | SEP | OHTH5465C | 06-09-2012 | 31-10-2012 | 21-12-2012 | 20 | 0.02 | 87 | 51 | 10 | 257.40 |
| Implement and monitor OHS policies and procedures | SEP | OHTH5465C | 13-09-2012 | 31-10-2012 | 21-12-2012 | 20 | 0.02 | 87 | 51 | 10 | 257.40 |
| Implement and monitor OHS policies and procedures | SEP | OHTH5465C | 24-09-2012 | 31-10-2012 | 02-11-2012 | 20 | 0.02 | 87 | 51 | 10 | 257.40 |
| Participate in development and follow a personal competency development plan | SEP | BUSM6211C | 06-09-2012 | 31-10-2012 | 21-12-2012 | 20 | 0.02 | 87 | 51 | 10 | 257.40 |
| Participate in development and follow a personal competency development plan | SEP | BUSM6211C | 13-09-2012 | 31-10-2012 | 21-12-2012 | 20 | 0.02 | 87 | 51 | 10 | 257.40 |
| Participate in development and follow a personal competency development plan | SEP | BUSM6211C | 24-09-2012 | 31-10-2012 | 02-11-2012 | 20 | 0.02 | 87 | 51 | 10 | 257.40 |
* EFTSL : Equivalent Full Time Study Load
** Concession fees are only available at diploma and advanced diploma level for indigenous students.
Back to Program List
| Unit Of Study (Course) | Session | Course Code | Commencement Date | Census Date | Completion Date | Student Contact Hours (SCH) | EFTSL* | Tuition Fee: Onsite|Distance|RPL | |||
| Government Subsidised Fee | Full Fee (Non Government Subsidised) | ||||||||||
| Program commenced 1 July 2009-30 June 2012 ($) | Program commenced 1 July 2012-31 December 2012 ($) | Program commenced 1 July 2012-31 December 2012 Concession ** ($) | Australian Full Fee Paying ($) | ||||||||
| Apply OHS practices in the workplace | AUG | OHTH5464C | 08-08-2012 | 30-09-2012 | 21-12-2012 | 20 | 0.02 | 87 | 63 | 13 | 263.00 |
| Apply OHS practices in the workplace | AUG | OHTH5464C | 28-08-2012 | 30-09-2012 | 21-12-2012 | 20 | 0.02 | 87 | 63 | 13 | 263.00 |
| Participate in development and follow a personal competency development plan | AUG | BUSM6211C | 21-08-2012 | 30-09-2012 | 21-12-2012 | 20 | 0.02 | 87 | 63 | 13 | 263.00 |
| Participate in development and follow a personal competency development plan | AUG | BUSM6211C | 30-08-2012 | 30-09-2012 | 21-12-2012 | 20 | 0.02 | 87 | 63 | 13 | 263.00 |
| Dismantle, assemble and fabricate electrotechnology components | AUG | EEET6747C | 13-08-2012 | 30-09-2012 | 09-11-2012 | 40 | 0.04 | 173 | 126 | 25 | 526.00 |
| Fix and secure equipment | AUG | EEET6748C | 13-08-2012 | 30-09-2012 | 09-11-2012 | 20 | 0.02 | 87 | 63 | 13 | 263.00 |
| Use drawings, diagrams, schedules and manuals | AUG | EEET6749C | 13-08-2012 | 30-09-2012 | 09-11-2012 | 40 | 0.04 | 173 | 126 | 25 | 526.00 |
| Use drawings, diagrams, schedules and manuals | AUG | EEET6749C | 13-08-2012 | 30-09-2012 | 14-12-2012 | 40 | 0.04 | 173 | 126 | 25 | 526.00 |
| Solve problems in extra-low voltage single path circuits | AUG | EEET6775C | 13-08-2012 | 30-09-2012 | 09-11-2012 | 40 | 0.04 | 173 | 126 | 25 | 526.00 |
| Solve problems in extra-low voltage single path circuits | AUG | EEET6775C | 13-08-2012 | 30-09-2012 | 14-12-2012 | 40 | 0.04 | 173 | 126 | 25 | 526.00 |
| Solve problems in multiple path d.c. circuits | AUG | EEET6780C | 01-08-2012 | 30-09-2012 | 19-09-2012 | 40 | 0.04 | 173 | 126 | 25 | 526.00 |
| Solve problems in multiple path d.c. circuits | AUG | EEET6780C | 13-08-2012 | 30-09-2012 | 09-11-2012 | 40 | 0.04 | 173 | 126 | 25 | 526.00 |
| Solve problems in multiple path d.c. circuits | AUG | EEET6780C | 30-08-2012 | 30-09-2012 | 21-12-2012 | 40 | 0.04 | 173 | 126 | 25 | 526.00 |
| Lay wiring/cabling and terminate accessories for extra-low voltage circuits | AUG | EEET6781C | 30-08-2012 | 30-09-2012 | 21-12-2012 | 40 | 0.04 | 173 | 126 | 25 | 526.00 |
| Document occupational hazards and risks in electrical | AUG | COMM5464C | 13-08-2012 | 30-09-2012 | 09-11-2012 | 20 | 0.02 | 87 | 63 | 13 | 263.00 |
| Solve problems in electromagnetic circuits | AUG | EEET6784C | 30-08-2012 | 30-09-2012 | 21-12-2012 | 60 | 0.06 | 260 | 190 | 38 | 789.00 |
| Use basic computer applications relevant to a Part 2.1D - Computer Systems Units workplace | AUG | OFFC5195C | 13-08-2012 | 30-09-2012 | 09-11-2012 | 20 | 0.02 | 87 | 63 | 13 | 263.00 |
| Develop, enter and verify programs for programmable logic controllers using ladder instruction set | AUG | EEET6790C | 22-08-2012 | 30-09-2012 | 21-12-2012 | 60 | 0.06 | 260 | 190 | 38 | 789.00 |
| Develop, enter and verify programs for programmable logic controllers using ladder instruction set | AUG | EEET6790C | 27-08-2012 | 30-09-2012 | 31-08-2012 | 60 | 0.06 | 260 | 190 | 38 | 789.00 |
| Apply OHS practices in the workplace | CY2 | OHTH5464C | 01-08-2012 | 31-03-2013 | 31-07-2013 | 20 | 0.02 | 87 | 63 | 13 | 263.00 |
| Apply OHS practices in the workplace | CY2 | OHTH5464C | 02-07-2012 | 31-03-2013 | 28-06-2013 | 20 | 0.02 | 87 | 63 | 13 | 263.00 |
| Apply OHS practices in the workplace | CY2 | OHTH5464C | 16-07-2012 | 31-03-2013 | 26-04-2013 | 20 | 0.02 | 87 | 63 | 13 | 263.00 |
| Apply OHS practices in the workplace | CY2 | OHTH5464C | 25-06-2012 | 31-03-2013 | 28-06-2013 | 20 | 0.02 | 87 | 63 | 13 | 263.00 |
| Participate in development and follow a personal competency development plan | CY2 | BUSM6211C | 27-09-2012 | 31-03-2013 | 26-09-2013 | 20 | 0.02 | 87 | 63 | 13 | 263.00 |
| Dismantle, assemble and fabricate electrotechnology components | CY2 | EEET6747C | 01-08-2012 | 31-03-2013 | 31-07-2013 | 40 | 0.04 | 173 | 126 | 25 | 526.00 |
| Dismantle, assemble and fabricate electrotechnology components | CY2 | EEET6747C | 02-07-2012 | 31-03-2013 | 28-06-2013 | 40 | 0.04 | 173 | 126 | 25 | 526.00 |
| Dismantle, assemble and fabricate electrotechnology components | CY2 | EEET6747C | 16-07-2012 | 31-03-2013 | 28-02-2013 | 40 | 0.04 | 173 | 126 | 25 | 526.00 |
| Dismantle, assemble and fabricate electrotechnology components | CY2 | EEET6747C | 16-07-2012 | 31-03-2013 | 31-05-2013 | 40 | 0.04 | 173 | 126 | 25 | 526.00 |
| Dismantle, assemble and fabricate electrotechnology components | CY2 | EEET6747C | 25-06-2012 | 31-03-2013 | 28-06-2013 | 40 | 0.04 | 173 | 126 | 25 | 526.00 |
| Fix and secure equipment | CY2 | EEET6748C | 01-08-2012 | 31-03-2013 | 31-07-2013 | 20 | 0.02 | 87 | 63 | 13 | 263.00 |
| Fix and secure equipment | CY2 | EEET6748C | 02-07-2012 | 31-03-2013 | 28-06-2013 | 20 | 0.02 | 87 | 63 | 13 | 263.00 |
| Fix and secure equipment | CY2 | EEET6748C | 16-07-2012 | 31-03-2013 | 26-04-2013 | 20 | 0.02 | 87 | 63 | 13 | 263.00 |
| Fix and secure equipment | CY2 | EEET6748C | 16-07-2012 | 31-03-2013 | 31-05-2013 | 20 | 0.02 | 87 | 63 | 13 | 263.00 |
| Fix and secure equipment | CY2 | EEET6748C | 25-06-2012 | 31-03-2013 | 28-06-2013 | 20 | 0.02 | 87 | 63 | 13 | 263.00 |
| Use drawings, diagrams, schedules and manuals | CY2 | EEET6749C | 01-08-2012 | 31-03-2013 | 31-07-2013 | 40 | 0.04 | 173 | 126 | 25 | 526.00 |
| Use drawings, diagrams, schedules and manuals | CY2 | EEET6749C | 02-07-2012 | 31-03-2013 | 28-06-2013 | 40 | 0.04 | 173 | 126 | 25 | 526.00 |
| Use drawings, diagrams, schedules and manuals | CY2 | EEET6749C | 16-07-2012 | 31-03-2013 | 26-04-2013 | 40 | 0.04 | 173 | 126 | 25 | 526.00 |
| Use drawings, diagrams, schedules and manuals | CY2 | EEET6749C | 16-07-2012 | 31-03-2013 | 28-02-2013 | 40 | 0.04 | 173 | 126 | 25 | 526.00 |
| Use drawings, diagrams, schedules and manuals | CY2 | EEET6749C | 16-07-2012 | 31-03-2013 | 31-05-2013 | 40 | 0.04 | 173 | 126 | 25 | 526.00 |
| Use drawings, diagrams, schedules and manuals | CY2 | EEET6749C | 19-10-2012 | 31-03-2013 | 28-02-2013 | 40 | 0.04 | 173 | 126 | 25 | 526.00 |
| Use drawings, diagrams, schedules and manuals | CY2 | EEET6749C | 25-06-2012 | 31-03-2013 | 28-06-2013 | 40 | 0.04 | 173 | 126 | 25 | 526.00 |
| Solve problems in extra-low voltage single path circuits | CY2 | EEET6775C | 01-08-2012 | 31-03-2013 | 31-07-2013 | 40 | 0.04 | 173 | 126 | 25 | 526.00 |
| Solve problems in extra-low voltage single path circuits | CY2 | EEET6775C | 02-07-2012 | 31-03-2013 | 28-06-2013 | 40 | 0.04 | 173 | 126 | 25 | 526.00 |
| Solve problems in extra-low voltage single path circuits | CY2 | EEET6775C | 16-07-2012 | 31-03-2013 | 26-04-2013 | 40 | 0.04 | 173 | 126 | 25 | 526.00 |
| Solve problems in extra-low voltage single path circuits | CY2 | EEET6775C | 16-07-2012 | 31-03-2013 | 28-02-2013 | 40 | 0.04 | 173 | 126 | 25 | 526.00 |
| Solve problems in extra-low voltage single path circuits | CY2 | EEET6775C | 16-07-2012 | 31-03-2013 | 31-05-2013 | 40 | 0.04 | 173 | 126 | 25 | 526.00 |
| Solve problems in extra-low voltage single path circuits | CY2 | EEET6775C | 19-10-2012 | 31-03-2013 | 28-02-2013 | 40 | 0.04 | 173 | 126 | 25 | 526.00 |
| Solve problems in extra-low voltage single path circuits | CY2 | EEET6775C | 25-06-2012 | 31-03-2013 | 28-06-2013 | 40 | 0.04 | 173 | 126 | 25 | 526.00 |
| Use basic computer applications relevant to a Part 2.1D - Computer Systems Units workplace | CY2 | OFFC5195C | 01-08-2012 | 31-03-2013 | 31-07-2013 | 20 | 0.02 | 87 | 63 | 13 | 263.00 |
| Use basic computer applications relevant to a Part 2.1D - Computer Systems Units workplace | CY2 | OFFC5195C | 02-07-2012 | 31-03-2013 | 28-06-2013 | 20 | 0.02 | 87 | 63 | 13 | 263.00 |
| Use basic computer applications relevant to a Part 2.1D - Computer Systems Units workplace | CY2 | OFFC5195C | 16-07-2012 | 31-03-2013 | 26-04-2013 | 20 | 0.02 | 87 | 63 | 13 | 263.00 |
| Use basic computer applications relevant to a Part 2.1D - Computer Systems Units workplace | CY2 | OFFC5195C | 16-07-2012 | 31-03-2013 | 28-02-2013 | 20 | 0.02 | 87 | 63 | 13 | 263.00 |
| Use basic computer applications relevant to a Part 2.1D - Computer Systems Units workplace | CY2 | OFFC5195C | 16-07-2012 | 31-03-2013 | 31-05-2013 | 20 | 0.02 | 87 | 63 | 13 | 263.00 |
| Use basic computer applications relevant to a Part 2.1D - Computer Systems Units workplace | CY2 | OFFC5195C | 19-07-2012 | 31-03-2013 | 28-02-2013 | 20 | 0.02 | 87 | 63 | 13 | 263.00 |
| Use basic computer applications relevant to a Part 2.1D - Computer Systems Units workplace | CY2 | OFFC5195C | 25-06-2012 | 31-03-2013 | 28-06-2013 | 20 | 0.02 | 87 | 63 | 13 | 263.00 |
| Ensure team effectiveness | JUL | EMPL5620C | 25-06-2012 | 31-08-2012 | 09-11-2012 | 60 | 0.06 | 260 | 190 | 38 | 789.00 |
| Apply OHS practices in the workplace | JUL | OHTH5464C | 16-07-2012 | 31-08-2012 | 14-12-2012 | 20 | 0.02 | 87 | 63 | 13 | 263.00 |
| Apply OHS practices in the workplace | JUL | OHTH5464C | 16-07-2012 | 31-08-2012 | 21-12-2012 | 20 | 0.02 | 87 | 63 | 13 | 263.00 |
| Apply OHS practices in the workplace | JUL | OHTH5464C | 18-07-2012 | 31-08-2012 | 21-12-2012 | 20 | 0.02 | 87 | 63 | 13 | 263.00 |
| Apply OHS practices in the workplace | JUL | OHTH5464C | 25-06-2012 | 31-08-2012 | 09-11-2012 | 20 | 0.02 | 87 | 63 | 13 | 263.00 |
| Apply OHS practices in the workplace | JUL | OHTH5464C | 25-06-2012 | 31-08-2012 | 14-12-2012 | 20 | 0.02 | 87 | 63 | 13 | 263.00 |
| Participate in development and follow a personal competency development plan | JUL | BUSM6211C | 19-07-2012 | 31-08-2012 | 18-10-2012 | 20 | 0.02 | 87 | 63 | 13 | 263.00 |
| Participate in development and follow a personal competency development plan | JUL | BUSM6211C | 25-06-2012 | 31-08-2012 | 09-11-2012 | 20 | 0.02 | 87 | 63 | 13 | 263.00 |
| Participate in development and follow a personal competency development plan | JUL | BUSM6211C | 25-06-2012 | 31-08-2012 | 14-12-2012 | 20 | 0.02 | 87 | 63 | 13 | 263.00 |
| Participate in development and follow a personal competency development plan | JUL | BUSM6211C | 25-07-2012 | 31-08-2012 | 21-12-2012 | 20 | 0.02 | 87 | 63 | 13 | 263.00 |
| Use engineering applications software | JUL | ISYS5662C | 25-06-2012 | 31-08-2012 | 09-11-2012 | 40 | 0.04 | 173 | 126 | 25 | 526.00 |
| Enter and verify operating instructions in microprocessor equipped devices | JUL | EEET6744C | 25-06-2012 | 31-08-2012 | 09-11-2012 | 20 | 0.02 | 87 | 63 | 13 | 263.00 |
| Enter and verify operating instructions in microprocessor equipped devices | JUL | EEET6744C | 25-06-2012 | 31-08-2012 | 14-12-2012 | 20 | 0.02 | 87 | 63 | 13 | 263.00 |
| Provide programming solution for engineering problems | JUL | ISYS5663C | 25-06-2012 | 31-08-2012 | 09-11-2012 | 60 | 0.06 | 260 | 190 | 38 | 789.00 |
| Dismantle, assemble and fabricate electrotechnology components | JUL | EEET6747C | 16-07-2012 | 31-08-2012 | 10-10-2012 | 40 | 0.04 | 173 | 126 | 25 | 526.00 |
| Dismantle, assemble and fabricate electrotechnology components | JUL | EEET6747C | 25-06-2012 | 31-08-2012 | 09-11-2012 | 40 | 0.04 | 173 | 126 | 25 | 526.00 |
| Dismantle, assemble and fabricate electrotechnology components | JUL | EEET6747C | 25-06-2012 | 31-08-2012 | 14-12-2012 | 40 | 0.04 | 173 | 126 | 25 | 526.00 |
| Dismantle, assemble and fabricate electrotechnology components | JUL | EEET6747C | 25-07-2012 | 31-08-2012 | 17-10-2012 | 40 | 0.04 | 173 | 126 | 25 | 526.00 |
| Fix and secure equipment | JUL | EEET6748C | 02-07-2012 | 31-08-2012 | 09-11-2012 | 20 | 0.02 | 87 | 63 | 13 | 263.00 |
| Fix and secure equipment | JUL | EEET6748C | 16-07-2012 | 31-08-2012 | 12-10-2012 | 20 | 0.02 | 87 | 63 | 13 | 263.00 |
| Fix and secure equipment | JUL | EEET6748C | 16-07-2012 | 31-08-2012 | 14-12-2012 | 20 | 0.02 | 87 | 63 | 13 | 263.00 |
| Fix and secure equipment | JUL | EEET6748C | 25-06-2012 | 31-08-2012 | 14-12-2012 | 20 | 0.02 | 87 | 63 | 13 | 263.00 |
| Fix and secure equipment | JUL | EEET6748C | 25-07-2012 | 31-08-2012 | 17-10-2012 | 20 | 0.02 | 87 | 63 | 13 | 263.00 |
| Use drawings, diagrams, schedules and manuals | JUL | EEET6749C | 16-07-2012 | 31-08-2012 | 12-10-2012 | 40 | 0.04 | 173 | 126 | 25 | 526.00 |
| Use drawings, diagrams, schedules and manuals | JUL | EEET6749C | 16-07-2012 | 31-08-2012 | 14-12-2012 | 40 | 0.04 | 173 | 126 | 25 | 526.00 |
| Use drawings, diagrams, schedules and manuals | JUL | EEET6749C | 25-06-2012 | 31-08-2012 | 09-11-2012 | 40 | 0.04 | 173 | 126 | 25 | 526.00 |
| Use drawings, diagrams, schedules and manuals | JUL | EEET6749C | 25-07-2012 | 31-08-2012 | 17-10-2012 | 40 | 0.04 | 173 | 126 | 25 | 526.00 |
| Carry out basic repairs to electronic apparatus by replacement of components | JUL | EEET6750C | 25-06-2012 | 31-08-2012 | 09-11-2012 | 40 | 0.04 | 173 | 126 | 25 | 526.00 |
| Carry out basic repairs to electronic apparatus by replacement of components | JUL | EEET6750C | 25-06-2012 | 31-08-2012 | 14-12-2012 | 40 | 0.04 | 173 | 126 | 25 | 526.00 |
| Troubleshoot digital subsystems | JUL | EEET6751C | 25-06-2012 | 31-08-2012 | 09-11-2012 | 80 | 0.08 | 346 | 253 | 50 | 1,052.00 |
| Troubleshoot digital subsystems | JUL | EEET6751C | 25-06-2012 | 31-08-2012 | 14-12-2012 | 80 | 0.08 | 346 | 253 | 50 | 1,052.00 |
| Solve problems in extra-low voltage single path circuits | JUL | EEET6775C | 16-07-2012 | 31-08-2012 | 12-10-2012 | 40 | 0.04 | 173 | 126 | 25 | 526.00 |
| Solve problems in extra-low voltage single path circuits | JUL | EEET6775C | 16-07-2012 | 31-08-2012 | 14-12-2012 | 40 | 0.04 | 173 | 126 | 25 | 526.00 |
| Solve problems in extra-low voltage single path circuits | JUL | EEET6775C | 25-06-2012 | 31-08-2012 | 09-11-2012 | 40 | 0.04 | 173 | 126 | 25 | 526.00 |
| Solve problems in extra-low voltage single path circuits | JUL | EEET6775C | 25-06-2012 | 31-08-2012 | 14-12-2012 | 40 | 0.04 | 173 | 126 | 25 | 526.00 |
| Solve problems in multiple path d.c. circuits | JUL | EEET6780C | 16-07-2012 | 31-08-2012 | 12-10-2012 | 40 | 0.04 | 173 | 126 | 25 | 526.00 |
| Solve problems in multiple path d.c. circuits | JUL | EEET6780C | 16-07-2012 | 31-08-2012 | 21-12-2012 | 40 | 0.04 | 173 | 126 | 25 | 526.00 |
| Solve problems in multiple path d.c. circuits | JUL | EEET6780C | 19-07-2012 | 31-08-2012 | 21-12-2012 | 40 | 0.04 | 173 | 126 | 25 | 526.00 |
| Solve problems in multiple path d.c. circuits | JUL | EEET6780C | 24-07-2012 | 31-08-2012 | 21-12-2012 | 40 | 0.04 | 173 | 126 | 25 | 526.00 |
| Solve problems in multiple path d.c. circuits | JUL | EEET6780C | 25-06-2012 | 31-08-2012 | 09-11-2012 | 40 | 0.04 | 173 | 126 | 25 | 526.00 |
| Solve problems in multiple path d.c. circuits | JUL | EEET6780C | 25-06-2012 | 31-08-2012 | 14-12-2012 | 40 | 0.04 | 173 | 126 | 25 | 526.00 |
| Lay wiring/cabling and terminate accessories for extra-low voltage circuits | JUL | EEET6781C | 25-06-2012 | 31-08-2012 | 09-11-2012 | 40 | 0.04 | 173 | 126 | 25 | 526.00 |
| Document occupational hazards and risks in electrical | JUL | COMM5464C | 16-07-2012 | 31-08-2012 | 12-10-2012 | 20 | 0.02 | 87 | 63 | 13 | 263.00 |
| Document occupational hazards and risks in electrical | JUL | COMM5464C | 25-06-2012 | 31-08-2012 | 09-11-2012 | 20 | 0.02 | 87 | 63 | 13 | 263.00 |
| Document occupational hazards and risks in electrical | JUL | COMM5464C | 25-07-2012 | 31-08-2012 | 17-10-2012 | 20 | 0.02 | 87 | 63 | 13 | 263.00 |
| Undertake computations in an electrotechnology environment | JUL | EEET6783C | 25-06-2012 | 31-08-2012 | 09-11-2012 | 120 | 0.13 | 520 | 379 | 76 | 1,578.00 |
| Solve problems in electromagnetic circuits | JUL | EEET6784C | 20-07-2012 | 31-08-2012 | 21-12-2012 | 60 | 0.06 | 260 | 190 | 38 | 789.00 |
| Solve problems in electromagnetic circuits | JUL | EEET6784C | 24-07-2012 | 31-08-2012 | 21-12-2012 | 60 | 0.06 | 260 | 190 | 38 | 789.00 |
| Solve problems in electromagnetic circuits | JUL | EEET6784C | 25-06-2012 | 31-08-2012 | 09-11-2012 | 60 | 0.06 | 260 | 190 | 38 | 789.00 |
| Solve problems in single and three phase low voltage circuits | JUL | EEET6785C | 19-07-2012 | 31-08-2012 | 21-12-2012 | 80 | 0.08 | 346 | 253 | 50 | 1,052.00 |
| Solve problems in single and three phase low voltage circuits | JUL | EEET6785C | 20-07-2012 | 31-08-2012 | 21-12-2012 | 80 | 0.08 | 346 | 253 | 50 | 1,052.00 |
| Solve problems in single and three phase low voltage circuits | JUL | EEET6785C | 25-06-2012 | 31-08-2012 | 09-11-2012 | 80 | 0.08 | 346 | 253 | 50 | 1,052.00 |
| Provide computational solutions to power engineering problems | JUL | EEET6786C | 25-06-2012 | 31-08-2012 | 09-11-2012 | 60 | 0.06 | 260 | 190 | 38 | 789.00 |
| Solve problems in complex polyphase power circuits | JUL | EEET6788C | 25-06-2012 | 31-08-2012 | 09-11-2012 | 60 | 0.06 | 260 | 190 | 38 | 789.00 |
| Provide basic instruction in the use of electrotechnology apparatus | JUL | EEET6789C | 25-06-2012 | 31-08-2012 | 14-12-2012 | 20 | 0.02 | 87 | 63 | 13 | 263.00 |
| Use basic computer applications relevant to a Part 2.1D - Computer Systems Units workplace | JUL | OFFC5195C | 16-07-2012 | 31-08-2012 | 12-10-2012 | 20 | 0.02 | 87 | 63 | 13 | 263.00 |
| Use basic computer applications relevant to a Part 2.1D - Computer Systems Units workplace | JUL | OFFC5195C | 16-07-2012 | 31-08-2012 | 14-12-2012 | 20 | 0.02 | 87 | 63 | 13 | 263.00 |
| Use basic computer applications relevant to a Part 2.1D - Computer Systems Units workplace | JUL | OFFC5195C | 19-07-2012 | 31-08-2012 | 18-10-2012 | 20 | 0.02 | 87 | 63 | 13 | 263.00 |
| Use basic computer applications relevant to a Part 2.1D - Computer Systems Units workplace | JUL | OFFC5195C | 24-07-2012 | 31-08-2012 | 14-12-2012 | 20 | 0.02 | 87 | 63 | 13 | 263.00 |
| Use basic computer applications relevant to a Part 2.1D - Computer Systems Units workplace | JUL | OFFC5195C | 25-06-2012 | 31-08-2012 | 09-11-2012 | 20 | 0.02 | 87 | 63 | 13 | 263.00 |
| Use basic computer applications relevant to a Part 2.1D - Computer Systems Units workplace | JUL | OFFC5195C | 25-06-2012 | 31-08-2012 | 14-12-2012 | 20 | 0.02 | 87 | 63 | 13 | 263.00 |
| Maintain documentation | JUL | BUSM6229C | 19-07-2012 | 31-08-2012 | 18-10-2012 | 20 | 0.02 | 87 | 63 | 13 | 263.00 |
| Maintain documentation | JUL | BUSM6229C | 25-06-2012 | 31-08-2012 | 14-12-2012 | 20 | 0.02 | 87 | 63 | 13 | 263.00 |
| Develop, enter and verify programs for programmable logic controllers using ladder instruction set | JUL | EEET6790C | 25-06-2012 | 31-08-2012 | 09-11-2012 | 60 | 0.06 | 260 | 190 | 38 | 789.00 |
| Develop, enter and verify programs for industrial control systems using high level instructions | JUL | EEET6791C | 25-06-2012 | 31-08-2012 | 09-11-2012 | 60 | 0.06 | 260 | 190 | 38 | 789.00 |
| Develop, enter and verify programs for industrial control systems using high level instructions | JUL | EEET6791C | 25-07-2012 | 31-08-2012 | 21-12-2012 | 60 | 0.06 | 260 | 190 | 38 | 789.00 |
| Develop, enter and verify programs in Supervisory Control and Data Acquisition systems | JUL | EEET6794C | 25-06-2012 | 31-08-2012 | 09-11-2012 | 60 | 0.06 | 260 | 190 | 38 | 789.00 |
| Provide solutions to problems in basic industrial control systems | JUL | EEET6796C | 25-06-2012 | 31-08-2012 | 09-11-2012 | 60 | 0.06 | 260 | 190 | 38 | 789.00 |
| Solve problems in stand-alone renewable energy systems | JUL | EEET6798C | 25-06-2012 | 31-08-2012 | 09-11-2012 | 60 | 0.06 | 260 | 190 | 38 | 789.00 |
| Design stand-alone renewable energy systems | JUL | EEET6799C | 25-06-2012 | 31-08-2012 | 09-11-2012 | 40 | 0.04 | 173 | 126 | 25 | 526.00 |
| Develop engineering solutions for induction motor problems | JUL | EEET6800C | 25-06-2012 | 31-08-2012 | 09-11-2012 | 60 | 0.06 | 260 | 190 | 38 | 789.00 |
| Select and arrange equipment for general electrical installations | JUL | EEET6801C | 16-07-2012 | 31-08-2012 | 21-12-2012 | 120 | 0.13 | 520 | 379 | 76 | 1,578.00 |
| Select and arrange equipment for general electrical installations | JUL | EEET6801C | 17-07-2012 | 31-08-2012 | 21-12-2012 | 120 | 0.13 | 520 | 379 | 76 | 1,578.00 |
| Select and arrange equipment for general electrical installations | JUL | EEET6801C | 18-07-2012 | 31-08-2012 | 21-12-2012 | 120 | 0.13 | 520 | 379 | 76 | 1,578.00 |
| Evaluate performance of electrical apparatus | JUL | EEET6804C | 25-06-2012 | 31-08-2012 | 14-12-2012 | 40 | 0.04 | 173 | 126 | 25 | 526.00 |
| Use drawings, diagrams, schedules and manuals | NOV | EEET6749C | 02-11-2012 | 31-12-2012 | 21-12-2012 | 40 | 0.04 | 173 | 126 | 25 | 526.00 |
| Lay wiring/cabling and terminate accessories for extra-low voltage circuits | NOV | EEET6781C | 08-11-2012 | 31-12-2012 | 21-12-2012 | 40 | 0.04 | 173 | 126 | 25 | 526.00 |
| Select and arrange equipment for general electrical installations | NOV | EEET6801C | 07-11-2012 | 31-12-2012 | 21-12-2012 | 120 | 0.13 | 520 | 379 | 76 | 1,578.00 |
| Select and arrange equipment for general electrical installations | NOV | EEET6801C | 16-11-2012 | 31-12-2012 | 21-12-2012 | 120 | 0.13 | 520 | 379 | 76 | 1,578.00 |
| Manage workplace information systems | OCT | BUSM6214C | 24-10-2012 | 30-11-2012 | 15-11-2012 | 60 | 0.06 | 260 | 190 | 38 | 789.00 |
| Fix and secure equipment | OCT | EEET6748C | 08-10-2012 | 30-11-2012 | 14-12-2012 | 20 | 0.02 | 87 | 63 | 13 | 263.00 |
| Use drawings, diagrams, schedules and manuals | OCT | EEET6749C | 22-10-2012 | 30-11-2012 | 14-12-2012 | 40 | 0.04 | 173 | 126 | 25 | 526.00 |
| Solve problems in extra-low voltage single path circuits | OCT | EEET6775C | 22-10-2012 | 30-11-2012 | 14-12-2012 | 40 | 0.04 | 173 | 126 | 25 | 526.00 |
| Solve problems in extra-low voltage single path circuits | OCT | EEET6775C | 24-10-2012 | 30-11-2012 | 19-12-2012 | 40 | 0.04 | 173 | 126 | 25 | 526.00 |
| Solve problems in multiple path d.c. circuits | OCT | EEET6780C | 24-10-2012 | 30-11-2012 | 19-12-2012 | 40 | 0.04 | 173 | 126 | 25 | 526.00 |
| Lay wiring/cabling and terminate accessories for extra-low voltage circuits | OCT | EEET6781C | 08-10-2012 | 30-11-2012 | 21-12-2012 | 40 | 0.04 | 173 | 126 | 25 | 526.00 |
| Lay wiring/cabling and terminate accessories for extra-low voltage circuits | OCT | EEET6781C | 16-10-2012 | 30-11-2012 | 21-12-2012 | 40 | 0.04 | 173 | 126 | 25 | 526.00 |
| Solve problems in electromagnetic circuits | OCT | EEET6784C | 01-10-2012 | 30-11-2012 | 21-12-2012 | 60 | 0.06 | 260 | 190 | 38 | 789.00 |
| Solve problems in single and three phase low voltage circuits | OCT | EEET6785C | 01-10-2012 | 30-11-2012 | 21-12-2012 | 80 | 0.08 | 346 | 253 | 50 | 1,052.00 |
| Solve problems in single and three phase low voltage circuits | OCT | EEET6785C | 15-10-2012 | 30-11-2012 | 21-12-2012 | 80 | 0.08 | 346 | 253 | 50 | 1,052.00 |
| Use basic computer applications relevant to a Part 2.1D - Computer Systems Units workplace | OCT | OFFC5195C | 08-10-2012 | 30-11-2012 | 14-12-2012 | 20 | 0.02 | 87 | 63 | 13 | 263.00 |
| Select and arrange equipment for general electrical installations | OCT | EEET6801C | 01-10-2012 | 30-11-2012 | 21-12-2012 | 120 | 0.13 | 520 | 379 | 76 | 1,578.00 |
| Participate in development and follow a personal competency development plan | SEP | BUSM6211C | 06-09-2012 | 31-10-2012 | 21-12-2012 | 20 | 0.02 | 87 | 63 | 13 | 263.00 |
| Participate in development and follow a personal competency development plan | SEP | BUSM6211C | 13-09-2012 | 31-10-2012 | 21-12-2012 | 20 | 0.02 | 87 | 63 | 13 | 263.00 |
| Participate in development and follow a personal competency development plan | SEP | BUSM6211C | 24-09-2012 | 31-10-2012 | 02-11-2012 | 20 | 0.02 | 87 | 63 | 13 | 263.00 |
| Use drawings, diagrams, schedules and manuals | SEP | EEET6749C | 03-09-2012 | 31-10-2012 | 07-09-2012 | 40 | 0.04 | 173 | 126 | 25 | 526.00 |
| Use drawings, diagrams, schedules and manuals | SEP | EEET6749C | 03-09-2012 | 31-10-2012 | 14-12-2012 | 40 | 0.04 | 173 | 126 | 25 | 526.00 |
| Use drawings, diagrams, schedules and manuals | SEP | EEET6749C | 05-09-2012 | 31-10-2012 | 17-10-2012 | 40 | 0.04 | 173 | 126 | 25 | 526.00 |
| Lay wiring/cabling and terminate accessories for extra-low voltage circuits | SEP | EEET6781C | 20-09-2012 | 31-10-2012 | 21-12-2012 | 40 | 0.04 | 173 | 126 | 25 | 526.00 |
| Use basic computer applications relevant to a Part 2.1D - Computer Systems Units workplace | SEP | OFFC5195C | 06-09-2012 | 31-10-2012 | 21-12-2012 | 20 | 0.02 | 87 | 63 | 13 | 263.00 |
| Use basic computer applications relevant to a Part 2.1D - Computer Systems Units workplace | SEP | OFFC5195C | 13-09-2012 | 31-10-2012 | 21-12-2012 | 20 | 0.02 | 87 | 63 | 13 | 263.00 |
| Use basic computer applications relevant to a Part 2.1D - Computer Systems Units workplace | SEP | OFFC5195C | 24-09-2012 | 31-10-2012 | 02-11-2012 | 20 | 0.02 | 87 | 63 | 13 | 263.00 |
| Maintain documentation | SEP | BUSM6229C | 06-09-2012 | 31-10-2012 | 21-12-2012 | 20 | 0.02 | 87 | 63 | 13 | 263.00 |
| Maintain documentation | SEP | BUSM6229C | 13-09-2012 | 31-10-2012 | 21-12-2012 | 20 | 0.02 | 87 | 63 | 13 | 263.00 |
| Maintain documentation | SEP | BUSM6229C | 24-09-2012 | 31-10-2012 | 02-11-2012 | 20 | 0.02 | 87 | 63 | 13 | 263.00 |
| Diagnose and rectify faults in analogue circuits and components in electronic control systems | SEP | EEET6793C | 17-09-2012 | 31-10-2012 | 21-12-2012 | 60 | 0.06 | 260 | 190 | 38 | 789.00 |
| Carry out basic repairs to renewable energy apparatus by replacement of components | SEP | EEET6797C | 05-09-2012 | 31-10-2012 | 09-11-2012 | 80 | 0.08 | 346 | 253 | 50 | 1,052.00 |
* EFTSL : Equivalent Full Time Study Load
** Concession fees are only available at diploma and advanced diploma level for indigenous students.
Back to Program List
| Unit Of Study (Course) | Session | Course Code | Commencement Date | Census Date | Completion Date | Student Contact Hours (SCH) | EFTSL* | Tuition Fee: Onsite|Distance|RPL | |||
| Government Subsidised Fee | Full Fee (Non Government Subsidised) | ||||||||||
| Program commenced 1 July 2009-30 June 2012 ($) | Program commenced 1 July 2012-31 December 2012 ($) | Program commenced 1 July 2012-31 December 2012 Concession ** ($) | Australian Full Fee Paying ($) | ||||||||
| Identify fibres, yarns and textile materials and their uses in textile production | CY2 | MKTG5756C | 26-11-2012 | 31-03-2013 | 27-02-2013 | 50 | 0.03 | 216 | 181 | 36 | 583.50 |
| Interpret and apply textile calculations and specifications | CY2 | MANU5910C | 26-11-2012 | 31-03-2013 | 27-02-2013 | 50 | 0.03 | 216 | 181 | 36 | 583.50 |
| Operate computing technology in a Textiles, Clothing and Footwear workplace | CY2 | MIET6060C | 26-11-2012 | 31-03-2013 | 27-02-2013 | 50 | 0.03 | 216 | 181 | 36 | 583.50 |
| Perform computations | CY2 | MATH5306C | 26-11-2012 | 31-03-2013 | 27-02-2013 | 30 | 0.02 | 130 | 109 | 22 | 350.10 |
| Identify opportunities in the textiles, clothing and footwear market | CY2 | MKTG5755C | 26-11-2012 | 31-03-2013 | 27-02-2013 | 70 | 0.04 | 303 | 253 | 50 | 816.90 |
| Identify fibres and fabrics | CY2 | VART5902C | 02-07-2012 | 31-03-2013 | 28-06-2013 | 50 | 0.03 | 216 | 181 | 36 | 583.50 |
| Identify fibres and fabrics | CY2 | VART5902C | 03-09-2012 | 31-03-2013 | 30-08-2013 | 50 | 0.03 | 216 | 181 | 36 | 583.50 |
| Identify fibres and fabrics | CY2 | VART5902C | 08-10-2012 | 31-03-2013 | 07-10-2013 | 50 | 0.03 | 216 | 181 | 36 | 583.50 |
| Identify fibres and fabrics | CY2 | VART5902C | 09-10-2012 | 31-03-2013 | 08-10-2013 | 50 | 0.03 | 216 | 181 | 36 | 583.50 |
| Identify fibres and fabrics | CY2 | VART5902C | 10-09-2012 | 31-03-2013 | 06-09-2013 | 50 | 0.03 | 216 | 181 | 36 | 583.50 |
| Identify fibres and fabrics | CY2 | VART5902C | 16-07-2012 | 31-03-2013 | 28-06-2013 | 50 | 0.03 | 216 | 181 | 36 | 583.50 |
| Identify fibres and fabrics | CY2 | VART5902C | 25-06-2012 | 31-03-2013 | 28-06-2013 | 50 | 0.03 | 216 | 181 | 36 | 583.50 |
| Identify fibres and fabrics | CY2 | VART5902C | 29-08-2012 | 31-03-2013 | 28-08-2013 | 50 | 0.03 | 216 | 181 | 36 | 583.50 |
| Identify fibres and fabrics | CY2 | VART5902C | 29-10-2012 | 31-03-2013 | 25-10-2013 | 50 | 0.03 | 216 | 181 | 36 | 583.50 |
| Interact and network with fashion industry participants | CY2 | EMPL5599C | 25-06-2012 | 31-03-2013 | 07-06-2013 | 80 | 0.05 | 346 | 290 | 58 | 933.60 |
| Follow defined OH&S policies and procedures | CY2 | OHTH5471C | 02-07-2012 | 31-03-2013 | 28-06-2013 | 30 | 0.02 | 130 | 109 | 22 | 350.10 |
| Follow defined OH&S policies and procedures | CY2 | OHTH5471C | 03-09-2012 | 31-03-2013 | 30-08-2013 | 30 | 0.02 | 130 | 109 | 22 | 350.10 |
| Follow defined OH&S policies and procedures | CY2 | OHTH5471C | 08-10-2012 | 31-03-2013 | 07-10-2013 | 30 | 0.02 | 130 | 109 | 22 | 350.10 |
| Follow defined OH&S policies and procedures | CY2 | OHTH5471C | 09-10-2012 | 31-03-2013 | 08-10-2013 | 30 | 0.02 | 130 | 109 | 22 | 350.10 |
| Follow defined OH&S policies and procedures | CY2 | OHTH5471C | 10-09-2012 | 31-03-2013 | 06-09-2013 | 30 | 0.02 | 130 | 109 | 22 | 350.10 |
| Follow defined OH&S policies and procedures | CY2 | OHTH5471C | 16-07-2012 | 31-03-2013 | 28-06-2013 | 30 | 0.02 | 130 | 109 | 22 | 350.10 |
| Follow defined OH&S policies and procedures | CY2 | OHTH5471C | 25-06-2012 | 31-03-2013 | 28-06-2013 | 30 | 0.02 | 130 | 109 | 22 | 350.10 |
| Follow defined OH&S policies and procedures | CY2 | OHTH5471C | 29-08-2012 | 31-03-2013 | 28-08-2013 | 30 | 0.02 | 130 | 109 | 22 | 350.10 |
| Follow defined OH&S policies and procedures | CY2 | OHTH5471C | 29-10-2012 | 31-03-2013 | 25-10-2013 | 30 | 0.02 | 130 | 109 | 22 | 350.10 |
| Analyse consumer behaviour for specific markets | JUL | MKTG7755C | 25-06-2012 | 31-08-2012 | 16-11-2012 | 60 | 0.04 | 260 | 217 | 43 | 700.20 |
| Identify fibres, yarns and textile materials and their uses in textile production | JUL | MKTG5756C | 25-06-2012 | 31-08-2012 | 16-11-2012 | 50 | 0.03 | 216 | 181 | 36 | 583.50 |
| Identify fibres, yarns and textile materials and their uses in textile production | JUL | MKTG5756C | 25-07-2012 | 31-08-2012 | 23-11-2012 | 50 | 0.03 | 216 | 181 | 36 | 583.50 |
| Interpret and apply textile calculations and specifications | JUL | MANU5910C | 25-06-2012 | 31-08-2012 | 16-11-2012 | 50 | 0.03 | 216 | 181 | 36 | 583.50 |
| Interpret and apply textile calculations and specifications | JUL | MANU5910C | 25-07-2012 | 31-08-2012 | 23-11-2012 | 50 | 0.03 | 216 | 181 | 36 | 583.50 |
| Operate computing technology in a Textiles, Clothing and Footwear workplace | JUL | MIET6060C | 25-06-2012 | 31-08-2012 | 16-11-2012 | 50 | 0.03 | 216 | 181 | 36 | 583.50 |
| Operate computing technology in a Textiles, Clothing and Footwear workplace | JUL | MIET6060C | 25-07-2012 | 31-08-2012 | 23-11-2012 | 50 | 0.03 | 216 | 181 | 36 | 583.50 |
| Perform computations | JUL | MATH5306C | 25-06-2012 | 31-08-2012 | 16-11-2012 | 30 | 0.02 | 130 | 109 | 22 | 350.10 |
| Perform computations | JUL | MATH5306C | 25-07-2012 | 31-08-2012 | 23-11-2012 | 30 | 0.02 | 130 | 109 | 22 | 350.10 |
| Identify opportunities in the textiles, clothing and footwear market | JUL | MKTG5755C | 25-06-2012 | 31-08-2012 | 16-11-2012 | 70 | 0.04 | 303 | 253 | 50 | 816.90 |
| Identify opportunities in the textiles, clothing and footwear market | JUL | MKTG5755C | 25-07-2012 | 31-08-2012 | 23-11-2012 | 70 | 0.04 | 303 | 253 | 50 | 816.90 |
| Coordinate quality assurance for textiles, clothing and footwear products and services | JUL | MIET6061C | 25-06-2012 | 31-08-2012 | 02-11-2012 | 40 | 0.02 | 173 | 145 | 29 | 466.80 |
| Coordinate quality assurance for textiles, clothing and footwear products and services | JUL | MIET6061C | 25-06-2012 | 31-08-2012 | 16-11-2012 | 40 | 0.02 | 173 | 145 | 29 | 466.80 |
| Work with international textiles, clothing and footwear supply chains | JUL | MKTG5757C | 25-06-2012 | 31-08-2012 | 02-11-2012 | 60 | 0.04 | 260 | 217 | 43 | 700.20 |
| Calculate cost estimates for fashion products | JUL | GRAP5211C | 25-06-2012 | 31-08-2012 | 02-11-2012 | 30 | 0.02 | 130 | 109 | 22 | 350.10 |
| Calculate cost estimates for fashion products | JUL | GRAP5211C | 25-06-2012 | 31-08-2012 | 16-11-2012 | 30 | 0.02 | 130 | 109 | 22 | 350.10 |
| Use electronic fashion design tools | JUL | GRAP5212C | 25-06-2012 | 31-08-2012 | 02-11-2012 | 80 | 0.05 | 346 | 290 | 58 | 933.60 |
| Use electronic fashion design tools | JUL | GRAP5212C | 25-06-2012 | 31-08-2012 | 16-11-2012 | 80 | 0.05 | 346 | 290 | 58 | 933.60 |
| Source textile materials and resources | JUL | MANU5923C | 25-06-2012 | 31-08-2012 | 02-11-2012 | 20 | 0.01 | 87 | 72 | 14 | 233.40 |
| Implement and monitor environmentally sustainable work practices | JUL | OHTH5461C | 25-06-2012 | 31-08-2012 | 02-11-2012 | 40 | 0.02 | 173 | 145 | 29 | 466.80 |
| Communicate and sell design concepts | JUL | VART5913C | 25-06-2012 | 31-08-2012 | 02-11-2012 | 30 | 0.02 | 130 | 109 | 22 | 350.10 |
| Communicate and sell design concepts | JUL | VART5913C | 25-06-2012 | 31-08-2012 | 16-11-2012 | 30 | 0.02 | 130 | 109 | 22 | 350.10 |
| Cost production of textile designs | JUL | BUSM6204C | 25-06-2012 | 31-08-2012 | 02-11-2012 | 20 | 0.01 | 87 | 72 | 14 | 233.40 |
| Research and evaluate processes and products | JUL | GRAP5217C | 25-06-2012 | 31-08-2012 | 16-11-2012 | 80 | 0.05 | 346 | 290 | 58 | 933.60 |
| Manage quality system and procedures | JUL | BUSM6207C | 25-06-2012 | 31-08-2012 | 16-11-2012 | 80 | 0.05 | 346 | 290 | 58 | 933.60 |
| Interact and network with fashion industry participants | JUL | EMPL5599C | 25-06-2012 | 31-08-2012 | 16-11-2012 | 80 | 0.05 | 346 | 290 | 58 | 933.60 |
| Apply textile, clothing and footwear market supply systems | JUL | MKTG5772C | 25-06-2012 | 31-08-2012 | 16-11-2012 | 60 | 0.04 | 260 | 217 | 43 | 700.20 |
| Develop patterns from a block using basic patternmaking principles | JUL | MANU7228C | 02-07-2012 | 31-08-2012 | 01-10-2012 | 50 | 0.03 | 216 | 181 | 36 | 583.50 |
| Develop patterns from a block using basic patternmaking principles | JUL | MANU7228C | 23-07-2012 | 31-08-2012 | 30-11-2012 | 50 | 0.03 | 216 | 181 | 36 | 583.50 |
| Develop patterns from a block using basic patternmaking principles | JUL | MANU7228C | 25-06-2012 | 31-08-2012 | 16-11-2012 | 50 | 0.03 | 216 | 181 | 36 | 583.50 |
| Develop product specifications for fashion design | JUL | GRAP5227C | 25-06-2012 | 31-08-2012 | 02-11-2012 | 40 | 0.02 | 173 | 145 | 29 | 466.80 |
| Develop product specifications for fashion design | JUL | GRAP5227C | 25-06-2012 | 31-08-2012 | 16-11-2012 | 40 | 0.02 | 173 | 145 | 29 | 466.80 |
| Identify contemporary fashion influences and construction techniques | JUL | GRAP5228C | 25-06-2012 | 31-08-2012 | 02-11-2012 | 40 | 0.02 | 173 | 145 | 29 | 466.80 |
| Manage merchandise and store presentation | JUL | MKTG5776C | 25-06-2012 | 31-08-2012 | 16-11-2012 | 35 | 0.02 | 152 | 127 | 25 | 408.45 |
| Assist in preparation of preliminary design concepts | JUL | GRAP5226C | 25-06-2012 | 31-08-2012 | 02-11-2012 | 80 | 0.05 | 346 | 290 | 58 | 933.60 |
| Develop and present design concepts within specific guidelines | JUL | MKTG5779C | 25-06-2012 | 31-08-2012 | 02-11-2012 | 50 | 0.03 | 216 | 181 | 36 | 583.50 |
| Develop and present design concepts within specific guidelines | JUL | MKTG5779C | 25-06-2012 | 31-08-2012 | 16-11-2012 | 50 | 0.03 | 216 | 181 | 36 | 583.50 |
| Develop merchandising plans for fashion products | JUL | MKTG5780C | 25-06-2012 | 31-08-2012 | 16-11-2012 | 40 | 0.02 | 173 | 145 | 29 | 466.80 |
| Map and establish textiles, clothing or footwear supply chain process | JUL | MKTG5782C | 25-06-2012 | 31-08-2012 | 16-11-2012 | 80 | 0.05 | 346 | 290 | 58 | 933.60 |
| Analyse fashion industry textiles to guide commercial development | JUL | MKTG5783C | 25-06-2012 | 31-08-2012 | 16-11-2012 | 60 | 0.04 | 260 | 217 | 43 | 700.20 |
| Prepare business documents for the international trade of goods | JUL | MKTG5784C | 25-06-2012 | 31-08-2012 | 16-11-2012 | 40 | 0.02 | 173 | 145 | 29 | 466.80 |
| Follow defined OH&S policies and procedures | JUL | OHTH5471C | 25-06-2012 | 31-08-2012 | 16-11-2012 | 30 | 0.02 | 130 | 109 | 22 | 350.10 |
| Develop marketing plans for fashion products | JUL | GRAP5240C | 25-06-2012 | 31-08-2012 | 02-11-2012 | 50 | 0.03 | 216 | 181 | 36 | 583.50 |
| Develop marketing plans for fashion products | JUL | GRAP5240C | 25-06-2012 | 31-08-2012 | 16-11-2012 | 50 | 0.03 | 216 | 181 | 36 | 583.50 |
| Develop and use complex spreadsheets | JUL | COSC5977C | 25-06-2012 | 31-08-2012 | 16-11-2012 | 50 | 0.03 | 216 | 181 | 36 | 583.50 |
| Follow defined OH&S policies and procedures | OCT | OHTH5471C | 15-10-2012 | 30-11-2012 | 23-11-2012 | 30 | 0.02 | 130 | 109 | 22 | 350.10 |
* EFTSL : Equivalent Full Time Study Load
** Concession fees are only available at diploma and advanced diploma level for indigenous students.
Back to Program List
| Unit Of Study (Course) | Session | Course Code | Commencement Date | Census Date | Completion Date | Student Contact Hours (SCH) | EFTSL* | Tuition Fee: Onsite|Distance|RPL | |||
| Government Subsidised Fee | Full Fee (Non Government Subsidised) | ||||||||||
| Program commenced 1 July 2009-30 June 2012 ($) | Program commenced 1 July 2012-31 December 2012 ($) | Program commenced 1 July 2012-31 December 2012 Concession ** ($) | Australian Full Fee Paying ($) | ||||||||
| Manage design realisation | CY2 | GRAP5330C | 17-09-2012 | 31-03-2013 | 30-08-2013 | 50 | 0.16 | 216 | 243 | 48 | 608.00 |
| Apply 3-D visualisation techniques to represent interior designs | CY2 | ARCH5188C | 17-09-2012 | 31-03-2013 | 30-08-2013 | 54 | 0.18 | 234 | 262 | 52 | 656.64 |
| Research and apply concepts and theories of creativity | JUL | MKTG5777C | 25-06-2012 | 31-08-2012 | 23-11-2012 | 20 | 0.06 | 87 | 97 | 19 | 243.20 |
| Originate and develop concepts | JUL | BUSM6217C | 25-06-2012 | 31-08-2012 | 23-11-2012 | 30 | 0.10 | 130 | 146 | 29 | 364.80 |
| Establish the creative vision for screen productions | JUL | VART5924C | 25-06-2012 | 31-08-2012 | 23-11-2012 | 50 | 0.16 | 216 | 243 | 48 | 608.00 |
| Write scripts | JUL | COMM5907C | 25-06-2012 | 31-08-2012 | 23-11-2012 | 50 | 0.16 | 216 | 243 | 48 | 608.00 |
| Establish systems that support innovation | JUL | BUSM6220C | 25-06-2012 | 31-08-2012 | 23-11-2012 | 50 | 0.16 | 216 | 243 | 48 | 608.00 |
| Build and sustain an innovative work environment | JUL | BUSM6221C | 25-06-2012 | 31-08-2012 | 23-11-2012 | 50 | 0.16 | 216 | 243 | 48 | 608.00 |
| Direct screen production crews | JUL | VART5926C | 25-06-2012 | 31-08-2012 | 23-11-2012 | 50 | 0.16 | 216 | 243 | 48 | 608.00 |
| Plan and manage film and media post-production | JUL | VART5927C | 25-06-2012 | 31-08-2012 | 23-11-2012 | 35 | 0.11 | 152 | 170 | 34 | 425.60 |
| Manage projects | JUL | BUSM6223C | 25-06-2012 | 31-08-2012 | 23-11-2012 | 60 | 0.19 | 260 | 292 | 58 | 729.60 |
| Create digital visual effects | JUL | COSC5382C | 25-06-2012 | 31-08-2012 | 23-11-2012 | 70 | 0.23 | 303 | 340 | 68 | 851.20 |
| Develop storylines and treatments | JUL | COMM5909C | 25-06-2012 | 31-08-2012 | 23-11-2012 | 50 | 0.16 | 216 | 243 | 48 | 608.00 |
| Design interaction | JUL | VART5935C | 25-06-2012 | 31-08-2012 | 23-11-2012 | 40 | 0.13 | 173 | 194 | 39 | 486.40 |
| Design web environments | JUL | COSC5949C | 25-06-2012 | 31-08-2012 | 23-11-2012 | 50 | 0.16 | 216 | 243 | 48 | 608.00 |
| Manage the marketing process | JUL | MKTG5806C | 25-06-2012 | 31-08-2012 | 23-11-2012 | 50 | 0.16 | 216 | 243 | 48 | 608.00 |
| Develop a marketing plan | JUL | MKTG5807C | 25-06-2012 | 31-08-2012 | 23-11-2012 | 50 | 0.16 | 216 | 243 | 48 | 608.00 |
| Develop sound designs | JUL | VART6065C | 25-06-2012 | 31-08-2012 | 23-11-2012 | 50 | 0.16 | 216 | 243 | 48 | 608.00 |
| Implement sound designs | JUL | VART6067C | 25-06-2012 | 31-08-2012 | 23-11-2012 | 50 | 0.16 | 216 | 243 | 48 | 608.00 |
* EFTSL : Equivalent Full Time Study Load
** Concession fees are only available at diploma and advanced diploma level for indigenous students.
Back to Program List
| Unit Of Study (Course) | Session | Course Code | Commencement Date | Census Date | Completion Date | Student Contact Hours (SCH) | EFTSL* | Tuition Fee: Onsite|Distance|RPL | |||
| Government Subsidised Fee | Full Fee (Non Government Subsidised) | ||||||||||
| Program commenced 1 July 2009-30 June 2012 ($) | Program commenced 1 July 2012-31 December 2012 ($) | Program commenced 1 July 2012-31 December 2012 Concession ** ($) | Australian Full Fee Paying ($) | ||||||||
| Research and critically analyse history and theory to inform artistic practice | JUL | VART5797C | 25-06-2012 | 31-08-2012 | 23-11-2012 | 70 | 0.10 | 303 | 428 | 85 | 1,107.40 |
| Establish and maintain work and contractual relationships | JUL | EMPL5401C | 25-06-2012 | 31-08-2012 | 23-11-2012 | 70 | 0.10 | 303 | 428 | 85 | 1,107.40 |
| Originate and develop concepts | JUL | BUSM6217C | 25-06-2012 | 31-08-2012 | 23-11-2012 | 30 | 0.04 | 130 | 184 | 37 | 474.60 |
| Establish the creative vision for screen productions | JUL | VART5924C | 25-06-2012 | 31-08-2012 | 23-11-2012 | 50 | 0.07 | 216 | 306 | 61 | 791.00 |
| Write scripts | JUL | COMM5907C | 25-06-2012 | 31-08-2012 | 23-11-2012 | 50 | 0.07 | 216 | 306 | 61 | 791.00 |
| Collaborate in a creative process | JUL | MKTG5778C | 25-06-2012 | 31-08-2012 | 23-11-2012 | 40 | 0.06 | 173 | 245 | 49 | 632.80 |
| Develop storylines and treatments | JUL | COMM5909C | 25-06-2012 | 31-08-2012 | 23-11-2012 | 50 | 0.07 | 216 | 306 | 61 | 791.00 |
| Write simple stories | JUL | COMM5910C | 25-06-2012 | 31-08-2012 | 23-11-2012 | 30 | 0.04 | 130 | 184 | 37 | 474.60 |
| Write extended stories | JUL | COMM5911C | 25-06-2012 | 31-08-2012 | 23-11-2012 | 40 | 0.06 | 173 | 245 | 49 | 632.80 |
| Edit scripts | JUL | COMM5912C | 25-06-2012 | 31-08-2012 | 23-11-2012 | 50 | 0.07 | 216 | 306 | 61 | 791.00 |
| Articulate, present and debate ideas | JUL | COMM5915C | 25-06-2012 | 31-08-2012 | 23-11-2012 | 40 | 0.06 | 173 | 245 | 49 | 632.80 |
| Create storyboards | JUL | COMM5917C | 25-06-2012 | 31-08-2012 | 23-11-2012 | 40 | 0.06 | 173 | 245 | 49 | 632.80 |
| Work as an independent screenwriter | JUL | COMM5919 | 25-06-2012 | 31-08-2012 | 23-11-2012 | 70 | 0.10 | 303 | 428 | 85 | 1,107.40 |
| Write an episode of a TV series | JUL | COMM5922 | 25-06-2012 | 31-08-2012 | 23-11-2012 | 70 | 0.10 | 303 | 428 | 85 | 1,107.40 |
| Write content for cross platform delivery | JUL | COMM5926 | 25-06-2012 | 31-08-2012 | 23-11-2012 | 70 | 0.10 | 303 | 428 | 85 | 1,107.40 |
| Write for children's television | JUL | COMM5933 | 25-06-2012 | 31-08-2012 | 23-11-2012 | 70 | 0.10 | 303 | 428 | 85 | 1,107.40 |
| Adapt fiction and non fiction work for the screen | JUL | COMM5934 | 25-06-2012 | 31-08-2012 | 23-11-2012 | 70 | 0.10 | 303 | 428 | 85 | 1,107.40 |
| Script and story edit television drama | JUL | COMM5936 | 25-06-2012 | 31-08-2012 | 23-11-2012 | 70 | 0.10 | 303 | 428 | 85 | 1,107.40 |
* EFTSL : Equivalent Full Time Study Load
** Concession fees are only available at diploma and advanced diploma level for indigenous students.
Back to Program List
| Unit Of Study (Course) | Session | Course Code | Commencement Date | Census Date | Completion Date | Student Contact Hours (SCH) | EFTSL* | Tuition Fee: Onsite|Distance|RPL | |||
| Government Subsidised Fee | Full Fee (Non Government Subsidised) | ||||||||||
| Program commenced 1 July 2009-30 June 2012 ($) | Program commenced 1 July 2012-31 December 2012 ($) | Program commenced 1 July 2012-31 December 2012 Concession ** ($) | Australian Full Fee Paying ($) | ||||||||
| Identify fibres and fabrics | CY2 | VART5902C | 02-07-2012 | 31-03-2013 | 28-06-2013 | 50 | 0.23 | 216 | 253 | 50 | 674.00 |
| Identify fibres and fabrics | CY2 | VART5902C | 03-09-2012 | 31-03-2013 | 30-08-2013 | 50 | 0.23 | 216 | 253 | 50 | 674.00 |
| Identify fibres and fabrics | CY2 | VART5902C | 08-10-2012 | 31-03-2013 | 07-10-2013 | 50 | 0.23 | 216 | 253 | 50 | 674.00 |
| Identify fibres and fabrics | CY2 | VART5902C | 09-10-2012 | 31-03-2013 | 08-10-2013 | 50 | 0.23 | 216 | 253 | 50 | 674.00 |
| Identify fibres and fabrics | CY2 | VART5902C | 10-09-2012 | 31-03-2013 | 06-09-2013 | 50 | 0.23 | 216 | 253 | 50 | 674.00 |
| Identify fibres and fabrics | CY2 | VART5902C | 16-07-2012 | 31-03-2013 | 28-06-2013 | 50 | 0.23 | 216 | 253 | 50 | 674.00 |
| Identify fibres and fabrics | CY2 | VART5902C | 25-06-2012 | 31-03-2013 | 28-06-2013 | 50 | 0.23 | 216 | 253 | 50 | 674.00 |
| Identify fibres and fabrics | CY2 | VART5902C | 29-08-2012 | 31-03-2013 | 28-08-2013 | 50 | 0.23 | 216 | 253 | 50 | 674.00 |
| Identify fibres and fabrics | CY2 | VART5902C | 29-10-2012 | 31-03-2013 | 25-10-2013 | 50 | 0.23 | 216 | 253 | 50 | 674.00 |
| Interact and network with fashion industry participants | CY2 | EMPL5599C | 25-06-2012 | 31-03-2013 | 07-06-2013 | 80 | 0.36 | 346 | 405 | 81 | 1,078.40 |
| Follow defined OH&S policies and procedures | CY2 | OHTH5471C | 02-07-2012 | 31-03-2013 | 28-06-2013 | 30 | 0.14 | 130 | 152 | 30 | 404.40 |
| Follow defined OH&S policies and procedures | CY2 | OHTH5471C | 03-09-2012 | 31-03-2013 | 30-08-2013 | 30 | 0.14 | 130 | 152 | 30 | 404.40 |
| Follow defined OH&S policies and procedures | CY2 | OHTH5471C | 08-10-2012 | 31-03-2013 | 07-10-2013 | 30 | 0.14 | 130 | 152 | 30 | 404.40 |
| Follow defined OH&S policies and procedures | CY2 | OHTH5471C | 09-10-2012 | 31-03-2013 | 08-10-2013 | 30 | 0.14 | 130 | 152 | 30 | 404.40 |
| Follow defined OH&S policies and procedures | CY2 | OHTH5471C | 10-09-2012 | 31-03-2013 | 06-09-2013 | 30 | 0.14 | 130 | 152 | 30 | 404.40 |
| Follow defined OH&S policies and procedures | CY2 | OHTH5471C | 16-07-2012 | 31-03-2013 | 28-06-2013 | 30 | 0.14 | 130 | 152 | 30 | 404.40 |
| Follow defined OH&S policies and procedures | CY2 | OHTH5471C | 25-06-2012 | 31-03-2013 | 28-06-2013 | 30 | 0.14 | 130 | 152 | 30 | 404.40 |
| Follow defined OH&S policies and procedures | CY2 | OHTH5471C | 29-08-2012 | 31-03-2013 | 28-08-2013 | 30 | 0.14 | 130 | 152 | 30 | 404.40 |
| Follow defined OH&S policies and procedures | CY2 | OHTH5471C | 29-10-2012 | 31-03-2013 | 25-10-2013 | 30 | 0.14 | 130 | 152 | 30 | 404.40 |
| Research and evaluate processes and products | JUL | GRAP5217C | 25-06-2012 | 31-08-2012 | 16-11-2012 | 80 | 0.36 | 346 | 405 | 81 | 1,078.40 |
| Manage quality system and procedures | JUL | BUSM6207C | 25-06-2012 | 31-08-2012 | 16-11-2012 | 80 | 0.36 | 346 | 405 | 81 | 1,078.40 |
| Interact and network with fashion industry participants | JUL | EMPL5599C | 25-06-2012 | 31-08-2012 | 16-11-2012 | 80 | 0.36 | 346 | 405 | 81 | 1,078.40 |
| Develop product specifications for fashion design | JUL | GRAP5227C | 25-06-2012 | 31-08-2012 | 02-11-2012 | 40 | 0.18 | 173 | 202 | 40 | 539.20 |
| Develop product specifications for fashion design | JUL | GRAP5227C | 25-06-2012 | 31-08-2012 | 16-11-2012 | 40 | 0.18 | 173 | 202 | 40 | 539.20 |
| Analyse fashion industry textiles to guide commercial development | JUL | MKTG5783C | 25-06-2012 | 31-08-2012 | 16-11-2012 | 60 | 0.27 | 260 | 304 | 61 | 808.80 |
| Follow defined OH&S policies and procedures | JUL | OHTH5471C | 25-06-2012 | 31-08-2012 | 16-11-2012 | 30 | 0.14 | 130 | 152 | 30 | 404.40 |
| Modify patterns to create basic styles | JUL | MANU5926C | 02-07-2012 | 31-08-2012 | 01-10-2012 | 50 | 0.23 | 216 | 253 | 50 | 674.00 |
| Modify patterns to create basic styles | JUL | MANU5926C | 23-07-2012 | 31-08-2012 | 30-11-2012 | 50 | 0.23 | 216 | 253 | 50 | 674.00 |
| Identify fabric performance and handling requirements | JUL | MANU5928C | 02-07-2012 | 31-08-2012 | 01-10-2012 | 40 | 0.18 | 173 | 202 | 40 | 539.20 |
| Identify fabric performance and handling requirements | JUL | MANU5928C | 25-06-2012 | 31-08-2012 | 02-11-2012 | 40 | 0.18 | 173 | 202 | 40 | 539.20 |
| Apply design studio process | JUL | GRAP5234C | 25-06-2012 | 31-08-2012 | 02-11-2012 | 90 | 0.41 | 390 | 455 | 91 | 1,213.20 |
| Grade shaped patterns | JUL | GRAP5248C | 25-06-2012 | 31-08-2012 | 02-11-2012 | 60 | 0.27 | 260 | 304 | 61 | 808.80 |
| Follow defined OH&S policies and procedures | OCT | OHTH5471C | 15-10-2012 | 30-11-2012 | 23-11-2012 | 30 | 0.14 | 130 | 152 | 30 | 404.40 |
* EFTSL : Equivalent Full Time Study Load
** Concession fees are only available at diploma and advanced diploma level for indigenous students.
Back to Program List
| Unit Of Study (Course) | Session | Course Code | Commencement Date | Census Date | Completion Date | Student Contact Hours (SCH) | EFTSL* | Tuition Fee: Onsite|Distance|RPL | |||
| Government Subsidised Fee | Full Fee (Non Government Subsidised) | ||||||||||
| Program commenced 1 July 2009-30 June 2012 ($) | Program commenced 1 July 2012-31 December 2012 ($) | Program commenced 1 July 2012-31 December 2012 Concession ** ($) | Australian Full Fee Paying ($) | ||||||||
| Manage finances | OCT | ACCT5288C | 15-10-2012 | 30-11-2012 | 23-11-2012 | 80 | 0.16 | 346 | 364 | 73 | 800.00 |
* EFTSL : Equivalent Full Time Study Load
** Concession fees are only available at diploma and advanced diploma level for indigenous students.
Back to Program List
| Unit Of Study (Course) | Session | Course Code | Commencement Date | Census Date | Completion Date | Student Contact Hours (SCH) | EFTSL* | Tuition Fee: Onsite|Distance|RPL | |||
| Government Subsidised Fee | Full Fee (Non Government Subsidised) | ||||||||||
| Program commenced 1 July 2009-30 June 2012 ($) | Program commenced 1 July 2012-31 December 2012 ($) | Program commenced 1 July 2012-31 December 2012 Concession ** ($) | Australian Full Fee Paying ($) | ||||||||
| Develop and implement a business plan | JUL | BUSM6247C | 25-06-2012 | 31-08-2012 | 09-11-2012 | 60 | 0.28 | 260 | 409 | 82 | 783.60 |
| Manage market research | JUL | MKTG5839C | 02-07-2012 | 31-08-2012 | 30-07-2012 | 50 | 0.23 | 216 | 341 | 68 | 653.00 |
| Manage the marketing process | JUL | MKTG5840C | 02-07-2012 | 31-08-2012 | 30-07-2012 | 50 | 0.23 | 216 | 341 | 68 | 653.00 |
| Develop a marketing plan | JUL | MKTG5841C | 25-06-2012 | 31-08-2012 | 09-11-2012 | 50 | 0.23 | 216 | 341 | 68 | 653.00 |
| Develop organisational marketing objectives | JUL | MKTG5842C | 25-06-2012 | 31-08-2012 | 09-11-2012 | 60 | 0.28 | 260 | 409 | 82 | 783.60 |
| Evaluate international marketing opportunities | JUL | MKTG5843C | 25-06-2012 | 31-08-2012 | 09-11-2012 | 60 | 0.28 | 260 | 409 | 82 | 783.60 |
| Manage international marketing programs | JUL | BUSM6263C | 25-06-2012 | 31-08-2012 | 09-11-2012 | 50 | 0.23 | 216 | 341 | 68 | 653.00 |
| Develop workplace policy and procedures for sustainability | JUL | BUSM6394C | 25-06-2012 | 31-08-2012 | 09-11-2012 | 50 | 0.23 | 216 | 341 | 68 | 653.00 |
| Develop workplace policy and procedures for sustainability | JUL | BUSM6394C | 25-06-2012 | 31-08-2012 | 26-10-2012 | 50 | 0.23 | 216 | 341 | 68 | 653.00 |
* EFTSL : Equivalent Full Time Study Load
** Concession fees are only available at diploma and advanced diploma level for indigenous students.
Back to Program List
| Unit Of Study (Course) | Session | Course Code | Commencement Date | Census Date | Completion Date | Student Contact Hours (SCH) | EFTSL* | Tuition Fee: Onsite|Distance|RPL | |||
| Government Subsidised Fee | Full Fee (Non Government Subsidised) | ||||||||||
| Program commenced 1 July 2009-30 June 2012 ($) | Program commenced 1 July 2012-31 December 2012 ($) | Program commenced 1 July 2012-31 December 2012 Concession ** ($) | Australian Full Fee Paying ($) | ||||||||
| Communicate and apply standard industry procedures and policies in an engineering design office | JUL | CIVE5654 | 25-06-2012 | 31-08-2012 | 09-11-2012 | 60 | 0.08 | 260 | 284 | 57 | 831.00 |
| Prepare basic mechanical and structural engineering drawings to AS 1100 | JUL | CIVE5655 | 25-06-2012 | 31-08-2012 | 26-10-2012 | 40 | 0.05 | 173 | 189 | 38 | 554.00 |
| Apply knowledge of environmental issues | JUL | CIVE5656 | 25-06-2012 | 31-08-2012 | 09-11-2012 | 40 | 0.05 | 173 | 189 | 38 | 554.00 |
| Apply knowledge of environmental issues | JUL | CIVE5656 | 25-06-2012 | 31-08-2012 | 24-08-2012 | 40 | 0.05 | 173 | 189 | 38 | 554.00 |
| Use computer aided drafting systems to produce basic engineering drawings | JUL | MIET6093C | 25-06-2012 | 31-08-2012 | 07-09-2012 | 60 | 0.08 | 260 | 284 | 57 | 831.00 |
| Use technical mathematics (basic) | JUL | CIVE5658 | 25-06-2012 | 31-08-2012 | 09-11-2012 | 60 | 0.08 | 260 | 284 | 57 | 831.00 |
| Use standard office computer software for technical applications | JUL | CIVE5659 | 25-06-2012 | 31-08-2012 | 03-08-2012 | 20 | 0.03 | 87 | 95 | 19 | 277.00 |
| Apply knowledge of civil construction processes | JUL | CIVE5661 | 25-06-2012 | 31-08-2012 | 07-09-2012 | 40 | 0.05 | 173 | 189 | 38 | 554.00 |
| Apply knowledge of civil construction processes | JUL | CIVE5661 | 25-06-2012 | 31-08-2012 | 09-11-2012 | 40 | 0.05 | 173 | 189 | 38 | 554.00 |
| Prepare reinforced concrete drawings | JUL | CIVE5662 | 25-06-2012 | 31-08-2012 | 07-09-2012 | 60 | 0.08 | 260 | 284 | 57 | 831.00 |
| Prepare structural steel design drawings | JUL | CIVE5663 | 25-06-2012 | 31-08-2012 | 07-09-2012 | 40 | 0.05 | 173 | 189 | 38 | 554.00 |
| Apply knowledge of concrete technology | JUL | CIVE5664 | 25-06-2012 | 31-08-2012 | 09-11-2012 | 40 | 0.05 | 173 | 189 | 38 | 554.00 |
| Apply timber technology to engineering | JUL | CIVE5665 | 02-07-2012 | 31-08-2012 | 24-08-2012 | 40 | 0.05 | 173 | 189 | 38 | 554.00 |
| Prepare drawings required in the construction of urban roads | JUL | CIVE5666 | 25-06-2012 | 31-08-2012 | 24-08-2012 | 40 | 0.05 | 173 | 189 | 38 | 554.00 |
| Carry out geotechnical site investigation | JUL | CIVE5670 | 25-06-2012 | 31-08-2012 | 09-11-2012 | 40 | 0.05 | 173 | 189 | 38 | 554.00 |
| Analyse force systems (basic) | JUL | CIVE5671 | 25-06-2012 | 31-08-2012 | 09-11-2012 | 60 | 0.08 | 260 | 284 | 57 | 831.00 |
| Prepare cost estimates | JUL | CIVE5673 | 02-07-2012 | 31-08-2012 | 09-11-2012 | 20 | 0.03 | 87 | 95 | 19 | 277.00 |
| Prepare cost estimates | JUL | CIVE5673 | 25-06-2012 | 31-08-2012 | 09-11-2012 | 20 | 0.03 | 87 | 95 | 19 | 277.00 |
| Use technical mathematics (advanced) | JUL | CIVE5674 | 25-06-2012 | 31-08-2012 | 09-11-2012 | 60 | 0.08 | 260 | 284 | 57 | 831.00 |
| Analyse force systems (advanced) | JUL | CIVE5675 | 25-06-2012 | 31-08-2012 | 09-11-2012 | 60 | 0.08 | 260 | 284 | 57 | 831.00 |
| Select common engineering materials | JUL | PROC5277C | 25-06-2012 | 31-08-2012 | 09-11-2012 | 40 | 0.05 | 173 | 189 | 38 | 554.00 |
| Complete an engineering design project | JUL | CIVE5676 | 25-06-2012 | 31-08-2012 | 09-11-2012 | 60 | 0.08 | 260 | 284 | 57 | 831.00 |
| Carry out geometric road design | JUL | CIVE5678 | 25-06-2012 | 31-08-2012 | 09-11-2012 | 40 | 0.05 | 173 | 189 | 38 | 554.00 |
| Analyse and design flexural concrete members (simple) | JUL | CIVE5680 | 25-06-2012 | 31-08-2012 | 21-09-2012 | 40 | 0.05 | 173 | 189 | 38 | 554.00 |
| Analyse and design flexural concrete members (simple) | JUL | CIVE5680 | 25-06-2012 | 31-08-2012 | 22-09-2012 | 40 | 0.05 | 173 | 189 | 38 | 554.00 |
| Analyse and design flexural concrete members (simple) | JUL | CIVE5680 | 25-06-2012 | 31-08-2012 | 24-08-2012 | 40 | 0.05 | 173 | 189 | 38 | 554.00 |
| Analyse and design simple structural steel members | JUL | CIVE5681 | 25-06-2012 | 31-08-2012 | 09-11-2012 | 60 | 0.08 | 260 | 284 | 57 | 831.00 |
| Test and evaluate soils | JUL | CIVE5683 | 25-06-2012 | 31-08-2012 | 09-11-2012 | 40 | 0.05 | 173 | 189 | 38 | 554.00 |
| Analyse and design foundations | JUL | CIVE5684 | 25-06-2012 | 31-08-2012 | 09-11-2012 | 60 | 0.08 | 260 | 284 | 57 | 831.00 |
| Perform calulations related to simple fluid systems | JUL | CIVE5687 | 25-06-2012 | 31-08-2012 | 24-08-2012 | 40 | 0.05 | 173 | 189 | 38 | 554.00 |
| Design sewerage reticulation systems and small sewerage treatment plants | JUL | CIVE5691 | 25-06-2012 | 31-08-2012 | 09-11-2012 | 40 | 0.05 | 173 | 189 | 38 | 554.00 |
| Design underground piping drainage systems and minor culverts | JUL | CIVE5692 | 25-06-2012 | 31-08-2012 | 09-11-2012 | 40 | 0.05 | 173 | 189 | 38 | 554.00 |
| Design traffic control elements | JUL | CIVE5695 | 25-06-2012 | 31-08-2012 | 21-09-2012 | 20 | 0.03 | 87 | 95 | 19 | 277.00 |
| Apply knowledge of physical principles | JUL | CIVE5698 | 25-06-2012 | 31-08-2012 | 09-11-2012 | 50 | 0.07 | 216 | 236 | 48 | 692.50 |
| Use calculus | JUL | MATH5318 | 02-07-2012 | 31-08-2012 | 31-07-2012 | 60 | 0.08 | 260 | 284 | 57 | 831.00 |
| Use mathematics for higher level engineering | JUL | CIVE5699 | 25-06-2012 | 31-08-2012 | 09-11-2012 | 60 | 0.08 | 260 | 284 | 57 | 831.00 |
| Apply basic survey methods to engineering | JUL | MIET6333 | 25-06-2012 | 31-08-2012 | 07-09-2012 | 40 | 0.05 | 173 | 189 | 38 | 554.00 |
| Apply basic survey methods to engineering | JUL | MIET6333 | 25-06-2012 | 31-08-2012 | 24-08-2012 | 40 | 0.05 | 173 | 189 | 38 | 554.00 |
| Consider environmental issues in making engineering decisions | JUL | CIVE5717 | 25-06-2012 | 31-08-2012 | 09-11-2012 | 40 | 0.05 | 173 | 189 | 38 | 554.00 |
| Select common engineering materials | OCT | PROC5277C | 10-10-2012 | 30-11-2012 | 09-11-2012 | 40 | 0.05 | 173 | 189 | 38 | 554.00 |
| Analyse and design flexural members (complex) | OCT | CIVE5682 | 01-10-2012 | 30-11-2012 | 09-11-2012 | 40 | 0.05 | 173 | 189 | 38 | 554.00 |
| Analyse and design flexural members (complex) | OCT | CIVE5682 | 01-10-2012 | 30-11-2012 | 16-11-2012 | 40 | 0.05 | 173 | 189 | 38 | 554.00 |
| Design pavements | OCT | CIVE5694 | 01-10-2012 | 30-11-2012 | 09-11-2012 | 20 | 0.03 | 87 | 95 | 19 | 277.00 |
| Prepare basic mechanical and structural engineering drawings to AS 1100 | SEP | CIVE5655 | 17-09-2012 | 31-10-2012 | 09-11-2012 | 40 | 0.05 | 173 | 189 | 38 | 554.00 |
| Use computer aided drafting systems to produce basic engineering drawings | SEP | MIET6093C | 17-09-2012 | 31-10-2012 | 09-11-2012 | 60 | 0.08 | 260 | 284 | 57 | 831.00 |
| Use extended features of CAD | SEP | CIVE5657 | 10-09-2012 | 31-10-2012 | 09-11-2012 | 60 | 0.08 | 260 | 284 | 57 | 831.00 |
| Use extended features of CAD | SEP | CIVE5657 | 17-09-2012 | 31-10-2012 | 09-11-2012 | 60 | 0.08 | 260 | 284 | 57 | 831.00 |
| Use standard office computer software for technical applications | SEP | CIVE5659 | 17-09-2012 | 31-10-2012 | 09-11-2012 | 20 | 0.03 | 87 | 95 | 19 | 277.00 |
| Interpret and process survey data | SEP | CIVE5660 | 03-09-2012 | 31-10-2012 | 09-11-2012 | 40 | 0.05 | 173 | 189 | 38 | 554.00 |
| Interpret and process survey data | SEP | CIVE5660 | 10-09-2012 | 31-10-2012 | 09-11-2012 | 40 | 0.05 | 173 | 189 | 38 | 554.00 |
| Apply knowledge of civil construction processes | SEP | CIVE5661 | 03-09-2012 | 31-10-2012 | 09-11-2012 | 40 | 0.05 | 173 | 189 | 38 | 554.00 |
| Prepare reinforced concrete drawings | SEP | CIVE5662 | 10-09-2012 | 31-10-2012 | 09-11-2012 | 60 | 0.08 | 260 | 284 | 57 | 831.00 |
| Prepare structural steel design drawings | SEP | CIVE5663 | 10-09-2012 | 31-10-2012 | 09-11-2012 | 40 | 0.05 | 173 | 189 | 38 | 554.00 |
| Apply timber technology to engineering | SEP | CIVE5665 | 03-09-2012 | 31-10-2012 | 09-11-2012 | 40 | 0.05 | 173 | 189 | 38 | 554.00 |
| Prepare drawings for reticulatation systems | SEP | CIVE5667 | 03-09-2012 | 31-10-2012 | 09-11-2012 | 40 | 0.05 | 173 | 189 | 38 | 554.00 |
| Prepare cost estimates | SEP | CIVE5673 | 03-09-2012 | 31-10-2012 | 09-11-2012 | 20 | 0.03 | 87 | 95 | 19 | 277.00 |
| Determine design actions and analyse structures | SEP | CIVE5679 | 07-09-2012 | 31-10-2012 | 09-11-2012 | 60 | 0.08 | 260 | 284 | 57 | 831.00 |
| Analyse and design flexural members (complex) | SEP | CIVE5682 | 03-09-2012 | 31-10-2012 | 09-11-2012 | 40 | 0.05 | 173 | 189 | 38 | 554.00 |
| Perform calulations related to more complex fluid systems | SEP | CIVE5688 | 03-09-2012 | 31-10-2012 | 09-11-2012 | 40 | 0.05 | 173 | 189 | 38 | 554.00 |
| Manage an engineering project | SEP | CIVE5696 | 07-09-2012 | 31-10-2012 | 09-11-2012 | 40 | 0.05 | 173 | 189 | 38 | 554.00 |
| Use calculus | SEP | MATH5318 | 07-09-2012 | 31-10-2012 | 09-11-2012 | 60 | 0.08 | 260 | 284 | 57 | 831.00 |
* EFTSL : Equivalent Full Time Study Load
** Concession fees are only available at diploma and advanced diploma level for indigenous students.
Back to Program List
| Unit Of Study (Course) | Session | Course Code | Commencement Date | Census Date | Completion Date | Student Contact Hours (SCH) | EFTSL* | Tuition Fee: Onsite|Distance|RPL | |||
| Government Subsidised Fee | Full Fee (Non Government Subsidised) | ||||||||||
| Program commenced 1 July 2009-30 June 2012 ($) | Program commenced 1 July 2012-31 December 2012 ($) | Program commenced 1 July 2012-31 December 2012 Concession ** ($) | Australian Full Fee Paying ($) | ||||||||
| Apply structural and construction technology to the design of residential buildings | CY2 | BUIL5923 | 25-06-2012 | 31-03-2013 | 18-01-2013 | 180 | 0.23 | 779 | 1,024 | 205 | 2,264.40 |
| Comply with codes and standards in the design of residential buildings | CY2 | BUIL5925 | 25-06-2012 | 31-03-2013 | 18-01-2013 | 40 | 0.05 | 173 | 228 | 46 | 503.20 |
| Produce working drawings for residential buildings | CY2 | ARCH5157 | 25-06-2012 | 31-03-2013 | 18-01-2013 | 180 | 0.23 | 779 | 1,024 | 205 | 2,264.40 |
| Present architectural designs | CY2 | ARCH5161 | 25-06-2012 | 31-03-2013 | 18-01-2013 | 120 | 0.15 | 520 | 683 | 137 | 1,509.60 |
| Provide design solutions for residential and commercial buildings | CY2 | ARCH5184 | 25-06-2012 | 31-03-2013 | 18-01-2013 | 100 | 0.13 | 433 | 569 | 114 | 1,258.00 |
| Undertake site survey and analysis to inform design process | JUL | BUIL5922 | 25-06-2012 | 31-08-2012 | 23-11-2012 | 40 | 0.05 | 173 | 228 | 46 | 503.20 |
| Comply with codes and standards in the design of residential buildings | JUL | BUIL5925 | 25-06-2012 | 31-08-2012 | 23-11-2012 | 40 | 0.05 | 173 | 228 | 46 | 503.20 |
| Design safe buildings | JUL | ARCH5154 | 25-06-2012 | 31-08-2012 | 23-11-2012 | 40 | 0.05 | 173 | 228 | 46 | 503.20 |
| Select construction materials for building projects | JUL | BUIL5927 | 25-06-2012 | 31-08-2012 | 23-11-2012 | 40 | 0.05 | 173 | 228 | 46 | 503.20 |
| Manage architectural project administration | JUL | ARCH5162 | 25-06-2012 | 31-08-2012 | 23-11-2012 | 60 | 0.08 | 260 | 341 | 68 | 754.80 |
| Undertake small business planning | JUL | BUSM6315C | 25-06-2012 | 31-08-2012 | 23-11-2012 | 50 | 0.06 | 216 | 284 | 57 | 629.00 |
| Design sustainable buildings | JUL | ARCH5182 | 25-06-2012 | 31-08-2012 | 23-11-2012 | 30 | 0.04 | 130 | 171 | 34 | 377.40 |
| Integrate digital applications into architectural workflows | JUL | ARCH5186 | 25-06-2012 | 31-08-2012 | 14-12-2012 | 120 | 0.15 | 520 | 683 | 137 | 1,509.60 |
| Conduct a Bushfire Attack Level (BAL) assessment | JUL | BUIL6131 | 25-06-2012 | 31-08-2012 | 23-11-2012 | 60 | 0.08 | 260 | 341 | 68 | 754.80 |
| Apply a Bushfire Attack Level (BAL) assessment to the design and construction process | JUL | BUIL6132 | 25-06-2012 | 31-08-2012 | 23-11-2012 | 30 | 0.04 | 130 | 171 | 34 | 377.40 |
| Work safely in the construction industry | OCT | OHTH5534 | 08-10-2012 | 30-11-2012 | 19-10-2012 | 6 | 0.01 | 26 | 34 | 7 | 75.48 |
* EFTSL : Equivalent Full Time Study Load
** Concession fees are only available at diploma and advanced diploma level for indigenous students.
Back to Program List
| Unit Of Study (Course) | Session | Course Code | Commencement Date | Census Date | Completion Date | Student Contact Hours (SCH) | EFTSL* | Tuition Fee: Onsite|Distance|RPL | |||
| Government Subsidised Fee | Full Fee (Non Government Subsidised) | ||||||||||
| Program commenced 1 July 2009-30 June 2012 ($) | Program commenced 1 July 2012-31 December 2012 ($) | Program commenced 1 July 2012-31 December 2012 Concession ** ($) | Australian Full Fee Paying ($) | ||||||||
| Determine client spatial requirements | JUL | GEOM5107C | 25-06-2012 | 31-08-2012 | 09-11-2012 | 40 | 0.04 | 173 | 239 | 48 | 543.20 |
| Design a spatial project plan | JUL | BUSM6331C | 25-06-2012 | 31-08-2012 | 09-11-2012 | 60 | 0.07 | 260 | 359 | 72 | 814.80 |
| Undertake spatial information services research and development | JUL | GEOM5108C | 25-06-2012 | 31-08-2012 | 09-11-2012 | 80 | 0.09 | 346 | 478 | 96 | 1,086.40 |
| Conduct design and set out survey | JUL | GEOM5109C | 25-06-2012 | 31-08-2012 | 09-11-2012 | 60 | 0.07 | 260 | 359 | 72 | 814.80 |
| Conduct advanced remote sensing analysis | JUL | GEOM5112C | 25-06-2012 | 31-08-2012 | 09-11-2012 | 120 | 0.13 | 520 | 718 | 144 | 1,629.60 |
| Develop, monitor and maintain geographic information systems | JUL | COSC5981C | 25-06-2012 | 31-08-2012 | 09-11-2012 | 35 | 0.04 | 152 | 209 | 42 | 475.30 |
| Manage data within council's geographic information system | JUL | COSC5982C | 25-06-2012 | 31-08-2012 | 09-11-2012 | 35 | 0.04 | 152 | 209 | 42 | 475.30 |
* EFTSL : Equivalent Full Time Study Load
** Concession fees are only available at diploma and advanced diploma level for indigenous students.
Back to Program List
| Unit Of Study (Course) | Session | Course Code | Commencement Date | Census Date | Completion Date | Student Contact Hours (SCH) | EFTSL* | Tuition Fee: Onsite|Distance|RPL | |||
| Government Subsidised Fee | Full Fee (Non Government Subsidised) | ||||||||||
| Program commenced 1 July 2009-30 June 2012 ($) | Program commenced 1 July 2012-31 December 2012 ($) | Program commenced 1 July 2012-31 December 2012 Concession ** ($) | Australian Full Fee Paying ($) | ||||||||
| Manage operational plan | CY2 | BUSM6227C | 23-08-2012 | 31-03-2013 | 17-04-2013 | 60 | 0.08 | 260 | 111 | 22 | 585.60 |
| Develop, implement and promote effective workplace communication | CY2 | HWSS5431C | 23-08-2012 | 31-03-2013 | 17-04-2013 | 80 | 0.11 | 346 | 148 | 30 | 780.80 |
| Develop, implement and promote effective workplace communication | CY2 | HWSS5431C | 25-06-2012 | 31-03-2013 | 28-06-2013 | 80 | 0.11 | 346 | 148 | 30 | 780.80 |
| Reflect on and improve own professional practice | CY2 | EMPL5721C | 23-08-2012 | 31-03-2013 | 17-04-2013 | 120 | 0.16 | 520 | 222 | 44 | 1,171.20 |
| Reflect on and improve own professional practice | CY2 | EMPL5721C | 24-07-2012 | 31-03-2013 | 21-06-2013 | 120 | 0.16 | 520 | 222 | 44 | 1,171.20 |
| Reflect on and improve own professional practice | CY2 | EMPL5721C | 25-06-2012 | 31-03-2013 | 28-06-2013 | 120 | 0.16 | 520 | 222 | 44 | 1,171.20 |
| Develop new networks | CY2 | HWSS5441C | 23-08-2012 | 31-03-2013 | 17-04-2013 | 75 | 0.10 | 325 | 139 | 28 | 732.00 |
| Provide systems advocacy services | CY2 | JUST5168C | 23-08-2012 | 31-03-2013 | 17-04-2013 | 90 | 0.12 | 390 | 166 | 33 | 878.40 |
| Manage the delivery of quality services to clients | CY2 | MIET6209C | 23-08-2012 | 31-03-2013 | 17-04-2013 | 90 | 0.12 | 390 | 166 | 33 | 878.40 |
| Coordinate in-service assessment and response to address client needs | CY2 | MIET6210C | 23-08-2012 | 31-03-2013 | 17-04-2013 | 75 | 0.10 | 325 | 139 | 28 | 732.00 |
| Coordinate services for people with disabilities | CY2 | HWSS5469C | 23-08-2012 | 31-03-2013 | 17-04-2013 | 125 | 0.17 | 541 | 231 | 46 | 1,220.00 |
| Manage the organisation's information systems | CY2 | BUSM6333C | 23-08-2012 | 31-03-2013 | 17-04-2013 | 75 | 0.10 | 325 | 139 | 28 | 732.00 |
| Manage workplace issues | CY2 | BUSM6334C | 23-08-2012 | 31-03-2013 | 17-04-2013 | 75 | 0.10 | 325 | 139 | 28 | 732.00 |
| Establish and manage new programs or services | CY2 | BUSM6335C | 23-08-2012 | 31-03-2013 | 17-04-2013 | 75 | 0.10 | 325 | 139 | 28 | 732.00 |
| Manage quality of organisation's service delivery outcomes | CY2 | MIET6211C | 23-08-2012 | 31-03-2013 | 17-04-2013 | 90 | 0.12 | 390 | 166 | 33 | 878.40 |
| Promote and represent the service | CY2 | MKTG5956C | 23-08-2012 | 31-03-2013 | 17-04-2013 | 90 | 0.12 | 390 | 166 | 33 | 878.40 |
| Use targeted communication skills to build relationships | CY2 | MKTG5957C | 24-07-2012 | 31-03-2013 | 21-06-2013 | 55 | 0.07 | 238 | 102 | 20 | 536.80 |
| Work intensively with clients | CY2 | HWSS5472C | 24-07-2012 | 31-03-2013 | 21-06-2013 | 75 | 0.10 | 325 | 139 | 28 | 732.00 |
| Provide mentoring support to colleagues | CY2 | EMPL5734C | 23-08-2012 | 31-03-2013 | 17-04-2013 | 40 | 0.05 | 173 | 74 | 15 | 390.40 |
| Manage innovation and continuous improvement | CY2 | MIET6212C | 23-08-2012 | 31-03-2013 | 17-04-2013 | 60 | 0.08 | 260 | 111 | 22 | 585.60 |
| Manage the finances, accounts and resources of an organisation | CY2 | ACCT5335C | 23-08-2012 | 31-03-2013 | 17-04-2013 | 90 | 0.12 | 390 | 166 | 33 | 878.40 |
| Manage projects and strategies | CY2 | BUSM6453C | 23-08-2012 | 31-03-2013 | 17-04-2013 | 90 | 0.12 | 390 | 166 | 33 | 878.40 |
| Manage change in a community sector organisation | CY2 | BUSM6454C | 23-08-2012 | 31-03-2013 | 17-04-2013 | 150 | 0.20 | 650 | 278 | 56 | 1,464.00 |
| Lead and develop others in a community sector workplace | CY2 | BUSM6455C | 23-08-2012 | 31-03-2013 | 17-04-2013 | 90 | 0.12 | 390 | 166 | 33 | 878.40 |
| Manage workplace OHS processes | CY2 | OHTH5663C | 23-08-2012 | 31-03-2013 | 17-04-2013 | 40 | 0.05 | 173 | 74 | 15 | 390.40 |
| Use targeted communication skills to build relationships | OCT | MKTG5957C | 15-10-2012 | 30-11-2012 | 14-12-2012 | 55 | 0.07 | 238 | 102 | 20 | 536.80 |
| Work effectively with culturally diverse clients and co-workers | OCT | EMPL5932C | 15-10-2012 | 30-11-2012 | 14-12-2012 | 20 | 0.03 | 87 | 37 | 7 | 195.20 |
| Work effectively with culturally diverse clients and co-workers | SEP | EMPL5932C | 04-09-2012 | 31-10-2012 | 11-09-2012 | 20 | 0.03 | 87 | 37 | 7 | 195.20 |
* EFTSL : Equivalent Full Time Study Load
** Concession fees are only available at diploma and advanced diploma level for indigenous students.
Back to Program List
| Unit Of Study (Course) | Session | Course Code | Commencement Date | Census Date | Completion Date | Student Contact Hours (SCH) | EFTSL* | Tuition Fee: Onsite|Distance|RPL | |||
| Government Subsidised Fee | Full Fee (Non Government Subsidised) | ||||||||||
| Program commenced 1 July 2009-30 June 2012 ($) | Program commenced 1 July 2012-31 December 2012 ($) | Program commenced 1 July 2012-31 December 2012 Concession ** ($) | Australian Full Fee Paying ($) | ||||||||
| Provide leadership across the organisation | AUG | BUSM6355C | 27-08-2012 | 30-09-2012 | 25-11-2012 | 60 | 0.22 | 260 | 409 | 82 | 600.00 |
| Manage risk | CY2 | BUSM6445C | 13-08-2012 | 31-03-2013 | 09-08-2013 | 60 | 0.22 | 260 | 409 | 82 | 600.00 |
| Manage risk | CY2 | BUSM6445C | 23-07-2012 | 31-03-2013 | 22-07-2013 | 60 | 0.22 | 260 | 409 | 82 | 600.00 |
| Manage risk | CY2 | BUSM7816C | 09-08-2012 | 31-03-2013 | 02-08-2013 | 60 | 0.22 | 260 | 409 | 82 | 600.00 |
| Manage risk | CY2 | BUSM8701C | 26-11-2012 | 31-03-2013 | 24-02-2013 | 60 | 0.22 | 260 | 409 | 82 | 600.00 |
| Provide leadership across the organisation | CY2 | BUSM7813C | 13-08-2012 | 31-03-2013 | 09-08-2013 | 60 | 0.22 | 260 | 409 | 82 | 600.00 |
| Provide leadership across the organisation | CY2 | BUSM7813C | 23-07-2012 | 31-03-2013 | 22-07-2013 | 60 | 0.22 | 260 | 409 | 82 | 600.00 |
| Provide leadership across the organisation | CY2 | BUSM8709C | 09-08-2012 | 31-03-2013 | 02-08-2013 | 60 | 0.22 | 260 | 409 | 82 | 600.00 |
| Develop and implement a business plan | JUL | BUSM6247C | 25-06-2012 | 31-08-2012 | 09-11-2012 | 60 | 0.22 | 260 | 409 | 82 | 600.00 |
| Develop a marketing plan | JUL | MKTG5841C | 25-06-2012 | 31-08-2012 | 09-11-2012 | 50 | 0.18 | 216 | 341 | 68 | 500.00 |
| Manage risk | JUL | BUSM8701C | 25-06-2012 | 31-08-2012 | 26-10-2012 | 60 | 0.22 | 260 | 409 | 82 | 600.00 |
| Provide leadership across the organisation | JUL | BUSM6355C | 25-06-2012 | 31-08-2012 | 26-10-2012 | 60 | 0.22 | 260 | 409 | 82 | 600.00 |
* EFTSL : Equivalent Full Time Study Load
** Concession fees are only available at diploma and advanced diploma level for indigenous students.
Back to Program List
| Unit Of Study (Course) | Session | Course Code | Commencement Date | Census Date | Completion Date | Student Contact Hours (SCH) | EFTSL* | Tuition Fee: Onsite|Distance|RPL | |||
| Government Subsidised Fee | Full Fee (Non Government Subsidised) | ||||||||||
| Program commenced 1 July 2009-30 June 2012 ($) | Program commenced 1 July 2012-31 December 2012 ($) | Program commenced 1 July 2012-31 December 2012 Concession ** ($) | Australian Full Fee Paying ($) | ||||||||
| Manage operational plan | AUG | BUSM6233C | 06-08-2012 | 30-09-2012 | 09-11-2012 | 60 | 0.11 | 260 | 375 | 75 | 807.60 |
| Provide leadership across the organisation | AUG | BUSM6355C | 27-08-2012 | 30-09-2012 | 25-11-2012 | 60 | 0.11 | 260 | 375 | 75 | 807.60 |
| Manage operational plan | CY2 | BUSM7814C | 13-08-2012 | 31-03-2013 | 09-08-2013 | 60 | 0.11 | 260 | 375 | 75 | 807.60 |
| Manage operational plan | CY2 | BUSM7814C | 23-07-2012 | 31-03-2013 | 22-07-2013 | 60 | 0.11 | 260 | 375 | 75 | 807.60 |
| Manage operational plan | CY2 | BUSM8708C | 09-08-2012 | 31-03-2013 | 02-08-2013 | 60 | 0.11 | 260 | 375 | 75 | 807.60 |
| Manage risk | CY2 | BUSM6445C | 13-08-2012 | 31-03-2013 | 09-08-2013 | 60 | 0.11 | 260 | 375 | 75 | 807.60 |
| Manage risk | CY2 | BUSM6445C | 23-07-2012 | 31-03-2013 | 22-07-2013 | 60 | 0.11 | 260 | 375 | 75 | 807.60 |
| Manage risk | CY2 | BUSM7816C | 09-08-2012 | 31-03-2013 | 02-08-2013 | 60 | 0.11 | 260 | 375 | 75 | 807.60 |
| Manage risk | CY2 | BUSM8701C | 26-11-2012 | 31-03-2013 | 24-02-2013 | 60 | 0.11 | 260 | 375 | 75 | 807.60 |
| Provide leadership across the organisation | CY2 | BUSM7813C | 13-08-2012 | 31-03-2013 | 09-08-2013 | 60 | 0.11 | 260 | 375 | 75 | 807.60 |
| Provide leadership across the organisation | CY2 | BUSM7813C | 23-07-2012 | 31-03-2013 | 22-07-2013 | 60 | 0.11 | 260 | 375 | 75 | 807.60 |
| Provide leadership across the organisation | CY2 | BUSM8709C | 09-08-2012 | 31-03-2013 | 02-08-2013 | 60 | 0.11 | 260 | 375 | 75 | 807.60 |
| Manage export logistics | JUL | BUSM6186C | 25-06-2012 | 31-08-2012 | 09-11-2012 | 100 | 0.19 | 433 | 625 | 125 | 1,346.00 |
| Manage operational plan | JUL | BUSM6233C | 18-07-2012 | 31-08-2012 | 15-10-2012 | 60 | 0.11 | 260 | 375 | 75 | 807.60 |
| Manage risk | JUL | BUSM8701C | 25-06-2012 | 31-08-2012 | 26-10-2012 | 60 | 0.11 | 260 | 375 | 75 | 807.60 |
| Provide leadership across the organisation | JUL | BUSM6355C | 25-06-2012 | 31-08-2012 | 26-10-2012 | 60 | 0.11 | 260 | 375 | 75 | 807.60 |
| Apply contract law to international business activities | JUL | LAW5178 | 25-06-2012 | 31-08-2012 | 09-11-2012 | 60 | 0.11 | 260 | 375 | 75 | 807.60 |
| Review the financial structures and processes in international trade | JUL | MKTG6981 | 25-06-2012 | 31-08-2012 | 09-11-2012 | 80 | 0.15 | 346 | 500 | 100 | 1,076.80 |
| Manage economic trends in the global market | JUL | MKTG6982 | 25-06-2012 | 31-08-2012 | 09-11-2012 | 60 | 0.11 | 260 | 375 | 75 | 807.60 |
| Establish and maintain strategic networks | JUL | POLI5036C | 25-06-2012 | 31-08-2012 | 09-11-2012 | 40 | 0.07 | 173 | 250 | 50 | 538.40 |
| Direct the management of contracts | JUL | LAW5179C | 25-06-2012 | 31-08-2012 | 09-11-2012 | 60 | 0.11 | 260 | 375 | 75 | 807.60 |
| Manage operational plan | SEP | BUSM6233C | 01-09-2012 | 31-10-2012 | 21-12-2012 | 60 | 0.11 | 260 | 375 | 75 | 807.60 |
* EFTSL : Equivalent Full Time Study Load
** Concession fees are only available at diploma and advanced diploma level for indigenous students.
Back to Program List
| Unit Of Study (Course) | Session | Course Code | Commencement Date | Census Date | Completion Date | Student Contact Hours (SCH) | EFTSL* | Tuition Fee: Onsite|Distance|RPL | |||
| Government Subsidised Fee | Full Fee (Non Government Subsidised) | ||||||||||
| Program commenced 1 July 2009-30 June 2012 ($) | Program commenced 1 July 2012-31 December 2012 ($) | Program commenced 1 July 2012-31 December 2012 Concession ** ($) | Australian Full Fee Paying ($) | ||||||||
| Manage budgets and financial plans | AUG | ACCT5272C | 01-08-2012 | 30-09-2012 | 21-12-2012 | 70 | 0.13 | 303 | 398 | 80 | 942.90 |
| Establish and adjust the marketing mix | AUG | MKTG5811C | 27-08-2012 | 30-09-2012 | 30-10-2012 | 60 | 0.11 | 260 | 341 | 68 | 808.20 |
| Write complex documents | AUG | OFFC5208C | 01-08-2012 | 30-09-2012 | 20-12-2012 | 50 | 0.09 | 216 | 284 | 57 | 673.50 |
| Manage budgets and financial plans | CY2 | ACCT5329C | 13-08-2012 | 31-03-2013 | 09-08-2013 | 70 | 0.13 | 303 | 398 | 80 | 942.90 |
| Manage budgets and financial plans | CY2 | ACCT5329C | 23-07-2012 | 31-03-2013 | 22-07-2013 | 70 | 0.13 | 303 | 398 | 80 | 942.90 |
| Manage budgets and financial plans | CY2 | ACCT5331C | 09-08-2012 | 31-03-2013 | 02-08-2013 | 70 | 0.13 | 303 | 398 | 80 | 942.90 |
| Write complex documents | CY2 | OFFC5208C | 01-08-2012 | 31-03-2013 | 15-02-2013 | 50 | 0.09 | 216 | 284 | 57 | 673.50 |
| Write complex documents | CY2 | OFFC5208C | 01-11-2012 | 31-03-2013 | 28-02-2013 | 50 | 0.09 | 216 | 284 | 57 | 673.50 |
| Ensure a safe workplace | CY2 | OHTH5592C | 26-11-2012 | 31-03-2013 | 24-02-2013 | 60 | 0.11 | 260 | 341 | 68 | 808.20 |
| Address legal and administrative requirements | JUL | BUSM5794C | 25-06-2012 | 31-08-2012 | 26-10-2012 | 50 | 0.09 | 216 | 284 | 57 | 673.50 |
| Develop and apply industry knowledge | JUL | EMPL5392C | 25-06-2012 | 31-08-2012 | 26-10-2012 | 15 | 0.03 | 65 | 85 | 17 | 202.05 |
| Ensure team effectiveness | JUL | EMPL5627C | 25-06-2012 | 31-08-2012 | 26-10-2012 | 60 | 0.11 | 260 | 341 | 68 | 808.20 |
| Manage budgets and financial plans | JUL | ACCT5272C | 18-07-2012 | 31-08-2012 | 15-10-2012 | 70 | 0.13 | 303 | 398 | 80 | 942.90 |
| Manage budgets and financial plans | JUL | ACCT5272C | 25-06-2012 | 31-08-2012 | 09-11-2012 | 70 | 0.13 | 303 | 398 | 80 | 942.90 |
| Manage budgets and financial plans | JUL | ACCT5272C | 25-06-2012 | 31-08-2012 | 26-10-2012 | 70 | 0.13 | 303 | 398 | 80 | 942.90 |
| Establish and adjust the marketing mix | JUL | MKTG5811C | 25-06-2012 | 31-08-2012 | 26-10-2012 | 60 | 0.11 | 260 | 341 | 68 | 808.20 |
| Develop an advertising campaign | JUL | MKTG5824C | 25-06-2012 | 31-08-2012 | 26-10-2012 | 60 | 0.11 | 260 | 341 | 68 | 808.20 |
| Execute an advertising campaign | JUL | MKTG5825C | 25-06-2012 | 31-08-2012 | 26-10-2012 | 70 | 0.13 | 303 | 398 | 80 | 942.90 |
| Evaluate campaign effectiveness | JUL | MKTG5826C | 25-06-2012 | 31-08-2012 | 26-10-2012 | 60 | 0.11 | 260 | 341 | 68 | 808.20 |
| Develop and implement a business plan | JUL | BUSM6247C | 25-06-2012 | 31-08-2012 | 09-11-2012 | 60 | 0.11 | 260 | 341 | 68 | 808.20 |
| Build client relationships and business networks | JUL | MKTG5828C | 25-06-2012 | 31-08-2012 | 26-10-2012 | 50 | 0.09 | 216 | 284 | 57 | 673.50 |
| Develop organisational marketing objectives | JUL | MKTG5842C | 25-06-2012 | 31-08-2012 | 09-11-2012 | 60 | 0.11 | 260 | 341 | 68 | 808.20 |
| Develop and implement crisis management plans | JUL | MKTG7828C | 25-06-2012 | 31-08-2012 | 26-10-2012 | 40 | 0.07 | 173 | 228 | 46 | 538.80 |
| Manage fundraising and sponsorship activities | JUL | MKTG7829C | 25-06-2012 | 31-08-2012 | 26-10-2012 | 50 | 0.09 | 216 | 284 | 57 | 673.50 |
| Write complex documents | JUL | OFFC5208C | 25-06-2012 | 31-08-2012 | 26-10-2012 | 50 | 0.09 | 216 | 284 | 57 | 673.50 |
| Develop workplace policy and procedures for sustainability | JUL | BUSM6394C | 25-06-2012 | 31-08-2012 | 09-11-2012 | 50 | 0.09 | 216 | 284 | 57 | 673.50 |
| Develop workplace policy and procedures for sustainability | JUL | BUSM6394C | 25-06-2012 | 31-08-2012 | 26-10-2012 | 50 | 0.09 | 216 | 284 | 57 | 673.50 |
| Manage the public relations publication process | JUL | MKTG6048C | 25-06-2012 | 31-08-2012 | 26-10-2012 | 45 | 0.08 | 195 | 256 | 51 | 606.15 |
| Undertake research and analysis | JUL | MATH5332C | 25-06-2012 | 31-08-2012 | 26-10-2012 | 40 | 0.07 | 173 | 228 | 46 | 538.80 |
| Create visual design components | JUL | VART6059C | 25-06-2012 | 31-08-2012 | 26-10-2012 | 30 | 0.05 | 130 | 171 | 34 | 404.10 |
| Ensure a safe workplace | JUL | OHTH5592C | 25-06-2012 | 31-08-2012 | 26-10-2012 | 60 | 0.11 | 260 | 341 | 68 | 808.20 |
| Develop and manage complex public relations campaigns | JUL | MKTG6049C | 25-06-2012 | 31-08-2012 | 26-10-2012 | 50 | 0.09 | 216 | 284 | 57 | 673.50 |
| Ensure a safe workplace | NOV | OHTH5592C | 29-11-2012 | 31-12-2012 | 21-12-2012 | 60 | 0.11 | 260 | 341 | 68 | 808.20 |
| Ensure a safe workplace | NOV | OHTH5592C | 29-11-2012 | 31-12-2012 | 31-12-2012 | 60 | 0.11 | 260 | 341 | 68 | 808.20 |
| Establish and adjust the marketing mix | OCT | MKTG5811C | 01-10-2012 | 30-11-2012 | 21-12-2012 | 60 | 0.11 | 260 | 341 | 68 | 808.20 |
* EFTSL : Equivalent Full Time Study Load
** Concession fees are only available at diploma and advanced diploma level for indigenous students.
Back to Program List
| Unit Of Study (Course) | Session | Course Code | Commencement Date | Census Date | Completion Date | Student Contact Hours (SCH) | EFTSL* | Tuition Fee: Onsite|Distance|RPL | |||
| Government Subsidised Fee | Full Fee (Non Government Subsidised) | ||||||||||
| Program commenced 1 July 2009-30 June 2012 ($) | Program commenced 1 July 2012-31 December 2012 ($) | Program commenced 1 July 2012-31 December 2012 Concession ** ($) | Australian Full Fee Paying ($) | ||||||||
| Plan and manage film and media post-production | JUL | VART5927C | 25-06-2012 | 31-08-2012 | 23-11-2012 | 35 | 0.04 | 152 | 160 | 32 | 444.15 |
| Ensure a safe workplace | JUL | OHTH5467C | 25-06-2012 | 31-08-2012 | 23-11-2012 | 60 | 0.06 | 260 | 274 | 55 | 761.40 |
| Manage projects | JUL | BUSM6223C | 25-06-2012 | 31-08-2012 | 23-11-2012 | 60 | 0.06 | 260 | 274 | 55 | 761.40 |
| Design web environments | JUL | COSC5949C | 25-06-2012 | 31-08-2012 | 23-11-2012 | 50 | 0.05 | 216 | 228 | 46 | 634.50 |
| Manage the marketing process | JUL | MKTG5806C | 25-06-2012 | 31-08-2012 | 23-11-2012 | 50 | 0.05 | 216 | 228 | 46 | 634.50 |
| Manage production of sound recordings | JUL | PERF5074C | 25-06-2012 | 31-08-2012 | 23-11-2012 | 50 | 0.05 | 216 | 228 | 46 | 634.50 |
| Develop sound designs | JUL | VART6065C | 25-06-2012 | 31-08-2012 | 23-11-2012 | 50 | 0.05 | 216 | 228 | 46 | 634.50 |
| Implement sound designs | JUL | VART6067C | 25-06-2012 | 31-08-2012 | 23-11-2012 | 50 | 0.05 | 216 | 228 | 46 | 634.50 |
| Incorporate interactive technology into performance | JUL | VART6080C | 25-06-2012 | 31-08-2012 | 23-11-2012 | 60 | 0.06 | 260 | 274 | 55 | 761.40 |
* EFTSL : Equivalent Full Time Study Load
** Concession fees are only available at diploma and advanced diploma level for indigenous students.
Back to Program List
| Unit Of Study (Course) | Session | Course Code | Commencement Date | Census Date | Completion Date | Student Contact Hours (SCH) | EFTSL* | Tuition Fee: Onsite|Distance|RPL | |||
| Government Subsidised Fee | Full Fee (Non Government Subsidised) | ||||||||||
| Program commenced 1 July 2009-30 June 2012 ($) | Program commenced 1 July 2012-31 December 2012 ($) | Program commenced 1 July 2012-31 December 2012 Concession ** ($) | Australian Full Fee Paying ($) | ||||||||
| Design and produce business documents | AUG | BUSM6232C | 06-08-2012 | 30-09-2012 | 09-11-2012 | 80 | 0.15 | 346 | 522 | 104 | 1,042.40 |
| Design and produce text documents | AUG | COSC5941C | 29-08-2012 | 30-09-2012 | 20-12-2012 | 90 | 0.17 | 390 | 587 | 117 | 1,172.70 |
| Produce spreadsheets | AUG | COSC5942C | 01-08-2012 | 30-09-2012 | 14-12-2012 | 35 | 0.06 | 152 | 228 | 46 | 456.05 |
| Make a presentation | AUG | COMM5928C | 01-08-2012 | 30-09-2012 | 21-12-2012 | 30 | 0.06 | 130 | 196 | 39 | 390.90 |
| Manage people performance | AUG | EMPL5632C | 21-08-2012 | 30-09-2012 | 22-11-2012 | 70 | 0.13 | 303 | 456 | 91 | 912.10 |
| Manage people performance | AUG | EMPL5632C | 21-08-2012 | 30-09-2012 | 26-10-2012 | 70 | 0.13 | 303 | 456 | 91 | 912.10 |
| Write complex documents | AUG | OFFC5208C | 01-08-2012 | 30-09-2012 | 20-12-2012 | 50 | 0.09 | 216 | 326 | 65 | 651.50 |
| Design and produce business documents | CY2 | BUSM6232C | 11-07-2012 | 31-03-2013 | 31-01-2013 | 80 | 0.15 | 346 | 522 | 104 | 1,042.40 |
| Develop keyboarding speed and accuracy | CY2 | OFFC5196C | 11-07-2012 | 31-03-2013 | 28-02-2013 | 50 | 0.09 | 216 | 326 | 65 | 651.50 |
| Develop keyboarding speed and accuracy | CY2 | OFFC5196C | 11-07-2012 | 31-03-2013 | 31-01-2013 | 50 | 0.09 | 216 | 326 | 65 | 651.50 |
| Design and produce text documents | CY2 | COSC5941C | 11-07-2012 | 31-03-2013 | 31-01-2013 | 90 | 0.17 | 390 | 587 | 117 | 1,172.70 |
| Produce spreadsheets | CY2 | COSC5942C | 01-08-2012 | 31-03-2013 | 18-02-2013 | 35 | 0.06 | 152 | 228 | 46 | 456.05 |
| Produce spreadsheets | CY2 | COSC5942C | 01-08-2012 | 31-03-2013 | 25-01-2013 | 35 | 0.06 | 152 | 228 | 46 | 456.05 |
| Produce spreadsheets | CY2 | COSC5942C | 01-10-2012 | 31-03-2013 | 11-04-2013 | 35 | 0.06 | 152 | 228 | 46 | 456.05 |
| Produce spreadsheets | CY2 | COSC5942C | 01-10-2012 | 31-03-2013 | 22-04-2013 | 35 | 0.06 | 152 | 228 | 46 | 456.05 |
| Produce spreadsheets | CY2 | COSC5942C | 01-10-2012 | 31-03-2013 | 31-01-2013 | 35 | 0.06 | 152 | 228 | 46 | 456.05 |
| Produce spreadsheets | CY2 | COSC5942C | 17-12-2012 | 31-03-2013 | 06-06-2013 | 35 | 0.06 | 152 | 228 | 46 | 456.05 |
| Organise workplace information | CY2 | OFFC5200C | 01-07-2012 | 31-03-2013 | 23-01-2013 | 30 | 0.06 | 130 | 196 | 39 | 390.90 |
| Organise workplace information | CY2 | OFFC5200C | 01-08-2012 | 31-03-2013 | 28-02-2013 | 30 | 0.06 | 130 | 196 | 39 | 390.90 |
| Organise workplace information | CY2 | OFFC5200C | 01-10-2012 | 31-03-2013 | 22-04-2013 | 30 | 0.06 | 130 | 196 | 39 | 390.90 |
| Organise workplace information | CY2 | OFFC5200C | 17-12-2012 | 31-03-2013 | 18-06-2013 | 30 | 0.06 | 130 | 196 | 39 | 390.90 |
| Organise workplace information | CY2 | OFFC5200C | 17-12-2012 | 31-03-2013 | 25-05-2013 | 30 | 0.06 | 130 | 196 | 39 | 390.90 |
| Make a presentation | CY2 | COMM5928C | 01-08-2012 | 31-03-2013 | 13-02-2013 | 30 | 0.06 | 130 | 196 | 39 | 390.90 |
| Make a presentation | CY2 | COMM5928C | 15-10-2012 | 31-03-2013 | 28-06-2013 | 30 | 0.06 | 130 | 196 | 39 | 390.90 |
| Manage people performance | CY2 | EMPL5632C | 07-11-2012 | 31-03-2013 | 16-01-2013 | 70 | 0.13 | 303 | 456 | 91 | 912.10 |
| Manage people performance | CY2 | EMPL9757C | 01-08-2012 | 31-03-2013 | 31-07-2013 | 70 | 0.13 | 303 | 456 | 91 | 912.10 |
| Manage people performance | CY2 | EMPL9757C | 12-07-2012 | 31-03-2013 | 11-07-2013 | 70 | 0.13 | 303 | 456 | 91 | 912.10 |
| Manage people performance | CY2 | EMPL9757C | 13-08-2012 | 31-03-2013 | 09-08-2013 | 70 | 0.13 | 303 | 456 | 91 | 912.10 |
| Manage people performance | CY2 | EMPL9757C | 16-08-2012 | 31-03-2013 | 15-08-2013 | 70 | 0.13 | 303 | 456 | 91 | 912.10 |
| Manage people performance | CY2 | EMPL9757C | 17-09-2012 | 31-03-2013 | 16-09-2013 | 70 | 0.13 | 303 | 456 | 91 | 912.10 |
| Manage people performance | CY2 | EMPL9757C | 23-07-2012 | 31-03-2013 | 22-07-2013 | 70 | 0.13 | 303 | 456 | 91 | 912.10 |
| Manage people performance | CY2 | EMPL9758C | 02-07-2012 | 31-03-2013 | 01-07-2013 | 70 | 0.13 | 303 | 456 | 91 | 912.10 |
| Manage people performance | CY2 | EMPL9758C | 03-09-2012 | 31-03-2013 | 02-09-2013 | 70 | 0.13 | 303 | 456 | 91 | 912.10 |
| Manage people performance | CY2 | EMPL9758C | 07-08-2012 | 31-03-2013 | 06-08-2013 | 70 | 0.13 | 303 | 456 | 91 | 912.10 |
| Manage people performance | CY2 | EMPL9758C | 17-07-2012 | 31-03-2013 | 16-07-2013 | 70 | 0.13 | 303 | 456 | 91 | 912.10 |
| Manage people performance | CY2 | EMPL9758C | 23-07-2012 | 31-03-2013 | 22-07-2013 | 70 | 0.13 | 303 | 456 | 91 | 912.10 |
| Manage people performance | CY2 | EMPL9768C | 09-08-2012 | 31-03-2013 | 02-08-2013 | 70 | 0.13 | 303 | 456 | 91 | 912.10 |
| Write complex documents | CY2 | OFFC5208C | 01-08-2012 | 31-03-2013 | 15-02-2013 | 50 | 0.09 | 216 | 326 | 65 | 651.50 |
| Write complex documents | CY2 | OFFC5208C | 01-11-2012 | 31-03-2013 | 28-02-2013 | 50 | 0.09 | 216 | 326 | 65 | 651.50 |
| Use business technology | CY2 | OFFC5210C | 01-08-2012 | 31-03-2013 | 15-02-2013 | 20 | 0.04 | 87 | 130 | 26 | 260.60 |
| Use business technology | CY2 | OFFC5210C | 01-08-2012 | 31-03-2013 | 22-01-2013 | 20 | 0.04 | 87 | 130 | 26 | 260.60 |
| Use business technology | CY2 | OFFC5210C | 01-10-2012 | 31-03-2013 | 11-04-2013 | 20 | 0.04 | 87 | 130 | 26 | 260.60 |
| Use business technology | CY2 | OFFC5210C | 01-10-2012 | 31-03-2013 | 31-01-2013 | 20 | 0.04 | 87 | 130 | 26 | 260.60 |
| Design and produce business documents | JUL | BUSM6232C | 25-06-2012 | 31-08-2012 | 09-11-2012 | 80 | 0.15 | 346 | 522 | 104 | 1,042.40 |
| Design and produce business documents | JUL | BUSM6232C | 25-06-2012 | 31-08-2012 | 26-10-2012 | 80 | 0.15 | 346 | 522 | 104 | 1,042.40 |
| Develop keyboarding speed and accuracy | JUL | OFFC5196C | 25-06-2012 | 31-08-2012 | 26-10-2012 | 50 | 0.09 | 216 | 326 | 65 | 651.50 |
| Organise workplace information | JUL | OFFC5200C | 25-06-2012 | 31-08-2012 | 26-10-2012 | 30 | 0.06 | 130 | 196 | 39 | 390.90 |
| Plan or review administration systems | JUL | BUSM6242C | 25-06-2012 | 31-08-2012 | 26-10-2012 | 50 | 0.09 | 216 | 326 | 65 | 651.50 |
| Manage business document design and development | JUL | BUSM6243C | 25-06-2012 | 31-08-2012 | 26-10-2012 | 80 | 0.15 | 346 | 522 | 104 | 1,042.40 |
| Manage personal work priorities and professional development | JUL | EMPL5626C | 25-06-2012 | 31-08-2012 | 26-10-2012 | 60 | 0.11 | 260 | 391 | 78 | 781.80 |
| Ensure team effectiveness | JUL | EMPL5627C | 25-06-2012 | 31-08-2012 | 26-10-2012 | 60 | 0.11 | 260 | 391 | 78 | 781.80 |
| Make a presentation | JUL | COMM5928C | 25-06-2012 | 31-08-2012 | 26-10-2012 | 30 | 0.06 | 130 | 196 | 39 | 390.90 |
| Manage people performance | JUL | EMPL5632C | 25-06-2012 | 31-08-2012 | 26-10-2012 | 70 | 0.13 | 303 | 456 | 91 | 912.10 |
| Develop and nurture relationships with clients, other professionals and third party referrers | JUL | MKTG5878C | 25-06-2012 | 31-08-2012 | 28-09-2012 | 50 | 0.09 | 216 | 326 | 65 | 651.50 |
| Write complex documents | JUL | OFFC5208C | 25-06-2012 | 31-08-2012 | 26-10-2012 | 50 | 0.09 | 216 | 326 | 65 | 651.50 |
| Deliver and monitor a service to customers | JUL | MKTG5925C | 25-06-2012 | 31-08-2012 | 31-08-2012 | 35 | 0.06 | 152 | 228 | 46 | 456.05 |
| Use business technology | JUL | OFFC5210C | 25-06-2012 | 31-08-2012 | 26-10-2012 | 20 | 0.04 | 87 | 130 | 26 | 260.60 |
| Use business technology | JUL | OFFC5210C | 25-06-2012 | 31-08-2012 | 31-08-2012 | 20 | 0.04 | 87 | 130 | 26 | 260.60 |
| Implement and monitor environmentally sustainable work practices | JUL | EASC5040C | 25-06-2012 | 31-08-2012 | 26-10-2012 | 40 | 0.07 | 173 | 261 | 52 | 521.20 |
| Law of contract | JUL | LAW5184 | 25-06-2012 | 31-08-2012 | 26-10-2012 | 51 | 0.09 | 221 | 333 | 66 | 664.53 |
| Property law | JUL | LAW5185 | 25-06-2012 | 31-08-2012 | 26-10-2012 | 51 | 0.09 | 221 | 333 | 66 | 664.53 |
| Commercial law | JUL | LAW5188 | 25-06-2012 | 31-08-2012 | 26-10-2012 | 51 | 0.09 | 221 | 333 | 66 | 664.53 |
| Practise in a legal environment | JUL | LAW5189 | 25-06-2012 | 31-08-2012 | 26-10-2012 | 68 | 0.13 | 294 | 443 | 88 | 886.04 |
| The conveyancing process | JUL | LAW5190 | 25-06-2012 | 31-08-2012 | 26-10-2012 | 51 | 0.09 | 221 | 333 | 66 | 664.53 |
| Family law | JUL | LAW5191 | 25-06-2012 | 31-08-2012 | 26-10-2012 | 51 | 0.09 | 221 | 333 | 66 | 664.53 |
| Wills, probate and administration | JUL | LAW5192 | 25-06-2012 | 31-08-2012 | 26-10-2012 | 51 | 0.09 | 221 | 333 | 66 | 664.53 |
| Civil procedure | JUL | LAW5193 | 25-06-2012 | 31-08-2012 | 26-10-2012 | 51 | 0.09 | 221 | 333 | 66 | 664.53 |
| Land contracts | JUL | LAW5195 | 25-06-2012 | 31-08-2012 | 26-10-2012 | 51 | 0.09 | 221 | 333 | 66 | 664.53 |
| Mortgages leases and building contracts | JUL | LAW5196 | 25-06-2012 | 31-08-2012 | 26-10-2012 | 51 | 0.09 | 221 | 333 | 66 | 664.53 |
| Consumer protection law | JUL | LAW5197 | 25-06-2012 | 31-08-2012 | 26-10-2012 | 51 | 0.09 | 221 | 333 | 66 | 664.53 |
| Administration law | JUL | LAW5198 | 25-06-2012 | 31-08-2012 | 26-10-2012 | 51 | 0.09 | 221 | 333 | 66 | 664.53 |
| Intellectual property and business law | JUL | LAW5199 | 25-06-2012 | 31-08-2012 | 26-10-2012 | 51 | 0.09 | 221 | 333 | 66 | 664.53 |
| Prepare and produce complex legal documents | JUL | JUST5176C | 25-06-2012 | 31-08-2012 | 26-10-2012 | 80 | 0.15 | 346 | 522 | 104 | 1,042.40 |
| Maintain workplace safety | JUL | OHTH5595C | 25-06-2012 | 31-08-2012 | 24-08-2012 | 40 | 0.07 | 173 | 261 | 52 | 521.20 |
* EFTSL : Equivalent Full Time Study Load
** Concession fees are only available at diploma and advanced diploma level for indigenous students.
Back to Program List
| Unit Of Study (Course) | Session | Course Code | Commencement Date | Census Date | Completion Date | Student Contact Hours (SCH) | EFTSL* | Tuition Fee: Onsite|Distance|RPL | |||
| Government Subsidised Fee | Full Fee (Non Government Subsidised) | ||||||||||
| Program commenced 1 July 2009-30 June 2012 ($) | Program commenced 1 July 2012-31 December 2012 ($) | Program commenced 1 July 2012-31 December 2012 Concession ** ($) | Australian Full Fee Paying ($) | ||||||||
| Apply OHS practices in the workplace | AUG | OHTH5464C | 08-08-2012 | 30-09-2012 | 21-12-2012 | 20 | 0.02 | 87 | 66 | 13 | 257.40 |
| Apply OHS practices in the workplace | AUG | OHTH5464C | 28-08-2012 | 30-09-2012 | 21-12-2012 | 20 | 0.02 | 87 | 66 | 13 | 257.40 |
| Participate in development and follow a personal competency development plan | AUG | BUSM6211C | 21-08-2012 | 30-09-2012 | 21-12-2012 | 20 | 0.02 | 87 | 66 | 13 | 257.40 |
| Participate in development and follow a personal competency development plan | AUG | BUSM6211C | 30-08-2012 | 30-09-2012 | 21-12-2012 | 20 | 0.02 | 87 | 66 | 13 | 257.40 |
| Dismantle, assemble and fabricate electrotechnology components | AUG | EEET6747C | 13-08-2012 | 30-09-2012 | 09-11-2012 | 40 | 0.04 | 173 | 131 | 26 | 514.80 |
| Fix and secure equipment | AUG | EEET6748C | 13-08-2012 | 30-09-2012 | 09-11-2012 | 20 | 0.02 | 87 | 66 | 13 | 257.40 |
| Use drawings, diagrams, schedules and manuals | AUG | EEET6749C | 13-08-2012 | 30-09-2012 | 09-11-2012 | 40 | 0.04 | 173 | 131 | 26 | 514.80 |
| Use drawings, diagrams, schedules and manuals | AUG | EEET6749C | 13-08-2012 | 30-09-2012 | 14-12-2012 | 40 | 0.04 | 173 | 131 | 26 | 514.80 |
| Troubleshoot frequency dependent circuits | AUG | EEET6753C | 27-08-2012 | 30-09-2012 | 21-12-2012 | 80 | 0.08 | 346 | 262 | 53 | 1,029.60 |
| Apply OHS practices in the workplace | CY2 | OHTH5464C | 01-08-2012 | 31-03-2013 | 31-07-2013 | 20 | 0.02 | 87 | 66 | 13 | 257.40 |
| Apply OHS practices in the workplace | CY2 | OHTH5464C | 02-07-2012 | 31-03-2013 | 28-06-2013 | 20 | 0.02 | 87 | 66 | 13 | 257.40 |
| Apply OHS practices in the workplace | CY2 | OHTH5464C | 16-07-2012 | 31-03-2013 | 26-04-2013 | 20 | 0.02 | 87 | 66 | 13 | 257.40 |
| Apply OHS practices in the workplace | CY2 | OHTH5464C | 25-06-2012 | 31-03-2013 | 28-06-2013 | 20 | 0.02 | 87 | 66 | 13 | 257.40 |
| Participate in development and follow a personal competency development plan | CY2 | BUSM6211C | 27-09-2012 | 31-03-2013 | 26-09-2013 | 20 | 0.02 | 87 | 66 | 13 | 257.40 |
| Dismantle, assemble and fabricate electrotechnology components | CY2 | EEET6747C | 01-08-2012 | 31-03-2013 | 31-07-2013 | 40 | 0.04 | 173 | 131 | 26 | 514.80 |
| Dismantle, assemble and fabricate electrotechnology components | CY2 | EEET6747C | 02-07-2012 | 31-03-2013 | 28-06-2013 | 40 | 0.04 | 173 | 131 | 26 | 514.80 |
| Dismantle, assemble and fabricate electrotechnology components | CY2 | EEET6747C | 16-07-2012 | 31-03-2013 | 28-02-2013 | 40 | 0.04 | 173 | 131 | 26 | 514.80 |
| Dismantle, assemble and fabricate electrotechnology components | CY2 | EEET6747C | 16-07-2012 | 31-03-2013 | 31-05-2013 | 40 | 0.04 | 173 | 131 | 26 | 514.80 |
| Dismantle, assemble and fabricate electrotechnology components | CY2 | EEET6747C | 25-06-2012 | 31-03-2013 | 28-06-2013 | 40 | 0.04 | 173 | 131 | 26 | 514.80 |
| Fix and secure equipment | CY2 | EEET6748C | 01-08-2012 | 31-03-2013 | 31-07-2013 | 20 | 0.02 | 87 | 66 | 13 | 257.40 |
| Fix and secure equipment | CY2 | EEET6748C | 02-07-2012 | 31-03-2013 | 28-06-2013 | 20 | 0.02 | 87 | 66 | 13 | 257.40 |
| Fix and secure equipment | CY2 | EEET6748C | 16-07-2012 | 31-03-2013 | 26-04-2013 | 20 | 0.02 | 87 | 66 | 13 | 257.40 |
| Fix and secure equipment | CY2 | EEET6748C | 16-07-2012 | 31-03-2013 | 31-05-2013 | 20 | 0.02 | 87 | 66 | 13 | 257.40 |
| Fix and secure equipment | CY2 | EEET6748C | 25-06-2012 | 31-03-2013 | 28-06-2013 | 20 | 0.02 | 87 | 66 | 13 | 257.40 |
| Use drawings, diagrams, schedules and manuals | CY2 | EEET6749C | 01-08-2012 | 31-03-2013 | 31-07-2013 | 40 | 0.04 | 173 | 131 | 26 | 514.80 |
| Use drawings, diagrams, schedules and manuals | CY2 | EEET6749C | 02-07-2012 | 31-03-2013 | 28-06-2013 | 40 | 0.04 | 173 | 131 | 26 | 514.80 |
| Use drawings, diagrams, schedules and manuals | CY2 | EEET6749C | 16-07-2012 | 31-03-2013 | 26-04-2013 | 40 | 0.04 | 173 | 131 | 26 | 514.80 |
| Use drawings, diagrams, schedules and manuals | CY2 | EEET6749C | 16-07-2012 | 31-03-2013 | 28-02-2013 | 40 | 0.04 | 173 | 131 | 26 | 514.80 |
| Use drawings, diagrams, schedules and manuals | CY2 | EEET6749C | 16-07-2012 | 31-03-2013 | 31-05-2013 | 40 | 0.04 | 173 | 131 | 26 | 514.80 |
| Use drawings, diagrams, schedules and manuals | CY2 | EEET6749C | 19-10-2012 | 31-03-2013 | 28-02-2013 | 40 | 0.04 | 173 | 131 | 26 | 514.80 |
| Use drawings, diagrams, schedules and manuals | CY2 | EEET6749C | 25-06-2012 | 31-03-2013 | 28-06-2013 | 40 | 0.04 | 173 | 131 | 26 | 514.80 |
| Apply OHS practices in the workplace | JUL | OHTH5464C | 16-07-2012 | 31-08-2012 | 14-12-2012 | 20 | 0.02 | 87 | 66 | 13 | 257.40 |
| Apply OHS practices in the workplace | JUL | OHTH5464C | 16-07-2012 | 31-08-2012 | 21-12-2012 | 20 | 0.02 | 87 | 66 | 13 | 257.40 |
| Apply OHS practices in the workplace | JUL | OHTH5464C | 18-07-2012 | 31-08-2012 | 21-12-2012 | 20 | 0.02 | 87 | 66 | 13 | 257.40 |
| Apply OHS practices in the workplace | JUL | OHTH5464C | 25-06-2012 | 31-08-2012 | 09-11-2012 | 20 | 0.02 | 87 | 66 | 13 | 257.40 |
| Apply OHS practices in the workplace | JUL | OHTH5464C | 25-06-2012 | 31-08-2012 | 14-12-2012 | 20 | 0.02 | 87 | 66 | 13 | 257.40 |
| Develop design briefs for electrotechnology projects | JUL | EEET6740C | 25-06-2012 | 31-08-2012 | 09-11-2012 | 40 | 0.04 | 173 | 131 | 26 | 514.80 |
| Implement and monitor OHS policies and procedures | JUL | OHTH5465C | 19-07-2012 | 31-08-2012 | 18-10-2012 | 20 | 0.02 | 87 | 66 | 13 | 257.40 |
| Implement and monitor OHS policies and procedures | JUL | OHTH5465C | 25-06-2012 | 31-08-2012 | 09-11-2012 | 20 | 0.02 | 87 | 66 | 13 | 257.40 |
| Implement and monitor OHS policies and procedures | JUL | OHTH5465C | 25-06-2012 | 31-08-2012 | 14-12-2012 | 20 | 0.02 | 87 | 66 | 13 | 257.40 |
| Document occupational hazards and risks in electronics | JUL | OHTH5466C | 25-06-2012 | 31-08-2012 | 09-11-2012 | 20 | 0.02 | 87 | 66 | 13 | 257.40 |
| Document occupational hazards and risks in electronics | JUL | OHTH5466C | 25-06-2012 | 31-08-2012 | 14-12-2012 | 20 | 0.02 | 87 | 66 | 13 | 257.40 |
| Participate in development and follow a personal competency development plan | JUL | BUSM6211C | 19-07-2012 | 31-08-2012 | 18-10-2012 | 20 | 0.02 | 87 | 66 | 13 | 257.40 |
| Participate in development and follow a personal competency development plan | JUL | BUSM6211C | 25-06-2012 | 31-08-2012 | 09-11-2012 | 20 | 0.02 | 87 | 66 | 13 | 257.40 |
| Participate in development and follow a personal competency development plan | JUL | BUSM6211C | 25-06-2012 | 31-08-2012 | 14-12-2012 | 20 | 0.02 | 87 | 66 | 13 | 257.40 |
| Participate in development and follow a personal competency development plan | JUL | BUSM6211C | 25-07-2012 | 31-08-2012 | 21-12-2012 | 20 | 0.02 | 87 | 66 | 13 | 257.40 |
| Contribute to risk management in electrotechnology systems | JUL | BUSM6212C | 25-06-2012 | 31-08-2012 | 09-11-2012 | 20 | 0.02 | 87 | 66 | 13 | 257.40 |
| Manage electronics/computer systems projects | JUL | BUSM6213C | 25-06-2012 | 31-08-2012 | 09-11-2012 | 40 | 0.04 | 173 | 131 | 26 | 514.80 |
| Commission electronics and communications systems | JUL | EEET6741C | 25-06-2012 | 31-08-2012 | 09-11-2012 | 20 | 0.02 | 87 | 66 | 13 | 257.40 |
| Commission electronics and communications systems | JUL | EEET6741C | 25-06-2012 | 31-08-2012 | 14-12-2012 | 20 | 0.02 | 87 | 66 | 13 | 257.40 |
| Modify-redesign of electronics and communications system | JUL | EEET6742C | 25-06-2012 | 31-08-2012 | 09-11-2012 | 20 | 0.02 | 87 | 66 | 13 | 257.40 |
| Modify-redesign of electronics and communications system | JUL | EEET6742C | 25-06-2012 | 31-08-2012 | 14-12-2012 | 20 | 0.02 | 87 | 66 | 13 | 257.40 |
| Design and develop electronics/computer systems projects | JUL | EEET6743C | 25-06-2012 | 31-08-2012 | 09-11-2012 | 40 | 0.04 | 173 | 131 | 26 | 514.80 |
| Use engineering applications software | JUL | ISYS5662C | 25-06-2012 | 31-08-2012 | 09-11-2012 | 40 | 0.04 | 173 | 131 | 26 | 514.80 |
| Enter and verify operating instructions in microprocessor equipped devices | JUL | EEET6744C | 25-06-2012 | 31-08-2012 | 09-11-2012 | 20 | 0.02 | 87 | 66 | 13 | 257.40 |
| Enter and verify operating instructions in microprocessor equipped devices | JUL | EEET6744C | 25-06-2012 | 31-08-2012 | 14-12-2012 | 20 | 0.02 | 87 | 66 | 13 | 257.40 |
| Develop and test code for microcontroller devices | JUL | EEET6745C | 25-06-2012 | 31-08-2012 | 09-11-2012 | 60 | 0.06 | 260 | 197 | 40 | 772.20 |
| Provide programming solution for engineering problems | JUL | ISYS5663C | 25-06-2012 | 31-08-2012 | 09-11-2012 | 60 | 0.06 | 260 | 197 | 40 | 772.20 |
| Design embedded controller systems | JUL | EEET6746C | 25-06-2012 | 31-08-2012 | 09-11-2012 | 80 | 0.08 | 346 | 262 | 53 | 1,029.60 |
| Dismantle, assemble and fabricate electrotechnology components | JUL | EEET6747C | 16-07-2012 | 31-08-2012 | 10-10-2012 | 40 | 0.04 | 173 | 131 | 26 | 514.80 |
| Dismantle, assemble and fabricate electrotechnology components | JUL | EEET6747C | 25-06-2012 | 31-08-2012 | 09-11-2012 | 40 | 0.04 | 173 | 131 | 26 | 514.80 |
| Dismantle, assemble and fabricate electrotechnology components | JUL | EEET6747C | 25-06-2012 | 31-08-2012 | 14-12-2012 | 40 | 0.04 | 173 | 131 | 26 | 514.80 |
| Dismantle, assemble and fabricate electrotechnology components | JUL | EEET6747C | 25-07-2012 | 31-08-2012 | 17-10-2012 | 40 | 0.04 | 173 | 131 | 26 | 514.80 |
| Fix and secure equipment | JUL | EEET6748C | 02-07-2012 | 31-08-2012 | 09-11-2012 | 20 | 0.02 | 87 | 66 | 13 | 257.40 |
| Fix and secure equipment | JUL | EEET6748C | 16-07-2012 | 31-08-2012 | 12-10-2012 | 20 | 0.02 | 87 | 66 | 13 | 257.40 |
| Fix and secure equipment | JUL | EEET6748C | 16-07-2012 | 31-08-2012 | 14-12-2012 | 20 | 0.02 | 87 | 66 | 13 | 257.40 |
| Fix and secure equipment | JUL | EEET6748C | 25-06-2012 | 31-08-2012 | 14-12-2012 | 20 | 0.02 | 87 | 66 | 13 | 257.40 |
| Fix and secure equipment | JUL | EEET6748C | 25-07-2012 | 31-08-2012 | 17-10-2012 | 20 | 0.02 | 87 | 66 | 13 | 257.40 |
| Use drawings, diagrams, schedules and manuals | JUL | EEET6749C | 16-07-2012 | 31-08-2012 | 12-10-2012 | 40 | 0.04 | 173 | 131 | 26 | 514.80 |
| Use drawings, diagrams, schedules and manuals | JUL | EEET6749C | 16-07-2012 | 31-08-2012 | 14-12-2012 | 40 | 0.04 | 173 | 131 | 26 | 514.80 |
| Use drawings, diagrams, schedules and manuals | JUL | EEET6749C | 25-06-2012 | 31-08-2012 | 09-11-2012 | 40 | 0.04 | 173 | 131 | 26 | 514.80 |
| Use drawings, diagrams, schedules and manuals | JUL | EEET6749C | 25-07-2012 | 31-08-2012 | 17-10-2012 | 40 | 0.04 | 173 | 131 | 26 | 514.80 |
| Carry out basic repairs to electronic apparatus by replacement of components | JUL | EEET6750C | 25-06-2012 | 31-08-2012 | 09-11-2012 | 40 | 0.04 | 173 | 131 | 26 | 514.80 |
| Carry out basic repairs to electronic apparatus by replacement of components | JUL | EEET6750C | 25-06-2012 | 31-08-2012 | 14-12-2012 | 40 | 0.04 | 173 | 131 | 26 | 514.80 |
| Troubleshoot digital subsystems | JUL | EEET6751C | 25-06-2012 | 31-08-2012 | 09-11-2012 | 80 | 0.08 | 346 | 262 | 53 | 1,029.60 |
| Troubleshoot digital subsystems | JUL | EEET6751C | 25-06-2012 | 31-08-2012 | 14-12-2012 | 80 | 0.08 | 346 | 262 | 53 | 1,029.60 |
| Troubleshoot amplifiers | JUL | EEET6752C | 25-06-2012 | 31-08-2012 | 09-11-2012 | 80 | 0.08 | 346 | 262 | 53 | 1,029.60 |
| Troubleshoot amplifiers | JUL | EEET6752C | 25-06-2012 | 31-08-2012 | 14-12-2012 | 80 | 0.08 | 346 | 262 | 53 | 1,029.60 |
| Troubleshoot frequency dependent circuits | JUL | EEET6753C | 19-07-2012 | 31-08-2012 | 18-10-2012 | 80 | 0.08 | 346 | 262 | 53 | 1,029.60 |
| Troubleshoot frequency dependent circuits | JUL | EEET6753C | 25-06-2012 | 31-08-2012 | 09-11-2012 | 80 | 0.08 | 346 | 262 | 53 | 1,029.60 |
| Troubleshoot frequency dependent circuits | JUL | EEET6753C | 25-06-2012 | 31-08-2012 | 14-12-2012 | 80 | 0.08 | 346 | 262 | 53 | 1,029.60 |
| Diagnose and rectify faults in global positioning systems | JUL | EEET6755C | 25-06-2012 | 31-08-2012 | 09-11-2012 | 60 | 0.06 | 260 | 197 | 40 | 772.20 |
| Troubleshoot basic amplifiers | JUL | EEET6757C | 25-06-2012 | 31-08-2012 | 09-11-2012 | 40 | 0.04 | 173 | 131 | 26 | 514.80 |
| Troubleshoot basic amplifiers | JUL | EEET6757C | 25-06-2012 | 31-08-2012 | 14-12-2012 | 40 | 0.04 | 173 | 131 | 26 | 514.80 |
| Solve fundamental problems in electronic communications systems | JUL | EEET6759C | 25-06-2012 | 31-08-2012 | 09-11-2012 | 40 | 0.04 | 173 | 131 | 26 | 514.80 |
| Solve fundamental problems in electronic communications systems | JUL | EEET6759C | 25-06-2012 | 31-08-2012 | 14-12-2012 | 40 | 0.04 | 173 | 131 | 26 | 514.80 |
| Solve problems in electronic circuits | JUL | EEET6761C | 25-06-2012 | 31-08-2012 | 09-11-2012 | 100 | 0.10 | 433 | 328 | 66 | 1,287.00 |
| Terminate and connect components, conductors, wiring and cables for electronic circuits | JUL | EEET6762C | 25-06-2012 | 31-08-2012 | 09-11-2012 | 40 | 0.04 | 173 | 131 | 26 | 514.80 |
| Design printed circuit boards | JUL | EEET6764C | 25-06-2012 | 31-08-2012 | 09-11-2012 | 40 | 0.04 | 173 | 131 | 26 | 514.80 |
| Develop solutions to RF amplifiers problems | JUL | EEET6765C | 25-06-2012 | 31-08-2012 | 09-11-2012 | 40 | 0.04 | 173 | 131 | 26 | 514.80 |
| Use advanced computational processes to provide solutions to engineering problems | JUL | EEET6769C | 25-06-2012 | 31-08-2012 | 09-11-2012 | 80 | 0.08 | 346 | 262 | 53 | 1,029.60 |
| Modify DSP based sub-systems | JUL | EEET6774C | 25-06-2012 | 31-08-2012 | 09-11-2012 | 80 | 0.08 | 346 | 262 | 53 | 1,029.60 |
| Ensure team effectiveness | JUL | EMPL5813C | 25-06-2012 | 31-08-2012 | 09-11-2012 | 60 | 0.06 | 260 | 197 | 40 | 772.20 |
| Use drawings, diagrams, schedules and manuals | NOV | EEET6749C | 02-11-2012 | 31-12-2012 | 21-12-2012 | 40 | 0.04 | 173 | 131 | 26 | 514.80 |
| Fix and secure equipment | OCT | EEET6748C | 08-10-2012 | 30-11-2012 | 14-12-2012 | 20 | 0.02 | 87 | 66 | 13 | 257.40 |
| Use drawings, diagrams, schedules and manuals | OCT | EEET6749C | 22-10-2012 | 30-11-2012 | 14-12-2012 | 40 | 0.04 | 173 | 131 | 26 | 514.80 |
| Implement and monitor OHS policies and procedures | SEP | OHTH5465C | 06-09-2012 | 31-10-2012 | 21-12-2012 | 20 | 0.02 | 87 | 66 | 13 | 257.40 |
| Implement and monitor OHS policies and procedures | SEP | OHTH5465C | 13-09-2012 | 31-10-2012 | 21-12-2012 | 20 | 0.02 | 87 | 66 | 13 | 257.40 |
| Implement and monitor OHS policies and procedures | SEP | OHTH5465C | 24-09-2012 | 31-10-2012 | 02-11-2012 | 20 | 0.02 | 87 | 66 | 13 | 257.40 |
| Participate in development and follow a personal competency development plan | SEP | BUSM6211C | 06-09-2012 | 31-10-2012 | 21-12-2012 | 20 | 0.02 | 87 | 66 | 13 | 257.40 |
| Participate in development and follow a personal competency development plan | SEP | BUSM6211C | 13-09-2012 | 31-10-2012 | 21-12-2012 | 20 | 0.02 | 87 | 66 | 13 | 257.40 |
| Participate in development and follow a personal competency development plan | SEP | BUSM6211C | 24-09-2012 | 31-10-2012 | 02-11-2012 | 20 | 0.02 | 87 | 66 | 13 | 257.40 |
| Use drawings, diagrams, schedules and manuals | SEP | EEET6749C | 03-09-2012 | 31-10-2012 | 07-09-2012 | 40 | 0.04 | 173 | 131 | 26 | 514.80 |
| Use drawings, diagrams, schedules and manuals | SEP | EEET6749C | 03-09-2012 | 31-10-2012 | 14-12-2012 | 40 | 0.04 | 173 | 131 | 26 | 514.80 |
| Use drawings, diagrams, schedules and manuals | SEP | EEET6749C | 05-09-2012 | 31-10-2012 | 17-10-2012 | 40 | 0.04 | 173 | 131 | 26 | 514.80 |
| Develop software solutions in microcontroller based systems | SEP | ISYS5665C | 24-09-2012 | 31-10-2012 | 09-11-2012 | 60 | 0.06 | 260 | 197 | 40 | 772.20 |
| Develop solutions to analogue electronic problems | SEP | EEET6758C | 24-09-2012 | 31-10-2012 | 09-11-2012 | 80 | 0.08 | 346 | 262 | 53 | 1,029.60 |
| Design and develop advanced digital systems | SEP | EEET6760C | 24-09-2012 | 31-10-2012 | 09-11-2012 | 40 | 0.04 | 173 | 131 | 26 | 514.80 |
* EFTSL : Equivalent Full Time Study Load
** Concession fees are only available at diploma and advanced diploma level for indigenous students.
Back to Program List
| Unit Of Study (Course) | Session | Course Code | Commencement Date | Census Date | Completion Date | Student Contact Hours (SCH) | EFTSL* | Tuition Fee: Onsite|Distance|RPL | |||
| Government Subsidised Fee | Full Fee (Non Government Subsidised) | ||||||||||
| Program commenced 1 July 2009-30 June 2012 ($) | Program commenced 1 July 2012-31 December 2012 ($) | Program commenced 1 July 2012-31 December 2012 Concession ** ($) | Australian Full Fee Paying ($) | ||||||||
| Negotiate translating and interpreting assignments | JUL | LANG5760C | 25-06-2012 | 31-08-2012 | 09-11-2012 | 25 | 0.06 | 108 | 110 | 22 | 265.50 |
| Prepare to translate and interpret | JUL | LANG5761C | 25-06-2012 | 31-08-2012 | 09-11-2012 | 25 | 0.06 | 108 | 110 | 22 | 265.50 |
| Maintain and enhance professional practice | JUL | LANG5767C | 25-06-2012 | 31-08-2012 | 09-11-2012 | 20 | 0.05 | 87 | 88 | 18 | 212.40 |
| Analyse texts to be translated (LOTE) | JUL | LANG5769C | 25-06-2012 | 31-08-2012 | 09-11-2012 | 20 | 0.05 | 87 | 88 | 18 | 212.40 |
| Demonstrate written language proficiency in different subjects and cultural contexts | JUL | LANG5770C | 25-06-2012 | 31-08-2012 | 09-11-2012 | 70 | 0.18 | 303 | 307 | 62 | 743.40 |
| Quality assure translations | JUL | LANG5771C | 25-06-2012 | 31-08-2012 | 09-11-2012 | 30 | 0.08 | 130 | 131 | 26 | 318.60 |
| Apply codes and standards to professional judgement | JUL | LANG5772C | 25-06-2012 | 31-08-2012 | 09-11-2012 | 20 | 0.05 | 87 | 88 | 18 | 212.40 |
| Use translation technology | JUL | LANG5773C | 25-06-2012 | 31-08-2012 | 09-11-2012 | 30 | 0.08 | 130 | 131 | 26 | 318.60 |
| Apply theories to translating and interpreting work practices | JUL | LANG5774C | 25-06-2012 | 31-08-2012 | 09-11-2012 | 40 | 0.10 | 173 | 175 | 35 | 424.80 |
| Translate special purpose texts from English to LOTE | JUL | LANG5775C | 25-06-2012 | 31-08-2012 | 09-11-2012 | 60 | 0.15 | 260 | 263 | 53 | 637.20 |
| Translate special purpose texts from LOTE to English | JUL | LANG5776C | 25-06-2012 | 31-08-2012 | 09-11-2012 | 60 | 0.15 | 260 | 263 | 53 | 637.20 |
| Translate multimedia source material | JUL | LANG5777C | 25-06-2012 | 31-08-2012 | 09-11-2012 | 30 | 0.08 | 130 | 131 | 26 | 318.60 |
| Prepare translated transcripts | JUL | LANG5778C | 25-06-2012 | 31-08-2012 | 09-11-2012 | 30 | 0.08 | 130 | 131 | 26 | 318.60 |
* EFTSL : Equivalent Full Time Study Load
** Concession fees are only available at diploma and advanced diploma level for indigenous students.
Back to Program List
| Unit Of Study (Course) | Session | Course Code | Commencement Date | Census Date | Completion Date | Student Contact Hours (SCH) | EFTSL* | Tuition Fee: Onsite|Distance|RPL | |||
| Government Subsidised Fee | Full Fee (Non Government Subsidised) | ||||||||||
| Program commenced 1 July 2009-30 June 2012 ($) | Program commenced 1 July 2012-31 December 2012 ($) | Program commenced 1 July 2012-31 December 2012 Concession ** ($) | Australian Full Fee Paying ($) | ||||||||
| Apply OHS practices in the workplace | AUG | OHTH5464C | 08-08-2012 | 30-09-2012 | 21-12-2012 | 20 | 0.02 | 87 | 50 | 10 | 256.20 |
| Apply OHS practices in the workplace | AUG | OHTH5464C | 28-08-2012 | 30-09-2012 | 21-12-2012 | 20 | 0.02 | 87 | 50 | 10 | 256.20 |
| Participate in development and follow a personal competency development plan | AUG | BUSM6211C | 21-08-2012 | 30-09-2012 | 21-12-2012 | 20 | 0.02 | 87 | 50 | 10 | 256.20 |
| Participate in development and follow a personal competency development plan | AUG | BUSM6211C | 30-08-2012 | 30-09-2012 | 21-12-2012 | 20 | 0.02 | 87 | 50 | 10 | 256.20 |
| Dismantle, assemble and fabricate electrotechnology components | AUG | EEET6747C | 13-08-2012 | 30-09-2012 | 09-11-2012 | 40 | 0.04 | 173 | 100 | 20 | 512.40 |
| Install and administer Unix based computers | AUG | ISYS5671C | 13-08-2012 | 30-09-2012 | 09-11-2012 | 80 | 0.08 | 346 | 201 | 40 | 1,024.80 |
| Solve problems in extra-low voltage single path circuits | AUG | EEET6775C | 13-08-2012 | 30-09-2012 | 09-11-2012 | 40 | 0.04 | 173 | 100 | 20 | 512.40 |
| Solve problems in extra-low voltage single path circuits | AUG | EEET6775C | 13-08-2012 | 30-09-2012 | 14-12-2012 | 40 | 0.04 | 173 | 100 | 20 | 512.40 |
| Apply OHS practices in the workplace | CY2 | OHTH5464C | 01-08-2012 | 31-03-2013 | 31-07-2013 | 20 | 0.02 | 87 | 50 | 10 | 256.20 |
| Apply OHS practices in the workplace | CY2 | OHTH5464C | 02-07-2012 | 31-03-2013 | 28-06-2013 | 20 | 0.02 | 87 | 50 | 10 | 256.20 |
| Apply OHS practices in the workplace | CY2 | OHTH5464C | 16-07-2012 | 31-03-2013 | 26-04-2013 | 20 | 0.02 | 87 | 50 | 10 | 256.20 |
| Apply OHS practices in the workplace | CY2 | OHTH5464C | 25-06-2012 | 31-03-2013 | 28-06-2013 | 20 | 0.02 | 87 | 50 | 10 | 256.20 |
| Participate in development and follow a personal competency development plan | CY2 | BUSM6211C | 27-09-2012 | 31-03-2013 | 26-09-2013 | 20 | 0.02 | 87 | 50 | 10 | 256.20 |
| Dismantle, assemble and fabricate electrotechnology components | CY2 | EEET6747C | 01-08-2012 | 31-03-2013 | 31-07-2013 | 40 | 0.04 | 173 | 100 | 20 | 512.40 |
| Dismantle, assemble and fabricate electrotechnology components | CY2 | EEET6747C | 02-07-2012 | 31-03-2013 | 28-06-2013 | 40 | 0.04 | 173 | 100 | 20 | 512.40 |
| Dismantle, assemble and fabricate electrotechnology components | CY2 | EEET6747C | 16-07-2012 | 31-03-2013 | 28-02-2013 | 40 | 0.04 | 173 | 100 | 20 | 512.40 |
| Dismantle, assemble and fabricate electrotechnology components | CY2 | EEET6747C | 16-07-2012 | 31-03-2013 | 31-05-2013 | 40 | 0.04 | 173 | 100 | 20 | 512.40 |
| Dismantle, assemble and fabricate electrotechnology components | CY2 | EEET6747C | 25-06-2012 | 31-03-2013 | 28-06-2013 | 40 | 0.04 | 173 | 100 | 20 | 512.40 |
| Solve problems in extra-low voltage single path circuits | CY2 | EEET6775C | 01-08-2012 | 31-03-2013 | 31-07-2013 | 40 | 0.04 | 173 | 100 | 20 | 512.40 |
| Solve problems in extra-low voltage single path circuits | CY2 | EEET6775C | 02-07-2012 | 31-03-2013 | 28-06-2013 | 40 | 0.04 | 173 | 100 | 20 | 512.40 |
| Solve problems in extra-low voltage single path circuits | CY2 | EEET6775C | 16-07-2012 | 31-03-2013 | 26-04-2013 | 40 | 0.04 | 173 | 100 | 20 | 512.40 |
| Solve problems in extra-low voltage single path circuits | CY2 | EEET6775C | 16-07-2012 | 31-03-2013 | 28-02-2013 | 40 | 0.04 | 173 | 100 | 20 | 512.40 |
| Solve problems in extra-low voltage single path circuits | CY2 | EEET6775C | 16-07-2012 | 31-03-2013 | 31-05-2013 | 40 | 0.04 | 173 | 100 | 20 | 512.40 |
| Solve problems in extra-low voltage single path circuits | CY2 | EEET6775C | 19-10-2012 | 31-03-2013 | 28-02-2013 | 40 | 0.04 | 173 | 100 | 20 | 512.40 |
| Solve problems in extra-low voltage single path circuits | CY2 | EEET6775C | 25-06-2012 | 31-03-2013 | 28-06-2013 | 40 | 0.04 | 173 | 100 | 20 | 512.40 |
| Apply OHS practices in the workplace | JUL | OHTH5464C | 16-07-2012 | 31-08-2012 | 14-12-2012 | 20 | 0.02 | 87 | 50 | 10 | 256.20 |
| Apply OHS practices in the workplace | JUL | OHTH5464C | 16-07-2012 | 31-08-2012 | 21-12-2012 | 20 | 0.02 | 87 | 50 | 10 | 256.20 |
| Apply OHS practices in the workplace | JUL | OHTH5464C | 18-07-2012 | 31-08-2012 | 21-12-2012 | 20 | 0.02 | 87 | 50 | 10 | 256.20 |
| Apply OHS practices in the workplace | JUL | OHTH5464C | 25-06-2012 | 31-08-2012 | 09-11-2012 | 20 | 0.02 | 87 | 50 | 10 | 256.20 |
| Apply OHS practices in the workplace | JUL | OHTH5464C | 25-06-2012 | 31-08-2012 | 14-12-2012 | 20 | 0.02 | 87 | 50 | 10 | 256.20 |
| Develop design briefs for electrotechnology projects | JUL | EEET6740C | 25-06-2012 | 31-08-2012 | 09-11-2012 | 40 | 0.04 | 173 | 100 | 20 | 512.40 |
| Implement and monitor OHS policies and procedures | JUL | OHTH5465C | 19-07-2012 | 31-08-2012 | 18-10-2012 | 20 | 0.02 | 87 | 50 | 10 | 256.20 |
| Implement and monitor OHS policies and procedures | JUL | OHTH5465C | 25-06-2012 | 31-08-2012 | 09-11-2012 | 20 | 0.02 | 87 | 50 | 10 | 256.20 |
| Implement and monitor OHS policies and procedures | JUL | OHTH5465C | 25-06-2012 | 31-08-2012 | 14-12-2012 | 20 | 0.02 | 87 | 50 | 10 | 256.20 |
| Participate in development and follow a personal competency development plan | JUL | BUSM6211C | 19-07-2012 | 31-08-2012 | 18-10-2012 | 20 | 0.02 | 87 | 50 | 10 | 256.20 |
| Participate in development and follow a personal competency development plan | JUL | BUSM6211C | 25-06-2012 | 31-08-2012 | 09-11-2012 | 20 | 0.02 | 87 | 50 | 10 | 256.20 |
| Participate in development and follow a personal competency development plan | JUL | BUSM6211C | 25-06-2012 | 31-08-2012 | 14-12-2012 | 20 | 0.02 | 87 | 50 | 10 | 256.20 |
| Participate in development and follow a personal competency development plan | JUL | BUSM6211C | 25-07-2012 | 31-08-2012 | 21-12-2012 | 20 | 0.02 | 87 | 50 | 10 | 256.20 |
| Contribute to risk management in electrotechnology systems | JUL | BUSM6212C | 25-06-2012 | 31-08-2012 | 09-11-2012 | 20 | 0.02 | 87 | 50 | 10 | 256.20 |
| Manage electronics/computer systems projects | JUL | BUSM6213C | 25-06-2012 | 31-08-2012 | 09-11-2012 | 40 | 0.04 | 173 | 100 | 20 | 512.40 |
| Design and develop electronics/computer systems projects | JUL | EEET6743C | 25-06-2012 | 31-08-2012 | 09-11-2012 | 40 | 0.04 | 173 | 100 | 20 | 512.40 |
| Use engineering applications software | JUL | ISYS5662C | 25-06-2012 | 31-08-2012 | 09-11-2012 | 40 | 0.04 | 173 | 100 | 20 | 512.40 |
| Develop and test code for microcontroller devices | JUL | EEET6745C | 25-06-2012 | 31-08-2012 | 09-11-2012 | 60 | 0.06 | 260 | 151 | 30 | 768.60 |
| Design embedded controller systems | JUL | EEET6746C | 25-06-2012 | 31-08-2012 | 09-11-2012 | 80 | 0.08 | 346 | 201 | 40 | 1,024.80 |
| Dismantle, assemble and fabricate electrotechnology components | JUL | EEET6747C | 16-07-2012 | 31-08-2012 | 10-10-2012 | 40 | 0.04 | 173 | 100 | 20 | 512.40 |
| Dismantle, assemble and fabricate electrotechnology components | JUL | EEET6747C | 25-06-2012 | 31-08-2012 | 09-11-2012 | 40 | 0.04 | 173 | 100 | 20 | 512.40 |
| Dismantle, assemble and fabricate electrotechnology components | JUL | EEET6747C | 25-06-2012 | 31-08-2012 | 14-12-2012 | 40 | 0.04 | 173 | 100 | 20 | 512.40 |
| Dismantle, assemble and fabricate electrotechnology components | JUL | EEET6747C | 25-07-2012 | 31-08-2012 | 17-10-2012 | 40 | 0.04 | 173 | 100 | 20 | 512.40 |
| Use advanced computational processes to provide solutions to engineering problems | JUL | EEET6769C | 25-06-2012 | 31-08-2012 | 09-11-2012 | 80 | 0.08 | 346 | 201 | 40 | 1,024.80 |
| Modify DSP based sub-systems | JUL | EEET6774C | 25-06-2012 | 31-08-2012 | 09-11-2012 | 80 | 0.08 | 346 | 201 | 40 | 1,024.80 |
| Document occupational hazards and risks in computer systems | JUL | OHTH5468C | 25-06-2012 | 31-08-2012 | 09-11-2012 | 20 | 0.02 | 87 | 50 | 10 | 256.20 |
| Commission computer systems | JUL | ISYS5666C | 25-06-2012 | 31-08-2012 | 09-11-2012 | 20 | 0.02 | 87 | 50 | 10 | 256.20 |
| Modify-redesign of computer system | JUL | ISYS5667C | 25-06-2012 | 31-08-2012 | 09-11-2012 | 20 | 0.02 | 87 | 50 | 10 | 256.20 |
| Assemble, set up and test personal computers | JUL | ISYS5668C | 25-06-2012 | 31-08-2012 | 09-11-2012 | 80 | 0.08 | 346 | 201 | 40 | 1,024.80 |
| Set up and create content for a web server | JUL | ISYS5669C | 02-07-2012 | 31-08-2012 | 09-11-2012 | 120 | 0.12 | 520 | 301 | 60 | 1,537.20 |
| Administer user networks | JUL | ISYS5673C | 25-06-2012 | 31-08-2012 | 09-11-2012 | 80 | 0.08 | 346 | 201 | 40 | 1,024.80 |
| Develop network services | JUL | ISYS5674C | 25-06-2012 | 31-08-2012 | 09-11-2012 | 120 | 0.12 | 520 | 301 | 60 | 1,537.20 |
| Install and configure Internetworking systems | JUL | ISYS5675C | 25-06-2012 | 31-08-2012 | 09-11-2012 | 120 | 0.12 | 520 | 301 | 60 | 1,537.20 |
| Integrate multiple computer operating systems on a client server network | JUL | ISYS5677C | 25-06-2012 | 31-08-2012 | 09-11-2012 | 80 | 0.08 | 346 | 201 | 40 | 1,024.80 |
| Install and configure a computer operating system and software | JUL | ISYS5678C | 25-06-2012 | 31-08-2012 | 09-11-2012 | 40 | 0.04 | 173 | 100 | 20 | 512.40 |
| Solve problems in extra-low voltage single path circuits | JUL | EEET6775C | 16-07-2012 | 31-08-2012 | 12-10-2012 | 40 | 0.04 | 173 | 100 | 20 | 512.40 |
| Solve problems in extra-low voltage single path circuits | JUL | EEET6775C | 16-07-2012 | 31-08-2012 | 14-12-2012 | 40 | 0.04 | 173 | 100 | 20 | 512.40 |
| Solve problems in extra-low voltage single path circuits | JUL | EEET6775C | 25-06-2012 | 31-08-2012 | 09-11-2012 | 40 | 0.04 | 173 | 100 | 20 | 512.40 |
| Solve problems in extra-low voltage single path circuits | JUL | EEET6775C | 25-06-2012 | 31-08-2012 | 14-12-2012 | 40 | 0.04 | 173 | 100 | 20 | 512.40 |
| Design and implement Internetworking systems security | JUL | EEET6779C | 25-06-2012 | 31-08-2012 | 09-11-2012 | 100 | 0.10 | 433 | 251 | 50 | 1,281.00 |
| Set up and configure basic local area network | JUL | ISYS5681C | 25-06-2012 | 31-08-2012 | 09-11-2012 | 40 | 0.04 | 173 | 100 | 20 | 512.40 |
| Ensure team effectiveness | JUL | EMPL5813C | 25-06-2012 | 31-08-2012 | 09-11-2012 | 60 | 0.06 | 260 | 151 | 30 | 768.60 |
| Solve problems in extra-low voltage single path circuits | OCT | EEET6775C | 22-10-2012 | 30-11-2012 | 14-12-2012 | 40 | 0.04 | 173 | 100 | 20 | 512.40 |
| Solve problems in extra-low voltage single path circuits | OCT | EEET6775C | 24-10-2012 | 30-11-2012 | 19-12-2012 | 40 | 0.04 | 173 | 100 | 20 | 512.40 |
| Design and implement Internetworking systems wireless LANs/WANs | OCT | ISYS5679C | 01-10-2012 | 30-11-2012 | 09-11-2012 | 100 | 0.10 | 433 | 251 | 50 | 1,281.00 |
| Implement and monitor OHS policies and procedures | SEP | OHTH5465C | 06-09-2012 | 31-10-2012 | 21-12-2012 | 20 | 0.02 | 87 | 50 | 10 | 256.20 |
| Implement and monitor OHS policies and procedures | SEP | OHTH5465C | 13-09-2012 | 31-10-2012 | 21-12-2012 | 20 | 0.02 | 87 | 50 | 10 | 256.20 |
| Implement and monitor OHS policies and procedures | SEP | OHTH5465C | 24-09-2012 | 31-10-2012 | 02-11-2012 | 20 | 0.02 | 87 | 50 | 10 | 256.20 |
| Participate in development and follow a personal competency development plan | SEP | BUSM6211C | 06-09-2012 | 31-10-2012 | 21-12-2012 | 20 | 0.02 | 87 | 50 | 10 | 256.20 |
| Participate in development and follow a personal competency development plan | SEP | BUSM6211C | 13-09-2012 | 31-10-2012 | 21-12-2012 | 20 | 0.02 | 87 | 50 | 10 | 256.20 |
| Participate in development and follow a personal competency development plan | SEP | BUSM6211C | 24-09-2012 | 31-10-2012 | 02-11-2012 | 20 | 0.02 | 87 | 50 | 10 | 256.20 |
* EFTSL : Equivalent Full Time Study Load
** Concession fees are only available at diploma and advanced diploma level for indigenous students.
Back to Program List
| Unit Of Study (Course) | Session | Course Code | Commencement Date | Census Date | Completion Date | Student Contact Hours (SCH) | EFTSL* | Tuition Fee: Onsite|Distance|RPL | |||
| Government Subsidised Fee | Full Fee (Non Government Subsidised) | ||||||||||
| Program commenced 1 July 2009-30 June 2012 ($) | Program commenced 1 July 2012-31 December 2012 ($) | Program commenced 1 July 2012-31 December 2012 Concession ** ($) | Australian Full Fee Paying ($) | ||||||||
| Negotiate translating and interpreting assignments | JUL | LANG5760C | 25-06-2012 | 31-08-2012 | 09-11-2012 | 25 | 0.02 | 108 | 180 | 36 | 259.25 |
| Prepare to translate and interpret | JUL | LANG5761C | 25-06-2012 | 31-08-2012 | 09-11-2012 | 25 | 0.02 | 108 | 180 | 36 | 259.25 |
| Analyse, recall and reproduce source messages (LOTE) | JUL | LANG5765C | 25-06-2012 | 31-08-2012 | 09-11-2012 | 30 | 0.03 | 130 | 217 | 43 | 311.10 |
| Maintain and enhance professional practice | JUL | LANG5767C | 25-06-2012 | 31-08-2012 | 09-11-2012 | 20 | 0.02 | 87 | 144 | 29 | 207.40 |
| Apply codes and standards to professional judgement | JUL | LANG5772C | 25-06-2012 | 31-08-2012 | 09-11-2012 | 20 | 0.02 | 87 | 144 | 29 | 207.40 |
| Apply theories to translating and interpreting work practices | JUL | LANG5774C | 25-06-2012 | 31-08-2012 | 09-11-2012 | 40 | 0.04 | 173 | 289 | 58 | 414.80 |
| Interpret in complex dialogue settings (LOTE) | JUL | LANG5779C | 25-06-2012 | 31-08-2012 | 09-11-2012 | 100 | 0.09 | 433 | 722 | 144 | 1,037.00 |
| Interpret in complex monologue settings (LOTE) | JUL | LANG5780C | 25-06-2012 | 31-08-2012 | 09-11-2012 | 100 | 0.09 | 433 | 722 | 144 | 1,037.00 |
| Manage complex discourse settings | JUL | LANG5781C | 25-06-2012 | 31-08-2012 | 09-11-2012 | 30 | 0.03 | 130 | 217 | 43 | 311.10 |
| Sight translate (LOTE) | JUL | LANG5782C | 25-06-2012 | 31-08-2012 | 09-11-2012 | 60 | 0.05 | 260 | 433 | 86 | 622.20 |
| Interpret through communication media | JUL | LANG5783C | 25-06-2012 | 31-08-2012 | 09-11-2012 | 40 | 0.04 | 173 | 289 | 58 | 414.80 |
| Interpret as part of a team | JUL | LANG5784C | 25-06-2012 | 31-08-2012 | 09-11-2012 | 30 | 0.03 | 130 | 217 | 43 | 311.10 |
* EFTSL : Equivalent Full Time Study Load
** Concession fees are only available at diploma and advanced diploma level for indigenous students.
Back to Program List
| Unit Of Study (Course) | Session | Course Code | Commencement Date | Census Date | Completion Date | Student Contact Hours (SCH) | EFTSL* | Tuition Fee: Onsite|Distance|RPL | |||
| Government Subsidised Fee | Full Fee (Non Government Subsidised) | ||||||||||
| Program commenced 1 July 2009-30 June 2012 ($) | Program commenced 1 July 2012-31 December 2012 ($) | Program commenced 1 July 2012-31 December 2012 Concession ** ($) | Australian Full Fee Paying ($) | ||||||||
| Apply OHS practices in the workplace | AUG | OHTH5464C | 08-08-2012 | 30-09-2012 | 21-12-2012 | 20 | 0.02 | 87 | 63 | 13 | 268.40 |
| Apply OHS practices in the workplace | AUG | OHTH5464C | 28-08-2012 | 30-09-2012 | 21-12-2012 | 20 | 0.02 | 87 | 63 | 13 | 268.40 |
| Participate in development and follow a personal competency development plan | AUG | BUSM6211C | 21-08-2012 | 30-09-2012 | 21-12-2012 | 20 | 0.02 | 87 | 63 | 13 | 268.40 |
| Participate in development and follow a personal competency development plan | AUG | BUSM6211C | 30-08-2012 | 30-09-2012 | 21-12-2012 | 20 | 0.02 | 87 | 63 | 13 | 268.40 |
| Dismantle, assemble and fabricate electrotechnology components | AUG | EEET6747C | 13-08-2012 | 30-09-2012 | 09-11-2012 | 40 | 0.04 | 173 | 126 | 25 | 536.80 |
| Fix and secure equipment | AUG | EEET6748C | 13-08-2012 | 30-09-2012 | 09-11-2012 | 20 | 0.02 | 87 | 63 | 13 | 268.40 |
| Use drawings, diagrams, schedules and manuals | AUG | EEET6749C | 13-08-2012 | 30-09-2012 | 09-11-2012 | 40 | 0.04 | 173 | 126 | 25 | 536.80 |
| Use drawings, diagrams, schedules and manuals | AUG | EEET6749C | 13-08-2012 | 30-09-2012 | 14-12-2012 | 40 | 0.04 | 173 | 126 | 25 | 536.80 |
| Solve problems in extra-low voltage single path circuits | AUG | EEET6775C | 13-08-2012 | 30-09-2012 | 09-11-2012 | 40 | 0.04 | 173 | 126 | 25 | 536.80 |
| Solve problems in extra-low voltage single path circuits | AUG | EEET6775C | 13-08-2012 | 30-09-2012 | 14-12-2012 | 40 | 0.04 | 173 | 126 | 25 | 536.80 |
| Solve problems in multiple path d.c. circuits | AUG | EEET6780C | 01-08-2012 | 30-09-2012 | 19-09-2012 | 40 | 0.04 | 173 | 126 | 25 | 536.80 |
| Solve problems in multiple path d.c. circuits | AUG | EEET6780C | 13-08-2012 | 30-09-2012 | 09-11-2012 | 40 | 0.04 | 173 | 126 | 25 | 536.80 |
| Solve problems in multiple path d.c. circuits | AUG | EEET6780C | 30-08-2012 | 30-09-2012 | 21-12-2012 | 40 | 0.04 | 173 | 126 | 25 | 536.80 |
| Lay wiring/cabling and terminate accessories for extra-low voltage circuits | AUG | EEET6781C | 30-08-2012 | 30-09-2012 | 21-12-2012 | 40 | 0.04 | 173 | 126 | 25 | 536.80 |
| Document occupational hazards and risks in electrical | AUG | COMM5464C | 13-08-2012 | 30-09-2012 | 09-11-2012 | 20 | 0.02 | 87 | 63 | 13 | 268.40 |
| Solve problems in electromagnetic circuits | AUG | EEET6784C | 30-08-2012 | 30-09-2012 | 21-12-2012 | 60 | 0.06 | 260 | 190 | 38 | 805.20 |
| Use basic computer applications relevant to a Part 2.1D - Computer Systems Units workplace | AUG | OFFC5195C | 13-08-2012 | 30-09-2012 | 09-11-2012 | 20 | 0.02 | 87 | 63 | 13 | 268.40 |
| Develop, enter and verify programs for programmable logic controllers using ladder instruction set | AUG | EEET6790C | 22-08-2012 | 30-09-2012 | 21-12-2012 | 60 | 0.06 | 260 | 190 | 38 | 805.20 |
| Develop, enter and verify programs for programmable logic controllers using ladder instruction set | AUG | EEET6790C | 27-08-2012 | 30-09-2012 | 31-08-2012 | 60 | 0.06 | 260 | 190 | 38 | 805.20 |
| Source and purchase material/parts for installation or service jobs | AUG | BUSM6230C | 06-08-2012 | 30-09-2012 | 21-12-2012 | 20 | 0.02 | 87 | 63 | 13 | 268.40 |
| Provide quotations for installation or service jobs | AUG | BUSM6231C | 13-08-2012 | 30-09-2012 | 17-09-2012 | 20 | 0.02 | 87 | 63 | 13 | 268.40 |
| Deliver a service to customers | AUG | MKTG5787C | 13-08-2012 | 30-09-2012 | 17-09-2012 | 20 | 0.02 | 87 | 63 | 13 | 268.40 |
| Deliver a service to customers | AUG | MKTG5787C | 16-08-2012 | 30-09-2012 | 17-09-2012 | 20 | 0.02 | 87 | 63 | 13 | 268.40 |
| Participate in environmentally sustainable work practices | AUG | OHTH5469C | 22-08-2012 | 30-09-2012 | 14-12-2012 | 20 | 0.02 | 87 | 63 | 13 | 268.40 |
| Apply OHS practices in the workplace | CY2 | OHTH5464C | 01-08-2012 | 31-03-2013 | 31-07-2013 | 20 | 0.02 | 87 | 63 | 13 | 268.40 |
| Apply OHS practices in the workplace | CY2 | OHTH5464C | 02-07-2012 | 31-03-2013 | 28-06-2013 | 20 | 0.02 | 87 | 63 | 13 | 268.40 |
| Apply OHS practices in the workplace | CY2 | OHTH5464C | 16-07-2012 | 31-03-2013 | 26-04-2013 | 20 | 0.02 | 87 | 63 | 13 | 268.40 |
| Apply OHS practices in the workplace | CY2 | OHTH5464C | 25-06-2012 | 31-03-2013 | 28-06-2013 | 20 | 0.02 | 87 | 63 | 13 | 268.40 |
| Participate in development and follow a personal competency development plan | CY2 | BUSM6211C | 27-09-2012 | 31-03-2013 | 26-09-2013 | 20 | 0.02 | 87 | 63 | 13 | 268.40 |
| Dismantle, assemble and fabricate electrotechnology components | CY2 | EEET6747C | 01-08-2012 | 31-03-2013 | 31-07-2013 | 40 | 0.04 | 173 | 126 | 25 | 536.80 |
| Dismantle, assemble and fabricate electrotechnology components | CY2 | EEET6747C | 02-07-2012 | 31-03-2013 | 28-06-2013 | 40 | 0.04 | 173 | 126 | 25 | 536.80 |
| Dismantle, assemble and fabricate electrotechnology components | CY2 | EEET6747C | 16-07-2012 | 31-03-2013 | 28-02-2013 | 40 | 0.04 | 173 | 126 | 25 | 536.80 |
| Dismantle, assemble and fabricate electrotechnology components | CY2 | EEET6747C | 16-07-2012 | 31-03-2013 | 31-05-2013 | 40 | 0.04 | 173 | 126 | 25 | 536.80 |
| Dismantle, assemble and fabricate electrotechnology components | CY2 | EEET6747C | 25-06-2012 | 31-03-2013 | 28-06-2013 | 40 | 0.04 | 173 | 126 | 25 | 536.80 |
| Fix and secure equipment | CY2 | EEET6748C | 01-08-2012 | 31-03-2013 | 31-07-2013 | 20 | 0.02 | 87 | 63 | 13 | 268.40 |
| Fix and secure equipment | CY2 | EEET6748C | 02-07-2012 | 31-03-2013 | 28-06-2013 | 20 | 0.02 | 87 | 63 | 13 | 268.40 |
| Fix and secure equipment | CY2 | EEET6748C | 16-07-2012 | 31-03-2013 | 26-04-2013 | 20 | 0.02 | 87 | 63 | 13 | 268.40 |
| Fix and secure equipment | CY2 | EEET6748C | 16-07-2012 | 31-03-2013 | 31-05-2013 | 20 | 0.02 | 87 | 63 | 13 | 268.40 |
| Fix and secure equipment | CY2 | EEET6748C | 25-06-2012 | 31-03-2013 | 28-06-2013 | 20 | 0.02 | 87 | 63 | 13 | 268.40 |
| Use drawings, diagrams, schedules and manuals | CY2 | EEET6749C | 01-08-2012 | 31-03-2013 | 31-07-2013 | 40 | 0.04 | 173 | 126 | 25 | 536.80 |
| Use drawings, diagrams, schedules and manuals | CY2 | EEET6749C | 02-07-2012 | 31-03-2013 | 28-06-2013 | 40 | 0.04 | 173 | 126 | 25 | 536.80 |
| Use drawings, diagrams, schedules and manuals | CY2 | EEET6749C | 16-07-2012 | 31-03-2013 | 26-04-2013 | 40 | 0.04 | 173 | 126 | 25 | 536.80 |
| Use drawings, diagrams, schedules and manuals | CY2 | EEET6749C | 16-07-2012 | 31-03-2013 | 28-02-2013 | 40 | 0.04 | 173 | 126 | 25 | 536.80 |
| Use drawings, diagrams, schedules and manuals | CY2 | EEET6749C | 16-07-2012 | 31-03-2013 | 31-05-2013 | 40 | 0.04 | 173 | 126 | 25 | 536.80 |
| Use drawings, diagrams, schedules and manuals | CY2 | EEET6749C | 19-10-2012 | 31-03-2013 | 28-02-2013 | 40 | 0.04 | 173 | 126 | 25 | 536.80 |
| Use drawings, diagrams, schedules and manuals | CY2 | EEET6749C | 25-06-2012 | 31-03-2013 | 28-06-2013 | 40 | 0.04 | 173 | 126 | 25 | 536.80 |
| Solve problems in extra-low voltage single path circuits | CY2 | EEET6775C | 01-08-2012 | 31-03-2013 | 31-07-2013 | 40 | 0.04 | 173 | 126 | 25 | 536.80 |
| Solve problems in extra-low voltage single path circuits | CY2 | EEET6775C | 02-07-2012 | 31-03-2013 | 28-06-2013 | 40 | 0.04 | 173 | 126 | 25 | 536.80 |
| Solve problems in extra-low voltage single path circuits | CY2 | EEET6775C | 16-07-2012 | 31-03-2013 | 26-04-2013 | 40 | 0.04 | 173 | 126 | 25 | 536.80 |
| Solve problems in extra-low voltage single path circuits | CY2 | EEET6775C | 16-07-2012 | 31-03-2013 | 28-02-2013 | 40 | 0.04 | 173 | 126 | 25 | 536.80 |
| Solve problems in extra-low voltage single path circuits | CY2 | EEET6775C | 16-07-2012 | 31-03-2013 | 31-05-2013 | 40 | 0.04 | 173 | 126 | 25 | 536.80 |
| Solve problems in extra-low voltage single path circuits | CY2 | EEET6775C | 19-10-2012 | 31-03-2013 | 28-02-2013 | 40 | 0.04 | 173 | 126 | 25 | 536.80 |
| Solve problems in extra-low voltage single path circuits | CY2 | EEET6775C | 25-06-2012 | 31-03-2013 | 28-06-2013 | 40 | 0.04 | 173 | 126 | 25 | 536.80 |
| Use basic computer applications relevant to a Part 2.1D - Computer Systems Units workplace | CY2 | OFFC5195C | 01-08-2012 | 31-03-2013 | 31-07-2013 | 20 | 0.02 | 87 | 63 | 13 | 268.40 |
| Use basic computer applications relevant to a Part 2.1D - Computer Systems Units workplace | CY2 | OFFC5195C | 02-07-2012 | 31-03-2013 | 28-06-2013 | 20 | 0.02 | 87 | 63 | 13 | 268.40 |
| Use basic computer applications relevant to a Part 2.1D - Computer Systems Units workplace | CY2 | OFFC5195C | 16-07-2012 | 31-03-2013 | 26-04-2013 | 20 | 0.02 | 87 | 63 | 13 | 268.40 |
| Use basic computer applications relevant to a Part 2.1D - Computer Systems Units workplace | CY2 | OFFC5195C | 16-07-2012 | 31-03-2013 | 28-02-2013 | 20 | 0.02 | 87 | 63 | 13 | 268.40 |
| Use basic computer applications relevant to a Part 2.1D - Computer Systems Units workplace | CY2 | OFFC5195C | 16-07-2012 | 31-03-2013 | 31-05-2013 | 20 | 0.02 | 87 | 63 | 13 | 268.40 |
| Use basic computer applications relevant to a Part 2.1D - Computer Systems Units workplace | CY2 | OFFC5195C | 19-07-2012 | 31-03-2013 | 28-02-2013 | 20 | 0.02 | 87 | 63 | 13 | 268.40 |
| Use basic computer applications relevant to a Part 2.1D - Computer Systems Units workplace | CY2 | OFFC5195C | 25-06-2012 | 31-03-2013 | 28-06-2013 | 20 | 0.02 | 87 | 63 | 13 | 268.40 |
| Participate in environmentally sustainable work practices | CY2 | OHTH5469C | 14-08-2012 | 31-03-2013 | 09-08-2013 | 20 | 0.02 | 87 | 63 | 13 | 268.40 |
| Apply OHS practices in the workplace | JUL | OHTH5464C | 16-07-2012 | 31-08-2012 | 14-12-2012 | 20 | 0.02 | 87 | 63 | 13 | 268.40 |
| Apply OHS practices in the workplace | JUL | OHTH5464C | 16-07-2012 | 31-08-2012 | 21-12-2012 | 20 | 0.02 | 87 | 63 | 13 | 268.40 |
| Apply OHS practices in the workplace | JUL | OHTH5464C | 18-07-2012 | 31-08-2012 | 21-12-2012 | 20 | 0.02 | 87 | 63 | 13 | 268.40 |
| Apply OHS practices in the workplace | JUL | OHTH5464C | 25-06-2012 | 31-08-2012 | 09-11-2012 | 20 | 0.02 | 87 | 63 | 13 | 268.40 |
| Apply OHS practices in the workplace | JUL | OHTH5464C | 25-06-2012 | 31-08-2012 | 14-12-2012 | 20 | 0.02 | 87 | 63 | 13 | 268.40 |
| Participate in development and follow a personal competency development plan | JUL | BUSM6211C | 19-07-2012 | 31-08-2012 | 18-10-2012 | 20 | 0.02 | 87 | 63 | 13 | 268.40 |
| Participate in development and follow a personal competency development plan | JUL | BUSM6211C | 25-06-2012 | 31-08-2012 | 09-11-2012 | 20 | 0.02 | 87 | 63 | 13 | 268.40 |
| Participate in development and follow a personal competency development plan | JUL | BUSM6211C | 25-06-2012 | 31-08-2012 | 14-12-2012 | 20 | 0.02 | 87 | 63 | 13 | 268.40 |
| Participate in development and follow a personal competency development plan | JUL | BUSM6211C | 25-07-2012 | 31-08-2012 | 21-12-2012 | 20 | 0.02 | 87 | 63 | 13 | 268.40 |
| Provide programming solution for engineering problems | JUL | ISYS5663C | 25-06-2012 | 31-08-2012 | 09-11-2012 | 60 | 0.06 | 260 | 190 | 38 | 805.20 |
| Dismantle, assemble and fabricate electrotechnology components | JUL | EEET6747C | 16-07-2012 | 31-08-2012 | 10-10-2012 | 40 | 0.04 | 173 | 126 | 25 | 536.80 |
| Dismantle, assemble and fabricate electrotechnology components | JUL | EEET6747C | 25-06-2012 | 31-08-2012 | 09-11-2012 | 40 | 0.04 | 173 | 126 | 25 | 536.80 |
| Dismantle, assemble and fabricate electrotechnology components | JUL | EEET6747C | 25-06-2012 | 31-08-2012 | 14-12-2012 | 40 | 0.04 | 173 | 126 | 25 | 536.80 |
| Dismantle, assemble and fabricate electrotechnology components | JUL | EEET6747C | 25-07-2012 | 31-08-2012 | 17-10-2012 | 40 | 0.04 | 173 | 126 | 25 | 536.80 |
| Fix and secure equipment | JUL | EEET6748C | 02-07-2012 | 31-08-2012 | 09-11-2012 | 20 | 0.02 | 87 | 63 | 13 | 268.40 |
| Fix and secure equipment | JUL | EEET6748C | 16-07-2012 | 31-08-2012 | 12-10-2012 | 20 | 0.02 | 87 | 63 | 13 | 268.40 |
| Fix and secure equipment | JUL | EEET6748C | 16-07-2012 | 31-08-2012 | 14-12-2012 | 20 | 0.02 | 87 | 63 | 13 | 268.40 |
| Fix and secure equipment | JUL | EEET6748C | 25-06-2012 | 31-08-2012 | 14-12-2012 | 20 | 0.02 | 87 | 63 | 13 | 268.40 |
| Fix and secure equipment | JUL | EEET6748C | 25-07-2012 | 31-08-2012 | 17-10-2012 | 20 | 0.02 | 87 | 63 | 13 | 268.40 |
| Use drawings, diagrams, schedules and manuals | JUL | EEET6749C | 16-07-2012 | 31-08-2012 | 12-10-2012 | 40 | 0.04 | 173 | 126 | 25 | 536.80 |
| Use drawings, diagrams, schedules and manuals | JUL | EEET6749C | 16-07-2012 | 31-08-2012 | 14-12-2012 | 40 | 0.04 | 173 | 126 | 25 | 536.80 |
| Use drawings, diagrams, schedules and manuals | JUL | EEET6749C | 25-06-2012 | 31-08-2012 | 09-11-2012 | 40 | 0.04 | 173 | 126 | 25 | 536.80 |
| Use drawings, diagrams, schedules and manuals | JUL | EEET6749C | 25-07-2012 | 31-08-2012 | 17-10-2012 | 40 | 0.04 | 173 | 126 | 25 | 536.80 |
| Carry out basic repairs to electronic apparatus by replacement of components | JUL | EEET6750C | 25-06-2012 | 31-08-2012 | 09-11-2012 | 40 | 0.04 | 173 | 126 | 25 | 536.80 |
| Carry out basic repairs to electronic apparatus by replacement of components | JUL | EEET6750C | 25-06-2012 | 31-08-2012 | 14-12-2012 | 40 | 0.04 | 173 | 126 | 25 | 536.80 |
| Troubleshoot digital subsystems | JUL | EEET6751C | 25-06-2012 | 31-08-2012 | 09-11-2012 | 80 | 0.08 | 346 | 253 | 50 | 1,073.60 |
| Troubleshoot digital subsystems | JUL | EEET6751C | 25-06-2012 | 31-08-2012 | 14-12-2012 | 80 | 0.08 | 346 | 253 | 50 | 1,073.60 |
| Design printed circuit boards | JUL | EEET6764C | 25-06-2012 | 31-08-2012 | 09-11-2012 | 40 | 0.04 | 173 | 126 | 25 | 536.80 |
| Solve problems in extra-low voltage single path circuits | JUL | EEET6775C | 16-07-2012 | 31-08-2012 | 12-10-2012 | 40 | 0.04 | 173 | 126 | 25 | 536.80 |
| Solve problems in extra-low voltage single path circuits | JUL | EEET6775C | 16-07-2012 | 31-08-2012 | 14-12-2012 | 40 | 0.04 | 173 | 126 | 25 | 536.80 |
| Solve problems in extra-low voltage single path circuits | JUL | EEET6775C | 25-06-2012 | 31-08-2012 | 09-11-2012 | 40 | 0.04 | 173 | 126 | 25 | 536.80 |
| Solve problems in extra-low voltage single path circuits | JUL | EEET6775C | 25-06-2012 | 31-08-2012 | 14-12-2012 | 40 | 0.04 | 173 | 126 | 25 | 536.80 |
| Solve problems in multiple path d.c. circuits | JUL | EEET6780C | 16-07-2012 | 31-08-2012 | 12-10-2012 | 40 | 0.04 | 173 | 126 | 25 | 536.80 |
| Solve problems in multiple path d.c. circuits | JUL | EEET6780C | 16-07-2012 | 31-08-2012 | 21-12-2012 | 40 | 0.04 | 173 | 126 | 25 | 536.80 |
| Solve problems in multiple path d.c. circuits | JUL | EEET6780C | 19-07-2012 | 31-08-2012 | 21-12-2012 | 40 | 0.04 | 173 | 126 | 25 | 536.80 |
| Solve problems in multiple path d.c. circuits | JUL | EEET6780C | 24-07-2012 | 31-08-2012 | 21-12-2012 | 40 | 0.04 | 173 | 126 | 25 | 536.80 |
| Solve problems in multiple path d.c. circuits | JUL | EEET6780C | 25-06-2012 | 31-08-2012 | 09-11-2012 | 40 | 0.04 | 173 | 126 | 25 | 536.80 |
| Solve problems in multiple path d.c. circuits | JUL | EEET6780C | 25-06-2012 | 31-08-2012 | 14-12-2012 | 40 | 0.04 | 173 | 126 | 25 | 536.80 |
| Lay wiring/cabling and terminate accessories for extra-low voltage circuits | JUL | EEET6781C | 25-06-2012 | 31-08-2012 | 09-11-2012 | 40 | 0.04 | 173 | 126 | 25 | 536.80 |
| Document occupational hazards and risks in electrical | JUL | COMM5464C | 16-07-2012 | 31-08-2012 | 12-10-2012 | 20 | 0.02 | 87 | 63 | 13 | 268.40 |
| Document occupational hazards and risks in electrical | JUL | COMM5464C | 25-06-2012 | 31-08-2012 | 09-11-2012 | 20 | 0.02 | 87 | 63 | ||